14

Illustration of new Cruise Terminal 6

Illustration of new Cargo Berths & Marine Terminals 5/6 and 8

7

ReCenT, OngOIng and FuTuRe PORT PROjeCTs
1 Cruise Terminal 6

15

• New cruise terminal and berth able to accommodate next-generation 4,000-passenger ships (scheduled for occupancy in 2012)
2 New Parking Garage

• Two additional buildings being designed for site: North side Fire Station and Operations Building
7 Future Widening &

products; open to cruise port-ofcall passengers and other Port visitors (launched February 2011)
13 Canaveral Cove Phase II 3 6 4 12 13 11

Deepening of Channel • Proposed project to increase width of the harbor channel from 400 feet (current) to 500 feet and deepening to accommodate larger ships Widening West Turning Basin Entrance • Current project to allow larger ships to enter the basin (scheduled for completion in 2012)
9 Avocet Lagoon

• Additional parking for Cruise Terminal 5 and new Cruise Terminal 6 (scheduled for completion in 2012)
3 New Cargo Terminals

• Welcome Center complex: 10,000 square foot Welcome Center with additional 12,500 square foot exhibit or event space • Infrastructure improvements: new road; sidewalks; parking; stormwater system improvements • Pedestrian Promenade: walkway connecting George King Boulevard with waterfront
(All scheduled for completion in 2013)

5

8

• North cargo area site being developed for Bluewater Terminals, which includes a bulk conveyor (scheduled for completion in 2011)
4 Cargo Berth 5/6 &

Marine Terminal • New cargo berth (scheduled for completion in 2013) • Adjacent land available for development as terminal/ storage facility
5 Cargo Berth 8 & Marine Terminal

• New park proposed for 4-acre site near Canaveral Lock which will include an observation tower for viewing boats and local wildlife, including manatees
10 Hotel & Conference Center

14 Jetty Park Expansion

& Improvements • Pavilion general store improvements and new lounge (scheduled for completion in 2011) • 10 cabins; 25 new campsites; 40 upgraded hookup sites; 2 additional picnic pavilions; new paved and stabilized roadways; infrastructure in playground for future interactive fountain
15 Customs & Border Protection 2 1

• New cargo berth (scheduled for completion in 2013-14) • Adjacent land available for development as terminal/ storage facility
6 Inter-Agency Maritime

• Port-owned 26-acre site on the Banana River, proposed for future development as landmark hotel/ visitor destination complex
11 Amphitheater

Operations Center (IMOC) • New home of Port Canaveral Police Department (dedicated March 2011)

• Potential future facility for entertainment and other public events in The Cove redevelopment area
12 Cove Marketplace

Relocation to New Building • 1.65-acre site at 200 George King Boulevard leased by U.S. Customs and Border Protection • Former Canaveral Port Authority headquarters building demolished in preparation for construction of new CBP offices
10

• Open-air marketplace featuring local artisans and Florida-themed

2011 the State of

9

445 Challenger Rd, Suite 301 • Cape Canaveral, FL 32920 USA • 1-888-767-8226 TEL: 321-783-7831 • FAX: 321-784-6223 • www.portcanaveral.com
WJP#9866 / 2500 /4-11

D E V E L O P M E N T

P L A N

PORT CANAVERAL DEVELOPMENT MAP
PARKING CT5 & 6 PARKING GARAGE NCB8 MARINE TERMINAL
SNAPPER RD.

OPERATIONS FACILITY FIRE STATION

INTER-AGENCY MARITIME OPERATIONS CENTER

KENNEDY SPACE CENTER

SR 401
GROUPER RD.

MAGELLAN RD.

SEAPORT CANAVERAL FUEL TERMINAL
PAYNE WAY

PASS & I.D. SDDC 832ND CAPE CANAVERAL DETACHMENT ARMY TRANSPORTATION WHARF
WAREHOUSE RD.

MARINE TERMINAL SECURITY GATE NORTH INTERMODAL GATE
BULK CONVEYOR

TRIDENT BASIN
BASIN RD.

BANANA RIVER
CHARLES M. ROWLAND DR.

CT6

CT5 COAST GUARD

BLUE WATER TERMINALS

CONTAINER RD.

PARKING

CRUISE TERMINAL DR.

NCP1

DISNEY CRUISE LINE PKG

CARGO YARD

MORTON SALT
CARGO RD.

RO/RO RAMP

HERCULES RD.

PARKING GARAGE

C
PA

T8

RK IN G

WEST TURNING BASIN
35 MLW feet / 10.6 meters

SR 401

MARINE TERMINAL

HANSON SLAG
SNOOK RD.

CPA CARGO YARD WHSE.

NAVAL ORDNANCE TEST UNIT (NOTU)
POSEIDON WHARF

CAPE CANAVERAL AIR FORCE STATION

SUBMARINE WHARF

SP RIN TR D.

PORT ENTRANCE NORTH
TO LOCK/BARGE CANAL/ INTRACOASTAL WATERWAY

B5

/6

CEMEX SILOS

CT10
PARKING GARAGE

DOLPHIN RD.

NCP2

NC

MIDDLE TURNING BASIN
40 MLW feet / 12.1 meters, planned to 43 MLW feet

MILITARY PROPERTY FUTURE CUT TO WIDEN CHANNEL Entrance Channel 44 MLW feet / 13.4 meters, planned to 46 MLW feet

PARKING THE COVE/ RESTAURANT/ RETAIL AREA
GLEN CHEEK DR. BLUEWATER DR.

NCP4

NCP3 SCP5 TB2 SCP4 TB1 CONTINENTAL CEMENT
MARLIN ST. POMPANO ST.

BOAT RAMPS RODNEY S. KETCHAM PARK MARINA DISTRICT
SCALLOP DR.

BOAT RAMPS FPL BARGE BERTH FREDDIE PATRICK PARK
FLOUNDER ST.

SCP2 SCP3
HERRING ST. HERRING ST.

Channel 40 MLW Feet/12.1 meters, planned to 44 MLW feet SCP 1

JETTY PARK
BOARDWALK CONCESSIONS, BAIT & SNACK BAR PAVILION PARKING

MALCOLM E. McLOUTH FISHING PIER

AVOCET LAGOON

POMPANO ST.

ISBET DR.

COVE MARKETPLACE ROAD EXPANSION CANAVERAL COVE PHASE II FPL

ASI WAREHOUSES AND STORAGE YARDS

CT2

CT3

CT4

CHRISTOPHER COLUMBUS DR.

CT4 PARKING PARKING

COMMERCIAL PARK
MULLET ROAD

VE N

GENON

BEACH CONCESSIONS & RENTALS YEAR-ROUND LIFEGUARDS

DA

TO COCOA/ORLANDO

S.R. 528 BEACHLINE

FUTURE AMPHITHEATER

FTZ

PORT BADGING

CT2 PARKING

CT3 PARKING

SOUTH INTERMODAL GATE GEORGE J. KING BLVD.

CAMPING CABINS

REGISTRATION

CAMPGROUNDS GUARD GATE
JET TY P ARK DR.

GEORGE J. KING BLVD.

DISCOVERY RD.

Pier and Berth Draft Limits
Depth in Feet Depth in Meters

ATLANTIS RD. COLUMBIA RD.

SOUTH CARGO PIERS

1 2 3 4 5
TANKER BERTHS

34 36 36 39 39 39 39 38 38 32 34 35 35 33 33 31 32 35 31 33

10.3 10.9 10.9 11.8 11.8 11.8 11.8 11.5 11.5 9.7 10.3 10.6 10.6 10.0 10.0 9.4 9.7 10.6 9.4 10.0

CITY OF CAPE CANAVERAL

FIRE STATION, PORT CANAVERAL MARITIME ACADEMY & TOWER

1 2 1 2 3 4 5/6 8
CRUISE TERMINALS

NORTH

ATLANTI

BANANA RIVER

PORT PROPERTY

CANAVERAL PORT AUTHORITY MARITIME CENTER

C AVE.

OFFICE PARK
BEA

FTZ

MARTIN MARIETTA MATERIALS AGGREGATE TERMINAL

CBP EXPANSION

NORTH CARGO PIERS

Atlantic Ocean

Distances to key markets from the Port
Atlanta, GA (436 miles/703 km) Birmingham, AL (507 miles/817 km) Charleston, SC (310 miles/499 km) Charlotte, NC (471 miles/757 km) Freeport, The Bahamas (171 miles/275 km) Jacksonville, FL (140 miles/226 km) Knoxville, TN (560 miles/901 km) Miami, FL (183 miles/295 km) Nassau, The Bahamas (314 miles/505 km) Orlando, FL (31 miles/50 km) Raleigh, NC (522 miles/840 km) Richmond, VA (653 miles/1053 km) Savannah, GA (254 miles/410 km) Tampa, FL (123 miles/198 km)

Map Legend
= NORTH SIDE OF PORT A SIDE CRUISE TERMINALS
CT5 — Carnival Cruise Lines Norwegian Cruise Line CT8 — Disney Cruise Line CT10 — Carnival Cruise Lines Royal Caribbean International

Port Canaveral

Latitude: 28° 24’ 46” North Longitude: 80° 3’ 49” West

= GATE CT = CRUISE TERMINAL NCB = NORTH CARGO BERTH NCP = NORTH CAGO PIER SCP = SOUTH CARGO PIER TB = TANKER BERTH CARGO TERMINALS CONTROLLED ACCESS ROADS FTZ (Foreign Trade Zone) FUEL STORAGE POTENTIAL FUTURE PROJECTS MARINA DISTRICT PARKS THE COVE/RESTAURANTS/RETAIL AREA UNDER CONSTRUCTION

2 3 4 5 6 8 10

Gulf of Mexico

= SOUTH SIDE OF PORT B SIDE CRUISE TERMINALS
CT2 — Victory Casino Cruises CT3 — Carnival Ecstasy (Beginning Nov. 7, 2011)

BEAC

CUSTOMS & BORDER PATROL (CBP)

CITY OF CAPE CANAVERAL

HES &

HOTEL AND CONFERENCE CENTER

PORT ENTRANCE SOUTH

BULK CONVEYOR

WACHOVIA BANK

TRANSMONTAIGNE FUEL TERMINAL

FISHIN

OFFICE PARK

CHALLENGER RD.

G

ATLANTIC OCEAN

(AS

TH D.) SOU BLV A1A NAUT TRO

ES/ CH HO TEL S

F L O R I D A

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close