Rooftop and other small solar power plants connected of capacity up to 2 MW
Phase I of JNNSM covering plants of capacity more than 5 MW
Phase I & phase II of Gujarat Solar Policy
Project Allocations & Status
950 MW
750 MW
110 MW
Rooftop and other small Phase I of JNNSM of the totalcovering projects have Financial Closures solar power plants Phase I & phase IIin of plants of capacity connected of capacity up and EPC Contractors finalized. Gujarat Solar Policy place more than 5 MW to 2 MW
rd 1/3
The Process Flow
Detailed Project Report
Vetting of Drawings
Plant Commissioning
Allocation
Execution
Land Finalization
Contractor Finalization
Onsite Monitoring
Land Finalization Finalization T N A T R O P M I
Parameter
Metrological Resource Assessment
Purpose Purpose
Energy Generation Capacity of substation
Nearest Substation
Availability Availabili ty of feeder Transmission Transmiss ion Losses
Accessibility to site
Ease of Delivery of materials
Water Availability
Water requirement during construction
Nearby Terrain
Shadow Effects
Site Topography opograp hy
To analyze the water blockage problems and placement of mounting structures
Availability Availabili ty of Manpower
For Construction and subsequent O&M
GPS Survey
Site Layout
Storm History
Dust Losses Mounting Structure Strength
Type of Soil
To analyze the resistivity and load bearing capacity of soil