CAR PARKING 1

2

Footing F1

No.

Excavation

4

conc.work

4

F2 Excavation Conc. Work

18 18

Footing reinforcement F1 10 tor 150 c/c Bars parallel to length 1/0.15= 7+ 1 BAR= 8 Length=1-0.15-0.15= .7 Bars parallel to breadth 1/0.15= 7+ 1 BAR= 8 Length=1-0.15-0.15= .7 F2 10 tor 150 c/c Bars parallel to length 1.2/0.15= 8 + 1 Bar = 9 Length= 1.2-0.15-0.15 = .9 Bars parallel to breadth 1.2/0.15= 8 + 1 Bar = 9 Length= 1.2-0.15-0.15 = .9

3

Surface dressing

4

Lean Conc In footing F1 F2 For plinth beam H V

No. of column in footing

4

4

18

18

4 18

5

Column above plinth level C1 of Height 2.4 m

6

22

Reinforcement detail C1 of Height 2.4 m Length of Lateral Ties 2*(0.41)+4*(0.19) Spacing 12 Dia 75c/c Height of column/75 2.4/0.075 = 32 Bar + 1= 33

22

HOOKS= 8*Dia 8*0.012

7

Total rmft in stirup of 12 Dia

33

Longitudinal bar length 2.4+.045+1.5+48*0.012(DIA)

12

Plinth beams PB 1 Excavation H PB 1

2

HPB 1

2

Conc. Work

Reinf. Of 12 Dia Reinf. Of 16 Dia

2 4

PB 2 Excavation VPB 2

2

VPB 2

1

Conc Work

Reinf. Of 16 Dia

8

PB 3 Excavation VPB 3

9

VPB 3

9

Conc Work

Reinf. Of 16 Dia 8

6

Roof Beam RB 1 HRB 1 Reinf. Of 12 Dia

2 6

RB 2 VRB 2 Reinf. Of 16 Dia Reinf. Of 20 Dia 9

11 4 2

Shuttering Ar of roof Column C1 of Height 2.4m

22

Plinth Beam PB 1 HPB 1 PB 2 VPB 2 PB 3 VPB3

Column in footing F1 F2

4 18

10

Wall Drawf wall

11

Plaster

12

Roof Slab RS 1

13

1

Reinf in roof slab RS 1 Reinf. Of 8 Dia 150 c/c Spacing of bars Length /0.150 = 30.23/0.15 30.23/0.15= 202 Bar + 1 = 203 Breadth /0.15= 6.43/0.15 6.43/0.15= 43 Bar + 1 = 44

14

Flooring car parking

15

Ramp conc work

1

203 44

no walls , no plaster L

B

H

Quantity

Unit

1.1

1.1

1.6

7.744

cum

1.2

1.2

1.5

8.64

1.3 1.2

1.3 1.2

1.6 1.5

48.672 38.88

Total Excavation Total Conc. Work

56.416 47.52

cum cum

No. of Bars

L

8

0.7

22.4

m

8

0.7

22.4

m

9

0.9

145.8

m

9

0.9

145.8

m

31.46

9.46

297.6116

sqm

1 1.2

1 1.2

0.15 0.15

0.6 3.888

cum cum

60.46 70.73

0.23 0.23

0.15 0.15

2.08587 2.440185

cum cum

L

B

H

0.23

0.45

2.4

5.4648

cum

1.676

1216.776

m

4.521

1193.544

m

1.58

0.096

L

B

H

36.86

0.23

0.6

5.08668

cum

60.46

0.23

0.6

8.34348

cum

120.92 241.84

m m

10.86

0.23

0.6

1.49868

cum

12.86

0.23

0.6

1.77468

cum

102.88

m

47.07

0.23

0.45

4.871745

cum

57.87

0.23

0.45

5.989545

cum

347.22

m

6.25761

cum

362.76

m

7.320555

cum

282.92 141.46

m m

194.3789

sqm

L

B

H

60.46

0.23

0.45

70.73

0.23

0.45

0.23

0.45

2.4

71.808

2*(lh+bh)

60.46

0.23

0.6

72.828

sqm

12.86

0.23

0.6

15.708

sqm

57.87

0.23

0.45 Total

52.29 140.826

sqm sqm

1 1.2

1 1.2

1.5 1.5 Total

24 129.6 153.6

sqm

132.99

0.23

0.6

18.35262

cum

30.23

6.43

0.13

25.269257

cum

6.43

1305.29

30.23

1330.12

30.23

6.43

30.23

0.9

0.6

5270.82

m

194.3789

sqm

8.1621

cum

.1m added extra

10 336.4

12 2894 16 974.86 20 141.46

8 5270.82

2* becoz of bottom and top

PRICING OF CAR PARKING AT TUGHALAKABAD S. No. Description of item 1 Surface dressing not exceeding 15 cm deep in soft/loose soil 2

Excavation in trenches n. exc. 1.5 m wide and n. exc. 1.5 m in depth for foundation n.exc. 10 sqm on plan and n. exc. 1.5 m depth and getting out in soft/loose soil.

3

Returning, filling, in including spreading, levelling, watering and well ramming in layers not exc. 25 cm in soft/loose soil.

4

M/L Treating the bottom and sides of excavation at the rate of 5 litres per sqm of surface area

5

Treating the back fill in contact with foundation at the rate of 7.5 litre of emulsion per sqm of vertical surface

6

Treating the top surface of filled earth at the rate of 5 litres of emulsion per sqm of surface.

7 8

Treating the soil along with external perimeter of building at the rate of 2.25 litre of emulsion per meter of perimeter of wall. Cement concrete in foundation filling and mass concrete type D2 1:4:8

9

TMT bars 10 mm dia and over cut to length bent to shape required including cranking bending spirally for hooping for cloumns hooking ends and binding with mild steel wire not less than 0.9-0 mm dia

10

Formwork to sides of concrete in foundation footings bases of columns and plinth beams

11

Reinforced cement concrete (design mix) in foundation including footings foundation beams plinth beams bases of columns etc in M25

12

Formwork to soffits of suspended slabs such as roof slabs floor slabs landings and similar works

13

Reinforced cement concrete (design mix) in slabs simply supported on walls beams and columns in floor roof landings and balconies etc in M25

14

Modular bricks in cement mortar 1:6 with fly ash bricks straight or curved on plan not exc 6 m mean radius

15

Rendering 10mm thick in CM 1:4 second layer of 5 mm in CM 1:4 with water proofing compund sand finished external plaster

16

Rendering 10mm thick in CM 1:6 finished even and smooth internal plaster

17

Rendering 5mm thick in CM 1:3 to RCC soffits bottom of beams lintal RCC chajjas slabs etc

18

20-25 mm thick kota stone flooring 600x600 over 20 mm screed in CM1:6 over 100 mm thick PCC Type D2 over 150 mm thick hard core

19 20 21 22

7-8 mm thick non skid ceramic tiles 300x300 mm laid over cement screed in CM 1:4 over 100 mm thick PCC 1:2:4 Roof treatment Dry distemper Three coats of white wash on ceiling

23

Three coats of lime wash on internal walls

no plaster Qty 297.6116

Unit Sqm

Rate 7.9

Amount 2351.1316

SSR 3011

67.873105

Cum

115.2

7818.9817

3006

4.2454

Cum

41.7

177.03318

3009

550.998

Sqm

80.6

44410.439

3047

196.785

Sqm

126.8

24952.338

3048

194.3789

Sqm

80.6

15666.939

3049

297.6116

Sqm

38.6

11487.808

3051

9.014055

Cum

2303.3

20762.073

4025

6715.006

kg

48.6

326349.29

10034

366.234

Sqm

134.2

49148.603

7004

77.20587

Cum

3482.2

268846.28

4053

194.3789

Sqm

211.5

41111.137

7006

25.269257

Cum

3770

95265.099

4055

18.35262

Cum

255.3

4685.4239

5019

Sqm

134.8

0

14001 & 14004

Sqm

77.3

0

14001

Sqm

76.3

Sqm

805.69

0

13013 & others

Sqm

520.4

0

13074

Sqm Sqm Sqm

300 31.1 11.8

0 0 0

Assessed 15010 15006

194.3789

14831.1114001 & 14004

Sqm Total

11.8

0 927863.69

Add 3% for unforeseen items

27835.911

Grand total

955699.6

Plinth area of building Plinth area rate per Sqm

Sqm #DIV/0!

15006

8

10

12

16

20

25

0.39

0.61

0.89

1.57

2.46

3.85

5270.82

336.4

2894

974.86

141.46

5270.82

336.4

2894

974.86

141.46

2055.6198

205.204

2575.66

6715.0056

1530.5302 347.9916

0

0

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close