Charles D. Lashley 423 North St. CUTHBERT,

Published on July 2016 | Categories: Types, Resumes & CVs | Downloads: 53 | Comments: 0 | Views: 371
of 7
Download PDF   Embed   Report

Comments

Content

Charles D. Lashley 423 North St. CUTHBERT, GA 39840 Phone # 229-308-5905 Cell Phone #229-732-3257 [email protected] Objective Position as a CWI, QC, or QA Inspector Qualifications


AWS-CWI (American Welding Society Certified Welding Inspector)
Certificate # 03070441



ASNT-ACCP (American Society for Non-Destructive Testing Central
Certificate Program Level II Visual Testing) Certificate # 141404

• • • •

ASNT-SNT-TC-1A Ultrasonic Thickness Testing – Level IIA ASNT-SNT-TC-1A Ultrasonic Shear wave Testing – Level II ASNT-SNT-TC-1A Liquid Penetrant Testing – Level II ASNT-SNT-TC-1A Magnetic Particle Testing – Level II

• Active Passport • TWIC Card Professional Skills
Experienced with D1.1, D1.5, B31.1, and others. Microsoft word and Microsoft Excel. Blue Print Reading, X-ray reading, structural fitting and worked with exotic metals.

Experience Aerotech Construction Quality Control/ Welding Inspection (October-December) 2009 Coal Fire Power Plant Absorber


• • •


Inspected welding performed on fabricated parts Inspected repair work to code Arranged and accepted all NDT performed on absorber Had turn over packages ready for turn over to client Observed and accepted pneumatic test

D & C Inspection subcontracted to Black & Veach 1. Quality Control/Certified Welding Inspector (JuneSept.) 2008 Crane-Barge Construction, Greenville, MS
• • • Inspected welding performed on construction of a crane – barge Inspected repair work to code Observed and accepted pneumatic test

2. Quality Control/Certified Welding Inspector (MarchMay) 2008 Coal Fire Power Plant, Leroy, AL


• • •

Inspected structural and piping welds and fit-ups for design and AWS D1.1 and ASME B31.1 code compliance Inspected repair work completed to code Performed Hydro-test as needed Tested and certified welders

3. Quality Control/ Certified Welding Inspector (MayNovember) 2007 Baja Mar LNG Power Plant Construction, Ensenada, Mexico
• Inspected structural and pipe welding

4. Quality Control/ Certified Welding Inspector (July) 2006 Hovensa Project, Atlanta, GA
• • Inspected structural welds and galvanizing for design and code compliance Prepared reports and photographs for client

• • • •

Inspected fit-ups according to design and AWS compliance Inspected repair work completed to code Welder testing and qualification Assisted with document control

Quality Control/ Welding Inspection (March-June) 2009 Coal Fire Power Plant Absorber
• • • • • Inspected welding performed on coal plant absorber Inspected repair work to code Arranged and accepted all NDT performed on absorber Had turn over packages ready for turn over to client Obversed and accepted pneumatic test

Team Industrial Services Quality Control/ Certified Welding Inspector (MayJune) 2008 Fabrication Shop Inspection, Albany, GA
• • • Inspected structural and piping welds for AWS D1.1 and ASME 31.1 compliance Inspected for design compliance Inspected repair work completed to code

National Engineeering Resources Inc. Quality Control/ Certified Welding Inspector (FebMarch) 2008 Alcoa Coal Fire Power Plant, Evansville, IN
• • • • Inspected structural and piping welds for AWS D1.1 and ASME 31.1 compliance Inspected for design compliance Inspected repair work completed to code Performed Hydro-tests as needed

Total Western Construction

Quality Control/ Certified Welding Inspector (20062007) GE Gas Turbine Power Plant Construction, Romoland, CA
• • • • • Inspected structural and piping welds for AWS D1.1 and ASME 31.1 compliance Inspected for design compliance Inspected repair work completed to code Welder testing and qualification Assisted in document control

IQC Quality Control/ Certified Welding Inspector (AprilJune) 2006 Alstom Power- Coal Fire Power Plant, Erlanger, KY
• • • • • Inspected structural and piping welds for AWS D1.1 and ASME 31.1 compliance Inspected for design compliance Inspected repair work completed to code Welder testing and qualification Managed second and third shift craftsmen

Advantage Inspection Quality Control/ Certified Welding Inspector (April) 2006 Conoco/Phillips Turn Around, Philadelphia, PA
• •
• •

Inspected structural and piping welds for AWS D1.1 and ASME 31.1 compliance Inspected for design compliance
Inspected boiler equipment Performed UT thickness inspections as needed

Base Line Data Inc. 1. Quality Control/ Certified Welding Inspector 2006 Suncor Turn Around, Denver,CO
• •

(March)

Inspected structural and piping welds for AWS D1.1 and ASME 31.1 compliance Inspected for design compliance

• •

Inspected various sections of the regenerator using visual, PT, MT, and UT thickness Verified welder qualifications

2. Quality Control/ Certified Welding Inspector (Feb) 2006 Conoco/Phillips Turn Around, Lake Charles, LA
• • • Inspected structural and piping welds for AWS D1.1 and ASME 31.1 compliance Inspected for design compliance Inspected vale replacements and fit-ups

Universal Engineering Certified Welding Inspector/ Building Inspector (20052006) Walmart Store and Lowes Inspection, Southeastern US
• • • • • • Inspected structural and piping welds for AWS D1.1 and ASME 31.1 compliance Inspected for design compliance of previous contractors Inspected repair work for code and design compliance Managed teams of welders to complete project work Vendor Quality Assurance for Lowe’s project Assisted in soil density and moisture content daily evaluations

Bell Nuclear Engineering Quality Control/ Certified Welding Inspector (2005) Savannah River Nuclear Power Plant, Savannah River Site, SC

• •

Inspected structural, piping and stud welds as per Dept. of Energy codes and guidelines

Walked out stainless steel piping packages to ensure design and code compliance Witnessed Hydrostatic testing of nuclear waste holding facility to ensure pressure containment

Robert W. Hunt Certified Welding Inspector/ Building Inspector Walmart Stores Inspection, IL, MO, KY,ID


(2005)

Inspected structural and piping welds for AWS D1.1 and ASME 31.1 compliance

• • •

Inspected for design compliance of previous contractors Inspected repair work for code and design compliance Managed teams of welders to complete project work

Gulf Marine Fabricators Structural Fitter (2002-2004) Thunder Horse Crane Project and others
• Completed various marine platforms, jackets, and spars for Conoco, BP, and Atlantia

Kiewit Offshore Services Welder, (2001-2002)
• Completed various marine platforms, jackets, and spars for Conoco, BP, and Atlantia

Education 1982 Cuthbert, GA 1995 Columbus, GA Andrew College Associate of Science Columbus State University Bachelors of Science

2002
• • • •


Base Line Data Inc.
for for for for for for Liquid Penetrant Ultrasonic Thickness Ultrasonic Shear Wave Magnetic Particle Alloy Element Analyzation (Innox-X) PMI Hardness testing



Training Training Training Training Training Training

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close