Delivering for Pharma Giant
Project Name
Pharmaceutical
Manufacturing Facility
Project Location
Covington, Georgia
Project Team
Owner: Biopharmaceuticals
Manufacturer
General Contractor:
Fluor Corporation
Architect: Flad Architects
Engineers: AEI Corporation,
CRB Consulting Engineers
Subcontractor: McKenney’s, Inc.
Specializations
Building Information Modeling
Pipe Shop Prefab
Markets
Industrial
Central Plants
Science & Technology
M
cKenney’s completed a
large-scale HVAC and plumbing
installation at a new manu
facturing plant on a 100-acre campus in
Covington, Georgia.
The Challenge
From the outset, the owner had an aggressive
timeline for completing its new campus to
manufacture drugs for treating unusual diseases. Our team faced an immense project
404-622-5000
[email protected]
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
scope, a large number of trade workers in a
confined space, design changes, rigorous quality control requirements and the emergence
of an outside main instrument valve vendor.
The Solution
To navigate design changes and meticulously
track costs, McKenney’s held weekly—sometimes daily—meetings to identify the scope
of changes, evaluate pricing and inform the
owner of overages. Our quality control team
www.mckenneys.com
addressed onsite issues and procured a third
party firm to ensure welding in our prefab pipe
shop and field installations met the owner’s
standards. For much of the project, all trades
deployed two shifts along with extended work
hours to stay on schedule.
The Results
Our attentiveness to detail kept the project on
track and met the owner’s timeline and quality
control standards.
704-357-1200
[email protected]
3601 Performance Road
Charlotte, North Carolina 28214
© 2016 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
The content of this document is not intended as an endorsement.