N

MAR/APR 2014

TIONS
DA
I

DEEP FOUNDATIONS
N

DFI

ITUTE
ST

EP FO
U
DE

THE MAGAZINE OF THE DEEP FOUNDATIONS INSTITUTE

High Capacity Rock Anchors for
Bluestone Dam Safety Program
Toronto Tower
Foundation
Stabilizing a
Landslide
Contaminated
Soils

N

TIONS
DA
I

N

DFI

ITUTE
ST

EP FO
U
DE

CONTENTS FEATURES

DEEP FOUNDATIONS
The Magazine of the Deep
Foundations Institute (DFI) is
published bimonthly by DFI.

12 Bluestone Dam Safety Assurance Program: An OPA Runner Up
Jeff Hopple, P.E.
The U.S. Army Corps began its safety assurance program in 2001 at the Bluestone Dam
in West Virginia. The multiple-phase construction project is intended to upgrade the
capacity and the stability of the dam to meet the probable maximum flood. The Corps
chose Brayman Construction to perform Phase 2B, which involved installing 216 high
capacity rock anchors, 57 of which were meant to resist overturning. The other 159
rock anchors were installed on the dam face at an angle to resist sliding. Phase 2B also
included a steel platform to gain access to the spillway anchors.

326 Lafayette Avenue,
Hawthorne, NJ, 07506, USA
T: 973.423.4030 | F: 973.423.4031
Email: [email protected]
Executive Director
Theresa Rappaport
[email protected]
Executive Editors
Virginia Fairweather
[email protected]
Helen Robinson
[email protected]
Managing Editor Emeritus
Manuel A. Fine, [email protected]
Advertising Manager
Karol Paltsios, [email protected]

DFI Executive Committee

55 Soil Mixing in Contaminated Soils

President, Robert B. Bittner
Vice President, John R. Wolosick
Secretary, Matthew Janes
Treasurer, Dan Brown
Past President, James A. Morrison

Ken Andromalos, P.E., and Daniel Ruffing, EIT

Other Trustees
Patrick Bermingham
David Borger
Gianfranco Di Cicco
Khaldoun Fahoum
Rudolph P. Frizzi
Frank Haehnig
Bernard H. Hertlein
Gerry Houlahan
James O. Johnson
Douglas Keller
Samuel J. Kosa
K.S. Rama Krishna
Marine Lasne
J. Erik Loehr
Raymond J. Poletto
Michael H. Wysockey

A thorough overview of the history
of working with contaminated sites
in the U.S. Soil mixing originated in
the late 1990s, with the first nonstructural containment wall to
isolate PCBs. Government
sponsored sites followed, and
equipment was developed over the
years to deal with varying
contaminants. Cost-efficiency
improved as well. In-situ
stabilization and in-situ treatment
are defined as well as other kinds of
treatment commonly used today.

49 Member Profile: Marine Lasne, Soletanche
Freyssinet — Sustainability Crusader
DEEP FOUNDATIONS • MAR/APR 2014 • 3

RICAN P
ME

A
M FOU
J&

RICAN P
ME

T

A
OU

T

UIP
Q

TION E
DA
N

TION E
DA
N

MENT
UIP
Q

UIPMEN
EQ

IV
EDR ING
IL

UIPMEN
EQ

IV
EDR ING
IL

CONTENTS FEATURES

PRESIDENT’S MESSAGE

63 Stabilizing the Mill Creek
Landslide with Steel H-Piles

Are Your Young Engineers Fired Up and
Enthusiastic? . . . . . . . . . . . . . . . . . . . . . 7

Kessi E. Zicko, P.E., Paul J. Lewis, P.E., and
Robert E. Johnson

EXECUTIVE DIRECTOR UPDATE

A landslide along a Pennsylvania state
highway caused concern, and PennDOT
retained Gannett Fleming to evaluate
methods to stabilize the slope. They chose
driven steel H-piles based on construction
costs and site impacts. The final design
minimized land disturbance by using an
existing, inactive roadbed along the toe of
the embankment for the pile footprint. This
design avoided wetlands, habitat for the
timber rattle snake, and an area of
archaeological interest.

Departments

It’s All About Communication . . . . . . . . 9
DFI ACTIVITIES

A report on the recent Winter Planning
Meeting; news on upcoming DFI activities
including the DFI-EFFC International
Conference on Deep Foundations in
Sweden, SuperPile ’14 in Cambridge,
Mass., International Workshop on
Micropiles in Krakow and the 39th
Annual Conference in Atlanta; an update
on the DFI Journal and more.. . . . . . . . 21
REGIONAL REPORT

DFI Middle East. . . . . . . . . . . . . . . . . . 41
EDUCATIONAL TRUST REPORT . . . . 45

Brain Isherwood, MICE, FCSCE, P.Eng.; Tara Brown, P.Geo.; and Jenny Earle, EIT

TECHNICAL ACTIVITIES UPDATE

Updates on the activities of several DFI
Technical Committees . . . . . . . . . . . . . 71
DFI PEOPLE AND COMPANIES

News about people, companies and
products . . . . . . . . . . . . . . . . . . . . . . . 92
CALENDAR . . . . . . . . . . . . . . . . . . . 102
AD INDEX . . . . . . . . . . . . . . . . . . . . 102

®

FINDING COMMON GROUND

DFI is an international association of
contractors, engineers, suppliers,
academics and owners in the deep
foundations industry. We find common
ground through networking, education,
communication and collaboration. Our
multi-disciplinary membership creates a
consensus voice and a common vision for
continual improvement in the planning,
design and construction of deep
foundations and excavations.
Become a Member of DFI at www.dfi.org

77 Deep Excavation Support at Toronto’s Shangri-La
The Shangri-La hotel and tower was built
at a challenging Toronto site, surrounded
by other city buildings, and over an
active subway, highly sensitive to movement during construction. The risks to
the subway were major, and Isherwood
Associates had to find the best shoring
solution. After evaluating the situation,
they recommended that the owner give
up part of the eight-level basement so
the engineers could provide a more uniform movement pattern along one wall.

85 Seepage Control,
Cutoff Walls Manual:
A Progress Report
David B. Paul
The U.S. Army Corps of
Engineers is working on a
manual about seepage control
and cutoff walls, with input
from DFI. This preview of the
contents includes a summary of
the Corps’ history with cutoff
walls and the engineering
thinking involved in their
design.
DEEP FOUNDATIONS • MAR/APR 2014 • 5

Productivity.

Short Mast configuration now available.

Watson Philosophy:
While it is true that “making hole” basically translates to “making money”,
it is the overall time on the job that translates into profitability.
From the moment a rig leaves the yard, the clock is ticking on your profits. Watson rigs
not only excel at the drilling itself, but are specifically designed to reduce the time spent
outside the hole.
The 4400 targets big diameter rock drilling, but minimal setup and cycle times are two keys to its success:
• Remote controls and hydraulic pins keep setup/teardown to under an hour.
• Continuous Torque rotary and variable speed hoist reduce cycle time.
• New interchangeable low headroom option and superior mobility make short work of rugged powerline jobs.

Minimizing the time you spend NOT turning to the right.

Best in the World • Made in America

800-927-8486 • Fort Worth, Texas

PRESIDENT’S

MESSAGE

Are Your Young Engineers Fired Up and Enthusiastic?
n a previous message, I wrote that if we

I want to bring bright, young engineers

into the deep foundations industry and
keep them, we must convey to them our
enthusiasm and excitement about
construction in general and our industry in
particular. I cannot tell you how many
times in the last 40 years doctors, dentists
and attorneys have told me that they
started out in engineering and then
changed careers. Even in my own
engineering career, after I was out of college
a few years, I thought about getting a
graduate degree in another field and
leaving construction. It was not because I
didn’t find the work engaging. I was
working on very interesting marine
construction projects both overseas and in
the Pacific Northwest, and had a broad
range of assignments that were challenging
and provided valuable training. It was
more a feeling that I was not using my
creative talents. And when I did, they were
not being valued and respected.
It was only after the upper management
of the company I was working for at the
time, Riedel International, began involving
me in their problem-solving sessions, or
what they referred to as “brainstorming
sessions,” that I felt my creative talents were

of value and encouraged by my
associates. These sessions generally focused on two types of
challenges. The first was to
develop concepts for giving our
company a competitive edge on a
given project that we were
pursuing. The advantage could
be in the form of an
innovative way to perform
the work or developing a
piece of equipment that was
more efficient than our
competitors’. The second
type of challenge addressed
in these sessions involved a
specific problem or opportunity on a project already
under construction. Typically, I participated in these
sessions with the upper
management; project manager, project field superintendents, chief estimator,
and usually, one outside
construction engineering
consultant. Following the
session, the outside consultant and I would then develop the selected
concepts jointly.

Robert B. Bittner, P.E.
President
[email protected]

This experience conveyed the
message that my creative ideas
were valued and respected
on the same level as my
senior associates, and added
confidence in my work and a
sense of satisfaction. From
that point, there was no looking back. I knew I was in the
right field and was truly making a significant difference.
I cite this example to
illustrate the importance of
tapping into the creative
spirit in all your staff and
especially your young
engineers. Seek out opportunities for them to use their
creative talents and when
they do, treat that talent with
respect. They can provide a
fresh perspective, one that
can be very rewarding to your company and
very important to them personally.

I cannot tell you how

many times in the

last 40 years

doctors, dentists and

attorneys have told

me that they started

out in engineering

and then changed

careers.

DFI 2014 Awards: Call for Entries
DFI annually showcases and celebrates the achievements and
contributions of individuals, teams and companies in the deep
foundations industry.
We encourage you to submit your work and nominate your
colleagues for recognition.
The Outstanding Project Award recognizes the superior
work of DFI members. Each year, a project is chosen from several
geotechnical projects submitted for consideration by DFI members.
The Distinguished Service Award recognizes individuals
who have made exceptionally valuable contributions to the
advancement of the deep foundations industry.

C. William Bermingham Innovation Award encourages
and recognizes innovative contributions to deep foundation
technology. The award pays tribute to the innovative spirit of Bill
Bermingham, DFI past president, and his contributions to DFI
and the deep foundations industry.
Ben C. Gerwick Award for Innovation in Design and
Construction of Marine Foundations recognizes excellence in
marine engineering. The award is a tribute to Ben Gerwick, and
recognizes his exceptional achievements and contributions to
the design and construction of marine foundations.
For more information visit www.dfi.org/awardslectures.asp

Submissions for the 2014 Awards due by April 15, 2014
DEEP FOUNDATIONS • MAR/APR 2014 • 7

When you buy a LōDril® from Bay Shore Systems, you’ve made an investment
that will keep paying you over and over again. That's because, regardless of
whether you choose LōDril®, TR Series or LAD Series, Bay Shore rigs keep
working over and over again.
Bay Shore equipment is built with solid engineering that utilizes
easy-to-find parts and rugged construction. Plus, Bay Shore customer
service is committed to keep you drilling with 98% on-time parts
delivery and experienced service technicians who will come to your
jobsite. It’s no wonder that Bay Shore customers say things like this:
“Bay Shore has by far the best service in the industry and has been
a real breath of fresh air compared to other like companies.”
– Ray Sander, Xcel Energy

So, if you’re getting more downtime than drill time from your current
equipment, it’s time to make a move. Call Bay Shore Systems today.

Visit: www.bayshoresystems.com
Call: 888.569.3745

LōDril® DH60

EXECUTIVE DIRECTOR UPDATE

It’s All About Communication
ommunication may be the single most

C important element in every thread of our

life. Think about it! Personal relationships
do not work without communicating your
thoughts, feelings, likes and dislikes with
the other person, be it a spouse, relative or
friend. Working as a team in the workplace
is not possible without clear communication with your co-workers, so that each
piece of the puzzle falls into place for a
successful project. Fruitful business deals
cannot be realized unless each party
communicates their needs, expectations
and what part they are willing to play in the
partnership, verbally or in a contract.
Communication makes the world go
round, while “a failure to communicate”
can be detrimental to all these important
facets of our lives.
Last week, DFI’s leadership — board
members, senior staff and committee chairs
— met for the annual winter planning meeting
to do just that — communicate. Each attendee
informed the others of what projects have
been completed, what is in process and
their ideas for the future. DFI’s new 5-year
strategic plan, Revitalizing our Mission, was
the main topic of discussion with four
breakout sessions covering each main goal
of the plan (see page 21 for details).

With Past President Jim
Morrison, I led the globalization
workshop, where we determined
that communication across the
various DFI regions is key. In
order for DFI headquarters to
support the regional chapters,
there needs to be consistent
communication to ensure
that resources are allocated
as needed and activities to
benefit the local industry
are advanced. DFI and DFI
of India have accomplished
this with a weekly conference call to keep on track
with their plans for training
courses, workshops and
conferences. These events
communicate advances
and new methodology
being used elsewhere that
the Indian deep foundation
community can use in their projects.
Bringing the regional leaders together at the
planning meeting also gave them the
opportunity to explore ways they can work
together and communicate with each other
in order to serve all DFI members, wherever
they are.

Theresa Rappaport
Executive Director
[email protected]

We are lucky that communication far and wide is more easily
done with virtual meetings, audio and video
conference calls, email,
web platforms for document sharing and social
media. Having a global
organization provides a
forum where all members,
no matter where they are,
can communicate with
each other. This ability is a
benefit to each member
and to the industry. Be part
of the process and participate as much as your
schedule allows. The true value of being a
DFI member lies in the ability to communicate and network with others who have
similar interests, challenges and needs.

Having a global

organization provides

a forum where all

members, no matter

where they are, can

communicate with

each other.

Invitation to Speakers
Deep Foundations for Slope Stabilization and Excavation Support: TBD August/September 2014, Pittsburgh, PA
DFI’s Deep Foundations for Landslides/Slope Stabilization and
Tiebacks and Soil Nailing Committees are organizing a two-day
event featuring presentations on current technologies, as well as
key design concepts and case histories that illustrate effective
application of deep foundations for stabilization of slopes and
excavation support.
Presentation proposals on the following topics are being
requested: Case Studies, History/Theoretical Background, Quality
Control and Inspection, Long-term Maintenance, Innovative
Applications and Techniques and Practice-Oriented Research.

Interested parties should submit a brief summary (no more
than one page) describing the subject matter of their proposed
presentation to [email protected]. The due date for submissions
is May 1, 2014.
Notification of acceptance and guidelines for presentation
development will be returned to all submitters by June 2, 2014.
Authors of accepted proposals will be required to commit to
presenting their topic at the seminar and to submit a PowerPoint
presentation handout to be included in the seminar publication
by July 1, 2014.

DEEP FOUNDATIONS • MAR/APR 2014 • 9

ConstLumMatDFIAd092313:Layout 1

9/24/13

4:09 PM

Page 1

Buy Direct from the Sawmill and SAVE!

Lagging
and Mats

EARTH RETENTION

ACCESS MATS

• Largest Inventory in the Midwest
• Convenient, Quick Delivery to Your Job Site
• Truck-Rail-Barge

CONSTRUCTION
Pre-Cut Lagging
& Lagging Panels

®

Access
Mats

Crane, Timber
& Excavator
Mats

1-708-388-2223
www.sterlinglumber.com
[email protected]
Family Owned Since 1949
10 • DEEP FOUNDATIONS • MAR/APR 2014

Transition
Mats

Outrigger
Mats

Brasfond USA Corp.
1785 N. Geyers Chapel Rd.
Wooster, Ohio 44691
Office phone: 1-330-262-0015
e-mail: [email protected]

DEEP FOUNDATIONS • MAR/APR 2014 • 11

COVER STORY

Bluestone Dam Safety Assurance Program: An OPA Runner Up
Bluestone Dam in Hinton, W.Va., along the New River, is owned
and operated by the U.S. Army Corps of Engineers (USACE).
Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft
(624 m) wide, and encompasses a water shed that is 4,600 sq mi
(11,914 sq km). The Bluestone Dam Safety Assurance (DSA)
Program began in 2001, and is a multiple-phase construction
project to upgrade the capacity and stability of the structure to meet
the probable maximum flood event. Installing 216 high capacity
rock anchors was a major feature of the work.
The USACE selected Brayman Construction Corporation to
perform Phase 2B of the construction modifications to the
Bluestone Dam. Brayman was responsible for installing the high
capacity rock anchors, which range in size from 3 to 61 strands and
have a design load up to 2,145 kips (9,541 kN). Drill holes range in
size from 6.5 to 15 in (16.5 to 38 cm), and required full length
corrosion protection. Of the 216 anchors, 57 were installed on top
of the dam to resist overturning and the remaining 159 were
installed on the face of the dam at a 45-degree angle to resist sliding.
To gain access to the face of the dam anchor locations, the
project required dirt benches, excavations with temporary shoring,
and steel platforms. To access anchors on the east and west
abutment faces, the team excavated over 10,000 cu yds (7,645 cu
m) of material. Support of these excavations included the design
and installation of three soil nail walls with over 145 nails and
3,500 sq ft (325 sq m) of shotcrete.

AUTHOR

Jeff Hopple, P.E., Brayman Construction Corporation

12 • DEEP FOUNDATIONS • MAR/APR 2014

The project also called for a 780 ft (237 m) long steel platform to
gain access to the spillway anchors. The Stratus Group designed the
platform to support two 85 ton (80 tonne) crawler cranes and as
many as five drill rigs that were the equivalent to a design load of
3.5 ton per sq ft (335 kN per sq m). Once the final platform design
was approved, fabrication of roughly 3 million lbs (1,360 tonnes)
of structural steel began. Brayman’s in-house fabrication shop, in
conjunction with Dura-Bond Industries and Advantage Steel,
collaborated to fabricate and install the platform in less than five
months. Flexibility in the platform design allowed for sections of
the platform to be lowered as much as 16 ft (4.9 m) to provide
access to anchors at lower elevations along the spillway face. In
addition to the main spillway platform, Stratus Group, Brayman,
Dura-Bond and Advantage designed, fabricated and installed six
other unique platforms to facilitate anchor construction on various
areas of the dam.

Obstacles at the Site
The tops of dam anchors and face of dam anchors crossed planes at
depths up to 200 ft (61 m) with only 3 ft (0.9 m) of clearance
between boreholes. Due to the risk of intercepting adjacent
boreholes or tensioned anchors, the project specification called
for drill tolerances of 1:150 or 1 ft (0.3 m) of deviation for every
150 ft (45.7 m) of drill depth. In addition to the risk of
intercepting adjacent anchors, there are multiple obstructions

within the dam including two service galleries, hundreds of
foundation drains, mechanical controls for gate operation and
18 ft (5.5 m) diameter penstocks.
The USACE conducted a study in 2002 to verify whether
conventional drilling methods could produce the desired
tolerances. The results of this study proved that conventional
drilling methods could not produce the accuracy required. Thus,
Brayman developed a real-time directional drilling system
specifically for the project. The system needed to provide real-time
feedback in order to efficiently drill the quantity of holes required.
The system needed to be nonmagnetic due to embedded steel
within the dam and also be isolated from the drilling equipment
due to vibration. The system’s main component is an optical survey
instrument fitted with a camera. The camera monitors an LED
target located at the top of the down-the-hole hammer. The camera
is connected to a video monitor and gives real-time video footage of
the target. Dual-wall drill rods allow air to flow through the outer
rod to operate the hammer, leaving the inner rod free of water and
debris. This makes viewing the target at depths up to 275 ft (84 m)
possible. The slant-face bit is used in lieu of a standard button bit
and steers the drill string. The independent drill stand holds the
survey instrument and camera above the drill where it is isolated
from vibrations by the mass of the dam. The system constantly
monitors the location of the drill string throughout the entire
length of the hole.

Once the directionally drilled pilot holes are completed and
found to be within tolerance, workers ream each anchor hole to its
final specified diameter. The reaming was completed using downthe-hammer (DTH) rotary drilling techniques. The project
included anchor holes of 10, 13 and 15 in (25.4, 33.0 and 38.1 cm)
diameters. Hammer bits for these diameters were designed with 53/4 in (14.6 cm) diameter “snouts.” This specific hammer bit design
allowed the ream drilling to follow the original directionally drilled
pilot holes to provide assurance that the reamed holes met the
required drill tolerances.
A downhole survey instrument, manufactured by Reflex
Instruments, verified the borehole location. The instrument is
commonly used in the oil and gas industry. The engineers conducted

Directional Drilling
Workers used a small hydraulic crawler drill to directionally drill a
5.75 in (14.6 cm) pilot hole. The first step in setting up the
directional drill was to place the independent drill stand to support
the optical instrument. With the stand in place, the optical
instrument was located in-line with the theoretical drill line. The
drill was then set at the appropriate angle and azimuth along the
drill line between the optical instrument and a survey nail located at
the entry point on the concrete. As the hole advanced, the operator
was able to watch in real time the theoretical drill line versus the
actual drill line. The theoretical drill line was shown as a crosshair
on the operator’s computer screen.
Deviation from the crosshair can be
corrected by stopping the rotation of the
drill string and chiseling, or steering the
slant face bit back into the theoretical drill
line. The target has an extra LED light that
aligns with the slant face of the bit allowing
the operator to know its orientation at all
times. For quality control purposes,
optical three-dimensional observations
are made at intervals as the hole
progresses. The optical shots are more
accurate than the instrument surveys;
however, since they are taken before the
final drill operation has been completed,
they do not meet the contract specifications, but are used as reference in the
final verification survey.

Figure 1. Upstream deviation

two downhole surveys for each hole; the first survey was run after
directional drilling was complete. The second survey ran on
completion of the final reaming of the hole. The surveys were
performed with the instrument centralized inside the drill rods. For
each survey, data obtained at 10 ft (3 m)
intervals and the average from the survey,
going into and out of the hole, was used.
The project team compiled all the survey
data to make a final survey report.
The following two plots are typical of
what would be found in the final alignment survey report. The first plot depicts
the upstream deviation (Figure 1). Three
sets of survey data are shown for evaluation. The three-dimensional tolerance
cone is shown in two-dimensions for a
perspective reference. The data confirms
that the reaming passes followed the pilot
hole and the accuracy of the downhole
instrument compared well to the optical
directional survey shots. The second plot
depicts the dam axis deviations (Figure 2).

The USACE conducted a study in
2002 to verify whether

conventional drilling methods
could produce the desired

tolerances. The results of this

study proved that conventional

drilling methods could not produce
the accuracy required.

DEEP FOUNDATIONS • MAR/APR 2014 • 13

unique hole outside of the pilot hole prior to the pilot hole size
changes being made. Material changes were made to the directional
drill tooling to withstand the wear of hammer drilling in hard rock.
This ranged from metallurgy changes in the tooling manufacturing
to O-ring upgrades to keep rod seals lasting longer. Each part of the
drilling system became a potential source of error or problems in
the drilling process. Through experience, the drillers developed
sensitivity to detect problems early and fix them quickly.
Anchors installed and ready for stressing

Early installation of ACIP piles

Figure 2. Dam access deviation

The same sets of data are shown as in the upstream deviation graph.
Similarly, the deviations measured by the different sets of survey
data overlay closely.
The scale of the graph is notable. The vertical axis of each graph
is elevation with a 200 ft (61 m) range. The horizontal axis
represents the deviation in inches with a range of 4 in (10 cm). If the
graphs were shown on a 1:1 scale the deviation would not be visible
for evaluation.
For evaluation, the final survey for the hole shown in these
examples has a deviation of less than 1 in (2.4 cm) until a depth of
206 ft (62.7 m) and a maximum deviation of roughly 2 in (5 cm) to
the west at the bottom of the survey along the dam axis.
Perpendicular to the dam, the maximum deviation is 4 in (10 cm)
near the top of the hole and 4.5 in (11.4 cm) at the bottom of the
hole. The deviation for the total hole shown based on the last survey
reading is 4.5 in (11.4 cm). The tolerance at the bottom of the
survey is 1:608 compared to the required 1:150.
Of the 216 anchors, only 2% were out of tolerance at the bottom
of the hole. However, these anchors were within tolerance at 100 ft
(30.5 m). The anchors went out of tolerance beyond the depth of
any obstructions and were accepted in this manner. At 100 ft (30.5 m),
all of the anchors were within tolerance with the majority more
than triple the required tolerance. Distinguishing a varying
tolerance acceptance criteria based on known obstructions could
allow stricter tolerances in critical zones while allowing larger
tolerances in less critical zones. This offset can lead to a time savings
in the drilling process and thus reduce the expectation of having to
repeat work due to out-of-tolerance drilling.
Brayman modified the directional drill system throughout the
Bluestone Dam Safety Assurance project. The diameter of the
directional drill tooling was reduced to balance stiffness to keep the
hole aligned, with flexibility to steer and correct the hole when it
deviates from the target alignment. The directional drill pilot hole
size increased early in the project to allow design changes to the
reaming bits. Multiple reaming bits fractured while others drilled a
14 • DEEP FOUNDATIONS • MAR/APR 2014

Directional drilling setup

The sensitivity of the survey instrument and the effects of the sun
had to be monitored closely since the instrument was mounted on a
steel frame. Throughout the day, the lattice of the stand would
expand and contract moving the optical instrument with the camera.
This had the effect of moving the directional drill target that
appeared on the driller’s screen. Since this was a slow change, it
would appear to the driller that the hole was moving off target. To
prevent this problem, the surveyor would block sunlight from the

stand when possible, along with back sighting and adjusting the instrument more frequently when the weather conditions warranted it.
Most of the holes on the project have three sets of survey data:
the optical data, the directional downhole instrument survey and
the final downhole instrument survey. The ability to capture the
optical data was not understood at the time the specifications were
written or when the initial construction plans were established. As
the data became available, it became evident that the optical data
was the most reliable and accurate survey information. Thus, after
completing the directional drill hole, the USACE decided the
downhole survey with the Reflex Instrument was not required.
With proper design of the reaming bits and observing drill
penetration rates, the reaming process was guaranteed to follow the
pilot hole. Consequently, the downhole instrument survey could be
eliminated or reduced to a small percentage of verification tests.
The directional drilling system developed by Brayman at the
Bluestone Dam is ideal for drilling straight holes where accuracy is
vital to the object being anchored. It has been adapted for very
extreme rock drilling. Drilling through obstructions is difficult, but
can be accomplished with this system. The bit locating system is
not affected by embedded steel in the concrete and the location of
the bit is known to a high degree of accuracy in real time.

Summary
Working alongside the USACE, Brayman successfully installed the
largest rock anchors in the United States by way of directional
drilling. These anchors will effectively stabilize the dam under the
new flood protection design and prevent failure. The completion of
the first 216 anchors plays an integral part in the on-going
rehabilitation efforts at Bluestone Dam. Phase 2B was completed in
December 2011, and Brayman is now working on Phase 3.
Section of platform lowered for second row of anchors

DEEP FOUNDATIONS • MAR/APR 2014 • 15

Taking the Lead
in over 40 countries around the world

Lead Systems
Impact Hammers
Reverse Circulation Drills
Hard Rock Drill Bits
Custom Foundation Equipment
Site Support
Project Planning

600 Ferguson Avenue North
Hamilton, Ontario, Canada L8L 4Z9
Tel: 1.905.528.7924 Fax: 1.905.528.6187
Toll Free: 1.800.668.9432 (in Canada and USA)
www.berminghammer.com
Email: [email protected]

18 • DEEP FOUNDATIONS • MAR/APR 2014

Ground Improvement

We excel at tough challenges. Malcolm's experience and specialized
resources drive the construction state-of-practice, evolving new
solutions to meet the demands of our clients. Malcolm offers a full
array of ground improvement techniques to modify and enhance
the existing ground In-situ through densification, solidification,
reinforcement and drainage. When you have conditions that require
a higher level of expertise, contact us at MalcolmDrilling.com
Above Left: Cutter Soil Mixing, Seattle, WA
Below Left: Jet Grouting, Seattle, WA
Right: Deep Soil Mixing, Miami, FL

20 • DEEP FOUNDATIONS • MAR/APR 2014

Cutter Soil Mixing
Multi-Axis Soil Mixing
Jet Grouting
Vibro Systems
Deep Soil Mixing
Specialized Geotechnical
Grouting

DFI ACTIVITIES

WPM: Brainstorming Breakouts
Early every year, DFI’s Winter Planning Meeting provides a venue
for trustees to think about the future and discuss other business,
including the budget. In January, DFI’s trustees and the chairs of the
15 technical committees met at Marco Island, Fla. (The DFI
Educational Trust Board met the day before, see p. 45.)
At the meeting, participants took a fresh look at areas of
continuing interest to DFI. All were assigned to breakout groups
that addressed the four goals in DFI’s five-year strategic plan:
globalization of the institute, revitalization of technical activities,
engaging manufacturer/supplier members, and fostering
involvement of younger members. The recommendations for
accomplishing each goal were wide and varied, and many tasks
were identified for implementation through 2019.
The newest initiative to be strategized was the participation of
the manufacturer/supplier members; following up on a roundtable
discussion by this group during the Annual Conference in Phoenix
last September. The breakout group discussed how these members
are important to DFI, providing information about innovations in
quality, safety, sustainability and durability. One suggestion was to
introduce sessions or panel discussions on the future of the
industry and requirements in particular sectors during seminars
and conferences. The idea of an advisory committee comprised of
these technology providers was also proposed.
Another group looked at DFI’s technical committees, and
focused on identifying potential new committee activities. They
discussed publications, including the possibility of committeegenerated white papers as well as papers for DFI’s Journal. Among
other ideas was creating liaisons with organizations with similar
committees, and seeking exposure at their conferences. Webinars,
planned by technical committees, were also discussed.
Younger members are always important to DFI, and this
breakout group discussed many ideas, including a course aimed at
young college professors, and providing volunteer speakers for
universities. The group also talked about ways to incentivize
employers to encourage younger employees to participate in DFI
events. They proposed a definition of “younger” members as 35
years old or younger, or as having five years or less of experience.
The breakout group also proposed a survey of younger engineers
and their employers, if feasible, with the help of an expert.
The breakout group on globalization focused on the exchange
of information through regional chapters. The practice of regular

Paul Axtell (Drilled Shaft Committee chair), Ed Laczynski
(Tiebacks and Soil Nailing Committee), Kwabena Ofori-Awuah
(Seismic and Lateral Loads Committee chair) and Emad Sharif
from Dubai

telephone/virtual meetings and using various media to enhance
communication and disseminate information was explored. DFI is
working with current regional chapters to enhance the benefits to
members. Goals were set for increasing membership in each region,
and new regions will be explored over the next five years. Those
mentioned were Australasia, South America, Mexico and SubSaharan Africa. A task force was set up to determine the criteria
required to embark on the formation of a regional chapter and to
formalize a guidance document for the creation of chapters.

DFI Board Meeting
A principal subject of the board meeting was the project funding
program. This is the third year DFI designated funds to the program
where DFI technical committees submit proposals to conduct
research projects that “support approved undertakings, those
deemed useful toward advancing deep foundation technology.”
This year 11 proposals were submitted. A panel reviewed and
ranked them, recommending five projects for funding. The five were
submitted by DFI committees on Soil Mixing, Driven Piles, Marine
Foundations, Drilled Shafts/Seismic and Lateral Loads, and Deep
Foundations for Landslides and Slope Stabilization. The trustees
agreed to fund $100,000 towards four of these projects. Two of the
five were contingent on separate funding from other groups, so the
final projects will be announced in the next issue of this magazine.
The WPM ended with a trustee meeting where the 2013
financials were reviewed, the 2014 budget was adopted, a new
technical committee on subsurface characterization for deep
foundations was approved, and future meetings were discussed.

Attendees at the WPM (photo by Herb Engler)

DEEP FOUNDATIONS • MAR/APR 2014 • 21

Experience the progress.

Liebherr Nenzing Crane Co.
7075 Bennington Street
Houston, TX 77028-5812
Phone: +1 713 636 4050
[email protected]
facebook.com/LiebherrConstruction
www.liebherr.com

The Group

Follow Our Lead To A Solid Foundation
BAUER-Pileco is a leading global provider of foundation equipment and service to the construction
industry. Recognized for its technological advances and innovation, BAUER-Pileco and its network of
dealers represent the BAUER Group across North and Central America.

BAUER
RTG
FAMBO
BETEK
www.bauerpileco.com
[email protected]

www.facebook.com/bauerpileco

PILECO
KLEMM
MAT
PRAKLA

Scan this QR Code
to your smart phone
and contact us directly.

BAUER-Pileco Inc., 111 Berry Road, Houston, TX 77022
(713) 691-3000 / (800) 474-5326
www.youtube.com/PilecoTX

Plan to Attend the DFI-EFFC International Conference in Sweden
The complete program for the DFI-EFFC international conference
“Global Perspective on Sustainable Execution of Deep Foundation
Works,” being held in Stockholm, Sweden from May 21-23, 2014 is
available at www.dfi-effc2014.org.
During the three-day event, 23 technical presentations will be
made in five sessions: Harmonization of Execution Standards,
Bored and Driven Piles, Deep Mixing —Wet and Dry Methods,
Walls — In-situ and Pre-formed, and New Trends in Foundation
Practice. The fifth session also includes the tenth John Mitchell

the other submitted papers will be viewable as Electronic Poster
Presentations. These presentations will be viewable from the
conference website before, during and after the conference as well
as on kiosks at the conference for attendee convenience.

Exhibitor and Sponsor Opportunities

The exhibition will be open all three days of the conference,
featuring products and services of 40 companies. Exhibitor videos
will be shown throughout the conference, and will be available for
download from the conference website.
There are still booths available; view the
floor plan at www.dfi-effc2014.org.
At press time, the conference partner
2014 STOCKHOLM SWEDEN
sponsor is Ruukki, and Robit Rocktools
Ltd is a mentorship sponsor. Sponsorship
packages are still available for Banquet
Sponsors, General Sponsors and additional Partner and Mentorship Sponsors.
This conference is a unique opportunity for knowledge
Lecture by Bengt Fellenius and the Special Heritage Lecture on
dissemination and technical exchange between contractors, project
Swedish Contributions to Geotechnical Engineering by Stefan
owners, authorities, equipment manufacturers, material suppliers
Aronsson and K. Rainer Massarsch. The technical presentations
and researchers working with different aspects of deep foundations.
were selected from more than 150 submitted papers from around
To register as an attendee, exhibitor or sponsor visit www.dfithe globe. Each session also has a keynote lecture and concludes
effc2014.org.
with a panel discussion on the session topic. Additionally, many of

International Conference on
Piling & Deep Foundations

DEEP FOUNDATIONS • MAR/APR 2014 • 25

w optionally
® Hollow bar no
ll
ri
D
I
W
Y
D
c Steel
0% Domesti
available in 10 our Bolingbrook,
d in
manufacture
y!
lit
ci
Illinois fa
le sizes.
Contact your

ab

tatives for avail

local represen

RELY ON DSI
Material Characteristics:

DYWI® Drill Hollow Bar System

K

for Soil Nails - Micro Piles - Ground Anchors - Rock Bolts

K

Fully Threaded Rod Sections

Thread Profile

Standard ISO rope thread and T-Thread

Installation Advantages:

produces an excellent bond between the

K

Ability to work with small drill rigs without casing in narrow spaces

K

Similar installation methods for all ground conditions

K

Simultaneous Drill and Grout Installation

K The

K

No Casing Required

with air or water during drilling

K

Rotary Percussive Drilling Enables quick rates of installation

bar and grout

K

hollow core serves for flushing

Choice of drill bits for different

Ground conditions

Quick – Safe - Reliable

K

Enhanced corrosion protection is

available upon request

DYWIDAG-SYSTEMS
INTERNATIONAL USA Inc.

DYWIDAG-SYSTEMS
INTERNATIONAL CANADA, LTD

NORTH CENTRAL
Bolingbrook, IL
Phone (630) 739-1100

NORTH WEST
Kent, WA
Phone (253) 859-9995

CENTRAL AMERICA
Pompano Beach, FL
Phone (954) 532-1326

N. EAST / MID ATLANTIC
Toughkenamon, PA
Phone (610) 268-2221

CANADA WEST
Surrey, BC
Phone (604) 888-8818

SOUTH CENTRAL
Mansfield, TX
Phone (817) 473-6161

WEST
Long Beach, CA
Phone (562) 531-6161

SOUTH EAST
Tucker, GA
Phone (770) 491-3790

ALASKA:

Call North West

HAWAII:

Call West

CANADA EAST
Gormley, ON
Phone (905) 888-8988

www.dsiamerica.com
120906_

www.dsicanada.ca
9/6/2012 2:04:31 PM

Register for SuperPile ’14
DFI’s SuperPile organizing committee expects more than 200
attendees and 40 exhibitors at the Hyatt Regency in Cambridge,
Mass., for SuperPile ’14. From June 18 through June 20 seven of
DFI’s Technical Committees will host meetings and technical
presentations of local and national importance. Teams
of reviewers from the Driven Piles, Augered Cast-inPlace Pile/Drilled Displacement Pile, Micropile,
Marine Foundations, Testing and Evaluation,
Seismic and Lateral Loads, and Drilled
Shaft Committees are reviewing
abstracts and finalizing the
technical program for the
conference. SuperPile

2014 Chair Les R. Chernauskas, P.E. (Geosciences Testing and
Research, Inc.), has assembled an enthusiastic team of local
committee members to help bring attendees the most innovative,
state-of-the-practice piling technologies available to the deep
foundations industry. Also make plans to attend DFI’s
Technical Committee Meetings the evening of June 18, prior
to the conference.
To register or for more information
on the program, accommodations,
exhibit space and sponsorship opportunities visit
www.dfi.org.

Hyatt Regency in
Cambridge

June 18-20, 2014

DEEP FOUNDATIONS • MAR/APR 2014 • 27

SHEET PILE WALL DESIGN
1/1
PROJECT: ______________________________________________________________________
PAGE: _________
NORTH AMERICAN PILING MARKET
Q1 - 2014
LOCATION: __________________________________________________________
DATE: _____________

PROBLEM; DETERMINE BEST AND MOST ECONOMICAL HOT ROLLED SHEET PILE
WALL SOLUTION FOR CLIENT’S PROJECT.
q
TIEBACK

F

SAND
ɤ = 120lb/ft³
c´ = 0
Ø = 40°

SHEET PILE
SAND
ɤsat = 129.4lb/ft³
c´ = 0
Ø = 40°

DREDGE LINE

DESIGN PARAMETERS
ANCHORED WALL: \/
UNI. SURCHARGE (q) = 300 psf
DEFLECTION: < 1 in
RESULTS FROM SOFTWARE ANALYSIS
SHEET PILE LENGTH (L) = 40ft
ANCHOR FORCE (F) = 6 kips/ft
MAX MOMENT (Mmax) = 84 kip-ft/ft

L

STEP 1) FIND MIN. SECTION MODULUS (Sx) REQUIRED FROM THE Mmax.
USACE Design of Sheet Pile Walls EM 1994; 50% safety factor for allowable bending stress (Fa)
(Fa = .50 x
ksi for steel grade)

Sx = Mmax / Fa

40.3 in³/ft (A572 GR 50)

Sx = 84 kip-ft/ft (12in/ft) / 25ksi

NOTE: JD FIELDS EXCLUSIVELY SUPPLIES HOESCH 700mm SERIES IN MIN 60ksi YTM GR 60!
Determine (Sx) for Fa = 60 ksi

33.6 in³/ft (A572 YTM GR 60)

Sx = 84 kip-ft/ft (12in/ft) / 30ksi

STEP 2) COMPARE AVAILABLE HOT ROLLED Z-SHEET PILE SECTIONS.
(MATERIAL MUST BE STOCK SECTION FOR QUICK DELIVERY.)

SECTION

WEIGHT

GRADE

Sx

AZ 26-700

28.37 lb/ft²

50 ksi

48.4 in³/ft

PZC 26

31.8 lb/ft²

50 ksi

48.4 in³/ft

PZ 35

35.0 lb/ft²

50 ksi

48.5 in³/ft

(H 1907)

23.3 lb/ft²

60 ksi

34.7 in³/ft *

CHECK FOR DEFLECTION; OK, TIEBACKS OFFER
SUFFICIENT ANCHOR FORCE TO LIMIT WALL
MOVEMENT. \/
H 1907 MEETS STRUCTURAL REQUIREMENT. \/

SPECIFY HOESCH!

TECHNICAL BENEFITS: H 1907 YTM GR 60
*OFFERS A SIGNIFICANT WEIGHT SAVINGS OF
~20% OR MORE COMPARED TO OTHER GR 50
STOCK OPTIONS.
*HIGHER YIELD STEEL CAN IMPROVE DESIGN
DURABILITY, EXTEND WALL SERVICE LIFE,
AND POTENTIALLY ELIMINATE COATING.
*60 KSI YIELD WILL HOLD UP BETTER UNDER
HIGHER DRIVING STRESSES IN DIFFICULT SOIL
CONDITIONS.

CALL JDF; THEY’RE SETTING THE
STANDARD FOR SHEET PILING &
GEOSTRUCTURAL SYSTEMS.

JD Fields & Company Inc. I 55 Waugh Drive I Suite 1250 I Houston, TX 77007 I 855- GRADE 60 I www.jdfields.com

WHAT DO THE LINCOLN MEMORIAL
AND THE MID-ATLANTIC REGIONAL SPACEPORT
AT WALLOPS ISLAND, VA
HAVE IN COMMON?

NATIONAL RIG RENTAL
WHY ? JUNTTAN AVAILABILITY

Exclusively JUNTTAN www.nationalrigrental.com 302-539-1963

Hal Hunt Lecturer Chosen for 39th Annual Conference in Atlanta
The annual Hal Hunt Lecturer for DFI’s
39th Annual Conference on Deep
Foundations will be Paul W. Mayne, Ph.D.,
P.E., professor of Geosystems Engineering,
School of Civil and Environmental
Engineering at the Georgia Institute of
Technology. The lecture is a highlight of the
Annual Conference, and is named after Hal
Hunt, a trustee on the first DFI Board and
the first executive director. The lecture, set
up in 1989, was created to recognize
notable communicators in the deep
foundations community.
Professor Mayne is an international
researcher, focusing on in-situ testing, geotechnical site characterization and the evaluation of rock and soil properties. He gave
the 2006 James K. Mitchell Lecture and the
2009 Michael W. O’Neill Lecture, both high
honors within the geotechnical profession.
He also delivered the state-of-the-art lecture
at the 17th International Conference on Soil
Mechanics & Geotechnical Engineering in
Alexandria, Egypt in 2009. Mayne has

Mayne has consulted on
projects all over the world,
and written or co-authored
countless books, manuals and
technical papers.

consulted on projects all over the world,
and written or co-authored countless
books, manuals and technical papers.
Mayne attended Cornell University for
doctoral studies and since 1990 has been a
faculty member at Georgia Tech.
The Annual Conference is being held at
the Atlanta Marriott Marquis. It begins
Tuesday, October 21 with day-long
meetings of DFI’s 15 technical committees.
The conference officially opens Wednesday,
October 22, when the exhibit hall, featuring
over 100 manufacturer and supplier
displays, opens its doors, and presentations
on projects and case studies begin. The
conference closes on Friday, October 24.
The conference chair is John Wolosick,
Hayward Baker, and vice president of DFI.
Program co-chairs are Scott Ballenger,
Schnabel Foundation Company, and
Antonio Marinucci of American Equipment
and Fabrication. The organizing committee
is currently reviewing abstracts and
selecting keynote speakers.

Award Nominations Due April 15
Among the many DFI Awards to be presented are the Outstanding
Project Award (OPA), Distinguished Service Award (DSA), C.
William Bermingham Innovation Award, Young Professors Paper
Competition and the Student Paper Competition. The deadline to
submit nominations for these awards is April 15, 2014. More
information is available at http://www.dfi.org/awardslectures.asp.

City-by-City
City-by-City, the companions program, is an opportunity for
spouses, family and friends of conference attendees to experience
the great sights of Atlanta. Diane Bittner, wife of DFI President
Robert Bittner, has volunteered to work with DFI event
coordinator, Lauren Nance, 2014 Companions’ Program Chair
Megan Fitzgerald (HIIG Construction) and Pete Rose (ECA) to
ensure the group has a great time onsite and as they tour the city.
Exhibit space and underwriting opportunities are still available
for this exciting conference. Go to www.deepfoundations2014.org
to register online.

30 • DEEP FOUNDATIONS • MAR/APR 2014

DEEP FOUNDATIONS • MAR/APR 2014 • 31

THE NEW

CASAGRANDE USA, Inc. 93 Stickles Pond Road - Newton, NJ 07860 Tel. 973-579-1906
www.casagrande-usa.com

Eastern Distributor • INTERNATIONAL DRILLING EQUIPMENT, Inc.
645 Angus Street - Rural Hall, NC 27045 Tel. 877-207-6062
[email protected]

Texas Distributor • RODRILL, Inc.
11670 Interstate 10 Frontage Rd, - Converse, TX 78109 Tel. 210-667-2130
[email protected]

N

TIONS
DA
I

N

DFI

ITUTE
ST

EP FO
U
DE

COOPERATING ALLIANCE

12th International Workshop
On Micropiles: Kraków, Poland

Wawel Castle, Krakow

The 2014 International Workshop on Micropiles (IWM) is just a few
months away, from June 11-14, 2014 in Kraków, Poland. “Whether
you have been to every IWM since 1997 or this would be your first,
we look forward to seeing each of you to share past experiences and
create new memories,” says Allen Cadden, P.E., D.GE, chairman,
International Society for Micropiles (ISM). “You will not find a
better place to learn about what has been accomplished with
micropiles and what is being developed for future challenges. New
for the workshop is the added full day short course on micropiles on
Wednesday, June 11 and the World Cup of Micropiles Challenge.”

Social Program
Kraków is one of the most culturally and politically significant cities
in Poland. The companions’ and social programs will showcase
some of Kraków’s most interesting sites. On Thursday, June 12,
companions will visit the nearby Auschwitz concentration camp.
On Friday, June 13, the delegates and companions will take a
walking tour of the Kraków historic city center brimming with
cafés, shops and pubs. The traditional ISM awards dinner will
follow the walking tour. All delegates and companions are also
invited to tour the Wieliczka Salt Mine, one of the oldest salt mines
in the world. The mine’s attractions include dozens of statues, three
chapels and an entire cathedral carved from rock salt.
According to the holiday review site Zoover, Kraków is the best
European city trip in 2014. The complete review is at http://weblog.
zoover.com/press_release/krakow-best-european-city-trip-2014.

Sponsorship Opportunities
Titan Polska is the host sponsor for the event. Several other categories of sponsorship are available. For sponsorship details contact
Jan Hall at ADSC ([email protected]).
Registration will be open in March on the ADSC website at
www.adsc-iafd.com. For details, contact Dan MacLean, of Con-Tech
Systems, technical program chair, at [email protected] or
Mary Ellen Bruce, ISM technical lead at DFI, at [email protected].
DEEP FOUNDATIONS • MAR/APR 2014 • 33

DFI Journal Information Available
As reported in the Jan/Feb issue of Deep Foundations, Anne
Lemnitzer, Ph.D., and Timothy C. Siegel, P.E., G.E., D.GE, were
appointed co-editors of DFI Journal: The Journal of the Deep
Foundations Institute, and are eager to assume their roles this year.
They succeed Zia Zafir, Ali Porbaha and Dan Brown, who are
stepping down after serving as lead editors since the Journal’s
inception; though Zia will continue on the editorial board. Maney
Publishing, an independent publishing company specializing in
technical journals, contracted with DFI late last year to publish the
DFI Journal as Manny Fine, previous publisher, retired.
Siegel is a principal engineer
with Dan Brown and Associates, PC
and member of the adjunct faculty at
the University of Tennessee. He
holds a B.S. and M.S. in Civil
Engineering from Georgia Institute
of Technology, and has spent over 20
years working in industry. He is a
m e m b e r o f D F I ’s G r o u n d
Improvement and Seismic and
Lateral Loads Committees, has
authored or co-authored over 45 technical papers and has
presented at conferences throughout the U.S. His areas of expertise
are cast-in-place piles, foundations in Karst and foundation design

34 • DEEP FOUNDATIONS • MAR/APR 2014

for seismic conditions. Lemnitzer is assistant professor at the
University of California in Irvine. She holds a Ph.D. in structural
engineering from UCLA as well as a M.S. from California State
University, Long Beach and B.S. from the University of Applied
Science in Leipzig, Germany, where she was awarded a Fulbright
Scholarship to continue her education. Her research interests lie at
the interface of geotechnical and structural earthquake
engineering, including soil structure interaction, lateral design of
deep foundations, large scale and shake table testing, and seismic
behavior of bridge foundation systems.

At a time when many technical journals
are focused on the former, the DFI
Journal plays a vital role by offering a
balance between theory and experience.
Timothy C. Siegel, P.E., G.E., D.GE, co-editor

Siegel comments on the state of foundation engineering, saying
“At no time in history has the practice been as challenging as it is
now.” Ambitious projects, stringent design codes, the likelihood of

litigation and high expectations require engineers to effectively
intertwine theory and experience, he adds. At a time when many
technical journals are focused on the former, the DFI Journal plays a
vital role by offering a balance between theory and experience. This
is one reason the DFI Journal is a “leading platform for technology
transfer on design and construction of deep foundations and
ground improvement.”
Lemnitzer says she looks forward to working with colleague Tim
Siegel as co-editor of the DFI Journal and hopes to further enhance
the reputation of the Journal and its circulation in the geotechnical
community. “We are determined to seek the best deep foundation
research from across the world and combine it with the most
innovative design projects currently built, hereby creating a unique
stage for intellectual exchange, transfer of knowledge and
professional development.” The DFI Journal provides this
alternative approach compared to traditional scientific journals, she

says, and she looks forward to widening the audience through
“hands-on, understandable publications” that can make lasting
impacts on our foundation industry.
Theresa Rappaport, DFI’s executive director, says that DFI is
striving to increase the Journal readership and thinks the co-editors
Siegel and Lemnitzer will help towards that goal. The Journal is the
“perfect vehicle,” she says, for achieving DFI’s mission to
disseminate practical and useful content to the deep foundations
construction industry and be the information resource for design
and construction of foundations and excavations.

Author and Subscriber Information
DFI Journal publishes practice-oriented, high quality papers related
to the broad area of deep foundation engineering and construction.
Papers are welcome on topics of interest to the geo-professional
community. This includes all systems designed and constructed for
the support of heavy structures and
excavations. Submissions are welcomed
via the online submission site at
http://www.edmgr.com/dfi.
The co-editors can be contacted by
email at [email protected]
and for more information please visit
www.maneyonline.com/dfi.
Current and past issues of DFI Journal
are available online to DFI members at no
cost as a member benefit by signing-in to
My DFI and selecting the Journal from the
left-hand menu. Members and non-members can order printed
copies of the 2007-2013 volumes of the Journal from the
publications page of www.dfi.org; members at preferential rates.
Members can also subscribe to the 2014 print issues at a discounted
rate. DFI Journal is available to institutions as a print and online or
online-only subscription. Details of 2014 rates and ordering
information are available at www.maneyonline.com/pricing/dfi.

“We are determined to seek the best deep
foundation research from across the world
and combine it with the most innovative
design projects currently built, ...”
Anne Lemnitzer, Ph.D., co-editor

Save September 18-20, 2014
the Conference on Deep Foundation
Date Technologies for Infrastructure
Development in India
DFI of India, in collaboration with the Indian
Geotechnical Society – Delhi Chapter and Indian
Institute of Technology Delhi, will present the 2014
Conference on Deep Foundation Technologies for
Infrastructure Development in India on September
18-20, 2014 at IIT Delhi. Mark your calendars today!

DEEP FOUNDATIONS • MAR/APR 2014 • 35

800. 3 4 8 .1 89 0

STR

H M C- U S .CO M
Be the most versatile player on the worksite with the new Self-Contained Track Rig (STR). While other machines in
its class can perform only one function without the ability to switch tools, the STR tops them all by easily converting
from the Impact driver to the Vibro driver to the drill tool when installing small piles for solar or other applications.
One machine with the flexibility of three tools right at your fingertips makes you the MVP of any worksite.
Discover how the STR can transform your business. Call us today to find out how you can pre-order an STR.

36 • DEEP FOUNDATIONS • MAR/APR 2014

WWW.DFI.ORG

DFI Website: Did You Know?
Did you know that you can get help with searches by typing the
word “tips” in the search box.
The search box allows you to search for keywords within the
Publications, Members and Terms databases.
You may enter one or more keywords, separated by one space,
in the search text box above. You can then press the Enter key or
click on the
button to initiate a search.
Normally the search engine will only return database entries
that contain a match for ALL of the keywords entered. The keyword
may appear anywhere within the database entry, and case is not
significant. So entering the keyword ab will match on words like
absolute and taxicab and fabricate.
For the Publications database, the search engine will look in
the SUBJECT, ARTICLE TITLE, SUMMARY and AUTHOR fields
for matches.
For the Members database, the search engine will look in
the ORGANIZATION, MEMBER NAME and SERVICES fields
for matches.
For the Terms database, the search engine will look in the
ENGLISH field for matches.
When searching through the Members and Terms database it is
sometimes useful to be able to search for names or terms that begin

with a sequence of letters. For example, companies that begin with
American. Any keyword that ends with an asterisk will match this
way in the Members and Terms databases. So to find companies
like the example above, use the keyword American*. The keyword
A* finds all companies that begin with A, etc. When you use this
kind of “begins with” keyword in the Members database it will only
be matched against the ORGANIZATION and LAST NAME.

DEEP FOUNDATIONS • MAR/APR 2014 • 37

HOUSTON INTERNATIONAL INSURANCE GROUP

A leading global insurance company enterprise that delivers
sustainable protection for your deep foundation operations.
EASY ACCESS
for your agent to (4) wholly-owned
insurance carriers with ‘A’ ratings by A.M. Best Company
ALL LINES
of coverage with market-competitive rates
KNOWLEDGEABLE
underwriters in foundation / pile driving construction trades
Have your agent contact: [email protected] 770.933.3418

My Seven Year Stint at DFI
It’s hard to believe I’ve
been the executive
editor of DFI’s Deep
Foundations magazine
for seven years. When
I began, the magazine
appeared four times a year. Since 2012,
there have been six issues each year, or 50%
more articles and ads, with no additional
staff. (Disclosure department – we did use
two freelance writers for a total of six
articles over two years, so it wasn’t a singlehanded effort, but I’m still proud.)
DFI is different than it was when I
became editor. I’ve been a witness to many
changes the DFI Trustees have made, the
introduction and subsequent growth of the
DFI Regional Chapters is one. Another
positive change was that of hiring Technical
Activities Manager Mary Ellen Bruce to
oversee the 15 technical committees.
Perhaps the most remarkable change has
been the growth of the DFI Educational

Trust and the money disbursed to students.
The generosity of the DFI members is
impressive. I see a profession proud of its
accomplishments and one whose members
give to help others.
What have I been doing on a day-to-day
basis over those years? As executive editor,
I’ve been wading through technical papers,
PowerPoint presentations, press releases,
conference programs, seminar and short
course programs, and juggling subject
matter among DFI’s areas of deep
foundation concentration. I remain
impressed by the fact that every DFI
member who writes for the magazine and
serves on a committee also has a “real” job!
I also picked members’ brains about
what subjects are important and what’s new.
I spent more time imploring DFI members
to write articles. Then there is the ancillary
aspect, that of putting a magazine together.
I’ve been doing that for decades, if I count
my prior editorship at Civil Engineering

(ASCE), and I still like that part of the job.
It’s something akin to a 500-piece puzzle. I
thank Karol Paltsios, magazine and advertising manager, and Faye Klein, graphic designer,
for making all those pieces come together.
My admiration for Theresa Rappaport is
endless. She is always on top of a multitude
of details, juggling numberless priorities and
being patient. The talented, friendly and
helpful DFI staff reflect her example. I wish
the best to all of them and to my successor,
Helen Robinson.
Finally, the DFI members are terrific
people. Everyone I’ve met or dealt with
electronically over the years has been highly
professional, knowledgeable and devoted
to the deep foundation industry and to DFI.
It’s all been engrossing, interesting and
fun. I’ve loved doing it. I will miss the job
and all the people, and contributing to DFI.
So why am I leaving? I wonder.
Thanks! ... Virginia Fairweather,
Executive Editor, Deep Foundations

DEEP FOUNDATIONS • MAR/APR 2014 • 39

STEP UP
TO THE
FUTURE

Innovative Drilling Solutions

[email protected]
www.comacchio-industries.it

International Construction Equipment, Inc
ICE, Inc

ICE, Inc

Hammer & Steel, Inc.

Hammer & Steel, Inc.

301 Warehouse Drive,

259 Jernee Mill Road

11916 Missouri Bottom Rd.

401 West Channel Rd.

Matthews, North Carolina 28104 USA

Sayreville, New Jersey 08872 USA

Hazelwood, Missouri 63042 USA

Benicia, California 94510 USA

[email protected]

[email protected]

Toll Free: 1.800.325.PILE (7453)

Toll Free: 1.877.224.3356

www.iceusa.com

www.iceusa.com

[email protected]

[email protected]

Ph: 704 821 8200

Ph: 704 821 8200

Ph: 314.895.4600

Ph: 707.746.7820

REGIONAL

REPORT

DFI Middle East
Recent announcements regarding mega-projects in the Middle
East have reinvigorated the construction market in the region. In
Qatar, the country is bracing for a
new wave of construction projects to support the 2022 FIFA
World Cup, and in Saudi Arabia,
the completion of the foundation
works for the 3,300 ft (1,006 m)
high Kingdom Tower was
announced in December 2013.
Khaldoun Fahoum, Ph.D., P.E. In Dubai, the construction indusChair DFI Middle East
try is expecting a significant boost
[email protected]
with the city winning the bid to
host the World Expo in 2020. We expect the DFI Middle East
Chapter’s technical activities to surge over the next couple of years,
in tandem with these developments.

Conferences and Events
The Second DFI Middle East Conference (DFIMEC) takes place in
Dubai on April 2-3, 2014. The first one was held in November
2012, attended by more than 150 participants from the region. This
year’s conference builds on the success of DFIMEC 2012 and
promises to provide a top-quality forum for discussing cutting-edge
technologies and developments in the field through case histories.
The aim is to provide an opportunity for the region’s geotechnical
engineering practitioners and academicians to interface, exchange
information and experience, and present the latest developments in
the deep foundation field. The conference will be held at the
American University in Dubai in collaboration with the Dubai
Technology and Media Free Zone Authority.

A DFI-sponsored dewatering workshop held in 2013 also
attracted more than 100 local attendees. We expect the 2014
conference to draw more participants, given the recent launch of
new mega-projects in the region. Professor Dr.-Ing. Rolf
Katzenbach of Technical University of Darmstadt is the keynote
speaker at the conference, and he will discuss the latest
developments in pile-raft foundations.
The First Arabian Tunneling Conference took place in Dubai
on December 12-13, with the support of several DFI Middle East
Chapter corporate members. Among the keynote speakers at the
conference were Soren Eskesen, president of the International
Tunneling Association and chief project manager at COWI in
Denmark, and Joe Roby, vice president at The Robbins Company
in Seattle, Wash.

Projects
Nakheel, the real estate development firm behind Dubai’s Palm
Jumeirah Island project, recently closed the bidding process for
major foundation works in the proposed $680 million Nakheel
Mall, which will be constructed on the so-called trunk section of
the island. The project includes 4.5 million sq ft (418,000 sq m),
supported by drilled shafts. One of the main challenges is the
construction, waterproofing and protection of three basement
floors, which will be fully submerged in a highly corrosive marine
environment. The project is scheduled to go on a fast track, with a
projected completion date of December 2016.
The Saudi Railways Organization confirmed that the Saudi
Railway Master Plan (SRMP) is on schedule. The project entails
more than $17 billion in infrastructure investments through the
year 2025, with the goal to connect the kingdom’s main cities
through a high-speed rail network. Among the early phases of the
project are the Dammam-Jubail Rail Link and the Mecca-Medina

The foundation works for the Dubai Pearl
project with more than 500 drilled shafts are
complete, and superstructure construction is
currently underway.

DEEP FOUNDATIONS • MAR/APR 2014 • 41

High Speed Rail. In addition, the project entails construction of
underground metro systems in three large cities. Among the key
challenges of the project are excavation and tunneling works in the
densely populated urban centers of Riyadh, Mecca and Jeddah, and
more than 800 bridges and tunnels in urban and rural settings to
ensure seamless connectivity of the transportation network.

3. Bluewaters Island is the latest land reclamation project, which
will extend the city’s waterfront by another 4 mi (6.4 km), and
provide space for an entertainment theme park. The project will
feature the world’s largest Ferris wheel, Dubai Eye, which will
require the design and construction of a unique offshore
foundation system. Land reclamation works for the project
have not commenced yet, so it appears that this project is a
longer- term proposition.
4. A similar announcement was made regarding the Dubai
Adventure Studios, which will be completed in time for Expo
2020. This theme park will be built near the Expo Village and
will pose numerous foundation design and construction
challenges, given the unique nature of the structures.
5. The Deira project will be constructed on top of an existing land
reclamation site, offshore of the old city. It will feature a
traditional market, commercial and retail units, and a
recreational pier and marina.

Secant piles are commonly used to support deep excavations
in urban settings in Dubai. For this project in Dubai Media City,
the consultant recommended the use of a diaphragm wall.

6. The Lagoons is a mixed-use development encompassing two
skyscrapers, the Dubai Twin Towers, as well as a number of
smaller waterfront structures. The site was originally surveyed
and prepared prior to the real estate market recession of 2009,
but work had not commenced. The site was recently transferred
to a new developer, who announced plans to resume construction. DFI members have confirmed that subsurface exploration
works are underway, and tenders should circulate soon.

Education Activities
Expo 2020 – Dubai
In early December 2013, the International Bureau of Expositions
formally announced that Dubai will host the World Expo in 2020,
paving the way for a number of large-scale construction projects
that will break records in terms of size and budget. A new urban
center will be developed over 1,100 acres (4.5 sq km) at the
southwestern suburb of Jebel-Ali to accommodate the exposition,
and will connect to key locations in the city through an intricate
transportation network. In parallel, the government of Dubai
unveiled a master plan for six other large-scale developments to be
completed over the next 10 years.
1. The Mohammad Bin Rashid City is a mixed-use development
with over 100 hotels, a large shopping mall, an art gallery and a
theme park. The geotechnical site investigation works for a
number of projects within the city have already taken place, and
the initial foundation designs for several residential and hotel
structures are completed. We expect several foundation tenders
to start circulating for new projects soon.
2. The Dubai Water Canal is a $7 billion mega-project that will
expand the artificial waterway network across the city, and
includes a number of transportation infrastructure works to be
completed by 2017. A key challenge will be the construction of
a 300 ft (91 m) span bridge over the canal, along the city’s
existing 12-lane expressway.

The chapter provided scholarships for three students from the
American University in Dubai
(AUD) to spend a semester at
Georgia Tech, as part of the
exchange program between the
two universities. Nourhan Farrag,
Ghalia Gamal-Eldin and
Mohammed Khimjee, who have
been on the Dean’s List at their
home university, are members of AUD students Nourhan
Ghalia Gamal-Eldin
the DFI Student Chapter at AUD. Farrag,
and Mohammed Khimjee
The scholarship fund was are attending a semester at
endowed through industry Georgia Tech in Atlanta,
Ga., through a DFI Middle
sponsorships from the DFI 2012 East Chapter Scholarship.
conference in Dubai, and will
provide them with partial coverage of their tuition at Georgia Tech,
where the students registered for their classes in early January.
According to the students, the scholarship allows them to engage in
a unique opportunity to immerse in a new cultural and educational
experience. “We are particularly excited about the opportunity to
take classes in geotechnical engineering and concrete design at
Georgia Tech, and apply them toward our engineering program at
AUD,” said Gamal-Eldin, who is a third year honor student at her
home university.

This report from the DFI Middle East Chapter was written by Professor Alaa Ashmawy, P.E., dean of engineering, American University of Dubai

42 • DEEP FOUNDATIONS • MAR/APR 2014

35TH ANNUAL

SHORT COURSE:

Grouting Fundamentals
& Current Practice
www.pieresearch.com

800 . 342 . 2409

RED: PMS 185

QUICK-LOCK HD TM
AVAILABLE IN
2”/ 3”/ 4”/ 6” COVER

June 16-20, 2014
Graz Univ. of Technology

Geotechnical Group
Graz

This course covers injection grouting as a method to improve
soil settlement and strength characteristics, and to decrease
permeability of soil and rock masses. Major topics covered
include properties of cementitious and chemical grouts,
procedures for cement and chemical grouting, field monitoring and verification, grouting rock under dams, grouting of
rock anchors and micropiles, deep mixing, jet grouting, diaphragm walls, compaction grouting, slab jacking, structural
grouting, and grouting for underground structures. Included
in the curriculum is a field demonstration of compaction and
permeation grouting, flow of ultrafine cement, grout mixing,
use of cellular concrete in annular grouting, overburden drilling, grouting of rock anchors, and use of packers.

w w w.csmspace.com
CSM Grouting DFI.indd 1

12/17/13 4:57 PM

QUICK-LOCK TM
2”/ 3”/ 4” COVER

We have you covered,
from top to bottom.

PILE TOPS
PIER BOOT TM

CENTRALIZERS
AUGER CORKS

p ii ll e
e p
o p
p
prroot tecc ttiioo nn tt o
pss

WWW.PPTKC.COM • 913•207•2460
P.O. Box 3153•800 Southwest Boulevard•Kansas City, Kansas•66103

DEEP FOUNDATIONS • MAR/APR 2014 • 43

Today’s Best Drilling
Solutions
FINANCING AVAILABLE

RENTALS • SALES • RPO • TOOLING • PARTS • SERVICE • TECHNICAL SUPPORT

• Earth Retention Crawler Drills
• Piling Equipment
• Jet Grout & Soilmix Equipment, Pumps, Tooling
• CFA Equipment
• Diaphragm Wall Equipment
• Tunneling Equipment
• Geothermal Drilling
Equipment
• Limited Access &
Specialty Equipment
• Crawler Cranes
• Reverse Circulation Drilling
Equipment
• Casing Oscillators, Hydromills
• Drill Tooling & Accessories

For
All Your
Drilling
Needs!

Call or email today!
MAIN
1623 Mission Drive, Ste. #14 • Solvang, CA 93463
[email protected] • (800) 656-6766

SERVICE CENTER
1046 Carrier Parkway • Bakersfield, CA 93308
(800) 656-6766
Your Foundation
Distributor Since 1988

hennessyinternational.com
44 • DEEP FOUNDATIONS • MAR/APR 2014

800-656-6766

DFI Educational Trust Update
Trust Board Meeting at Winter
Planning Meeting
The DFI Educational Trust Board met on
January 29 in Marco Island, Fla., during the
Institute’s Winter Planning Meeting. A
substantial portion of the day’s agenda was
devoted to the discussion and development
of a five-year strategic plan to cover the
period from 2014-2019. Although the plan
is a work in progress that will be finalized
over the next few months, board members
reached consensus on various initiatives.
In the area of fundraising, the Trust
board set an ambitious goal of raising a total
of at least $1 million by 2019. The efforts
will be intensified in several ways:
members will approach more industry
leaders; expand fundraising drives and
campaigns to Canadian companies; and
explore new fundraising vehicles such as
planned giving, annual appeals, matching
gifts and on-line donations.
The Trust will seek to grow programmatically by continuing to develop targeted
efforts such as the Women in Engineering
initiative. In addition, the Trust will explore
expanding its scholarship assistance
beyond schools of engineering, making
funding available to students pursuing
studies in other areas relevant to the deep
foundations industry.
Similarly, the Trust is considering
developing programs other than scholarships that will help young people enter
the deep foundations industry, by
exploring cooperative relationships with
technical schools and other organizations,
especially those devoting substantial efforts
to STEM (Science, Technology, Engineering and Mathematics) initiatives.
Finally, the Trust board, with the
consent of the DFI Board of Trustees,
amended the Trust’s governance documents to allow the addition of several AtLarge Trustees who will serve two-year
terms and complement the efforts of the
five regular members. The board will also
add two classes of non-voting Trustees:
Emeritus Trustees, composed of former
Trust board chairs; and Honorary Trustees,
composed of individuals who have in some

way performed outstanding
service to the Trust. The Trustees
are confident that this expansion
will solidify and enhance
fundraising efforts and development of the organization.
In addition, David Coleman
of Underpinning & Foundation
Skanska, was elected to a second fiveyear term as Trustee (2014-2019), and
Roger Healey of Goettle, was elected to
second two-year term as At-Large Trustee
(2014-2016).

Trust Board
Welcomes New
Treasurer
Dan Brown joined
the DFI Educational
Trust Board as treasurer effective January
Dan Brown,
Treasurer
1, 2014. Professor
Brown is also treasurer of DFI’s Board of
Trustees. He is one of America’s leading

David Coleman, Chair
[email protected]

authorities on the construction
and design of deep foundations
for transportation structures.
After 22 years on the faculty at Auburn
University, Brown remains active in
deep foundation practice through his
consulting firm, Dan Brown and
Associates. He is the recipient of the DFI
Distinguished Service Award, ASCE
Martin Kapp Foundation Engineering
Award and the ADSC Outstanding
Service Award.
The elected officers for the 2014 DFI
Educational Trust Board are:
Chairman: David Coleman
Vice Chairman: M. Byrl Williams
Treasurer: Dan Brown
Secretary: Dan Dragone

Upcoming DFI Trust Fundraising Events
April 29
Osterberg Memorial Lecture and
Dinner in conjunction with the
DFI/ADSC Drilled Shaft Seminar,
Greensboro, NC

July 21
The Annual Golf Outing Fundraiser
at Chartiers Country Club in
Pittsburgh, PA

August
The Ben C. Gerwick Award for
Innovation in the Design and
Construction of Marine
Foundations in conjunction with the
Marine Foundations Seminar
Tarrytown, NY

DFI Educational Trust and ACE
Mentor Program of NJ Annual Golf
Outing at Forsgate Country Club,
Monroe Township, NJ

October 23

Awards Reception/Dinner at DFI’s
39th Annual Conference on Deep
Foundations, Atlanta, GA

October 27

The Annual Golf Outing
Fundraiser at the Castlewood
Country Club, Pleasanton, CA

November

Annual Gala Fundraising Dinner
to benefit DFI Educational Trust
Stanley Merjan CCNY Civil
Engineering Scholarship, NY/NJ

Check for details at www.dfitrust.org
DEEP FOUNDATIONS • MAR/APR 2014 • 45

Heavy Civil and Geotechnical Contractors
724.443.1533 | www.brayman.com

46 • DEEP FOUNDATIONS • MAR/APR 2014

Micropiles • Caissons • Sheet Piling • Anchors/Tiebacks
Bridges & Complex Structures • Demolition

Colloidal Grout Plants

Threaded Micropile Pipe

Portable Cement Silos

Duplexes, Micropile Subs

Drill Tooling and Foundation Teeth

Subs, Adapters, and more

PennDrill Manufacturing is quickly becoming the industries “one stop shop” for all things foundations,
geotechnical, and grouting. Our goal is to provide you with high quality products and second to none customer support. We have two manufacturing facilities, with equipment capable of making your “napkin
ideas” a reality. Weather you’re looking to rent or buy equipment, in need of jobsite materials, or need
custom work, our knowledgeable team will get it done. Call today for sales, quotes, or service.

McKees Rocks, PA

Winchester, VA

Punxsatawny, PA

800-245-4420

866-459-5309

877-938-1250

DEEP FOUNDATIONS • MAR/APR 2014 • 47

Geo-Solutions
Soil and Groundwater Problems Solved

The Leaders in Soil Mixing for
Environmental Remediation
for 25 years.

In-Situ:
Chemical Oxidation
Chemical Reduction
Stabilization/Solidification
Zero Valent Iron/Clay Soil Mixing
Blending of a Wide Variety of Reagents

724-335-7273
www.geo-solutions.com
48 • DEEP FOUNDATIONS • MAR/APR 2014

MEMBER

PROFILE

Marine Lasne: Sustainability Crusader
As a young girl in a small town in Brittany,
France, Marine Lasne had some broad,
unfocused goals. For example, she wanted
to practice a profession that served the
public and also served nature, but didn’t
know how. At some point in her long and
thorough education, she realized that
engineers have the potential to change the
environment. Her idea of changing the
world became increasingly focused on
sustainability. “If more emphasis were
placed on the early phases of project
design,” she says, “we wouldn’t have to
spend so much energy to protect the
environment and to repair damage done in
the construction phase.”
Lasne has made extraordinary strides as
an individual engineer toward a sustainable
world. She developed a singular vision of
how the construction world could change,
and has made her mark globally. Her
current title is sustainability director, VINCI
Construction, Soletanche Freyssinet,
where she reaches over 19,000 employees
with her message. She also has been a major
figure in the development of the
Geotechnical Carbon Calculator, with DFI,
EFFC (European Federation of Foundation
Contractors) and other international
construction groups. This tool (see the
Sept/Oct 2013 issue of this magazine) puts
specifics to carbon effects in construction
and offers guidance to the
engineering profession.
Philippe Liausu, deputy
managing director, Menard,
and past president of the
SOFFONS (Syndicat des
Entrepreneurs de Sondages,
Forages et Fondations
Spéciales), worked with
Lasne for about six years on
sustainability issues and
developing the carbon
calculator. He thinks the
carbon calculator’s existence
is “strongly” due to her,
partly he suggests, because
“she has a great facility to
communicate.” Within the

company, Lasne shows “strong determination to increase awareness of sustainability
issues to all staff.”
Another executive describes Marine
Lasne’s impact on the mammoth company.
Bruno Dupety, executive vice presidentCOO, VINCI Construction, recounts how
Lasne joined the firm as a result of the
merger between Soletanche Bachy and
Freyssinet in 2009. Dupety had launched
the motto “Sustainable Technologies.” In
October of that year, Lasne made an
impressive presentation at the company’s
convention in Paris in which, he says, she
“set forth the strategy and tools to attain
sustainability, down to the details.” She is
“passionate, committed and convincing,”
says Dupety. “It wasn’t easy,” but people in
the company are now aware of
sustainability. For Lasne, she says that
presentation was a milestone of her
education and preparation—and her
realization that changing the way design is
done in the first place is one of the keys to
solving the problem.

Unusual Career Path
Lasne’s career path was unusual. She
received her (five year) civil engineering
graduate degree from the Institut National
de Sciences Appliquées in Lyon, during
which she applied to study one year at
Concordia University in
Canada. There she met
students from all over the
world, from many cultures,
and sought knowledge of
those other ways of life. She
realized she really enjoyed
interacting with people from
different countries and
learning how to work with
others. She also earned a
masters in environmental
management, a postdoctoral
diploma awarded by the
Ecole des Mines de Paris.
After that lengthy and
highly-academic preparation, Lasne worked 13

She is “passionate,
committed and

convincing ... It

wasn’t easy,” but
people in the

company are now
aware of

sustainability.

years in the field. Part of her experience was
in France, but major portions were at gas
and oil pipeline sites in various parts of the
world. Sometimes she and other engineers
lived in construction camps at the sites and
endured some stressful work situations.
“We worked for 10 weeks, then went home
for 2 weeks to recover, then began again,”
she says. However she mentions being able
to practice sports there with her coworkers,
which helped maintain a “normal” life.
Those sports included running, squash and
tennis, depending on where she was
including Yemen and South Africa. Lasne
seems to have flourished at her many
arduous overseas assignments.
A brief summary of her career shows
her growing responsibilities. Lasne was an
environmental engineer for AMEC-SpieBatignolles in France, during which time
she wrote her thesis, an environmental
impact assessment of the firm’s activities.
Next she worked for ANTEA Group, doing
geotechnical and natural risk assessments.
She particularly liked the ANTEA work on
former quarries, many of which had been
partially backfilled. The work required a lot
of research and investigation as well as
interaction with local citizenry, which made
a lot of sense to her, as the work contributed
to solving some of their problems. Next, she
returned to AMEC Spie-Batignolles, to
DEEP FOUNDATIONS • MAR/APR 2014 • 49

work on oil and gas pipelines in Georgia,
Azerbaijan and Turkey, as a site
environmental manager, coordinating
environmental operational activities and a
staff of 50. Her next job was also for AMEC,
a gas pipeline, where her title was project
environment and socio-economic manager,
here with a staff of about100 people.
Until 2009, Lasne was project environmental manager on a Spiecapag, a 700 km
(435 mi) multiproduct pipeline. Lasne was
based near Johannesburg, South Africa. In
many of these projects, she oversaw
compliance with national, ISO and World
Bank standards. At various points in her
career, she contributed to ISO operational
strategy, making recommendations.

Implementing Sustainability
Another colleague, Didier Verrouil,
executive vice president, Eurofrance, North
America, United Kingdom, Soletanche
Bachy, says Lasne likes interacting with her
colleagues and sharing ideas, points of view

50 • DEEP FOUNDATIONS • MAR/APR 2014

and information with them. She is also
“very comfortable” speaking in public,
conveying her knowledge to others. She
works to make things happen, believes in
what she does and is “very persevering,”
according to Verrouil.
Jérôme Stubler, president-CEO,
Soletanche Freyssinet, adds that Lasne “can
transform a complex subject to clear
guidance for our business. She delivers
pragmatic ways to improve our projects
and resolve the details.” Lasne also works
hard and provides leadership through her
enthusiasm. Summing her up, Stubler says,
“she is totally devoted to sustainability.”

Spreading the Word on Sustainability
Some of Lasne’s early goals, those involving
sports, were much more easily attained, or
so it seems. She was a competitive squash
and tennis player as a youth, and later
found ways to play tennis in Sana’a in
Yemen and to pursue long-distance
running in South Africa. It’s possible that

her sports activities contributed to her ease
and skill at interacting with people from
other cultures. Through DFI and other
construction organizations, Lasne has
spread the word about sustainability. She is
the chair of DFI’s Sustainability Committee
and a trustee on the DFI Board of Trustees.
Speaking about her own work, she says she
likes working as a problem solver, helping
corporations deal with complex situations
and getting systems up to speed. She
explores various ways to incorporate
sustainability into construction projects at
different stages of the work. She also enjoys
relating what she has learned from these
experiences to younger generations and
tries to lecture at universities when she can.
She also says in her field, “one needs to
expend a lot of energy even to accomplish
little.” Lasne accepts that and, fortunately,
has a lot of energy and the perseverance to
continue her sustainability crusade.
Virginia Fairweather

DRILLING FLUIDS I FIELD SERVICES I GROUTS & SEALANTS I POLYMERS & ADDITIVES I TRAINING

YOUR
DRILLING
PRODUCT
EXPERTS
800.527.9948 I cetco.com
DEEP FOUNDATIONS • MAR/APR 2014 • 51

Check out New Orleans’ newest piece of mind.
Made from Nucor recycled steel, our steel pile is driven deep into the Louisiana earth,
and supports this levee that helps protect millions of the most resilient people in America.
Each and every person committed to rebuild New Orleans stronger, safer, and even more prepared for the future.
So it can be filled back up with a sea of fun-loving people.
www.nucoryamato.com

It’s Our Nature.®
DEEP FOUNDATIONS • MAR/APR 2014 • 53

Drilling Attachments

and Limited Access

MONTROSE, COLORADO USA

DRILL
COMPONENTS
• Patented Drifters
• Rotary Heads
• Feed Systems
• Clamp/Breaker
• Shock Subs

DRILLING
ATTACHMENTS

LIMITED
ACCESS DRILLS

• Does not modify the
excavator

• Electric Drills for
micropiles

• Uses TEI’s patented
components

• Man-Portable to
Mini-Drills

TEI
Rock
Drills
| Montrose,
Colorado USA | +1 (970) 249-1515 | teirockdrills.com
54 • DEEP
FOUNDATIONS
• MAR/APR
2014

The term soil mixing commonly refers to
any process by which reagents (wet or dry)
are added to and mixed with unsuitable or
contaminated soils. Other terms such as
deep mixing method, shallow soil mixing,
deep soil mixing , cutter soil mixing and
trench cutting remixing deep wall are
commonly used by engineers and
contractors in the geotechnical industry to
refer to soil mixing or a particular type of
equipment. The purpose is similar: the
efficient creation of a soil-reagent
composite with improved properties
relative to the in-situ soils. Improvements
for contaminated soil mixing generally
include factors such as strength increase,
permeability reduction and contaminant
mobility reduction. Contaminated soil
mixing is commonly performed in-situ
using single axis large diameter auger
mixing with wet reagent addition. Large
diameter auger mixing in this application is
performed by pumping a liquid reagent
mixture down through a hollow drill stem
into a large auger (auger diameters in the
0.9 m to 3.7 m [3 ft to 12 ft] range) where
the fluid is allowed to exit the system via
ports on the back of the auger and is mixed
with the soils. The result is a soil column
evenly mixed or treated with the reagent.
Subsequent columns are installed in an
overlapping pattern to confirm 100%
coverage of the target treatment area. In the
geoenvironmental industry, the terms used
to describe the application of soil mixing to
the stabilization/solidification and
treatment of contaminated soils are in-situ
stabilization/solidification (ISS) and in-situ
(chemical) treatment (IST).

Contaminated Soil Mixing History
The Nov/Dec 2013 Deep Foundations
magazine included a brief overall history of
deep mixing methods focused on soil
mixing to solve geotechnical problems. Soil
mixing of contaminated soils originated in
the United States in 1988 when Geo-Con
installed the first non-structural DSM
containment wall to isolate PCBcontaminated soils and groundwater from
a nearby river. The firm installed the wall
using the first U.S. manufactured multiauger soil mixing drill. In the same year,

AUTHORS

Soil Mixing in
Contaminated Soils

FEATURE ARTICLE
Soil mixing at an MGP site in northern N.Y.

part of the U.S. EPA’s Superfund Innovative
Technology Evaluation Program, Geo-Con
also performed an ISS pilot project at a
Florida Superfund site. This was the first
U.S. EPA-led project using this technology.
In 1990, the first large scale ISS project
used single auger soil mixing equipment at
a contaminated site in Texas. By 1991,
stabilization/solidification (S/S) was the
recommended treatment technology for
over a quarter of the U.S. EPA’s national
priority sites, primarily using ex-situ
techniques. After the initial applications
succeeded, development and use of the insitu S/S technology (ISS) was fueled by its
advantages over alternative remediation
options including eliminating the need for
excavation support, dewatering (including
the need for treatment of contaminated
dewatering waters) and double handling of
contaminated soils.

The ability to economically treat large
volumes of soil made large diameter (2.4 m
to 3.0 m [7.8 ft to 9.8 ft]) single auger soil
mixing equipment the equipment of choice
for ISS applications in the U.S. High profile
government-led efforts to clean-up projects
further developed the technology. These
included the Department of Energy-led
project in Piketon, Ohio (1990s), where a
combination of SSM and thermally
enhanced vapor extraction was used to treat
trichloroethylene (TCE) contaminated
soils, and the Geiger Oil Superfund Site
where ISS and IST were used to remediate
c h ro m i u m , l e a d , P C B a n d V O C
contaminated soils near Charleston, S.C.
in1994. The technology had a great impact
on the former manufactured gas plant
(MGP) industry. From the late 1800s
through the early 1900s manufactured gas
(produced from the gasification of coal) was

Ken Andromalos, P.E., vice president, and Daniel Ruffing, EIT, project manager, Geo-Solutions

DEEP FOUNDATIONS • MAR/APR 2014 • 55

Conceptual stabilized monolith’s
impact on groundwater flow

the source of light and heat for most major
cities. The process of creating manufactured gas created a significant amount of
wastes, the most prevalent of which were
coal tars. Despite efforts to containerize the
coal tar in subsurface holding tanks, pure
product and by-products (benzene,
toluene, ethylbenzene, xylene, among
others) migrated into the soils and
groundwater beneath and surrounding
MGPs. Some sources state that at one point
in the U.S. over 50,000 MGPs were
operating. Tens of thousands of these sites
still have heavily impacted subsurfaces. The
ISS technology using soil mixing has
proven to be one of the most cost-effective
and technically sound means of addressing
these sites. The Electric Power Research
Institute (EPRI), Georgia Power and other
utility owners have helped advance the
technology through paid research and by
specifying ISS for some of their MGP
projects. The major projects that helped
reinforce ISS for use on MGP sites include
the use of soil mixing for the S/S of coal tar
impacted soils on former MGP sites in
Columbus, Ga., in 1992, and Cambridge,
Mass., in 2001. Today, many major electric
utilities have programs to remediate their
MGP sites using the soil mixing technology.

Containment Walls
Soil mixed walls to contain contaminated
soil and prevent lateral migration of
contaminated groundwater are installed
using the same equipment and techniques
that are used in geotechnical applications.
However, these walls are installed to be
non-structural by design. Instead of
56 • DEEP FOUNDATIONS • MAR/APR 2014

strength improvement, the primary design
parameter is horizontal permeability
reduction. These walls are preferred over
other more conventional, and often less
expensive, cutoff wall types (e.g., slurry
trench cutoff walls) where there is an
elevated safety risk from exposure to
harmful constituents. Examples of early
applications of cutoff walls include two
projects involving the containment of
chemical warfare material with the
included risk of encountering unexploded
ordnances at a former U.S. Army facility in
1999. A more recent application involved
installing a DSM wall at a DOE facility to
contain tritium contamination in 2011.
In-situ solidification/stabilization (ISS)
refers to processes that utilize a binding
agent to manipulate the physical properties
of contaminated soils in place. In most
cases, ISS leaves the contaminants
chemically unaltered, but their impact on
the surrounding subsurface is greatly
reduced. ISS is the most common form of
soil mixing used for contaminated soil
remediation and Portland cement is by far
the most common binding reagent used.
Other common reagents include blast
furnace slag, fly ash, activated carbon,
bentonite clay and organophilic clay. Many
of these reagents are used in combination
with Portland cement to achieve property
improvements that would not be possible
if Portland cement were used alone. The
most common improvement objectives for
ISS projects are permeability reduction and
strength increase, but contaminant
mobility reduction objectives are
becoming more common.

Large diameter soil mixing augers

In terms of volume mixed, the most
common application of ISS for
contaminated soil remediation is for the
remediation of DNAPL (dense nonaqueous phase liquids, those denser than
water) impacted soils resulting from former
manufactured gas plant (MGP) or wood
treating operations. ISS has found widescale use in these applications because
other remediation alternatives are limited
by the properties of the coal tar and
creosote byproducts found on these sites,
both of which are viscous DNAPL materials
at the temperature ranges found in the
subsurface. Excavation and disposal can be

a competitive alternative to ISS for the
remediation of these sites in terms of cost
and treatment efficacy, but excavation and
disposal cause greater impact to the
surrounding community in nuisance
odors, public health concerns and
increased truck traffic than ISS. MGPs are
commonly located in heavily traveled
former industrial or commercial centers
that have since been converted into mixedu s e r e s i d e n t i a l a n d c o m m e rc i a l
neighborhoods that are sensitive to the
impacts caused by excavation and disposal
operations. ISS has become an accepted
alternative for MGP and wood treating site
remediation, and in many cases, the
preferred alternative.
In 2012, ISS was used to remediate MGP
impacted soils in Sacramento, Calif. On this
project, ISS with Portland cement and
granular regenerated activated carbon was
used to S/S 31,000 m3 (41,000 cu yds) of
coal tar impacted soils down to a maximum

depth of 12 m (40 ft) below ground surface.
This was the first documented use of ISS for
an MGP site remediation in California.
Another recent use of ISS was for the S/S of
wood treating impacted soils in
Portsmouth, Va. On this project, ISS with
Portland cement and organophillic clay was
used to S/S 36,000 m3 (47,000 cu yds) of
creosote impacted soils to depths ranging
from 2.4 to 8.2 m (8 to 27 ft). This work was
overseen by the Norfolk District of the U.S.
Army Corps of Engineers.

In-situ Treatment
In-situ treatment (IST) refers to processes
that use reagents to purposely alter harmful
contaminants in place. In some cases, IST
converts contaminants into inert
compounds, and in other cases into less
harmful compounds. IST is generally
performed using one of two chemical
processes, chemical oxidation or chemical
reduction, referred to as in-situ chemical

oxidation (ISCO) and in-situ chemical
reduction (ISCR). Treatment objectives
vary widely, ranging from contaminant
mass reduction to complete contaminant
mass destruction. Common reagents
include zero valent iron (ZVI), potassium
permanganate, sodium persulfate, ferrous
sulfate, calcium polysulfide, biological
nutrients and hot air. Commonly, other
reagents are injected with the main reagent
to catalyze the chemical reaction. These
other catalyzing reagents include lime,
soda ash, quick lime and phosphoric acid.
The widest application of IST to contaminated soil remediation has been in the
use of ZVI and bentonite clay added to
remediate chlorinated solvent impacted
soil. The concept of using ZVI delivered in a
bentonite slurry via soil mixing was
developed and patented by DuPont in the
early 90s. DuPont has since donated the
patent and royalty rights to Colorado State
University. In the authors’ experience, the

Soil mixing with potassium permanganate

DEEP FOUNDATIONS • MAR/APR 2014 • 57

application of the ZVI/clay technology to
solve environmental remediation problems
has seen significant increase over the last half
decade, after a relatively quiet period since
the initial applications in the early to mid-90s.
The ZVI/clay soil mixing technology
was used in 2011 to treat a TCE impacted
source zone on the OMC Superfund Site in
Waukegan, Ill. On the Waukegan project,
the ZVI was delivered and mixed with the
soils using a large diameter soil mixing rig
in a mixture with bentonite and water. On
that project, approximately 6,500 m3
(8,500 cu yds) of impacted soils were
treated down to a maximum depth of 7.2 m
(24 ft) BGS. Additionally, ISCR with the
ZVI/clay technology was used in 2012 to
treat PCE impacted soils at a former
wastewater lagoon that contained wastes
from a former industrial dry cleaning
facility in Alberta, Canada. The Alberta
project included soil mixing 7,500 m3
(9,800 cu yds) down to a maximum depth
of 8 m (26 ft).
Less common uses of IST include
oxidizing chlorinated solvents and other
volatile contaminants through adding
oxidants with or without catalysts. ISCO
performed with soil mixing has grown
rapidly over the last half decade as
engineers and owners have adapted the
technology to solve problematic sites. Soil
mixing offers numerous benefits over other
methods of performing IST, including the
potential for a reduced construction
schedule, a reduced cost, a reduced carbon
footprint, and improved contact between
the reagent and contaminated media in a
low permeability or fractured subsurface.
IST was used in combination in 2010
with ISS for the ISCO and S/S of 5,700 m3
(7,500 cu yds) of TCE impacted soils down
to a maximum depth of 5.8 m (19 ft) in East
Rutherford, N.J. Potassium permanganate
was used as the oxidant on that project. On
another project, in Robbinsville, N.J., in
2011, a base-catalyzed sodium persulfate
treatment was used on xylene and pesticide
impacted soils. The soil mixing in Robbinsville included treating 2,100 m3 (2,800 cu
yds) down to 4.6 m (15 ft) BGS. ISCO was
also used in Norwich, N.Y. (2012) in
combination with hot air stripping to treat
acetone impacted soils. The treatment
reagent used in Norwich, N.Y. was calcium
58 • DEEP FOUNDATIONS • MAR/APR 2014

Close-up of soils mixed with potassium permanganate

peroxide mixed with the soils, down to a
maximum depth of 8.2 m (27 ft), in
conjunction with fertilizer nutrients and
phosphoric acid. Prior to the treatment

“polishing step,” designed to enhance long
term biodegradation, a significant amount
of the acetone was stripped from the soils
using hot air soil mixing.

Potential Future Trends and Conclusions
• Increased scrutiny of sustainability related metrics in remedial method evaluation.
• A shift from S/S to treatment as regulators target gross concentration reduction rather
than impact reduction.
• Increased application of ISS to the in-place remediation of saturated sediments. (See
recent EPRI research, including information on the recent pilot study completed in
Springfield, Mass., in 2013).
• Increased viability of ISS to more sites as more applicable leaching/diffusion tests are
accepted. See the new EPA LEAF tests (methods 1313 – 1316) and the ITRC guidance
document (2011).
• Increased application of jet grouting to environmental remediation projects.
• An increase in novel reagent combinations that will further expand the use of soil
mixing to remediate historically difficult contaminants.
• Additional equipment modification and development, including improved batch
plants, drill rigs and quality control that will make soil mixing more cost effective.
The current practices in the soil mixing of contaminated soils were developed over 30
plus years. The technology has been used to stabilize, treat and contain contaminated soils.
The geoenvironmental industry has embraced this technology, particularly over the last 5
to 10 years, and should continue to support soil mixing for contaminated soil remediation.
Better overall understanding of this technology by designers, acceptance of this technology
by environmental regulators, the use of more realistic contaminant leaching methods, and
the further refinement of equipment, technique, and quality control procedures will help
further the growth of this technology.

Manufacturer of Quality Concrete Accessories

Your solution
to rebar
cage alignment
.

INTEGRATED SYSTEMS FOR EVERY JOB!

Quick - Lock

Bar Booster

TM
TM

Quick-Lock™ pier wheels are made of durable, noncorrosive
plastic. One model fits numbers 3 through 5 rebar ties and two
models fit 3 through 7 rebar ties. Quick - Lock™ wheels of various
sizes handle concrete cover of 2" to 4". They are also perfect for a
variety of other applications where concrete cover must be
maintained.
Bar Boosters™ and Quick-Lock™ pier wheels are the
economical solution for support and alignment of reinforcing steel
cages. Bar Boosters™ are made of durable, noncorrosive plastic
and attach to rebar of any size. Bar Boosters™ handle concrete
cover of 3". They are also great for supporting reinforcing steel over
waterproofing, in mat foundations and providing vertical support of
slurry wall mats.

Quick-Lock HD™ installation is a simple process, and is designed
to properly position a reinforcing steel cage in a drilled shaft.
Quick-Lock HD™ pier wheels are made of durable, noncorrosive
plastic and fit numbers 3 through 7 rebar ties and handle 2" to 6" of
concrete cover. They are also perfect for a variety of other
applications where concrete cover must be maintained.

Quick - Lock HD™

Pier Boot ™

Pier Boots™ and Quick-Lock HD Heavy Duty Pier Wheels™ are
your heavy duty solutions to rebar cage alignment. Pier Boots™ are
made of durable, noncorrosive plastic and attach to rebar sizes #6
thru #14. Pier Boots™ handle 3" of concrete cover. They are also
great for supporting reinforcing steel over waterproofing, in mat
foundations and providing vertical support of slurry walls.

Centraligner™ Pier Sled and Hijacker™ Pier Bolster
From PIERESEARCH comes the top of the line solution to cage-positioning problems
consisting of two 7,500 psi high-strength grout devices, the Centraligner™ Pier Sled
and Hijacker™ Pier Bolster.
Centraligner™ Pier Sled contains a notch for the spiral or circle tie and has four sets
of integral, embedded 16 gauge galvanized wires for ease of installation.
Centraligner™ Pier Sleds handle 2" to 9" of concrete cover. The sled's shape
prevents the cage from hanging on the casing and it doesn't protrude into the interior
of the cage so interference with the tremie is not a concern.
The Hijacker™ Pier Bolster is disk-like in shape and contains 12 gauge galvanized
looped tie wires for installation. The high-strength grout supports the weight of the
cage and will not shatter should the cage strike the casing or some other object. The
Hijacker™ Pier Bolster can handle 3" or 6" concrete cover. Because the sled and the
bolster are tied to the cage, the possibility of them becoming detached is eliminated.

“Helping To Build A Better Foundation For America!”©
Visit our website for information on our Concrete Wheels and Concrete Slurry Wall Sleds!

For more information about these and other products or a FREE SPEC KIT, visit us at

www.pieresearch.com or call 800. 342.2409

DEEP FOUNDATIONS • MAR/APR 2014 • 59

BUILDING
A POSITIVE
FUTURE
TOGETHER

AUTHORIZED DEALER:

Equipment Corporation of America (ECA) was founded in 1918 as a provider of construction,
industrial and material handling equipment. Today, ECA focuses primarily on the Foundation
Industry and is a premier distributor of Drilling Equipment for Large Diameter Drilled
Shafts, Small Diameter Drills for Earth Retention, Dedicated Piling Rigs and Pile Driving
Equipment and Accessories. We offer a full array of new equipment manufactured by the
Bauer Machine Group and Affiliated companies, supports a large and diverse rental fleet, and
provides parts and service from their five locations. Just as in 1918, ECA is the premier provider
of reliable and innovative products, services and solutions to the construction industry.
PROVEN EXPERTISE

SERVICE S & TE CHNOLOGIE S

ECA is consistently represented on nearly
every major and high profile project across the
U.S and Canada, and in a variety of capacities.
Our success stems from the diversity of our
product lines, our best-in-class service and our
specialized knowledge to adapt equipment to a
variety of projects.

➭ New and Used Equipment Sales and Rentals
➭ Large Diameter Drill Rigs
➭ Soil Mixing@ Slurry Wall Equipment
➭ Earth Retention & Micropile Drills
➭ Fixed & Telescopic Mast Mobile Piling Rigs
➭ Pile Driving Equipment
- Diesel
- Air
- Hydraulic Impact
- Free Hanging Vibratory Hammers
- Excavator Mounted Vibratory Hammers
➭ Drilling Tools and Accessories
➭ Overburden Drilling Systems
➭ Sectional Casing Systems
➭ Equipment Service and Rebuilding
➭ Welding & Fabricating
➭ Field Service Fleet
➭ Parts, Accessories, Replacement Drill Teeth

This knowledge and demonstrated success has
placed our employees and equipment in crucial
roles when and where they are needed the most.
Like the widening projects on the Pennsylvania
and New Jersey Turnpikes, Ground Zero,
levee restoration in the Gulf after Hurricane
Katrina, and the post-collapse replacement of
the Mississippi River Bridge in Minneapolis.
Stadiums? We have had our equipment on
basically every major stadium built east of the
Mississippi. Environmentally sensitive projects?
We have solved customer problems where local
emission standards have exceeded Federal EPA
standards or where the use of biodegradable and
synthetic oils are required.

Find out how we can build a foundation together. 1.800.PILE-USA -or- www.ecanet.com

EQUIPMENT CORPORATION OF AMERICA

B U I L D I N G F O U N DATI O N S S I N C E 1 91 8

PITTSBURGH
PO Box 306
Coraopolis, PA 15108
P 412.264.4480
F 412.264.1158

PHILADELPHIA
PO Box 837
Aldan, PA 19018
P 610.626.2200
F 610.626.2245

WASHINGTON, D.C.
6300 Foxley Road
Upper Marlboro, MD 20772
P 301.599.1300
F 301.599.1597

TORONTO
166 Bentworth Ave
Toronto, Ontario M6A 1P7
P 416.787.4259
F 416.787.4362

®

62 • DEEP FOUNDATIONS • MAR/APR 2014

Mill Creek landslide project site
(Photo courtesy of Glenn O. Hawbaker, Inc.)

FEATURE

ARTICLE

Stabilizing the Mill Creek Landslide With Steel H-piles
The Mill Creek landslide occurred along the
lower portion of the southbound embankment of State Route 15 adjacent to the Tioga
Reservoir in north central Pennsylvania.
Engineers from the Pennsylvania Department of Transportation (PennDOT)
observed a scarp following heavy rains and
snow melt in spring 2011. Although they
saw no damage to the highway, its close
proximity to the road posed a concern for
the long-term stability.
Gannett Fleming evaluated several
alternatives to stabilize the slope and, with
concurrence from PennDOT, selected
driven steel H-piles based on construction
costs and site impacts. The chosen design
minimized land disturbance by using an
existing, inactive roadbed along the toe of
the embankment for the footprint of the
piles. This design avoided wetlands,

AUTHORS

habitat for the timber rattlesnake and an
area of archaeological interest. Furthermore, it minimized impacts to reservoir
storage capacity and slope restoration due
to fill placement.

The program included:
• Seventeen borings aligned along two
cross-sections
• Two open standpipes and four vibrating
wire piezometers

Site Conditions

• Ten inclinometers

The landslide extended approximately
600 ft (183 m) along the length of highway
and spanned an average distance of about
300 ft (91 m) from the scarp toward the
reservoir. Instability occurred in the
portion of the highway embankment that
had been constructed at a slope angle of
1.75H:1V. Field reconnaissance was performed to identify landslide features, and
an exploration/instrumentation program
was conducted in summer 2011 to
investigate subsurface conditions and
identify the location of the failure plane.

• Two geophysical lines in the toe region
• Laboratory testing
Soils within the embankment footprint were
typically medium to very dense, granular
materials. In the toe area, the subsurface
profile consisted of a surficial granular layer
overlying glacial lake sediments, which
were underlain by glacial outwash, till and
eventually bedrock. Two natural conditions
in the toe region contributed to slope
instability: 1) artesian pressures up to 5 ft
(1.5 m) above ground surface carried in the

Kessi E. Zicko, P.E., and Paul J. Lewis, P.E., Gannett Fleming, Inc. and
Robert E. Johnson, P.E., Pennsylvania Department of Transportation

DEEP FOUNDATIONS • MAR/APR 2014 • 63

Figure 1. Subsurface profile along the critical cross-section at Station 1303+00

glacial outwash and 2) a zone of very soft
glacial lake sediment. Figure 1 shows the
critical cross-section for analysis.
To estimate the extent of the very soft
glacial lake sediment, we conducted a
geophysical survey using the Multichannel
Analysis of Surface Waves (MASW)
technique, which measures the elastic
condition (stiffness) of the ground. The
results of the survey are shown in Figure 2.
Laboratory testing indicated that the
glacial lake deposits classified as silt (ML)
and frequently had natural moisture
contents greater than their liquid limits.
Based on direct shear and consolidatedundrained triaxial shear strength tests, the
angles of internal friction for the silt layer
were 25º (peak) and 16.4º (residual).
Engineers have monitored the
piezometers and inclinometers since their
installation. The four inclinometers along
the S.R. 15 roadway above the head scarp
have shown no slope movement. The six
inclinometers located on the embankment
below the scarp and within the toe area
have indicated slope deformations up to
1.3 in (3.3 cm). In conjunction with the
field identified scarp and toe bulge, the
measured depths of movement in the
inclinometers provided an estimate of the
location of the failure surface. As shown in
Figure 1, the failure surface was wedge
shaped and followed near the bottom of the
lake deposits.
64 • DEEP FOUNDATIONS • MAR/APR 2014

Figure 2. Geophysical MASW subsurface profile along Old S.R. 15 at toe of embankment

Slope Stability Analyses
The project team performed slope stability
analyses initially to evaluate the deformed
slope condition and to calibrate the selection of soil parameters. The model included
a band of residual strengths along the existing failure plane to represent the weaker
shear strength of soils that had experienced
deformation. Maintaining the laboratory
test values for the silt layer, back analyses
were then conducted to adjust parameters
of other soil strata until the model was
calibrated to a factor of safety of 1.0.
The engineers subsequently added
vertical structural elements (i.e., piles) to
the calibrated model and applied different
lateral pile resistances at the failure plane to
achieve a target factor of safety of 1.3. The

geometry of the failure plane was favorable
to inserting one row of piles spaced 1 ft
(0.3 m) center-to-center along the embankment length near the toe of slope. This
spacing allowed the pile load to be evaluated on a per unit length basis and then
distributed onto individual piles based on
spacing and number of rows of piles.
Required lateral pile loads of 50 and
75 kips per ft (kpf) (729 and 1094 kN/m) of
embankment length were calculated at two
representative sections.

Limit Equilibrium and LRFD
An important consideration during design
was the relationship between the required
lateral load from the slope stability based
on limit equilibrium analyses and design of

the pile based on load and resistance factor
design (LRFD). We considered pile loads
that resulted in a factor of safety of 1.3 to be
factored loads for the strength limit state.
Computer analyses, therefore, were used to
evaluate the structural pile integrity
(moment and shear criteria) under the
strength limit state.
We considered a factor of safety of 1.0
for slope stability to correspond to the
service limit state, and design guidelines
indicate that the deflection of piles should
be evaluated under this case. Because the
slope stability model was calibrated to 1.0
without piles, deflection under the service
limit state was not evaluated.

Soil Resistance

Lateral Load Distribution

Results

The point loads from the slope stability
analyses were triangularly distributed along
the length of the H-piles starting at zero at
the ground surface and increasing to the
intersection of the failure plane (Figure 3).
Engineers determined distribution of the
lateral load on an individual pile by the
following equation and as shown in Table 1:
Fh (s/r) = ½ l (Ph)

For the selected HP 12x53 pile, the
factored moment and shear resistances and
the results of the computer analyses appear
in Table 2. For the triangularly distributed
lateral load applied to the piles, the
controlling design criterion was moment,
not shear. Although we did not evaluate
deflection under the service limit state, the
maximum pile deflection was 3.4 in (9 cm)
under the strength limit state. The pile
length required to extend below the failure
plane was conservatively selected as 10 ft
(3.0 m) although lesser depths satisfied pile
tip fixity requirements.
The MASW survey provided a
continuous subsurface profile for estimation of the minimum embedment depths
required for lateral pile stability (Figure 2).
The engineers aligned the piles along seven
straight-lined chords over a distance
of 780 ft (238 m) along Old S.R. 15.
We specified test piles to be
driven for verification of the design
lengths before procurement of the
project’s entire 462 piles. The test
piles were 10 ft (3.0 m) longer than
the estimated lengths of the stabilization piles to help ensure penetration
into the competent soil stratum. The
test piles were not load tested, but a
pile driving analyzer was used to
monitor driving stresses in the piles.

Where:
Fh = lateral load per unit length of embankment required by slope stability analysis
s = center-to-center pile spacing
r = number of rows of piles
l = distance from ground surface to failure
plane

The lateral resistance of soil is dependent
Ph = distributed lateral load at the failure
upon soil conditions and pile configuraplane for use in lateral pile analyses
tions, and is represented in computer
models using soil response (p-y)
curves. To account for the installation
of the piles within an active landslide,
the engineers reduced the lateral soil
resistance above the failure plane by
applying a p-multiplier of 0.231 in
the analyses. This p-multiplier was a
function of the factor of safety for
slope stability of the soil mass
downslope of the piles, pile spacing
and pile diameter. Soils below the
failure plane were assumed to
provide full lateral resistance.
Figure 3. Distribution of lateral load on a pile

Pile Properties
The engineers conducted lateral pile
analyses using numerous pile configurations, center-to-center spacings, and
sizes to determine the most economical
design. Steel HP12X53 piles driven at 6 ft
(1.8 m) centers and in three to four rows,
depending on location along the slide area,
were the most cost-effective option.
Engineers modeled corrosion by reducing all pile surfaces by 1/16 in (1.6 mm)
and then basing the width, area and
moment of inertia on the reduced pile sections. The top of the piles behaved in a free
head condition in the lateral pile analyses.

Variable

Station 1300+00

Station 1303+00

Fh

50 kips/ft

729 kN/m

75 kips/ft

1,094 kN/m

s

6 ft

1.8 m

6 ft

1.8 m

r

3 rows

3 rows

4 rows

4 rows

l

25 ft

7.6 m

35 ft

10.7 m

667 lbs/in

1,168 N/cm

536 lbs/in

939 N/cm

Calculated Ph

Table 1. Distribution of lateral loads for pile design

Variable

Station 1300+00

Station 1303+00

MMAX

696 kip·in

79 kN·m

1,744 kip·in

197 kN·m

VMAX

-10 kips

-44 kN

41 kips

182 kN

Table 2. Results of pile analyses for strength limit state

MR = Resisting moment of pile = 1,983 kip·in (224 kN·m)
MMAX = Maximum applied moment in pile
VR = Resisting shear force of pile = 98 kips (436 kN)
VMAX = Maximum applied shear load on pile
DEEP FOUNDATIONS • MAR/APR 2014 • 65

The results of the test pile program are
shown in Figure 2. Pile driving blow counts
were generally less than 10 blows per ft (33
blows per meter) as the pile advanced
through surficial soils and glacial lake deposits.
Blow counts increased as underlying soils
improved, and the estimated blow count
indicating competent material was 20 bpf
(66 bpm). The pile driving analyzer (PDA)
results showed similar trends in resistance.
An aerial view of the pile driving program is
shown at right.
The engineers specified that the piles be
driven their full lengths, or to refusal, and
adjusted the final pile layout based on the
test piles and results of production driving.
The pile lengths at the southern chord of
the project site were increased from 35 to
40 ft (10.7 to 12.2 m) as a result of the test
piles. During production driving in two
small areas, the pile driving records
indicated that competent soil was deeper
than anticipated, so we added 10 piles,
each 60 ft (18.3 m) long. Overall, this was
only a 3% increase for a project with
22,325 lineal ft (6,805 m) of piles.

66 • DEEP FOUNDATIONS • MAR/APR 2014

Pile driving along Old S.R. 15 at the embankment toe
(Photo courtesy of Glenn O. Hawbaker, Inc.)

Summary
Engineers designed steel piles to stabilize a
highway embankment slope in northern
Pennsylvania. They conducted slope stability
modeling to determine the lateral pile load
required to obtain a factor of safety of 1.3,
which was triangularly distributed from the
top of the piles to the failure plane for the
LRFD lateral pile design. To account for
installing piles within a landslide, the lateral

soil resistance for soils above the failure
plane was reduced using a p-multiplier.
Based on lateral pile analyses and cost, the
design called for Grade 50 HP12x53 steel
piles to be driven at 6 ft (1.8 m) centers and
in three and four rows. A geophysical survey
provided a continuous subsurface profile
that was successfully used to estimate pile
lengths over a distance of approximately 780 ft
(238 m) along the toe of the embankment.

THE DRILLING REVOLUTION IS HERE

Giuseppe Cartechini

800.348.189 0

H M C- U S .COM

You’ll never look at your current foundation drilling equipment the same way again. Hercules has partnered
with the preeminent drill designer in the world and owner of HPM, Giuseppe Cartechini, to bring the most
robust, highest quality foundation drills in the world to North America. Designed using high-strength
materials, HPM foundation drills provide excellent stability without the need for a large base. That means
you get a high-performing, robust machine at a good value.
Hercules is the exclusive HPM drill dealer in North America. Call us today to find out how you can
pre-order an HPM foundation drill.

HPM
SRL

HYDRAULIC PERFORMANCE MACHINES

DEEP FOUNDATIONS • MAR/APR 2014 • 67

WORLD LEADERS IN DEEP FOUNDATION TESTING

Rosario-Victoria Bridge
Rosario, Argentina

Rajiv Gandhi Sea Link
Mumbai, India

Venetian Causeway Bridge
Miami, Florida

Carquinez Bridge
Contra Costa County, California

TM

LOADTEST
Dubai, UAE
Singapore
London, UK
Gainesville, Florida
800.368.1138
[email protected]
www.loadtest.com

68 • DEEP FOUNDATIONS • MAR/APR 2014

Loadtest is dedicated to advancing state-of-the-art deep foundation load testing. Founded in 1991,
Loadtest specializes in bi-directional deep foundation load testing using the award winning Osterberg
Cell®. Through research and hard work, Loadtest has redefined the art of load testing.

KIEWIT FOUNDATIONS GROUP
Keeping safety in the forefront, Kiewit Foundations Group performs complex geotechnical projects
across North America. We deliver innovative and cost-effective solutions tailored to the specific needs
of each project. Our range of services include:





Diaphragm Walls
Slurry Cutoff Walls
Ground Improvements
Drilled Shafts

Kiewit Infrastructure Co.
302 South 36th Street, Suite 400
Omaha, NE 68131
(201) 571-2502

KIEWIT.COM/FOUNDATIONS

TECHNICAL ACTIVITIES
TECHNICAL ACTIVITIES MANAGER MARY ELLEN BRUCE

Technical Activities Update
Committee Webpages

Committee Liaisons

Details on committee projects, members
and publications are available through the
enhanced Technical Committee webpages
on the DFI website at www.dfi.org. Please
see the Groups tab to navigate to pages
dedicated to the activities of each of DFI’s
technical committees, regional chapters,
conference organizing committee,
operational committees, younger members
council and student chapters. All technical
committee pages contain the most recent
chairman’s report; a roster of committee
members with names, companies and
contact information; recent news; related
publications; other important news; and
instructions for joining committees. Please
visit these pages frequently as we update
information often.

The beginning of the year is always filled
with conferences and planning meetings for
the geotechnical community. For example,
the Transportation Research Board conference (Washington, D.C.), ADSC’s (The
International Association of Foundation
Drilling) Annual Meeting (Coronado,
Calif.), DFI’s Workshop on Levee and
Coastal Rehabilitation (Miami, Fla.) and the
GeoInstitute’s GeoCongress (Atlanta, Ga.)
in February, were opportunities to be involved
in the active foundation community.
DFI’s members are involved in many
other organizations. Knowledge and
experience of members involved in other
groups can enhance DFI’s understanding of
relevant issues and changes in the industry
that affect the foundation market and
practices. DFI works closely with the
technical committees of ADSC (Anchored

New Landslide Chair, Professor
Vern Schaefer
We are grateful for the
continued commitment
of Technical Committee chairs and vice
chairs. Professor Vern
Schaefer of Iowa State
University has accepted
the position of chair of
DFI’s Committee on Deep Foundations for
Landslides and Slope Stabilization.
Schaefer is currently on sabbatical with the
FHWA (Federal Highway Administration)
in Washington D.C., and he led the research
team preparing the www.GeoTechTools.org
system as part of the Strategic Highway
Research Program (SHRP 2).
We thank the outgoing and inaugural
chair, Professor Erik Loehr of University of
Missouri-Columbia, who did a great job
fostering this new committee and initiating
its success. We are delighted that Loehr continues his involvement with DFI by accepting a position on the Board of Trustees.

Earth Retention, Drilled Shafts and the
joint ADSC-DFI Micropile Committees),
and we have a good understanding of
mutual interests and benefits of
membership. We welcome members of
relevant technical committees in other
organizations, e.g., AASHTO (American
Association of State Highway and
Transportation Officials), ACI (American
Concrete Institute), ASTM (American
Society for Testing and Materials),
GeoInstitute, USSD (U.S. Society on
Dams), and ASDSO (Association of State
Dam Safety Officials), to share their
experiences by joining a technical
committee and serving as a liaison. The
goal of having liaisons is to improve
communication between committees for
our mutual benefit. If you have interest in a
liaison position, please contact Mary Ellen
Bruce at [email protected].

COMMITTEE CHAIR MIKE MORAN

Augered Cast-in-Place Pile Committee
The ACIP Pile Committee was active in
2013, and has planned several activities
through 2014. Our committee last met at
SuperPile 2013 in Minneapolis, Minn., in
May and also at the DFI Annual Conference
in Phoenix, Ariz., in September. The
meetings were well attended and provided a good opportunity for members to
stay current with our many ongoing committee activities.
The committee organized a seminar in
November 2013 in New York City on the
design, installation methods and quality
control of ACIP piles and drilled
displacement (DD) piles. The seminar
comprised a morning short course and an
afternoon of case histories involving ACIP
and DD piles. The seminar closed with a
panel discussion on the use of compressed

air during augering
and the pros and cons
of hydraulic fixed
mast installation platforms versus crane
attached augering rigs.
The following committee members made
this seminar a success:
• Matthew Meyer, Langan Engineering
and Environmental Services, and past
committee chair, spoke about the
evolution of the state of practice due to
technological advancements and availability of design and installation
guidance. He also discussed best
practices for quality control and construction, and automated monitoring
equipment and testing methods.

DEEP FOUNDATIONS • MAR/APR 2014 • 71

DFI Technical
Committee Chairs
Augered Cast-in-Place Pile
Mike Moran, Cajun Deep Foundations, LLC
[email protected]

Codes and Standards
Thomas Gurtowski, Shannon & Wilson, Inc.
[email protected]

Deep Foundations for
Landslides/Slope Stabilization
Prof. Vern Shaefer, Iowa State University
[email protected]

Drilled Shafts
Paul Axtell, Dan Brown and Associates
[email protected]

Driven Pile
Andrew Verity, Gerdau
[email protected]

Ground Improvement
Marty Taube, Menard
[email protected]

• Andres Baquerizo, HJ Foundation,
covered equipment, materials and techniques used to construct and assure the
quality of ACIP and DD piles. He also
addressed the effects of construction
installation on foundation performance.
• Morgan NeSmith, Berkel & Company
Contractors, presented commonly
referenced design methods and
comments on these methods based on
his experience with load test results vs.
predicted performance.
• Bernie Hertlein, GEI Consultants, Inc.,
introduced current commercially
available non-destructive test (NDT)
methods for deep foundations and
reviewed their operating principles,
and their various capabilities and
limitations for ACIP and DD piles.
• Case histories were provided by NeSmith
and Satyajit Vaidya, Langan Engineering and Environmental Services.

Seismic and Lateral Loads

The committee is updating the Augered
Cast-In-Place Pile Manual (originally
published in 1990, and updated in 2003).
The text updates will include evolutions in
equipment and procedures over the past
decade. Thank you to Chris Shewmaker,
Illini Drilled Foundations, who is leading
this committee-wide effort.
The ACIP Pile Committee Project Fund
project is practically complete. DFI
awarded the project to Professor Armin
Stuedlein of Oregon State University to
conduct an independent review and

Kwabena Ofori-Awuah
KCI Technologies, Inc.
[email protected]

COMMITTEE CHAIR MARTY TAUBE

Helical Piles and Tiebacks
Gary Seider
Chance Hubbell Power Systems, Inc.
[email protected]

Marine Foundations
Rick Ellman
Mueser Rutledge Consulting Engineers
[email protected]

Micropiles
Jonathan Bennett
Brayman Construction Corporation
[email protected]

Slurry Walls
Nicolas Willig, Case Foundations
[email protected]

Soil Mixing
Dennis Boehm, Hayward Baker, Inc.
[email protected]

Sustainability
Marine Lasne, Soletanche Freyssinet
[email protected]

Testing and Evaluation
Don Robertson, Applied Foundation Testing
[email protected]

Tiebacks and Soil Nailing
Ed Laczynski, G.A. & F.C. Wagman, Inc.
[email protected]

74 • DEEP FOUNDATIONS • MAR/APR 2014

analysis of available pile design
information, load testing results and
associated pile construction costs to
quantify the level of over-conservatism that
results from inappropriate acceptance
criteria commonly included in building
codes. Stuedlein submitted the project
report to the committee for approval, and
the summary will be published this year in
the DFI Journal.
Committee members Dan Stevenson
and Morgan Nesmith of Berkel &
Company have been involved in the
industry-wide effort to update Chapter 18
of the International Building Code. The
DFI Codes and Standards Committee is
working closely with representatives from
ASCE (American Society of Civil
Engineers), GeoInstitute, ASFE/GBA (The
Geoprofessional Business Association),
PDCA (Pile Driving Contractors
Association) and ADSC (the International
Association of Foundation Drilling) to
propose responsible changes to the
foundations provisions for the betterment
of the industry.
The committee is helping to organize
the SuperPile 2014 conference in Cambridge,
Mass., June 18-20, 2014. Several abstracts
for ACIP piles and DD piles papers have
been received, and we expect the
technologies to be well represented at this
DFI event that covers all piling techniques.
Please contact DFI headquarters at
[email protected] if you are interested in joining
the ACIP Pile Committee. We always
welcome new members.

Ground Improvement Committee
T h e D F I G ro u n d
Improvement Committee is comprised of
government agency
representatives, contractors, engineers
and researchers who
are involved in the
practice of technologies that are intended
to densify, reinforce or enhance drainage
characteristics of ground. The ground

improvement technologies covered
include, but are not limited to, vibratory
stone columns, vibrocompaction, vibro
concrete columns, aggregate piers,
dynamic compaction, wick drains and
grouted inclusions.
The committee recently completed two
liquefaction-related projects. One was a
survey funded through DFI’s Committee
Project Fund to define the state of practice
of ground improvement for liquefaction

mitigation. Tim Siegel of Dan Brown and
Associates led this project, which involved
preparing and issuing a detailed survey,
and compiling and synthesizing the results.
Over 150 practitioners from around the
world responded to the survey and
provided information related to the
prevalence of liquefaction as a design
consideration, and answered specific
technical questions regarding fine-grained
soils, site characterization tools, analytical
and computational methods, references
and resources, mitigation techniques, and
verification methods. Dan Brown and
Associates also contributed financially to
this successful study. The survey results
were reported in the August 2013 volume
of the DFI Journal.
The other project was completed by a
task force of committee members, led by
William (Billy) Camp of S&ME, Inc. The
group completed a study and report,

“Commentary on the Selection, Design and
Specification of Ground Improvement for
Mitigation of Earthquake-Induced
Liquefaction” published in the DFI Journal
in August 2013. This document reviews
the fundamental ground improvement
mechanisms for liquefaction mitigation
and the applicability of and limitation of
the various methods used. This
information is needed by designers when
recommending and specifying various
ground improvement methods for
liquefaction mitigation.
The committee has also finalized its
wick drain guide specifications. Thanks to
Matt Barendse of the New York State
Department of Transportation for working
with me on the project and to the
committee members and DFI Technical
Advisory Committee who provided
valuable comments. The specification
includes suggested text and guidance on

the materials, installation and quality
control and assurance for wick drain
projects, and is available through DFI.
The committee is looking forward to
working more closely with the GeoInstitute’s Soil Improvement Committee,
chaired by Professor Kyle Rollins of
Brigham Young University. The committees
hope to present joint seminars on ground
improvement topics in 2014 and 2015,
possibly in conjunction with ASCE
Geotechnical Sections. We are also working
on initiatives that relate to working
platform safety and guidance for preparing
ground improvement specifications.
If you have any questions or comments,
or if you would like to get involved with the
Ground Improvement Committee, please
contact DFI headquarters at [email protected].

DEEP FOUNDATIONS • MAR/APR 2014 • 73

Iron Works, Inc.

Serving the Drilling Industry

MAILING ADDRESS: 257 Caroline Street, Punxsutawney, PA 15767
SHIPPING ADDRESS: Mitchell Avenue, Big Run, PA 15715
814-427-2555 • USA/Canada 800-927-0560 • FAX: 814-427-5164
www.starironworks.com • e-mail: [email protected]

WE MANUFACTURE ACCESSORIES FOR ALL DRILLING APPLICATIONS
• Mini-Micro Pile
Threaded Casing
• Metric Threaded
Casing
• Drill Rods
• Equalizer/Balance
Rods
• Grout Equipment
Tremie Pipe, Hoppers
Racks and Rods
• Rotary Subs

• Fishing Tools
• Overburden Systems
• Percussion Hammers
and Bits
• Drop-Off Bits
• Drag Bits
• Swivels/Flushing Heads

Managing Uncertainty Underground
Geostructural Solutions Delivered Nationwide

Wolf Creek Dam Gallery
and Plaza Grouting
Jamestown, KY

Mike Walker, P.E.
781.721.4057
Giovanni Bonita, Ph.D., P.E.
202.828.9511
Bill Walton, P.E., S.E.
847.984.3494

74 • DEEP FOUNDATIONS • MAR/APR 2014

Pile Driving &
Ground Improvement Equipment

PR16s
PILING RIG
With interchangeable
Vibrodriver and
hydraulic hammer

The PTC PR16S Piling Rig building a PU22 sheet
pilewall for a riverbank reinforcement project.
The PR16S is equipped with a 16RHFVS, a variable
moment and high frequency Vibrodriver, which
allows for resonance free driving of piles near
sensitive areas.

Sales & Rental
PTC FRANCE

56, rue de Neuilly
93130 Noisy-le-Sec
Tel : +33 1 4942 7295
[email protected]

PTC U.S.A.

2000, Kentville Rd
61443 Kewanee IL
Tel : +1 309 852 6267
[email protected]

PTC FAR EAST

3, Tuas Avenue 16
638926 Singapore
Tel : +65 6861 6338
[email protected]

For more information www.ptc.fayat.com

PTC CHINA

2808, West Huancheng Road
201401 Fengxian Shanghai
Tel : +86 21 3365 5510
[email protected]

FEATURE ARTICLE

Deep Excavation Support
at Toronto’s Shangri-La

Aerial view of the site at final
depth while ramp is being removed

The Shangri-La hotel and luxury condominium tower is a
landmark of downtown Toronto. Located on prestigious University
Avenue, it comprises 81,104 sq m (873,000 sq ft) and has 66
storeys. Eight underground basement levels provide parking; the
lower four extending into the shale bedrock. The excavation for
Shangri-La was one of the deepest in Toronto’s history.
The site, bounded by city streets on three sides (Simcoe on the
west, Adelaide on the south and University on the east), shares the
block with a 14-storey building (200 University) with 5 underground levels, built from 1957-60. Along the east perimeter, seated
on the rock surface under University Avenue, is the Toronto Transit
Commissions (TTC) University Subway Line, with running track in
a triple-box structure built in the 1950s. This was intended to lie only
2.5 m (8.2 ft) from the property boundary at the site’s southeast corner.
The proposed excavation was to be 26.0 m (85.3 ft) deep. The
surface of the bedrock is relatively flat at about 13.0 m (42.7 ft)
below ground level. Earlier buildings on the site resulted in various
depths of fill and existing foundations.
The bedrock of the Georgian Bay Formation consists of shale
containing inter-beds of calcareous shale, limestone and calcareous
sandstone. It has very pronounced horizontal jointing typical of
shale, but provides a reliable foundation with allowable bearing
pressures of 2.4 MPa (25 tons/sf) for footings and 7.2 MPa
(75 tons/sf) for drilled shafts.

AUTHORS

However, the bedrock under Toronto is known to contain high
locked-in horizontal stresses around 3.8 MPa (40 tons/sf), much
higher than can be resisted by shoring techniques, resulting in inevitable wall movement when excavating deep into the rock. Vertical
joints in the rock are sealed tight by these stresses, but appear as the
excavation proceeds, with dominantly east-west orientation.
The TTC box structures are sensitive to movement, particularly
at the construction joints, typically spaced 12.2 m (40.0 ft) apart.
The TTC enforces strict alert levels for such movements because of
potential service disruption. The tender drawings indicated one of
these joints may be located very near the site’s critical southeast
corner, where differential rock movement along existing vertical
fissures was expected to be at a maximum.

Giving up Underground Space
In 2007, Anchor Shoring & Caissons retained Isherwood
Associates to provide an alternative design-build solution for its
shoring proposal, with a mandate to better address the perceived
serious risks to the TTC subway. Isherwood recommended asking
the owner to give up space, allowing relocation of the basement wall
further away from the critical corner. The owner agreed to abandon
all eight basement levels in a 9 m x 35 m (29.5 ft x 114.8 ft)
triangular area and thus move the closest approach to the subway
from the southeast corner nearer to the center of the wall, providing

Brian Isherwood, MICE, FCSCE, P.Eng.; Tara Brown, P.Geo.; and Jenny Earle, EIT, all of Isherwood Associates;
and Paul Kreycir, CET, Anchor Shoring & Caissons Ltd.

DEEP FOUNDATIONS • MAR/APR 2014 • 77

a more uniform movement pattern along
the whole east wall.
The shoring design proposed by Isherwood comprised standard soldier pile and
lagging, braced by two levels of rock anchor
tiebacks to retain the overburden soils at the
streets. This shoring penetrated and supported the upper weathered rock. The rock
face below was deemed self-supporting.
Along the east boundary, where the
subway obstructed use of normal rock
anchors, Isherwood proposed substituting
soil anchors (generally two levels) in place
of the tender drawing’s internal bracing,
using the space between the excavation and
subway where adequate. Otherwise, the
design called for threading them between
the subway roof and under existing street
utilities to anchor in the subway fill.
After the award, Isherwood approached
all private and public authorities to obtain
as-built drawings of adjacent structures and
utilities. The subway’s precise location in
the portion adjacent to the site was
unknown, so a survey of the tunnel was
required. Isherwood had information from

1.8 m (5.9 ft) and 14.1 m (46.3 ft) at
southeast and northeast corners, and that
the nearest joint was some 9 m (29.5 ft)
north of the critical corner. With the revised
excavation footprint, the smallest clearance
to the subway became 7.3 m (24 ft).
At 200 University, inspection showed
the basements were built in a half-step
scissor arrangement along the building’s
south wall, rather than horizontally as the
tender drawings showed. Isherwood
obtained copies of the original structural
drawings. No construction details were
available, but Isherwood assumed
previous buildings on the Shangri-La site
had been underpinned by concrete panels
to the rock. This proved to be the case.

Shoring System
Anchor Shoring chose double piles at 3.2 m
(10.5 ft) centers along Adelaide and Simcoe
Streets, installed in 915 mm (36 in)
diameter holes. Along University Avenue,
the use of single piles at 3.0 m (9.8 ft)
centers allowed tiebacks to be skewed
where needed to avoid obstructions, such

PTM results for east wall

work at two adjacent stations, and was
retained to locate the structure. At the same
time, crews installed remote-reading
instruments in the tunnels bordering the
site to determine joint movement
accurately. The survey showed that the
structure was almost 1.0 m (3.3 ft) nearer to
the property than assumed, with offsets of
78 • DEEP FOUNDATIONS • MAR/APR 2014

Inclinometer 5 results

as abandoned subway shoring piles.
Generally, Toronto practice is to take piles
to full depth rather than perch them on the
rock; Anchor Shoring elected to employ
pipe “flamingos” for the extensions through
the rock. The firm installed the piles in
915 mm (36 in) diameter holes using Bauer
rigs, but employed a down-the-hole hammer

technique to drill the 12 m (39.4 ft) deep,
380 mm (15 in) diameter rock sockets.
Lateral bracing comprised two rows of
rock anchors plus a rock pin at the top of
the pile rock socket, except for University
Avenue. Here, the combination of one or
two upper soil anchors was individually
selected, depending on the subway

location. Because of the complex geometry,
Isherwood’s drafting team created a section
for each of the 27 piles. Tiebacks employed
150 mm (6 in) diameter cased holes in soil
and 115 mm (4.5 in) diameter in rock.
With the 13 m (42.7 ft) high rock face
assumed to be self-supporting, the design
did not attempt to resist the release of the
locked-in stresses. During rock excavation,
prominent east-west vertical joints
appeared. These were of concern at the
south wall where the jointing was
subparallel, creating thin vertical slabs with
the potential to break loose. Isherwood
decided to protect this face with a curtain of
wire mesh and rock-bolts. The east and
west walls were stable, as was the north
rock face under 200 University. At the
remainder of the north wall, between the
existing building and University Avenue,
Isherwood used the mesh as well.
Under 200 University, rock anchors,
installed in a grid pattern directly on the
rock face, were designed to counteract the
building’s weight. Layout included active
anchors at the column lines and passive
anchors elsewhere.

the top of each pile for survey monitoring
by total station. At Shangri-La, the TTC
subway and 200 University both required
more comprehensive monitoring.
At the east wall, the monitoring plan
required for the TTC approval process
comprised pile targets at the top and at each
tieback elevation (as exposed during
excavation) on every pile, as well as four
inclinometers attached to shoring piles
plus two in boreholes behind the shoring,
extending 6 m (19.7 ft) below pile toes.
These instruments had an accuracy of 2 mm
(0.08 in) or better. In the subway tunnel,
electrolevels were installed across 10
expansion joints to record relative
displacement and tilt of the subway box
sections in real time, with an accuracy of
0.1 mm (0.004 in). Precision survey targets
at expansion joints, with an accuracy of
1 mm (0.04 in) or better, served as a backup for electrolevel readings. Borehole
extensometers installed at three locations
monitored differential rock movement
directly below the subway tunnel,
recording elongation at sensors 5 m (16.4 ft)
apart along the 30 m (98.4 ft) length.

FLAC Modeling
Two-dimensional Fast Lagrangian Analysis
of Continua (FLAC) modeling was
completed for the proposed shoring and
construction sequence at one location in
the center of the east wall. For each stage,
the model provided soil and structure
behavior: soil stress and strain, structural
displacements, axial, shear and moment
forces. Soil parameters were derived from
the geotechnical investigation conducted
by Terraprobe Ltd. The geometry was
based on a 7 m (23 ft) clearance between
the excavation and the subway tunnel.
The baseline analysis was conducted
with a lateral rock stress of 3.8 MPa
(40 tons/sf) and a rock bulk modulus of
3.8 MPa (40 tons/sf). Two parametric
studies were also conducted, using rock
bulk moduli of 2.9 MPa (30 tons/sf) and
7.7 MPa (80 tons/sf). The maximum movements predicted for the 2D displacement at
the center of the excavated face ranged
between 9 and 32 mm (0.35 and 1.26 in).
Isherwood standard practice is to
attach inclinometer casings to soldier piles
at representative locations and targets near

The inclinometer and pile target monitoring indicated that overburden excavation
down to the rock surface resulted in shoring
wall movements in the expected 15 mm
(0.59 in) range, and that excavation of the
unsupported rock face below resulted in a
further 10 to 13 mm (0.39 to 0.51 in), bringing the overburden and shoring with it.
The three extensometers gave very similar
results, indicating lateral movement of the
rock just below the subway of 10 to 12 mm
(0.39 to 0.47 in) at the excavation face and
at the 5 m (16.4 ft) node, reducing to 7 to 8 mm
(0.28 to 0.31 in) at the 10 m node (32.8 ft),
3 mm (0.12 in) at the 15.0 m node (49.2 ft),
2 mm (0.08 in) at the 20 m (65.6 ft) node,
and less than 1 mm (0.04 in) at the remaining nodes. A comparison with the FLAC
predictions indicates the displacement at
the near edge of the subway of 7 to 9 mm
(0.28 to 0.35 in) was significantly smaller
than the prediction of 12 mm (0.47 in).
However, the extensometers indicated the
rock movement did not extend back to the
far side of the subway, so differential displacement across the width of the subway
structure of 7 to 9 mm (0.28 to 0.35 in)
appeared to be larger than the FLAC
prediction of 5 mm (0.20 in).

Monitoring at TTC:
A section of FLAC analysis
and actual readings

DEEP FOUNDATIONS • MAR/APR 2014 • 79

The electrolevels indicated that
movement across the joints never exceeded
0.4 mm (0.02 in), well below TTC alert
levels of 2 mm (0.08 in).
At the north wall (200 University), the
foundation, 1 to 1.5 basements below the
rock surface, comprised a grillage of grade
beams along the column grids cast
integrally with the lowest floor slab to
provide a continuous raft. Because of the
potential for rock expansion to cause
differential movement, the monitoring
plan included precision survey monitoring
of the exterior walls and interior columns,
tape extensometers in north-south arrays
within the lower basement, and two
borehole extensometers installed in the
rock just below the foundations.
Internal precision survey monitoring of
parking level 3 (5th lowest level) indicated
a maximum of 3 mm (0.12 in) into-site
movement of the building’s south wall;
exterior monitoring on the south wall
indicated a maximum of 4 mm (0.16 in)
into-site movement. Monitoring of the east
and west walls of the building indicated
negligible movement throughout.
The tape extensometer monitoring
indicated negligible movement between
adjacent columns, with a maximum
cumulative movement of 3 mm (0.12 in)
across the entire building. The borehole
extensometers indicated up to 3 mm
(0.12 in) movement at the excavated rock
face, 3 mm (0.12 in) at the 5 m (16.4 ft)
node, 2 mm (0.08 in) at the 10 m (32.8 ft)
node and less than 1 mm (0.04 in) at the 15
to 30 m (49.2 to 98.4 ft) nodes, consistent
with the other measurements.
A reasonable explanation for the more
modest movements at the north wall is that
the 1950s construction of that building had
removed the upper 5 to 7 m (16.4 to 23 ft)
of rock, relieving the locked-in stresses,
and the new rock excavation below the
foundations was no more than 7 m (23 ft)
in height. The largest rate of rock
movement occurred under the first two
bays of the building during excavation
through the first 5 m (16.4 ft) of rock. Rock
movement continued with decreasing rates
until excavation was complete.

Monitoring at 200 University:
A section of actual readings

Conclusions
The design-build excavation shoring
scheme by Isherwood and Anchor Shoring
succeeding in addressing the serious risks
associated with the project. By communicating all potential risks to the owner and
reducing the basement footprint, with no
impact to the future foundations or parking
capacity, the team limited the risk to the
subway significantly. Using external rather
than internal bracing improved constructability of the shoring system, excavation,
and underground forming.
Another pillar of Isherwood’s effective
risk management was the comprehensive

modeling and monitoring program for the
north and east shoring walls. FLAC
modeling of predicted rock movement
provided good insight into the extent of
total movement, and the monitoring program confirmed actual movements were
within predictions. The level of monitoring
proved adequate for assessment of shoring
performance throughout construction.
The project team achieved the excavation and construction of the eight level
underground basement structure with
insignificant impact on the existing building at 200 University and the TTC Subway,
and on adjacent streets and utilities.

North wall and 200 University basement

The authors acknowledge the contributions of the following contributors: Professor K.Y. Lo for review of rock behavior; Renata Li and Keith Stott, Shangri-La, for
objectivity and support; Marcelo Chuaqui, Monir Precision Monitoring for all monitoring and tunnel survey work; Paul Kreycir, Anchor Shoring, for comradeship and
all the great projects he introduced to Isherwood. Kreycir died in February 2011.
80 • DEEP FOUNDATIONS • MAR/APR 2014

INAL
The ORIG ar® !
TITAN B
ugh

IBO®/TITAN System
Micropiles / Anchors / Soil Nails

thro
vailable
• Only a Systems Ltd.
h
!
Con-Tec
America
in North
ted.

duplica
• Never
pricing.
petitive
m
co
• New

• One step fast installation
• Simultaneous drilling and grouting
• Smaller equipment at lower cost
• Low overhead and limited access installation
• Ground improvement (densification)
• Higher skin friction
• Total corrosion protection

www.contechsystems.com

Toll-free: 1-888-818-4826

The registered trademark is owned by Con-Tech Systems Ltd. and the registered trade-mark Ischebeck Titan® is owned by Friedrich Ischebeck GMBH and is used under license.

82 • DEEP FOUNDATIONS • MAR/APR 2014

DRILL AND GO.

The new A125 Tier 4 hydraulic drilling rig is a high-performing power house
that is efficient and super reliable. It folds down to transport mode and in
only 10 minutes is moving down the road to its next big job.
Over 100 machines in our hydraulic rig rental fleet.
Kelly Tractor has 15 years of experience in the foundation industry with
the dealer network, parts and service to keep your equipment going.

Get a Link-Belt telescopic crawler crane
on site at competitive rental rates.

1.888.955.3559 www.kellytractor.com/foundation-group

A Pioneer In AugerPile Construction
Still Leads The Way
Multiple Rigs

Pile Load Testing

“When we needed an
experienced, qualified AugerPile®
contractor, we called Barcus.”
Low Headroom Piles

At L.G. Barcus and Sons, we’re proud of the fact that we helped pioneer today’s
Augered Cast-In-Place Pile foundation engineering and construction technology.
AugerPiles have proven their effectiveness again and again. With six decades of
experience as a General Contractor and a Specialty Subcontractor, you can feel
confident in knowing that we understand your construction requirements. We will
work with you to develop the most efficient and cost effective high-strength pile
foundation. With offices strategically located around the United States, we can
mobilize to your job quickly and inexpensively. Why take a chance with anyone
less than a Contractor who pioneered the way and continues to lead today.
CORPORATE OFFICE:
1430 State Ave.
Kansas City, KS 66102
913-621-1100 • 1-800-255-0180 • FAX 913-621-3288
www.barcus.com
REGIONAL OFFICES: Albuquerque • Atlanta • Beaumont/Port Arthur • New Orleans

FEATURE

ARTICLE

Seepage Control, Cutoffs Walls Manual: A Progress Report
The U.S. Army Corps of Engineers (USACE) has 704 dams in its
inventory and over 100,000 miles of levees with a capital value of
more than $150 billion. Currently, USACE has over $2 billion of
cutoff wall projects under construction and/or design/planning.
Given the magnitude of the dam and levee safety issues, we are
developing a new engineering manual, Seepage Control Cutoffs for
Dams and Levees. USACE has partnered with Deep Foundations
Institute (DFI) in preparing the manual to ensure that it is
comprehensive and draws from the expertise of the specialty
foundation engineering companies that design, manufacture and
construct seepage control cutoffs around the world.
The manual contains case histories as well as a comprehensive
project statistical summary and guide specifications. The goal of
USACE was to make the manual a state-of-the-art document for use
by USACE districts and the civil engineering profession.
Currently, there are 319 dams classified as high hazard, with
actionable failure modes that will require structural modifications.
The USACE dam inventory has been evaluated and assigned a Dam
Safety Action Classification (DSAC) rating from I to V, with I being
the most serious. We are also evaluating the levee inventory, using
Levee Safety Action Classification (LSAC) ratings assigned from I to V.

Cutoff Wall History
Slurry wall construction techniques were developed in the late
1940s in Italy by ICOS. The first use of the slurry trench method of
construction in the U.S. was by the USACE Memphis District in
September 1945, to form a partial cutoff along the Mississippi River
levee just below Memphis, Tenn. A soil-bentonite slurry trench
cutoff was first used for control of underseepage at a major earth dam
at Wanapum Dam on the Columbia River in Washington in 1959. A
cutoff wall using cement-bentonite was first utilized in the U.S. at the
Tilden Tailings Project to store tailings from the Tilden Mine in
Michigan in 1976. And finally the first cement-bentonite cutoff
constructed at a dam on a river retaining a reservoir was completed
in 1978 at the Elgo Dam (formerly the San Carlos Dam) in Arizona.
The USACE has designed and constructed some of the deepest
and most complex cutoff walls for dams since the 1970s. The first
major concrete panel cutoff wall constructed in a dam in the U.S.
was at Wolf Creek Dam by ICOS from 1974-77. Arturo Ressi, who
was a trustee of DFI, was president of ICOS at the time. In 1968,
about 17 years after first being impounded, wet areas and muddy
flows in the tailrace and sinkholes in the downstream toe adjacent
to the switchyard occurred. Other major cutoff wall projects
include Mud Mountain Dam — one of the deepest walls ever
constructed, Beaver Dam, Mississinewa Dam and the Walter F.
George Dam. Center Hill Dam is currently under construction.

AUTHOR

Figure 1. Source of life safety risks for USACE dams

USACE Dam and Levee Safety Programs
USACE and other federal agencies are using risk-informed decision
processes in dam and levee safety programs. The basic elements are:
potential failure modes analysis, event trees, load frequency
analyses, probabilistic analyses and models, subjective probability
and expert elicitation, and consequence evaluation. USACE
classifies its dams into one of five Dam Safety Action Classifications
(DSAC). We determined that 319 dams were either I, II or III, with
failure modes above the Tolerable Risk Guidelines, which will likely
require a structural modification. The most prevalent actionable
failure mode for dams was seepage and piping that could lead to
breach, see Figure 1.
The manual we are developing with DFI will be limited to
foundation treatments by vertical cutoff-type barriers for dams and
levees, and does not discuss horizontal seepage barriers or other
upstream sealing alternatives. It contains eight chapters:
• Chapter 1 – Introduction
• Chapter 2 – Dam Safety Issues
• Chapter 3 – Geologic Considerations
• Chapter 4 – Engineering Considerations
• Chapter 5 – Continuous Trench Cutoff Walls
• Chapter 6 – Soil Mix Cutoff Walls (excluding jet grouting)
• Chapter 7 – Element Walls (panel and secant)
• Chapter 8 – Jet Grouting and Other Methods including
Geomembrane, Sheet Pile and Vibratory Beam

David B. Paul, Risk Management Center, Lead Engineer, U.S. Army Corps of Engineers, Lakewood, Colo.

DEEP FOUNDATIONS • MAR/APR 2014 • 85

Currently, USACE is going through a
similar screening process for the levee
systems in the U.S. A similar percentage of
seepage and piping issues also exist for
levees, see Figure 2.
The manual will also have various
appendices containing relevant information and example contract documents and
specifications. A comprehensive summary
table of projects with relevant information
for each type of cutoff wall has been compiled as well as a detailed list of terminology.
The primary factors affecting the
selection of a cutoff are:
• Depth of the pervious strata to be sealed
• Shape (morphology) of the valley
• Characteristics of the embankment and
foundation materials to be sealed
• Loading and stress conditions
• Location of cutoff within embankment
or levee
• Modulus of surrounding material
• Hydraulic gradient at operating
conditions
• Available equipment for making the
cutoff
• Operation requirements
• Site access and constraints

Cutoff Walls
The critical design criteria for cutoff barrier
walls are: deformability, permeability and
permanence. The design of a cutoff wall is a
soil-structure interaction problem, and the
most important issue is to select the proper
modulus of deformation of the wall. The
forces on the wall are different depending
on whether the wall has been constructed
prior to embankment fill or constructed
through the core of an existing dam. When
the embankment is constructed and the
foundation loaded, the alluvial material
will undergo deformations, both in vertical
and horizontal directions. When the
reservoir is filled, the wall has to carry an
extra hydrostatic load. The wall should
have a modulus such that it can follow
these deformations without cracking. If the
wall is too rigid to follow the soil when it

86 • DEEP FOUNDATIONS • MAR/APR 2014

Figure 2. Estimated percentage of failure modes by type for USACE levee inventory

settles under the weight of the dam, load
will be transferred to the wall. The
additional stresses caused by this load
transfer may lead to cracking. Cracks in the
cutoff wall reduce its sealing efficiency. If
the cutoff wall is too plastic, its resistance
to shear forces and internal erosion by
seepage flow is reduced.
If the expected settlements and late
settlements and lateral deformations under
the dam are large, some designers choose
to install the cutoff near the upstream toe of
the dam to decrease the load on top of the
cutoff. However, horizontal deformations
in the dam foundation are not eliminated
in this way and are even greater at that
location than below the central part of the
dam. Finite element modeling is most
suitable to treat such questions and to find
an optimal location for the cutoff wall.
Permeability is considered the cutoff
wall’s most important characteristic.
Deformability addresses the capability of
the wall to sustain without cracking
foundation strains, which may amount to

several percent. Deformability can be
steered by using a proper mixture for the
backfill. Finally, permanence refers to the
w a l l ’s s t a b i l i t y w i t h r e s p e c t t o
decomposition by leaching or aggressive
environmental conditions. Specifications
for cutoff walls should be based on these
design criteria, keeping in mind the details
of a particular structure.
The practical applications of each
cutoff wall construction method are
illustrated by case histories in an appendix
to the manual. They demonstrate how
specific difficulties have been dealt with at
a particular site. One of the most widely
used type of cutoff wall for sites of great
depths in rock is the element wall, see
Figure 3. Well documented case histories
have been published in the technical
literature of the Association of State Dam
Safety Officials, U.S. Society on Dams, and
International Commission on Large Dams.
Case histories for jet grouting and deep
mixing are not as common.

Data Management
In recent cutoff wall projects, collection,
storage and presentation of geo-referenced
data in GIS (Geographic Information
System) databases advanced significantly.
For Wolf Creek Dam, the Wolf Creek
Information Management System was
developed by Treviicos, Geosyntec and
USACE. The system contains topographic,
geologic, instrumentation, grouting and
cutoff wall QA/QC data, and allows for
rapid and accurate verification of depth
and overlap elements as well as creating a
detailed as-built record. The USACE
Nashville District and Dam Safety Program
is using the system for the postimplementation evaluation for changing
the DSAC rating. A similar system is in use
at Center Hill Dam, where it allows realtime data uploads from the equipment and
is tied to the dam instrumentation system
that issues alarms to the contractor and
USACE if a threshold value is exceeded
during construction.

Erosion test that can be used by the civil
engineering profession. We plan to
conduct further research efforts on “plastic”
concrete mixes. Similar work has been
completed by Hydro Quebec and BC
Hydro as well as in The Netherlands, U.K.
and France.
As summarized previously, the levee
inventory has a significant percentage of
seepage issues that will require
remediation. USACE envisions that jet

425 ft (129 m) with a high degree of
confidence. Drilling techniques to assure
overlap and alignment have been proven
on Wolf Creek Dam and other recent dam
safety projects.
Data management systems are an
important improvement in the industry
and profession. The ability to collect and
store geo-referenced data is very important
for the future management of USACE’s dam
and levee inventories. There are other

Seepage Barrier Research Needs
Professor John Rice of Utah State
University has been conducting research
on seepage barrier erosion of various
backfill mixes and gradients for USACE.
Testing has been completed on four cutoff
wall backfill mixes: AV Watkins-cement
bentonite, Herbert Hoover Dike-soil
cement bentonite, New Waddell Dam“plastic” concrete, and Wolf Creek Damconventional concrete. As we expected, the
cement bentonite mix had the greatest
amount of erosion and the Wolf Creek
samples exhibited little to no erosion.
Testing showed that the mixes with the
highest degree of erosion also showed an
ability to plug with time. There are two
testing devices developed that simulate
open fractures in rock foundation surfaces
and evaluate erosion characteristics of
different soil types under different flow
velocities and gradients. The testing of
Teton Dam core material is complete, and
the testing of East Branch Dam core
material is ongoing. The testing devices,
instrumentation and test procedures have
been refined to a stable reproducible
condition. The goal is to establish a testing
procedure for the Cutoff Wall Crack

Figure 3. Walter F. George Dam – secant wall elements being drilled through casing
from the water side of the dam

grouting applications will be more
commonly used, particularly in locations
where there are pipe penetrations through
the levee. The use of jet grouting for these
applications requires careful monitoring
given the high pressures involved.
Additional research is required to develop
monitoring instrumentation to measure
pressures in-situ and to validate overlap of
elements that are created.

Conclusions
Cutoff walls are one of the most effective
engineering solutions for mitigating
seepage and piping failure modes for dams
and levees. Equipment and construction
techniques have been developed and field
tested that show that a uniform cutoff wall
can be constructed to depths in excess of

design standards and documents available.
For example, the U.S. Bureau of
Reclamation is updating its Design Standard,
Chapter 10, Cutoff Walls (1986). In Europe,
EN 1538 – Execution of Special Geotechnical
Works – Diaphragm Wall (2010) is used as a
standard. The Embankment Dams
Committee of ICOLD has also recently
published a bulletin on cutoff walls.
The dam safety profession needs to
research the long-term performance of
various cutoff wall backfills, including their
cracking and erosion potential under high
stress and gradient loading conditions.
USACE anticipates completing and
issuing the new engineering manual,
Seepage Control Cutoffs for Dams and Levees
by the end of September 2014.

DEEP FOUNDATIONS • MAR/APR 2014 • 87

-- What Lally Pipe customers know --

FAST BREAKING PROJECTS
{ often benefit from }

INVENTORY BASED SOLUTIONS

Get cut-to-length and spliced-to-length steel pipe
piles in sizes up to 24Ó O.D. from inventory.
Lally Pipe is AmericaÕs largest single source of
New Secondary, Structural and Limited Service
steel pipe products and customized solutions.
BE IN THE KNOW. Just call 1-800-533-6835, e-mail
[email protected] or visit LallyPipe.com.

80 0. 3 4 8 .1 89 0

sonic
side-grip®

h m c- u s .co m
Be your own man with the Sonic SideGrip®. Don’t stand by waiting on other contractors.
Work your own schedule. Drive toward higher profits. The Sonic SideGrip® puts it all within
your reach. With two unique side-gripping jaws and one bottom jaw, the Sonic SideGrip®
vibratory pile driver has unmatched dexterity for handling, driving or extracting just about
any style of piling. Choose from a range of models with 40 to 100 tons drive force for
18 to 55 ton excavators. Grab the future and drive your success.

DEEP FOUNDATIONS • MAR/APR 2014 • 89

CONSOLIDATED

PIPE & SUPPLY CO., INC.
STRUCTURAL DIVISION
-Steel Pipe
-All Sizes and
Specifications
-Cut to Length
-Tested Material
-Mill Certification
-Coating and Lining
to all Specifications

-Applications for:

Piling, Foundation, Marine,
Bridge, Tunnel
Bore Casing, Micropile

-Sheet Piling
-Prompt Delivery

CONSOLIDATED PIPE & SUPPLY
1205 HILLTOP PARKWAY
BIRMINGHAM, AL 35204
WATS
BUS.
FAX
Cell

1-800-467-7261
(205) 323-7261
(205) 251-7838
(205) 739-1211

BRIAN ROGERS
[email protected]

CONSOLIDATED

PIPE & SUPPLY CO., INC.

“DEDICATED

90 • DEEP FOUNDATIONS • MAR/APR 2014

TO

SERVICE”

new

MODEL GK- 405
VIBRATING WIRE READOUT
The Model GK- 405 Vibrating Wire Readout is
designed for use with all Geokon vibrating wire
sensors. It comprises a battery-powered readout
unit that communicates, via Bluetooth®, with a
Handheld Field PC running the GK- 405 application.
The Model GK- 405 can also read the thermistors
included with most Geokon vibrating wire sensors,
and display the temperature directly in °C.

Model 4900
Geokon Vibrating Wire Load Cell

All readings can be stored and exported to a number
of different file formats. Syncing to a host computer is
simple and straightforward, allowing project folders
and data files to be easily saved. The Model GK- 405
Readout is available with or without the Handheld
Field PC because the Model GK- 604-6 Field PC,
provided with Geokon’s GK- 604 Inclinometer
Readout, is compatible with both systems.
For more information visit : www.geokon.com/GK-405

35 YEARS OF INNOVATION AND QUALITY
1 • 603 • 448 •1562
[email protected]
www.geokon.com

Geokon is
ISO 9001:2008
registered

DEEP FOUNDATIONS • MAR/APR 2014 • 91

PEOPLE &

COMPANIES

Tracy Brettmann, P.E.,
D.GE, joined A.H. Beck
Foundation Company as
vice president of engineering working from Houston,
Texas. In this capacity,
Brettmann is responsible for engineering
oversight of all specialty deep foundation,
soil improvement and earth retention
projects. His expertise in the geotechnical
engineering and specialty deep foundation
industry will provide additional leadership
to increase Beck’s design-build opportunities as the company enters its 82nd year
in business. Brettmann has 25 years of
experience, is a past president of DFI, and a
former chair of the Augered Cast-in-Place
Pile Committee. He currently serves on the
board of the DFI Educational Trust.
Nicholson Construction was awarded a
$72.1 million design-build contract to
replace an existing force main from the
Virginia Key Central District Wastewater
Treatment Plant under Biscayne Bay Norris
Cut to Fisher Island. The project, which
involves changing out the current 54 in
(1.37 m) sewer force main for a 60 in (1.52 m)
replacement, should last approximately 26
months. The main scope includes the
installation of a precast concrete segmental
tunnel, which will stretch more than a mile
from the treatment plant on Virginia Key to
Fisher Island. The design-build contract
includes planning, engineering, design,
permitting, procurement, construction/
installation, testing and the start-up of the
replacement force main. Nicholson will act
as the general contractor for the project,
with subcontractors including Arup and
various local sub-consultants and
subcontractors. The project was slated to
start in early 2014.

92 • DEEP FOUNDATIONS • MAR/APR 2014

Schnabel Engineering, Inc., Glen Allen,
Va., announced an addition to the Schnabel
family of companies with the acquisition of
Geo/Environmental Associates, Inc. (GA),
Knoxville, Tenn. GA specializes in the
design of dams, waste disposal impoundments, landslide repairs, retaining structures,
ground improvements, environmental
assessments, environmental remediation and
foundation design. Schnabel specializes in
geotechnical, geostructural, dam and tunnel
engineering, as well as environmental,
geosciences, construction monitoring and
resident engineering services. The merging
of Schnabel and GA provides an
opportunity for both firms to expand and
enhance the services they both provide
throughout the country and globally.
Schnabel, an employee-owned company,
employs nearly 300 in 18 offices nationwide. GA, with a staff of 20 in one location
in Knoxville, Tenn., will operate as a
wholly-owned subsidiary of Schnabel.
Schnabel Engineering also
announced that William
K. Petersen, P.E., joined
the firm as senior associate
in the West Chester, Pa.,
office. Petersen has over
24 years of experience in geotechnical and
geological engineering including site
investigations, design recommendations,
and construction monitoring for bridge,
dam, tunnel, highway, railroad, commercial
and residential projects.
ASFE/The Geoprofessional Business
Association (GBA) is now offering DFI
members a free subscription to NewsLog the electronic newsletter of the association,
issued every two weeks. GBA is a not-forprofit organization that specializes in helping
its 300 member firms and their clients confront risk and optimize performance in
order to maximize geoprofessionals’
importance and value to the marketplace.
To sign-up for the newsletter go to
www.asfe.com.

Kevin Cargill, P.E., was
promoted to president
and CEO of Schnabel
Foundation Company in
Sterling, Va. Cargill was
p re v i o u s l y t h e v i c e
president and regional
manager of Schnabel’s
Southeast Regional Office
since 2003. Cargill
replaces Hubert Deaton
III, P.E., who served as
Schnabel’s president
since 1988 and will
continue on as a director.
Scott Ballenger, P.E., has
been named to replace
Cargill as Schnabel’s
southeast regional manager. Ballenger
joined Schnabel in 2003 as a construction
manager. Schnabel Foundation Company
is a nationwide contractor specializing in
earth retaining structures, micropiles and
ground improvement since 1959.
Ronald J. Ebelhar, P.E., D.GE, a senior
principal at Terracon in Cincinnati, Ohio,
was elected to serve a one-year term as vice
chairman of the ASTM International board
of directors. Ebelhar, who joined ASTM
International in 1980, is chairman of
Committee D18 on Soil and Rock. An
ASTM fellow and 2003 Award of Merit
recipient, Ebelhar has received several
awards from D18, including R.S. Ladd
Standards Development Awards, the
Woodland G. Shockley Award, the A. Ivan
Johnson Outstanding Achievement Award,
two Special Service Awards and the
Committee D18 Technical Editor’s Award.
He also received a Service Award from the
ASTM Committee on Technical Committee
Operations, on which he served a two-year
term. He has served on the ASTM board of
directors since 2010.

Mary Pohlman joined
Jeffrey Machine, Inc. in
Birmingham, Ala., as
international sales representative with over 13
years of experience in the
foundation drilling and construction
industry. Pohlman’s extensive marketplace
knowledge helps to accurately identify
customers’ needs and assists the
manufacturing team with developing the
right drilling tool solution. Her broad
understanding of the foundation tooling
industry will help to extend Jeffrey
Machine’s customer service into the
international marketplace.
The Shamsher Prakash Foundation is
soliciting nominations for the 2014
Shamsher Prakash Research Award for
young engineers, scientists and researchers
(40 years or younger) from all over the
world. Nominations are due March 31,
2014. The candidates should specialize in
geotechnical engineering and/or geotechnical

earthquake engineering, have significant
independent contributions and show
promise of excellence in research. The
award is a $1,100 cash prize and a plaque.
See nomination requirements at
www.yoga10.org. For further information,
please contact Shamsher Prakash at
[email protected].
Specialty geotechnical
contractor Moretrench
announced two new
senior management positions. Scott D. Dodds
joined the company as
general manager–
geotechnical group, MidAtlantic & Midwest
Regions. Dodds is a graduate of the University of
Pittsburgh with a B.S. in
Civil Engineering, and has more than 25
years of construction industry experience.
Greg Peitz joined the company as
operations manager–geotechnical group,

Mid-Atlantic & Midwest Regions. Peitz has
a B.A. in business administration from
Robert Morris University, Pittsburgh, Pa.,
and more than 30 years of specialty
geotechnical construction management
experience. His expertise is in large
diameter drilled shafts.
Geocomp’s Dr. Rachid Hankour, 53, of
Harvard, Mass., died in December 2013,
following a brief battle with cancer.
Hankour earned his M.S. and Ph.D. in Civil
Engineering from Tufts University in
Medford, Mass., where he taught for the
next quarter century. In 1994, Hankour
joined Geocomp Corporation in Acton,
Mass., and became vice president and
director of lab systems. He taught
undergraduate and graduate level courses
at Tufts and, in 2011, was appointed
Professor of the Practice in recognition of
his widely-recognized expertise in state-of
the-art geotechnical testing and
instrumentation and his commitment to
excellence in teaching.

DEEP FOUNDATIONS • MAR/APR 2014 • 93

Can you be green
and more powerful?
With Soilmec, you can. New, powerful Tier 4i engines
are now available on most Soilmec rigs. Meet emission
standards while improving productivity.

Soilmec: Your Solutions Provider.

OUR NEW
TIER 4i RIGS
ARE AVAILABLE
NOW
CALL TODAY

EASTERN & CENTRAL U.S.
AMERICAN EQUIPMENT & FABRICATING CORP
401.438.2626
CANADA & WESTERN U.S.
CHAMPION EQUIPMENT SALES, LLC
562.634.8180

www.Soilmec.com
DEEP FOUNDATIONS • MAR/APR 2014 • 95

Junttan Oy Rolls Out New X-Series Pile Driving Rigs
Junttan Oy launched three new models in
its X-Series pile driving rig family in
addition to the smaller range PMx20,
PMx22, PMx24 and PMx25 rigs launched
a few years ago. The new models, carrying
the nickname J-reX, are the PMx26,
PMx27 and PMx28, and have maximum
leader capacities of 20, 23 and 25 tonnes
(44, 51 and 55 kips) and maximum pile
lengths of 24, 25 and 28 m (79, 82, and
92 ft) respectively.
The structure and component layout of
the PMx26-28 series was redeveloped
according to Junttan’s 35 years of
experience in the field. The hydraulic
system was overhauled and the X-control
system for the PMx26-28 series was further
developed for convenient and productive
operation and low fuel consumption.
Improving operator efficiency and
safety, as well as minimizing energy losses
within the system, were the key design
goals for the PMx26-28 series. Deep system

The new J-reX pile driving rig

integration resulted in reduced emissions,
improved performance and improved fuel
economy without compromising machine
performance. Several developments dramatically minimized fuel consumption including a thermostatically-controlled engine
and hydraulic oil coolers with an optimized
air circulation system and a streamlined
main hydraulic oil circuit with extended
hose diameters. These changes decreased
fuel consumption by up to 2 L (0.5 gal) per
hour compared to previous models. The
new post-compensated and load sensing
hydraulic system saves another 1 L (.25 gal)
per hour compared to traditional hydraulic
systems. The PileCruise feature eliminates
human factors from the total system
efficiency, decreasing the power consumption of the hammer by up to 20%, depending on the operator. Tier 4 certified Cummins
engines are also available to further decrease
emissions. The PMx26-28 series premiered
at Conexpo 2014, in Las Vegas, Nev.

DEEP FOUNDATIONS • MAR/APR 2014 • 97

Versatility, Reliability & Durability

EMDE Large and small-bore drill tooling
Betek Product Distributor
Comacchio Drill and Geothermal Rigs- East of the Mississippi Dist.
Customized Drilling Solutions
ICE® Limited Access Drills
ICE® Top Drive Rotary Heads and Augers
ICE® Excavator-mounted Rotary Heads
Hydraulic Vibratory Drivers/Extractors
Excavator-mounted Vibratory Drivers/Extractors
Diesel Impact Hammers
Hydraulic Impact Hammers
ICE® Pilemer Hydraulic Hammers
Piling and Drilling Mast
Leads, Spotters, and Accessories
& Manufacturing and Service of More Deep Foundation Equipment

InternatIonal ConstruCtIon equIpment, InC
301 Warehouse Drive
MattheWs, NC 28104 usa
704-821-8200 | WWW.iCeusa.CoM

98 • DEEP FOUNDATIONS • MAR/APR 2014

BSP Launches New Range of
Lightweight Hammers
BSP International Foundations (BSP) announced the launch of a
new range of powerful yet lightweight hammers, which provide
greater stability to piling rigs, especially in applications where a
greater reach is required. Designated the LX range and comprising
three models, the new hammers also provide a solution for the
installation of all pile types.
The three hammers, LX30, LX40 and LX50, can drive steel,
concrete or timber piles in a variety of soil conditions. Major
features include total control of hammer stroke and blow rate,
precise matching of energy to suit the pile driving requirements
while an efficient hydraulic system gives low energy loss, and a low
running cost.
The hammers can be fitted with a single acting hydraulic system
to give an equivalent stroke of 800 mm (31.5 in) or alternatively a
double acting cylinder can be fitted to give an equivalent stroke of
1.2 m (3.9 ft). A range of standard drive caps and pile helmets are
available for the LX range, which can be operated from BSP power
packs or from hydraulic piling rigs or cranes.
The new LX40 lightweight hammer

DEEP FOUNDATIONS • MAR/APR 2014 • 99

DFI_March_April_FP_Ad.indd 1

1/10/2014 4:21:27 PM

The world’s largest Equipment Exhibition
and Technical Conference Dedicated to the
Deep Foundations industry

15
, 20

★ SAN

AN

TO

NI

O

,

XA

M

CH

17

-21

TE

AR

JW Marriott
Hill Country
Resort & Spa
San Antonio
Texas

S

International Foundations Congress and Equipment Expo

ww

w.I

FCEE2015.c

om

March
2015
➤ Over 2,700 Attendees
➤ Indoor and Outdoor Exhibit Space
➤ Over 27 Hours of Exhibit Time
➤ Exceptional Promotional Program
➤ Face-to-Face with Key Decision
Makers

iT S
b
i
Exh SAlE
Th pEN
o
bo w o com
.
015 n!
No
2
e
o
e
i
c
w.if format
w
w
t
in
Visi more
r
fo

AD INDEX

CALENDAR

American Piledriving Equipment Inc . . . . . . 4
BAUER Foundation Corp. . . . . . . . . . . . . . . 69
BAUER-Pileco . . . . . . . . . . . . . . . . . . . . . . . . 24
Bay Shore Systems, Inc. . . . . . . . . . . . . . . . . . 8
Bermingham Foundation Solutions . . . . . . 18
Brasfond Fundacoes Especiais S/A. . . . . . . . 11
Brayman Construction Corporation . . . . . . 46
Casagrande USA . . . . . . . . . . . . . . . . . . . . . 32
Center Rock Inc. . . . . . . . . . . . . . . . . . . . . . . 16
CETCO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Colorado School of Mines . . . . . . . . . . . . . . 43
Comacchio SRL . . . . . . . . . . . . . . . . . . . . . . . 40
Consolidated Pipe and Supply. . . . . . . . . . . 90
Con-Tech Systems Ltd. . . . . . . . . . . . . . . . . . 82
Cranes, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . 91
CZM Foundation Equipment . . . . . . . . . . . . 62
Dahil Corporation . . . . . . . . . . . . . . . . . . . . 51
Drilltools . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Dywidag Systems International (DSI) . . . . . 26
Equipment Corporation of America . . . 60, 61
Foundation Technologies, Inc. . . . . . . . . . . 10
GEI Consultants, Inc. . . . . . . . . . . . . . . . . . . 74
Geokon, Inc. . . . . . . . . . . . . . . . . . . . . . . . . 91
Geo-Solutions . . . . . . . . . . . . . . . . . . . . . . . . 48
Giken America Corporation . . . . . . . . . . . . 33
Givens International Drilling Supplies, Inc. 50
GMS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93
Goettle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Hammer and Steel . . . . . . . . . . . . . . . . . . . 103
Hardman Construction, Inc. . . . . . . . . . . . . 82
Hayward Baker . . . . . . . . . . . . . . . . . . . . . . 76
Hennessy International, Inc. . . . . . . . . . . . 44
Hercules Machinery Group . . . . . . . 36, 67, 89
HIIG Construction. . . . . . . . . . . . . . . . . . . . . 38
Hong Xiang Technologies . . . . . . . . . . . . . . 96
ICE-International Construction
Equipment, Inc. . . . . . . . . . . . . . . . . . . . . . 98
Instantel . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
JD Fields & Company, Inc. . . . . . . . . . . . . . . 28
Jeffrey Machine, Inc. . . . . . . . . . . . . . . . . . 100
Kelly Tractor . . . . . . . . . . . . . . . . . . . . . . . . 83
Kiewit Infrastructure Co. . . . . . . . . . . . . . . . 70
L. G. Barcus & Sons . . . . . . . . . . . . . . . . . . . . 84
Lally Pipe & Tube . . . . . . . . . . . . . . . . . . . . . 88
Langan Engineering &
Environmental Services . . . . . . . . . . . . . . . 43
Liebherr-Werk Nenzing GmbH . . . . . . . . . . 23
Loadtest . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
Magnus Pacific Corporation . . . . . . . . . . . . . 2
Mait S.p.A . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Malcolm Drilling Company Incorporated . . 20
Mueser Rutledge Consulting Engineers . . . 93
National Rig Rental . . . . . . . . . . . . . . . . . . . 29
Naylor Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Nucor-Yamato . . . . . . . . . . . . . . . . . . . . 52, 53
PennDrill Manufacturing. . . . . . . . . . . . . . . 47
Pieresearch . . . . . . . . . . . . . . . . . . . . . . . . . 59
Pieresearch and Pile Protection Tops . . . . . 43
Pile Dynamics . . . . . . . . . . . . . . . . . . . . . . . . 35
PJ’s Rebar . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
Plaxis bv . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Pro-Dig, LLC . . . . . . . . . . . . . . . . . . . . . . . . . 27
PTC Fayat . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
PVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68, 99
RST Instruments LTD . . . . . . . . . . . . . . . . . . 34
SAS Stressteel, Inc. . . . . . . . . . . . . . . . . . . . . 17
Soilmec North America . . . . . . . . . . . . . . . . 95
Star Iron Works, Inc.. . . . . . . . . . . . . . . . . . . 74
Sterling Lumber . . . . . . . . . . . . . . . . . . . . . . 10
Steven M. Hain Co., Inc. . . . . . . . . . . . . . . . 39
Subsurface Constructors, Inc. . . . . . . . . . . . 81
Tectonic Engineering & Surveying
Consultants, P.C. . . . . . . . . . . . . . . . . . . . . . 30
TEI Rock Drills . . . . . . . . . . . . . . . . . . . . . . . . 54
Treviicos Corporation . . . . . . . . . . . . . . . . . . 19
Watson Drill Rigs . . . . . . . . . . . . . . . . . . . . . . 6
Williams Form Engineering Corp. . . . . . . . 94

102 • DEEP FOUNDATIONS • MAR/APR 2014

DFI 2014 Events
March
19-20

DFI-ADSC Anchored Earth Retention/Micropile Design and
Construction Seminar

Hilton Seattle Airport and Conference Center, Seattle, WA

April
2-3

DFIMEC 2014, American University, Dubai, UAE

3

Helical Piles and Tiebacks Specialty Seminar

Ameristar Casino Resort Spa, St. Louis, MO
4

DFI-CSCE Spring Workshop

State University of New Haven, West Haven, CT
28-30

DFI-ADSC Drilled Shaft Seminar

Grandover Resort & Conference Center, Greensboro, NC
(TBD)

Practical Deep Foundation Design and Construction for
Seismic and Lateral Loads, Seattle, WA

May
21-23

DFI-EFFC International Conference on Piling and
Deep Foundations, Stockholmsmässan, Stockholm, Sweden

June
11-14

ISM-DFI-ADSC 12th International Workshop on Micropiles

Qubus Hotel Kraków, Kraków, Poland
18-20

SuperPile 2014, Hyatt Regency Cambridge, Cambridge, MA

26

Slurry Wall Seminar, Los Angeles, CA

July
21

DFI Educational Trust Annual Golf Outing Fundraiser

Chartiers Country Club, Pittsburgh, PA

August
TBD

Marine Foundations Seminar – Design and Construction of
the New Tappan Zee Bridge, Tarrytown, NY

September
TBD
TBD

DFI-CSCE Annual Fall Seminar, CT
Slope Stabilization and Excavation Support Seminar

Pittsburgh, PA

October
21-24

39th Annual Conference on Deep Foundations

Atlanta Marriott Marquis, Atlanta, GA
27

DFI Educational Trust Annual Golf Outing Fundraiser

Castlewood Country Club, Pleasanton, CA

November
TBD

DFI Educational Trust Annual Gala Fundraising Dinner

New York/New Jersey
DFI Events: Go to www.dfi.org/dfievents.asp for up-to-date information
Industry Events: A complete list can be found at www.dfi.org/industryevents.asp

DRILLING RIGS
Hammer & Steel
Sells and Rents Comacchio MC Line

The basic line of multiuse rigid and articulated hydraulic crawler drill
rigs which are suitable for several types of specialized works, such as
ground consolidation, anchor drilling, geotechnical works, water well
drilling and geothermal energy.

Hammer & Steel has been in business for 25 years and offer superior after-sales service
on all equipment. We have stocking facilities throughout the U.S.

www.hammersteel.com

SALES • RENTAL
PARTS • SERVICE

800-325-PILE (7453) • (314) 895-4600
Piling, Pile Driving & Drilling Equipment

Missouri

California

Florida

Kansas

Minnesota

New Jersey

Texas

800.325.PILE (7453) • 877.224.3356 • 904.284.6800 • 913.768.1505 • 952.469.6060 • 973.512.2940 • 936.257.8790

DFI

ITUTE
ST

EP FO
U
DE

TIONS
DA
I

N

N

Deep Foundations
Institute
326 Lafayette Avenue
Hawthorne, NJ
07506 USA
973-423-4030
Fax 973-423-4031

Aerial View of Spillway Platform of Bluestone Dam

PRESORTED STANDARD
U.S. POSTAGE PAID
PHILADELPHIA, PA
PERMIT NO. 102

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close