NATIONAL CONSTRUCTION LIMITED PITAD PROJECT H-8/4 ISLAMABAD STEEL STRUCTURE WITH MS PIPE, LOW-E GLASS ON CURTAIN WALL AND LEXON SHEET ON ROOF Sr. No. Description

Unit

Qty

Rate

Amount

1

M.S Builtup Section 3x3, 2x2

KG

40,500.00

85.00

3,442,500.00

2

Glass (Low-E) i/c installation

Sft

8,560.00

1,000.00

8,560,000.00

3

LEXON Sheet (Baisc)

Sft

4,650.00

250.00

1,162,500.00

4

MS Plate (7.5"x7.5"x0.5")

Kg

412.00

100.00

41,200.00

5

MS Plate (10"x10"x0.5")

Kg

230.00

100.00

23,000.00

6

3" wide 16SWG SS covering patti

Rft

2,752.00

125.00

344,000.00

7

PCC (1:2:4)

Cft

115.00

350.00

40,250.00

8

Sand

Cft

341.00

60.00

20,460.00

9

RCC(1:1.5:3)

Cft

421.00

500.00

210,500.00

10

Steel G-40

Ton

0.80

85,000.00

68,000.00

11

Steel G-60

Ton

1.50

88,000.00

132,000.00

12

M16, Anchor bolt

No

144.00

1,000.00

144,000.00

13

M12, Anchor bolt

No

224.00

1,200.00

268,800.00

14

Rubber Pad

No

56.00

600.00

33,600.00

15

Welding Rods

KG

3,125.00

158.00

493,750.00

16

Fabrication and fixing Cost

Sft

14,050.00

250.00

3,512,500.00

17

Concrete Work

Job

1.00

45,000.00

45,000.00

17

Red Oxide

Sft

27,000.00

6.00

162,000.00

18

Dico Paint

Sft

27,000.00

60.00

1,620,000.00

Total Design Fee 1.5% Sub-Cont Tax 8% Sub-Cont Profit 15% Total

20,324,060.00 304,860.90 1,625,924.80 3,048,609.00 25,303,454.70

NATIONAL CONSTRUCTION LIMITED PITAD PROJECT H-8/4 ISLAMABAD STEEL STRUCTURE WITH MS PIPE, LOW-E GLASS ON CURTAIN WALL AND Sr. No. Description 1 M.S Builtup Section 3x3, 2x2 2

Unit KG

Qty 40,500.00

Rate 55.00

Glass (Low-E) i/c installation

Sft

-

1,000.00

Glass 8mm Thick

Sft

27,500.00

70.00

Tempering for 50%

Sft

13,750.00

50.00

3

LEXON Sheet (Baisc)

Sft

4

MS Plate (7.5"x7.5"x0.5")

Kg

412.00

65.00

5

MS Plate (10"x10"x0.5")

Kg

230.00

65.00

6

3" wide 16SWG SS covering patti

Rft

2,752.00

100.00

7

PCC (1:2:4)

Cft

115.00

350.00

8

Sand

Cft

341.00

60.00

9

RCC(1:1.5:3)

Cft

421.00

500.00

10

Steel G-40

Ton

0.80

53,000.00

11

Steel G-60

Ton

1.50

56,000.00

12

M16, Anchor bolt

No

144.00

700.00

13

M12, Anchor bolt

No

224.00

900.00

14

Rubber Pad

No

56.00

400.00

15

Welding rods

KG

3,000.00

124.00

16

Fabrication and fixing Cost

Sft

14,050.00

175.00

17

Concrete Work

Job

1.00

35,000.00

18

Red Oxide

Sft

27,000.00

4.00

19

Dico Paint

Sft

27,000.00

45.00

-

250.00

Total

Design Fee 0% Sub-Cont Tax 6% Sub-Cont Profit 15% Total

N LIMITED AMABAD

ASS ON CURTAIN WALL AND Amount 2,227,500.00 1,925,000.00 687,500.00 26,780.00 14,950.00 275,200.00 40,250.00 20,460.00 210,500.00 42,400.00 84,000.00 100,800.00 201,600.00 22,400.00 372,000.00 2,458,750.00 35,000.00 108,000.00 1,215,000.00 10,068,090.00

604,085.40 1,510,213.50 12,182,388.90

NATIONAL CONSTRUCTION LIMITED PITAD PROJECT H-8/4 ISLAMABAD STEEL STRUCTURE Sr. No. Description

Unit

Qty

Rate

Amount

1

SS Pipe 201

Rft

25,000.00

180.00

4,500,000.00

2

Glass (Low-E) i/c fixing

Sft

8,560.00

1,000.00

8,560,000.00

3

LEXON Sheet

Sft

4,650.00

250.00

1,162,500.00

4

MS Plate (7.5"x7.5"x0.5")

Kg

412.00

100.00

41,200.00

5

MS Plate (10"x10"x0.5")

Kg

230.00

100.00

23,000.00

6

3" SS covering patti

Rft

2,752.00

125.00

344,000.00

7

PCC (1:2:4)

Cft

115.00

350.00

40,250.00

8

Sand

Cft

341.00

60.00

20,460.00

9

RCC(1:1.5:3)

Cft

421.00

500.00

210,500.00

10

Steel G-40

Ton

0.80

85,000.00

68,000.00

11

Steel G-60

Ton

1.50

88,000.00

132,000.00

12

M16, Anchor bolt

No

144.00

1,000.00

144,000.00

13

M12, Anchor bolt

No

224.00

1,200.00

268,800.00

14

Rubber Pad

No

56.00

600.00

33,600.00

15

Organ welding Rods

No

5,600.00

1,200.00

6,720,000.00

16

Concrete work Labor cost

Job

1.00

45,000.00

45,000.00

17

Fabrication labor Cost

Sft

14,050.00

250.00

3,512,500.00 -

Total Design Fee 1.5% Sub-Cont Tax 8% Sub-Cont Profit 15% Total

25,825,810.00 387,387.15 2,066,064.80 3,873,871.50 32,153,133.45

NATIONAL CONSTRUCTION LIMITED PITAD PROJECT H-8/4 ISLAMABAD STEEL STRUCTURE

Area = 45.288 S Description

Unit

Qty

Rate

SS Pipe 201 Grade

Rft

115.00

250.00

Low-E Glass (6mm low-E glass + 12mm cavity + 6mm plain glass) including fitting

Sft

31.25

1,000.00

10mm multiwall LEXAN sheet

Sft

14.04

1,800.00 Total - A

MS plate @ 0.4% 3" SS covering patti @ 0.4% Anchor bolt @ 1.5% Rubber pad @ 0.10% Organ welding @ 10% PCC, RCC @ 2.0% Total - B Total cost for 45.288 Sft (A + B) for 01/Sft

Area = 45.288 Sft Amount

28,750.00 31,248.72 25,270.70 85,269.42 341.08 341.08 1,279.04 85.27 8,526.94 1,705.39 12,278.80 97,548.22 2,153.95

NATIONAL CONSTRUCTION LIMITED PITAD PROJECT H-8/4 ISLAMABAD

STEEL STRUCTURE WITH MS PIPE, LOW-E GLASS ON CURTAIN WALLS A LOW-E GLASS WITH SAFETY FILM ON ROOF

Description

Unit

Qty

MS Pipe (2"x2"x16SWG)

Rft

125.00

Low-E Glass (6mm low-E glass + 12mm cavity + 6mm plain glass) including fitting on Curtain wall

Sft

31.25

Low-E Glass (6mm low-E glass + 12mm cavity + 6mm plain glass) including fitting with safety film on roof

Sft

14.04

MS plate @ 0.5% Anchor bolt @ 2% Rubber pad @ 0.3% Red oxide @ 1% Dico Paint @ 10% PCC, RCC @ 3%

Total cost for 45.288 Sft (A + B)

N LIMITED AMABAD

ASS ON CURTAIN WALLS AND LM ON ROOF Area = 45.288 Sft Rate

Amount

125.00

15,625.00

1,000.00

31,248.72

1,300.00

18,251.06

Total - A

65,124.78 325.62 1,302.50 195.37 651.25 6,512.48 1,953.74

Total - B

10,940.96

ost for 45.288 Sft (A + B) for 01/Sft

76,065.75 1,679.60

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close