NERC CIP Considerations when Procuring and Implementing SCADA Systems
EMS Users Conference

September 18, 2012

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

1

Introductions

Mario Marchelli Director, Energy Management & Control Systems Practice Lead (832) 563‐0897 [email protected]  Gilbert Perez Manager, EMCS Practice (786) 879‐9544 [email protected] 

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

2

Agenda

• Best practices for SCADA procurement • Best practices for SCADA implementation • Best practices for SCADA Go‐Live • Proper steps for retirement of legacy SCADA • Conclusions 

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

3

Best Practices for SCADA System Procurement
Work with your vendor in order to drive your desired ESP Design …
CIP‐005

• Correctly communicate corporate standards for  Electronic Security Perimeters (ESP’s) to your vendor. ‐ Specify the location of the Production Assets. ‐ Specify the location of the Development Assets. ‐ Specify the location of the Training (DTS) Assets. ‐ Specify the location of the read only servers and  the remote access to them.
Reference: R1. Electronic Security Perimeter

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

4

Best Practices for SCADA System Procurement
Tighter Security will continue to be imposed on the industry, plan for the future  today …
CIP‐005

Request the following security enhancements: ‐ Secured DNP3. ‐ Secured ICCP. ‐ “Service DMZ” which will house the printers and  other non‐essential devices.
Reference: R2. Electronic Access Controls

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

5

Best Practices for SCADA System Procurement
CIP‐007 R1 is the most highly violated of all the CIP Standards. Request tools which  will help you achieve compliance…
CIP‐007

• Testing / QA environment ‐ Specify the location of the QA Assets. • Vendor provided tools for testing • Vendor services for testing
Reference :R1. Test Procedures
©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

6

Best Practices for SCADA System Procurement
Hardening of systems is a must, auditors love to dwell on ports and services ….
CIP‐007

• Documentation of your baseline software, ports and  services.  • Removing any non‐essential software, ports and services  prior to delivery of the SCADA system.
Reference: R2. Ports and Services 

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

7

Best Practices for SCADA System Procurement
Share the responsibility of keeping your system up to date with your vendor ….
CIP‐007

• Testing and validation of the patches for security  controls not just functionality.
Reference: R3. Security Patch Management 

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

8

Best Practices for SCADA System Procurement
Shared Accounts are headache , place the burden on your vendor…
CIP‐007

• • • •

Disable guest accounts. Implement password complexity and age requirements. Limit the use of administrator accounts. Implement the principle of least privilege.
Reference: R5. Account Management

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

9

Best Practices for SCADA System Procurement

CIP‐007

• Implement the usage of centralized logging. • Implement the usage of Host Based Intrusion Detection  System(HIDS)/Intrusion Detection System(IDS).
Reference: R6. Security Status Monitoring

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

10

Best Practices for SCADA System Procurement
Shared Accounts are headache, request tools for managing these accounts on your  vendor.
CIP‐007

• Implement logging tools which allows tracking of  generic usernames.  ‐ Track the user utilizing the generic username. ‐ Track the date and time which the generic  username was utilized. ‐ Track the actions which were taken.  
Reference: R5. Account Management

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

11

Best Practices for SCADA System Procurement
Decide who performs your vulnerability assessment prior issuing the RFP …
CIP‐007

Who will conduct the assessment? ‐ Vendor  ‐ In‐house  ‐ Third party  • Decide: ‐ Timing of assessment. ‐ Responsible party
Reference: R8. Cyber Vulnerability Assessment

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

12

Best Practices for SCADA System Procurement
Other issues to consider prior issuing the RFP …
CIP‐007

• Virtualization: ‐ CIP and Non‐CIP  • Storage Area Networks: ‐ CIP and Non‐CIP. ‐ IP connections.
Reference: System Design (CIP‐005 and CIP‐007)

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

13

Best Practices for SCADA System Procurement
Request tools and procedures to address Disaster Recovery on a per CCA basis…
CIP‐009

• Consider a vendor‐provided backup solution.
Reference: R4. Backup and Restore 

• Include in your RFP that the vendor must restore the  SCADA system from backup media prior to going online. 
*Please note that you must documented the full restoration of the SCADA in  order to provide book‐ending evidence.
Reference: R5. Testing Backup Media

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

14

Agenda

• Best practices for SCADA procurement • Best practices for SCADA implementation • Best practices for SCADA Go‐Live • Proper steps for retirement of legacy SCADA • Conclusions 

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

15

Best Practices for SCADA System Implementation
CIP‐002

• How to test the new SCADA System: – If  controlling  – Test one substation at a time. – Avoid Substations deemed Critical Assets – Avoid testing on 500 and 300 KV sites (CIP Version 4)  – Establish well documented test procedures.

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

16

Best Practices for SCADA System Implementation
Do not forget to add your new critical Cyber Assets to your CCA list …
CIP‐002

• Once a new SCADA system has the ability to control the  Bulk Electrical System, all of the Critical Cyber Assets  (CCA’s) associated with the new system need to be  declared and added to your existing CCA list.
Reference: R2. (V4) ‐ R3. (V3) Critical Cyber Asset Identification CIP‐003

• Make your company’s Cyber Security Policy readily  available to all vendor employees who will work on your  system. 
Reference: R1. Cyber Security Policy 
©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

17

Best Practices for SCADA System Implementation
Implementing a new ESP is the best path to take ……
CIP‐005

• If possible, establish a new ESP for the new SCADA  system. Doing so will allow you to: –Conduct testing prior to going on‐line. –Establish well documented firewall rules. –Insure that no new vulnerabilities are introduced  to the current production environment. –Allows for the implementation of newer network  equipment with minimal interruption to the  existing network.
Reference:R2. Electronic Access Controls
©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

18

Best Practices for SCADA System Implementation
Vulnerability Testing  and documentation are a must prior to going online…..
CIP‐005

Prior to the new ESP going live, you must perform a  Cyber Vulnerability Assessment.
‐ Verify that the vendor has provide you a listing of the ports  and services.    Reference: R4. Cyber Vulnerability Assessment (CVA)

Once the new ESP is established or the equipment has  been added to the existing ESP, you must update the  documentation to reflect the modification of the  network or controls within ninety calendar days of the  changes. Reference: R5.2  Documentation 
©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

19

Best Practices for SCADA System Implementation Lets not forget those TFE’s …

Technical Feasibility Exceptions
Request the following Technical Feasibility  Documentation: ‐ List of devices for which a TFE must be taken. ‐ Equipment vendor letters stating the specific  requirement which cannot be met. ‐ Roadmap for eliminating all of these TFE’s
Reference: CIP‐005 and CIP‐007

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

20

Agenda

• Best practices for SCADA procurement • Best practices for SCADA implementation • Best practices for SCADA Go‐Live • Proper steps for retirement of legacy SCADA • Conclusions 

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

21

Best Practices for System Go‐Live
Proper CIP Personnel credentials for Contractors and Vendors is a must….
CIP‐004

• Require the vendor to train their employees per your CIP program. • Require the vendor to provide records of the training results. • Contractual language to address liabilities for non‐compliance.
Reference: R2. Training

• Require the vendor to provide Personnel Risk Assessment for the  following: – Project Personnel
– Maintenance and support personnel. – Hardware OEM support personnel.

• Require the vendor to provide you records of the PRA results.
Reference: R3. Personnel Risk Assessment (PRA)
©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

22

Best Practices for System Go‐Live
Testing of  the monitoring capabilities prior to going LIVE is essential….
CIP‐007

Verify that logging is being performed for all of the following  security events: ‐ Failed access attempts. ‐ Successful access attempts. ‐ Anti‐virus and anti‐malware alerts.
*Develop a plan in order to test that the security events listed above are being 
properly logged once the system goes live.
Reference: R6. Security Status Monitoring
©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

23

Best Practices for System Go‐Live
Utilize strict security controls when allowing remote access once the system  is live is a must …
CIP‐005

Remote Access (Vendor and Employees) • Two factor authentication for vendor access thru the  firewall. • Secured VPN access. • Logging of all vendor access.  • Layered security, possibly a jump server with two factor  authentication. 
©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

24

Agenda

• Best practices for SCADA procurement • Best practices for SCADA implementation • Best practices for SCADA Go‐Live • Proper steps for retirement of legacy SCADA • Conclusions 

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

25

Proper Steps for retirement of legacy SCADA systems
Following the proper sequence of events is essential….
CIP‐007

– When redeploying magnetic media, overwrite the  media using DoD Standard. – When disposing of media, you must physically destroy  such media
*Please note that you must overwrite or destroy the discarded media while  it still resides within the PSP.

– You must created and maintained records of disposed  and/or redeployed media.
Reference: R7. Disposal or Redeployment
©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

26

Proper Steps for retirement of legacy SCADA systems

CIP‐005

Electronic Security Perimeter • If a new ESP was created, retire the old ESP.
• Remove the ESP where the retired equipment resided from any drawings.

CIP‐006

Physical Security Perimeter • If a new PSP was created, retire the old PSP.
• Remove the old PSP from the Physical Security Plan.

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

27

Agenda

• Best practices for SCADA procurement • Best practices for SCADA implementation • Best practices for SCADA Go‐Live • Proper steps for retirement of legacy SCADA • Conclusions 

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

28

Conclusions Become partners with your selected vendor in sharing the  CIP Security responsibilities. Select a vendor which has embraced CIP Security and has  a culture of exceeding the CIP Requirements. Develop test plans for Security Testing controls during the  implementation of your new SCADA system. Once the system goes live, insure that all of the vendor  personnel working on your system have the proper CIP  credentials. Proper disposal of your discarded system is essential.
©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

29

Key Cyber Security Considerations – Questions?

©2012 Copyright. Confidential and proprietary to The Structure Group, LLC.           

30

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close