Activity Summary Report
Title:
Ltr of Determination - Ice Advisors
Activity ID:
5147794
Activity Start Time:
06/08/2015 9:37:00 AM
Originating Unit:
SEC Anchorage
Owner Unit:
SEC Anchorage
Controlling Unit:
SEC Anchorage
Activity Type:
Vessel Inspection/PSC
Team Lead:
Status:
Open - Submitted for Review
Status Date:
06/08/2015
Prompt Date:
Subject POC:
Operating Organization Name
NOBLE DRILLING (U.S.) LLC
Corporation
Address
City
State
Zip
13135 South Dairy Ashford Suite 800 Sugar Land
TX
77478

Country
US

Province

Vessel Information
=============================================================================================
Vessel Name:
VIN:
Flag:
Length:
Tonnage(GRT/ITC):
NOBLE DISCOVERER
6608608
LIBERIA
571.9
Year Completed:
Vessel Type:
Propulsion Type:
1966
Offshore-MODU-Drill ships
Diesel Direct
Engine Compartment:
Fuel Compartment:
Construction:
Unknown
Unknown
Unknown

Activities Conducted:
=============================================================================================
Type
Date
Unit
Administrative Inspection
06/08/15
SEC Anchorage

Inspection Results
=============================================================================================
System
Date
Results

Inspection Results - Deficiencies
=============================================================================================
(None)

Documents and Certificates:
=============================================================================================
Certificates:
Document Description
Issue Date Expire Date
Minimum Safe Manning Document
03/11/14
Documents:
Name:
Description
PP & ND Ice Advisor Letter D17.pdf
PolarPioneer_NobleDiscoverer_IceAdvisors_08Jun2015.pdf

Locations:
Latitude

Longitude

Time

Description

=============================================================================================
61 16.13942 N
149 38.29344 W
06/08/2015 09:37
US Coast Guard Sector Anchorage

Narrative Summary:
=============================================================================================

Narrative Summary:
(Continued)
=============================================================================================
Completed Adminstrative Inspection to issue Letter of Determination (LOD). No requirements issued, cleared, or outstanding.
Rcvd attached ltr dtd 03Jun2015 requesting LOD for Ice Advisors for POLAR PIONEER & NOBLE DISCOVERER. Drafted LOD
for Sp signature.
08Jun2015 - Attached OCMI LOD dtd 08Jun2015 indicates Ice Advisors not members of the regular complement of a unit as
defined in 33CFR141.15(b). Mailed LOD to requesting party.
No requirements issued, cleared, or outstanding. Administrative inspection complete.
//s//
, GS12, USCG
Sector Anchorage

Activity Action Log:
Eff. Date Unit
Individual

Description

=============================================================================================
06/08/2015
SEC Anchorage
.
Activity Created. Status: "Open - In
Progress"
06/08/2015
SEC Anchorage
Status Changed to "Open - Submitted for
Review"

Activity Summary Report
Title:
EEP Review
Activity ID:
5142424
Activity Start Time:
06/01/2015 10:18:00 AM
Originating Unit:
SEC Anchorage
Owner Unit:
SEC Anchorage
Controlling Unit:
SEC Anchorage
Activity Type:
Vessel Inspection/PSC
Team Lead:
Status:
Open - Submitted for Review
Status Date:
06/02/2015
Prompt Date:
Subject POC:
Operating Organization Name
NOBLE DRILLING (U.S.) LLC
Corporation
Address
City
State
13135 South Dairy Ashford Suite 800 Sugar Land
TX

Zip
77478

Country
US

Province

Vessel Information
=============================================================================================
Vessel Name:
VIN:
Flag:
Length:
Tonnage(GRT/ITC):
NOBLE DISCOVERER
6608608
LIBERIA
571.9
Year Completed:
Vessel Type:
Propulsion Type:
1966
Offshore-MODU-Drill ships
Diesel Direct
Engine Compartment:
Fuel Compartment:
Construction:
Unknown
Unknown
Unknown

Activities Conducted:
=============================================================================================
Type
Date
Unit
Plan Review (Other than "T")
06/01/15
SEC Anchorage

Inspection Results
=============================================================================================
System
Date
Results
Documentation
06/01/15
Inspected Satisfactory

Inspection Results - Deficiencies
=============================================================================================
(None)

Documents and Certificates:
=============================================================================================
Certificates:
Document Description
Issue Date Expire Date
Documents:
Name:
Description
2015-05-28 Discoverer and Polar Pioneer EEP Submittalpdf.pdf
NobleDiscovererEEPChecklist_01Jun2015.pdf
NobleDiscoverer_EEPApproval_02Jun2015.pdf

Locations:
Latitude

Longitude

Time

Description

=============================================================================================
61 16.13942 N
149 38.29344 W
06/01/2015 10:18
US Coast Guard Sector Anchorage

Narrative Summary:

Narrative Summary:
(Continued)
=============================================================================================
=============================================================================================
Completed review of EEP. Issued approval letter & stamped cover page.
Rcvd attached EEP Rev 4.0 (18May2015) submitted by Shell Gulf of Mexico, Inc for the drillship Noble Discoverer in the Chukchi
Sea (Burger Prospect, Posey Blocks 6714 & 6915). Reviewed to 33 CFR 146.140 requirements. Attached OCMI Western AK ltr
w/ stamped "Approved" cover page to documents/certificates.
//s//
, GS12, USCG
Sector Anchorage

Activity Action Log:
Eff. Date Unit
Individual

Description

=============================================================================================
06/02/2015
SEC Anchorage
Activity Created. Status: "Open - In
Progress"
06/02/2015
SEC Anchorage
Status Changed to "Open - Submitted for
Review"

Activity Summary Report
Title:
COC MODU - Renewal
Activity ID:
5130777
Activity Start Time:
05/20/2015 9:00:00 AM
Originating Unit:
SEC PgtSnd
Owner Unit:
SEC PgtSnd
Controlling Unit:
SEC PgtSnd
Activity Type:
Vessel Inspection/PSC
Team Lead:
Status:
Closed - Approved Inspection
Status Date:
07/10/2015
Prompt Date:
Subject POC:
Operating Organization Name
NOBLE DRILLING (U.S.) LLC
Corporation
Address
City
State
13135 South Dairy Ashford Suite 800 Sugar Land
TX

Zip
77478

Country
US

Province

Vessel Information
=============================================================================================
Vessel Name:
VIN:
Flag:
Length:
Tonnage(GRT/ITC):
NOBLE DISCOVERER
6608608
LIBERIA
571.9
Year Completed:
Vessel Type:
Propulsion Type:
1966
Offshore-MODU-Drill ships
Diesel Direct
Engine Compartment:
Fuel Compartment:
Construction:
Unknown
Unknown
Unknown

Activities Conducted:
=============================================================================================
Type
Date
Unit
Deficiency Check
05/26/15
SEC PgtSnd
Ballast Water Examination
05/20/15
SEC PgtSnd
COC-MODU Renew
05/20/15
SEC PgtSnd
ISPS III Exam
05/20/15
SEC PgtSnd

Inspection Results
=============================================================================================
System
Date
Results
Operations/Management
05/20/15
Deficiencies Found and Corrected
Stability
05/20/15
Inspected Satisfactory
Accommodation/Occupational Safety 05/20/15
Inspected Satisfactory
Communications
05/20/15
Inspected Satisfactory
Construction/Loadline
05/20/15
Inspected Satisfactory
Deck/Cargo
05/20/15
Deficiencies Found and Corrected
Documentation
05/20/15
Inspected Satisfactory
Electrical
05/20/15
Deficiencies Found and Corrected
Engineering
05/20/15
Deficiencies Found and Corrected
Fire Fighting
05/20/15
Deficiencies Found and Corrected
Lifesaving
05/20/15
Inspected Satisfactory
Navigation
05/20/15
Inspected Satisfactory
Personnel
05/20/15
Inspected Satisfactory
Pollution Prevention/Response
05/20/15
Inspected Satisfactory

Inspection Results - Deficiencies
=============================================================================================
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
1
05/20/2015
05/20/2015
SYSTEM
SUBSYSTEM
COMPONENT
Fire Fighting
Ventilation Systems
Exhaust Ducts (Galley Ranges)
---Description---

0725-Fiixed fire extinguishing installation-Provide valid report attesting to the proper installation of the fusible link for the galley
fire curtain to prove the location is an equivalent level of safety.- 79MODU code 9.1.2 action taken: 10c
ITEM
10
SYSTEM
Electrical

COMPLIANCE DATE

DATE ISSUED
05/20/2015
COMPONENT
Generator

DATE RESOLVED
05/26/2015

SUBSYSTEM
Electric Generation Source (service)
---Description--0950-Electric equipment in general-Unable to test 3 of 6 generators(out of service for raw water strainer installation). Provide
report to capture satisfactory testing of remaining 3 generators.- 79MODU code 4.2. 3 & 4.2.4 action taken: 17a.
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
11
By specified date and/or by 06/20/2015
05/20/2015
05/26/2015
SYSTEM
SUBSYSTEM
COMPONENT
Fire Fighting
Fixed CO2 Fire Extinguishing System
Quantity of CO2
---Description--0725- Fixed fire extinguishing installation- Prove amount of fixed CO2 for paint locker is an adequate amount for volume of
space.- 79MODU code 9.5.1.1.2 action taken:50a.c.
ITEM
COMPLIANCE DATE
12
By specified date and/or by 06/03/2015
SYSTEM
SUBSYSTEM
Deck/Cargo
Cargo Transfer (solid)

DATE ISSUED
05/20/2015
COMPONENT
General

DATE RESOLVED
05/26/2015

---Description--1150-Loading and unloading equipment-Provide statement of fact for annual surveys of deck cranes. 79MODU code 12.1.5
action taken: 16c
ITEM
13
SYSTEM
Electrical

COMPLIANCE DATE

DATE ISSUED
05/20/2015
COMPONENT
Lighting Fixture

SUBSYSTEM
Lighting (emergency)

DATE RESOLVED
05/26/2015

---Description--0945-Emergency lighting, etc- Provide adequate emergency lighting in the aft machinery space. Replace emergency light bulbs
located at e-light #16 in aft machinery space and e-light bulb located adjacent to WTD #8.- 79MODU code 5.3.2.1.3
Action taken: 17a.c.
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
14
By specified date and/or by 06/20/2015
05/20/2015
05/26/2015
SYSTEM
SUBSYSTEM
COMPONENT
Operations/Management
Vessel Safety Management
Documentation Maintenance/Control
---Description--2535-Development of plans for shipboard ops- Procedures should be established for all critical equipment to ensure it is
maintained in conformity with the relevant rules and regulations. To resolve, company should provide the USCG and RO a
corrective action report that outlines the implementation of corrective actions, including measeres intended to prevent
reocurrance.74SOLAS(09) IX action: 50a.c
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
2
05/20/2015
05/20/2015
SYSTEM
SUBSYSTEM
COMPONENT
Engineering
Bilge Water Management System
Valve
---Description--1440-Bilge pumping arrangements-The emergency bilge valve was not properly assembled and therefore did not operate as
intended. Assemble valve to ensure proper operation.- 79MODU code 8.3.3 action taken: 10c.
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
3
05/20/2015
05/20/2015
SYSTEM
SUBSYSTEM
COMPONENT
Fire Fighting
Fixed Pressure Water-Spraying Fire Extinguishing System
Valves
---Description--0725-Fixed fire extinguishing installation- The aft water mist system protecting the machinery space was not properly aligned.
Ensure valve alignment for proper protection of space.-79MODU code 9.5.1.1.1 action taken: 10c.
ITEM
COMPLIANCE DATE
4
SYSTEM
SUBSYSTEM
Fire Fighting
Remote Fuel Shutoff

DATE ISSUED
05/20/2015
COMPONENT
General
---Description---

DATE RESOLVED
05/26/2015

0900-Safety in general-Label remote emergency shutdowns for generator service tank, generator settling tank, boiler service
tank, and tank to pump room purifier as identified in the operations manual.- 79MODU code 14.1.2.6 action taken: 17a.c
ITEM
COMPLIANCE DATE
5
SYSTEM
SUBSYSTEM
Fire Fighting
Ventilation Systems

DATE ISSUED
05/20/2015
COMPONENT
Ducts

DATE RESOLVED
05/20/2015

---Description--0700-Fire fighting appliances-Fire damper located in the emergency generator room is inoperable. Ensure fire damper can
properly shut.- 79MODU code 9.10.1 action taken: 10c.
ITEM
6
SYSTEM
Electrical

COMPLIANCE DATE

DATE ISSUED
05/20/2015
COMPONENT
Generator

DATE RESOLVED
05/26/2015

SUBSYSTEM
Electric Generation Source (emergency)
---Description--0950-Electric equipment in general-The crew could not test the overspeed shutdown on the emergency generator. Provide valid
procedure and verify proper operation.- 79MODU code 4.2.3 action taken: 17a.c.
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
7
05/20/2015
05/26/2015
SYSTEM
SUBSYSTEM
COMPONENT
Engineering
Generator (propulsion/auxiliary-electric)
Battery
---Description--0950-Electric equipment in general-The secondary battery bank for the emergency generator is not operational. Ensure
secondary battery bank is fully operational; Prove proper operation.- 79MODU code 5.4.2 action taken: 17a.c.
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
8
05/20/2015
05/26/2015
SYSTEM
SUBSYSTEM
COMPONENT
Fire Fighting
Fixed CO2 Fire Extinguishing System
Operating Instructions
---Description--0915-Sign indications-Provide proper labeling and instructions for CO2 remote release system for emergency generator room.79MODU code 9.5.1.1.2 action taken: 17a.c.
ITEM
COMPLIANCE DATE
9
SYSTEM
SUBSYSTEM
Deck/Cargo
Ballast

DATE ISSUED
05/20/2015
COMPONENT
Valves

DATE RESOLVED
05/26/2015

---Description--1440-Bilge pumping arrangements-The remote reach rod for the forward main ballast valve is inoperable. Prove proper operation
of remote closure.-79MODU code 8.3.3 action taken: 17a.c.

Documents and Certificates:
=============================================================================================
Certificates:
Document Description
Issue Date Expire Date
COC-MODU Renewal
05/20/15
05/20/17
Documents:
Name:
Description
DNV GL Survey Statement 25MAY2015.pdf
WIM Report (E-Gen testing procedure).pdf
Annual Crane Inspection (statement of fact).pdf
NOBLE DISCOVERER FORM A ISSUED 20MAY2015.pdf
NOBLE DISCOVER FORM B ISSUED 20MAY2015.PDF
NOBLE DISCOVERER COC ISSUED 20MAY2015.pdf
Fwd door #9 hydraulic port side SR repaired 19JUN2015.htm
DNV-GL Acceptance Helicopter Deck Foam 07JUN2015.pdf
Insp Recommendations 20 May 15.pdf

Locations:
Latitude

Longitude

Time

Description

=============================================================================================
47 59.0 N
122 13.2 W
05/20/2015 09:00
Port of Everett, WA

Narrative Summary:
=============================================================================================
20 MAY 2015: Sector Puget Sound conducted a COC renewal exam for the MODU (option C) NOBLE DISCOVERER, IMO
6608608. PII, ISPS III, and BWM exams were also conducted IAW MSM Vol. II Section D, international laws and treaties, and
applicable U.S. laws and regulations. The NOBLE DISCOVERER is a Liberian flagged, 571.9ft long, 10264 GT, self propelled
drillship with a keel laid date of 1965 and conversion date of 1976. The vessel's class society is DNV-GL. The vessel was
moored at Port of Everett, stbd side to the pier.
In addition to Sector Puget Sound personnel, the COC exam was conducted with Sector Anchorage, OCS NCOE, and CG-5 TI
personnel in attendance. Bureau of Safety and Environmental Enforcement (BSEE) Inspectors attended the exam to familiarize
themselves with CG inspected equipment as BSEE inspectors will be living onboard the vessel 24/7 during drilling operations.
Issued Certificate of Compliance to expire on 20 MAY 2017, Form A, and Form B.
HULL INSPECTION:
Examined the following certificates and documents: IMO MODU Certificate, Stability Letter and Booklet, COFR, Construction
Portfolio, Minimum Safe Manning Certificate, Certificate of Registry, ITC, Cargo Ship Safety Radio Certificate, ISM DOC, ISM
SMC, ILLC, IAPP, EIAPP, IAFS, Class Certificates, IOPP, SOPEP, NTVRP, ORB, Bunkering Notes, EPA Vessel General
Permit, Garbage Log, Waste Management Plan, and BWM Plan; all sat. Verified proof of BW Report submittal. Examined all
officer US licenses with Liberian endorsements and verified compliance with the Minimum Safe Manning Certificate; all sat.
Verified required number of lifeboat certified persons were onboard; all sat. Examined fire and abandon ship drill records; all sat.
Examined maintenance records for lifesaving equipment; found that the servicing report for lifeboats (LB) LB#1: POH4800173153 and LB#3: POH#4500173153 noted unsatisfactory air tank pressure gauges near helm. Chief Mate stated
replacements were onboard. The gauges were installed during examination and examined satisfactorily. Examined firefighting
equipment maintenance records; found that Foam Analysis Report noted failed alcohol fire resistance. USCG and DNV-GL
surveyor deemed Foam Analysis Report satisfactory due to the fact that the vessel does not carry alcohol onboard. Found
Operating Manual dated 04 FEB 2015 complete. Found annual Crane Load Test Statement of Fact Survey report for port and
stbd cranes were dated 16 NOV 2013; issued deficiency #12. Examined report detailing internal, hydrostatic, NDT, and pressure
relief valve testing for all pressure vessels dated FEB 2014; all, sat.
Tested/inspected navigation/bridge equipment, all sat. Witnessed steering test from bridge; all sat. Conducted deck walk:
Inspected deck/hull openings, safety and security items, hull markings, and draft marks; all sat. Examined port crane (Liebherr
MTC 1900-50D) & stbd crane (Liebherr MTC 1900-60D); all sat. Inspected firefighting equipment; paint locker fixed CO2 bottle
appeared to be undersized; issued def #11. Inspected heliport and associated firefighting equipment; all sat.
Inspected lifesaving equipment: Lifeboats were designed, equipped and maintained in accordance with the route and cargo of
the vessel. Completed check of lifeboat breathing air system; found Stbd LB #3 pressure gauge inoperable; corrected on the
spot. Found Port LB #4 leaking air at the manifold fitting; corrected on the spot. This was due to the noted unsatisfactory tank
pressure found as mentioned previously. Checked food, water, & distress flares of all 4 lifeboats in the stowed position; all sat.
Witnessed operation of all 4 lifeboat engines and steering while in the stowed position; all sat. Witnessed operation of port side
lifeboats' sprinkler systems after lowering the lifeboats to the water; all sat. Tested port lifeboat limit switches during retrieval of
lifeboat; all sat. Unable to witness in-water operation of Fast Rescue Boat due to utility barge moored adjacent to launch area;
engine tested satisfactorily in cradle. Starboard side lifeboats not lowered due to vessel being moored starboard side to pier.
Conducted general health and safety walkthrough: Examined hospital and first aid equipment; found excessive boxes stowed in
the hospital space; corrected on the spot. Medical items stocked and inventoried; all sat. Spot checked emergency lighting,
crew accommodations, and workplace health and safety; all sat. Examined galley spaces and noted boxes obstructing freezer
door; corrected on the spot. Found an automatically closing galley fire door with its fusible link located just outside of the galley;
issued def #1. Received letter dated 20 MAY 2015 from the Liberia Maritime Authority granting authorization for the fusible link
to be installed just outside the galley; cleared def #1.
SECURITY:
Conducted ISPS III inspection. Reviewed all vessel records and documents, including International Ship Security Certificate,
security maintenance logs, and security incident procedures. Evaluated communications, restricted areas, access control,
monitoring, and security incident procedures. Vessel found to be in compliance with ISPS Code.
HAZARDOUS LOCATIONS:
Examined hazardous location plan and conducted walkthrough from the drilling floor, throughout mud system, and return. Crew
provided a third party report regarding electrical hazards; all issues identified were minor and had corrective action plan initiated;
all sat.
MACHINERY INSPECTION:
Met with Chief Engineer and conducted operational test of steering gear both locally and remotely in follow up and non-follow up
modes; all sat. Conducted walkthrough of all machinery spaces paying particular attention to fire hazards, shock hazards, and

watertight integrity. Found aft water mist system improperly aligned; issued def#3; corrected on the spot. Found aft water mist
sensor tubing is broken; corrected on the spot. Found several electrical panels that were not latched; corrected on the spot.
Found several emergency lights that were missing/inoperable; issued def #13. Found debris (rust/scale) in the Generator Room
port side vent supply trunk; corrected on the spot. Witnessed test of WTDs @ the following locations: Engine room, port sack
room, port P-tank room fore & aft, stbd #4, & stbd generator room; all sat. Visually examined all accessible fuel supply lines, sea
water piping, and all other associated equipment. Found that remote shut-off valves were missing labels; issued def #4. Found
reach rod for fwd main ballast valve inoperable; issued def#9. Found emergency bilge valve inoperable; issued def #2; corrected
on the spot.
Engine safeties verified:
MDE is a low speed direct-drive diesel, therefore safety testing was conducted w/engine secured.
MDE: Oil Mist Detectors (1, 4 & 'C'); all sat. Low L/O alarm; all sat
MDG 5: attempted reverse power relay (RPR) but procedure was incorrect and test was unsatisfactory; later re-tested
satisfactorily but procedures need to be created with manufacturer's documentation to support the method used; see def #14.
MDG 6: Overspeed shutdown; intake air flaps closed; Low L/O shut-down; E-Stop; all sat.
MDG 4: Overspeed shutdown; intake air flaps closed; all sat.
MDG 1, MDG 2, & MDG3 were not tested due to an ongoing cooling water duplex strainer change-out; issued def # 10.
Strainers are to be replaced on MDGs 4, 5, & 6 after the completion of the first three MGDs.
Emergency Generator:
-Witnessed E-Gen auto-start & bus transfer (2 & 10 seconds, respectively); all sat. Overspeed was attempted but crew did not
know how to conduct the test; issued def #6. Low L/O alarm tested sat. 2nd means of starting failed due to a dead battery bank;
issued def #7. E-Stop tested sat. One of four E-Gen Room fire dampers did not close as required, issued def #5; corrected on
the spot. Tested E-Gen F/O valve remote trip; all sat. Found that CO2 system labeling and remote release instructions were
incomplete/inaccurate; issued def #8. Found E-Gen right bank J/W pre-heater hose damaged due to excessive heat; corrected
on the spot.
Noted crew and technicians onboard were unfamiliar with engine/generator safety device testing; see def #14.
Aux boilers were not tested due to being 'cold iron'.
MARPOL:
Reviewed Oil Record Book procedures with C/E prior to commencing testing. Tested OWS and reviewed OCM data; all sat.
The bunkering of L/O was not entered into the ORB if the L/O was brought onboard via packaged containers (55-gal drums).
Checked F/O samples for MARPOL Annex VI compliance. Noted one sample from Jurong Shipyard on 08 JUL 2014 was present
but did not meet labeling/sealing requirements. Noted that the current Chief Engineer had only been onboard for 4 voyages.
Counseled newly reported Chief Engineer on the importance of documenting packaged containers and the importance of proper
sample labeling and sealing.
SAFETY MANAGEMENT SYSTEM:
Examined vessel's Safety Management System IAW ISM. Personnel possessed heightened awareness of Safety Management.
SMS found to be satisfactory with the following exceptions:
1) SMS procedures lacked procedures to test/maintain the emergency generator and related equipment, including failure of the
secondary battery bank,
2) the crew's inability to conduct an over speed shutdown test,
3) improper labeling of fixed CO2 system protecting the e-gen space, and
4) the fire damper located on emergency generator room bulkhead was unable to properly close. Issued def #14.
DRILLS:
Fire Drill - Initiated within the Smoking Tea Room via actuation of a heat detector. Crewmember selected to find the simulated
fire had a firm grasp of reporting call points & use of portable firefighting equipment. General Alarm sounded and master took
appropriate actions. Crew immediately set fire watches & cooled boundaries, shut down ventilation, & simulated securing
electrical power. Witnessed dress-out of Fire Team 1 but due to rapid response by the primary team and boundary procedures,
the fire was called 'out' upon arrival of Fire Team 1. Flash hoods were not properly donned and discussed the same with the
team/crew. Observed good management/accountability of fire team members during the transit from the fwd Fire Locker to the
accommodations. Tested highest and lowest fire hoses; all sat.
Abandon ship drill - Witnessed satisfactory abandon ship drill with stbd lifeboats simulated to be out of service. Conducted drill
on the port side (combination of primary & alternate stations). Crews were mustered in 4 separate areas to reduce
confusion/congestion. Full muster was obtained but was delayed due to 2 contractors being counted as crew (contractors were
supposed to disembark for the drill). Boats were not loaded for the drill. To test the crew's ability to obtain proper personnel
accountability, one crewman was asked to stay in his stateroom during the mustering portion of the drill. Lifeboat coxswain &
OIM quickly realized a crewmember was missing, ordered a search, & found him in stateroom. Immersion suits were donned by
the crew separately after the drill on the Mess Deck; required some direction in proper donning. Drill was performed
satisfactorily.

Issued 14 deficiencies: 4 corrected on the spot and 10 remain outstanding. 7 of the deficiencies were required to be corrected
prior to departure to satisfaction of Class and/or CG. Examination complete.
//
26MAY2015: Attended MODU NOBLE DISCOVERER, to clear deficiencies issued on 20 MAY 2015. The following deficiencies
were cleared:
4. Label remote emergency shutdowns for generator service tank, generator settling tank, boiler service tank, and tank to
pumproom purifier as identified in the operations manual IAW 79 MODU CODE/ 9.5.1.1.1.
Permanent labels for remote shutdowns were properly added.
6. The crew could not test the overspeed shutdown on the emergency generator. Provide valid procedure and verify proper
operation IAW 79 MODU CODE/ 4.2.3. Accepted DNV-GL Class Report, 25MAY2015 of overspeed tested on EGEN indicated
a test procedure was presented to the attending surveyor and the overspeed protection function was tested in the emergency
generator engine with satisfactory results. Added procedures to MISLE documentation as "WIM Report (E-Gen testing
procedures)".
7. The secondary battery bank for the emergency generator is not operational. Ensure secondary battery bank is fully
operational; prove proper operation IAW 79 MODU CODE/ 5.4.2. Accepted DNV-GL class report 25MAY2015 that indicated the
batteries for the secondary battery bank were replaced and the emergency generator engine was manually started using both
sets of batteries with satisfactory results.
8. Provide proper labeling and instructions for CO2 remote release system for emergency generator room IAW 79 MODU
CODE/ 9.5.1.1.2.Observed new instructions and labels.
9. The remote reach rod for the forward main ballast valve is inoperable. Prove proper operation of remote closure IAW 79
MODU CODE 8.3.3. Witnessed engineer exercise valve.
10. Unable to test 3 of 6 generators (out of service for raw water strainer installation). Provide report to capture satisfactory
testing of remaining 3 generators (#1, #2, #3) IAW 79 MODU CODE 4.2.3 & 4.2.4
Accepted Class report from DNV-GL for generator testing that indicated safety shutdown functions for auxiliary diesel engines
numbers 1, 2, and 3 (port outboard, port inboard and center) were all tested and found in order. Overspeed, low lubricating oil
pressure and high cooling water temperature functions were tested on all three engines. Added DNV-GL report to MISLE
documentation as "DNV GL Survey Statement 25 MAY 2015". While onboard, USCG tested the overspeed shutdown on the #1
generator, low L.O. on the #2 generator, and high jacket water temperature on the #3 generator.
11. Prove amount of fixed CO2 for paint locker is an adequate amount for volume of space IAW 79 MODU CODE/ 9.5.1.1.2.
Accepted Class calculation report from DNV-GL for verification of CO2 quantity for paint locker.
12. Provide satisfactory statement of fact for annual surveys of deck cranes IAW 79 MODU CODE/ 12.1.5.
Accepted report from Class dated25MAY2015 that indicated A DNV GL Survey Statement with job id. 659464 dated 2015-05-21
for Annual Crain Inspection was verified onboard. . Report added to MISLE documentation as "Annual Crane Inspection
(statement of fact)".
13. Provide adequate lighting in the aft machinery space. Replace emergency light bulb located at E-light # 16 in aft machinery
space and E-light bulb located adjacent to WTD #8 IAW 79 MODU CODE 5.3.2.1.3.
Verified proper e-lighting in the aft machinery space and verified e-light operating IWO WTD#8.
14. Procedure should be established for all critical equipment to ensure it is maintained in conformity with the relevant rules and
regulations. To resolve, company should provide the USCG and RO a corrective action report that outlines the implementation of
corrective actions, including measures intended to prevent reoccurrence. Objective evidence to support is referenced on Form B
dated 20MAY2015, items 5,6,7, and 8 IAW 09 SOLAS CH IV. The following corrective actions were deemed acceptable:
a. Received/reviewed new main diesel generator shutdown automation testing procedures.
b. Received/reviewed new main engine shutdown automation testing procedures.
c. Received/reviewed new emergency generator shutdown automation testing procedures.
d. Received/reviewed internal email from Chief Mate to company requesting to add the following language to water mist system
maintenance procedures, "Ensure all potable water valves in system are opened and sealed with tags upon completion of
work/testing. Ensure system is placed back in auto/remote."
e. Received copy email from Chief Engineer sent request directly to company to add a highly detailed emergency generator
weekly maintenance, inspection, and test procedure PM within vessel SMS. All, Sat.
f. Received internal email from Chief Mate to company requesting a PM be created for monthly exercising of ballast valves.
(14) deficiencies issued, (14) deficiencies cleared, and (00) deficiencies remain outstanding.
09 JUN 15 - Reviewed photos of new, higher handrail installation on the engineroom catwalk; all sat. Reviewed photos of waste
oil pump in the Generator Room properly mounted; all sat.

Examination complete. See additional inspections recommendation in the attached file named "Insp Recommendations
20May15"
//

Activity Action Log:
Eff. Date Unit
Individual

Description

=============================================================================================
05/20/2015
SEC PgtSnd
Activity Created. Status: "Open - In
Progress"
05/20/2015
SEC PgtSnd
Status Changed to "Open - Submitted to
Fincen"
05/20/2015
SEC PgtSnd
User Fee Account Sent to Fincen TRX:6608608MAY15
06/10/2015
SEC PgtSnd
Status Changed to "Open - Submitted for
Review"
07/10/2015
SEC PgtSnd
.
Status Changed to "Closed - Approved
Inspection"

Page 1 of 2

From:
Sent:
To:
Subject:

@gmail.com]
Friday, June 19, 2015 8:15 AM
CIV
Fwd: door #9 hydraulic port side SR repaired

Begin forwarded message:
From:
@noblecorp.com>
Date: June 16, 2015 at 8:59:18 AM PDT
To: "
@gmail com"
@gmail.com>
Cc:
@noblecorp com>
Subject: FW: door #9 hydraulic port side SR repaired

Marine Assurance Supervisor
Noble Drilling (U.S.) LLC
188 W. Northern Lights Blvd.
Suite 620
Anchorage, AK 99503
TEL:
E mail:

@noblecorp com

This email and attachments, if any, are confidential and intended solely for the individual or entity to whom it is addressed. If you are not the named
addressee you should not disseminate, distribute, copy or take any action based on this e-mail or attachments. Notify the sender immediately if you
have received this e-mail by mistake and delete it and any attachments from your system. Finally, the recipient should check this email and any
attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this email.

From:
Sent: Tuesday, June 16, 2015 8:58 AM
To: mailto
@gmail.com
Cc:
Subject: FW: door #9 hydraulic port side SR repaired

Hi
This should close the door item and leave me two to go. Foam analysis and Egen. I have the Cat guys coming onboard today to get the codes and get me the setpoints,
R,

Marine Assurance Supervisor
Noble Drilling (U.S.) LLC
188 W. Northern Lights Blvd.
Suite 620
Anchorage, AK 99503
TEL: +1
MOB
E mail:
@noblecorp com
This email and attachments, if any, are confidential and intended solely for the individual or entity to whom it is addressed. If you are not the named
addressee you should not disseminate, distribute, copy or take any action based on this e-mail or attachments. Notify the sender immediately if you
have received this e-mail by mistake and delete it and any attachments from your system. Finally, the recipient should check this email and any
attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this email.

From: Rig - Discoverer - Captain
Sent: Monday, June 15, 2015 7:40 PM
To:
Subject: FW: door #9 hydraulic port side SR repaired

Door fixed.
Regards,
Noble Discoverer
@noblecorp.com

From: Rig Discoverer Rig Maintenance Supervisor
Sent: Monday, June 15, 2015 6:00 PM

file:///C:/Users/

/AppData/Local/Temp/3/Fwddoor#9hydraulicportsideSRrepaire... 07/13/2015

Page 2 of 2

To: Rig Discoverer Rig Manager
Cc: Rig Discoverer Captain; Rig Discoverer Chief Mate
Subject: door #9 hydraulic port side SR repaired

Thanks kindly,

Rig Maintenance Supervisor
Noble Discoverer
Office#

@noblecorp com

This email and attachments, if any, are confidential and intended solely for the individual or entity to whom it is addressed If you are not the named addressee
you should not disseminate, distribute, copy or take any action based on this e-mail or attachments Notify the sender immediately if you have received this e-mail
by mistake and delete it and any attachments from your system Finally, the recipient should check this email and any attachments for the presence of viruses The
company accepts no liability for any damage caused by any virus transmitted by this email

file:///C:/Users/

/AppData/Local/Temp/3/Fwddoor#9hydraulicportsideSRrepaire... 07/13/2015

Narrative Summary:
=============================================================================================
18MAY15: COTP Order 38-15 has been cancelled. The vessel submitted a class report attesting to the main engine's fitness for
service. The vessel's cylinder lube oil strainer was clogged; the strainer was dismantled and cleaned by the crew. Another
strainer, as well as the cylinder oil head tank were opened and cleaned. The oil was also changed. There was no main engine
damage reported or observed. Checking the strainer for cleanliness was added to the planned maintenance program to be
performed monthly as well as prior to starting the main engine.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------12MAY15: During its inbound transit to Everett, WA, the NOBLE DISCOVERER was forced to shut down its main engine due to
a clogged cylinder oil strainer. The vessel was issued a COTP Order requiring a tug to escort the vessel into Everett, WA. The
vessel was also required to submit a class report attesting to the main engine's fitness for service prior to departure from Everett,
WA.

Activity Action Log:
Eff. Date Unit
Individual

Description

=============================================================================================
05/12/2015
SEC PgtSnd
Activity Created. Status: "Open - In
Progress"
05/18/2015
SEC PgtSnd
Status Changed to "Open - Submitted for
Review"
06/11/2015
SEC PgtSnd
.
Status Changed to "Closed - Approved
Inspection"

Report of Investigation
I. INCIDENT BRIEF
On 12MAY15 at approximately 0906 local time the Liberian flagged NOBLE DISCOVERER
(O. N. 6608608) shut down their engine due to a low lube oil alarm while transiting in U. S.
waters through the Strait of Juan de Fuca.

2

Report of Investigation
II. EXECUTIVE SUMMARY
Incident Summary
On 12MAY15 at approximately 0906 local time the Liberian flagged NOBLE DISCOVERER
(O. N. 6608608) shut down their engine due to a low lube oil alarm while transiting in U. S.
waters through the Strait of Juan de Fuca.
Incident Involved:

Marine Casualty, Reportable

Level of Investigation:
IMO Classification: Routine
USCG Classification: Routine
Was this a Serious Marine Incident? No
Was a Marine Board Convened by Commandant? No
Personnel Casualty Summary
Total Missing = 0
Total Dead = 0
Total Injured = 0
Total at Risk, Not Injured = 0
Total People at Risk = 0
Other Personnel (Not at Risk) = 80
Vessel(s) Status Summary
Actual Total Loss(es) = 0
Total Constructive Loss, Salvaged = 0
Total Constructive Loss, Unsalvaged = 0
Damaged = 0
Undamaged = 1
Property Damage Summary/Total Damage
Vessel(s) = $
Cargo = $
Facility(s) = $
Other = $
* Includes estimates

Waterway Mobility Summary
Vessel Delays (including speed restrictions): None

3

Report of Investigation
III. ACTIONS IN RESPONSE TO THIS REPORT
Actions on Recommendations
Safety Alerts

4

Report of Investigation
IV. FINDINGS OF FACT
Subjects of the Investigation
Vessels. The following vessels were subjects of this investigation. Particulars for each vessel
follow.
Vessel Name:
Flag:
Vessel Identification Number:
Call Sign:
Status:
Role:
Vessel Class, Type, Sub-Type:
Gross Tonnage(GRT):
Net Tonnage(NRT):
Deadweight Tons:
Length:
Home/Hailing Port:
Keel Laid Date:
Delivery Date:
Place of Construction:
Builder Name:
Propulsion:
Horsepower:
Master:
Classification Society:
Owner:

NOBLE DISCOVERER
LIBERIA
6608608
A8XM6
Undamaged
Involved in a Marine Casualty
Offshore, MODU, Drill ships
15296
571.9
Monrovia, LIBERIA
09/30/1965
07/01/1966
NAMURA SHIPBUILDING CO., LTD.

DNV GL
Noble Drilling International GmbH (Foreign
Meritime Entity)
80 Broad Street
Monrovia, ,
LR

Operator:
Inspection Subchapter:
Most Recent Vessel Inspection Activity:

Facilities. The following facilities were subjects of this investigation. Particulars for each
facility follow.
Parties and Organizations. The following people and organizations were subjects of this
investigation.
Status:

Not at Risk

5

Report of Investigation
05/12/2015 9:06:00 to 05/12/2015 9:06:00 (Known): The main engine had low cylinder lube oil
alarm and crew shut down the engine and cleaned the debris out of the lube oil strainer, which
was the cause of the low lube oil alarm.
Event Type:
Material Failure (Vessels)
Event Class:
Engineering
Event Subclass:
Location: Known; US Waters
Description: NE of Port Angeles WA
Waterway Name: SAN JUAN DE:
Latitude: 48 10.1 N
Longitude: 123 20.8 W
Subject(s) and Details:
Name
Type
Status
NOBLE
Vessel
Undamaged
DISCOVERER
Details Filed: Material/Equipment Failure

Role
Involved in a Marine
Casualty

System:
Engineering
Sub-System:
Lubricating Oil Service System
Component:
Filter
Failure:
Yes
Category:
Non-Catastrophic Failure Requiring Repair/Replacement
Details:
The main engine had low cylinder lube oil alarm and crew
shut down the engine and cleaned the debris out of the lube oil strainer, which was the cause of the
low lube oil alarm.
Cite:
Equipment Approval Information
Q-Number:
Manufacturer:
Serial No:
Year Built:
Description:

05/12/2015 9:06:30 to 05/12/2015 9:12:00 (Known): The crew shut down the engine to clean the
debris out of the in line lube oil strainer.
Event Type:
Vessel Maneuverability
Event Class:
Other loss
Event Subclass:
Location: Known; US Waters
Description: NE of Port Angeles WA
Waterway Name: SAN JUAN DE:
Latitude: 48 10.1 N
Longitude: 123 20.8 W
Subject(s) and Details:
Name
NOBLE
DISCOVERER
Details Filed: None

Type
Vessel

Status
Undamaged

8

Role
Involved in a Marine
Casualty

Report of Investigation
05/12/2015 9:12:00 to 05/12/2015 9:12:00 (Estimated): The vessel main engine was restarted
without any alarms and the transit was completed without any other issues.
Condition Class: Operations Status
Condition Type: Vessel Operation Status
Subject Type:
Location: Known; US Waters
Description: NE of Port Angeles WA
Waterway Name: SAN JUAN DE:
Latitude: 48 10.1 N
Longitude: 123 20.8 W
Subject(s) and Details:
Name
Type
Status
NOBLE
Vessel
Undamaged
DISCOVERER
Details Filed: Vessel Activity Details
Vessel Activity Type:
Course:
Speed:
Activity Description:
Permit Required:
Latent Unsafe Condition:

Role
Involved in a Marine
Casualty

Underway
70 True
5.5 Knots
No
No

05/12/2015 17:11:00 to 05/12/2015 17:11:00 (Estimated): Initial Notification - The Noble
Discoverer while transiting near port Angeles WA enroute to Everett WA had an alarm sound in
relation to their cylinder oil strainer on their main engine. They took action and came to a stop,
diagnosed the issue and made appropriate fixes.
Action Type:
Other Actions - Reporting/Notifications
Action Class:
Report/Notification of Casualty or Incident
Location: Known; US Waters
Description: NE of Port Angeles WA
Waterway Name: SAN JUAN DE:
Latitude: 48 10.1 N
Longitude: 123 20.8 W
Subject(s) and Details:
Name

Type
Party

Status
Not at Risk

Role
Witness

Details Filed: Notification
Incident Detail/Location
Incident Type:
Incident Date/Time:

MS: Equipment Failure
05/12/2015 5:10:00 PM

Notification Method:
Date/Time Notified:
Specific Notification Problem:

Telephone call to Coast Guard
05/12/2015 5:11:00 PM
No

Incident Location:
Address:
City, St, Zip:

,

9

Report of Investigation
Province/Country:
Latitude:
Longitude:
General Location/Affected Area
Waterway Name: SAN JUAN DE FUCA
Reporting Party
Name:
Callback Phone:
Cell Phone:
Location:
Address:
City, ST, Zip:
Province/Country:
Facility Name:
Organization:
General Location:

/
48 13.48348 N
123 17.62761 W
NE of Port Angeles WA

/UNITED STATES
Coast Guard Puget Sound Vessel Traffic Center

Involved Subjects
Name:
Type:
Last Modification Date:
Modify By:
Unit Modify By:

Person
05/14/2015 4:59:01 PM
Sector Puget Sound

Name:
Type:
Last Modification Date:
Modify By:
Unit Modify By:

NOBLE DRILLING (U.S.) LLC
Organization
05/14/2015 4:59:01 PM
.
Sector Puget Sound

Name:
Type:
Last Modification Date:
Modify By:
Unit Modify By:

SAN JUAN DE FUCA
Waterway
05/14/2015 4:59:01 PM
.
Sector Puget Sound

Name:
Type:
Last Modification Date:
Modify By:
Unit Modify By:

Person
05/14/2015 4:59:02 PM
Sector Puget Sound

Name:
Type:
Last Modification Date:
Modify By:
Unit Modify By:

Person
05/14/2015 4:59:01 PM
Sector Puget Sound

Name:
Type:
Last Modification Date:
Modify By:
Unit Modify By:

NOBLE DISCOVERER
Vessel
05/14/2015 4:59:01 PM
.
Sector Puget Sound

Incident Description

10

Report of Investigation
The Noble Discoverer while transiting near port Angeles WA enroute to Everett WA had
an alarm sound in relation to their cylinder oil strainer on their main engine. They took
action and came to a stop, diagnosed the issue and made appropriate fixes.

11

Report of Investigation
V. CAUSAL ANALYSIS
The Initiating Event of the Incident
Initiating Event:
Failures of Defense Against Subsequent Events in the Incident

12

Report of Investigation
VI. REFERRAL FOR ENFORCEMENT ACTION
The following referrals for enforcement action have been made as a result of this investigation
and represent those instances where the Coast Guard has gathered evidence that indicates one or
more alleged violations or offenses may have occurred. Any determinations as to whether or not
one or more actual violations or offenses have occurred are documented in the appropriate Coast
Guard enforcement activities.

13

Report of Investigation
APPENDIX 1 - EVIDENCE
5125723-01CG-2692
Collection Information:
Date/Time:
05/13/2015 5:00:00 PM
Location:
Sector Puget Sound
Collected By: USCG Gathered; LT
, SEC PgtSnd
Witnessed By: USCG Witness; ,
Tracking:
Attachments:
- CG-2692.pdf; CG-2692 - Report of Marine Accident/Injury/Death; Sector Puget
Sound;
05/14/2015;
5125723-MISLE-001
MISLE Notification #690278 for report of incident received by Telephone call to Coast
Guard.
Collection Information:
Date/Time:
05/12/2015 5:11:00 PM
Location:
Sector Puget Sound
Collected By: USCG Gathered;
., Sector Puget Sound
Witnessed By: USCG Witness; ,
Tracking:
Attachments:

14

Report of Investigation
APPENDIX 2 - CORRESPONDENCE

15

Inspection Results
(Continued)
=============================================================================================
Personnel
04/23/15
Inspected Satisfactory
Pollution Prevention/Response
04/24/15
Deficiencies Found and Corrected
Stability
04/23/15
Inspected Satisfactory

Inspection Results - Deficiencies
=============================================================================================
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
1
To the satisfaction of the attending Coast Guard Marine
04/23/2015
04/24/2015
Inspector and/or by 04/23/2015
SYSTEM
SUBSYSTEM
COMPONENT
Pollution Prevention/Response Prevention Equipment
Oily Water Separator (15 ppm)
---Description--1730-Marine Pollution Annex I-Any Ship of 10,000 Gross Tonnage and above shall be fitted with oil filtering equipment complying
with paragraph 7 of this regulation. The installed MEPC 107(49) oil filtering equipment failed to process oily bilge water from the
vessel's bilge water remaining in tank 28PS. At each attempt to operate the oil filtering equipment it failed with error. 73
MARPOL I/14.2
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
2
Prior to departure from port and/or by 04/23/2015
04/23/2015
04/24/2015
SYSTEM
SUBSYSTEM
COMPONENT
Communications
Alarms/Indicators
Bilge Alarm
---Description--1099-Alarms-After any survey of the ship had been completed no change shall be made in equipment and other items covered
by the survey. The PSCO identified that the mud pump room bilge high level alarm was inoperable. An expanded exam of the
vessel maintenance history noted a failure on 12 APR 2015 without corrective action by the crew. 74 SOLAS (2009 Cons) I-11(b)
ITEM
3

COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
To the satisfaction of the attending Coast Guard Marine
04/23/2015
04/23/2015
Inspector and/or by 04/23/2015
SYSTEM
SUBSYSTEM
COMPONENT
Electrical
Electric Generation Source (emergency)
Generator
---Description--1499-Aux machine- [See Form B for full def] PSCO identified that the fire dampeners installed in the emergency generator room
were closed upon arrival. After further testing of the e-gen they were deemed inoperable. An expanded exam of the vessel
maintenance history noted a failure w/out corrective action taken by the crew. 74 SOLAS (2009 Cons) I-11(b)
ITEM
4

COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
To the satisfaction of the attending Coast Guard Marine
04/23/2015
04/23/2015
Inspector and/or by 04/23/2015
SYSTEM
SUBSYSTEM
COMPONENT
Documentation
Certificates/Documents
International Air Pollution Prevention Certificate
---Description--0199-Documents-The bunker delivery note shall be kept on board the ship in such a place as to be readily available for
inspection. The bunker delivery note from 10MAR2015 was unavailable for inspection. 73 MARPOL (2011 Cons) VI/18.6
ITEM
5

COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
To the satisfaction of the attending Coast Guard Marine
04/23/2015
04/23/2015
Inspector and/or by 04/23/2015
SYSTEM
SUBSYSTEM
COMPONENT
Construction/Loadline
Markings
Load Line Mark
---Description--1220-Load Line-The rings, lines and letters shall be painted in white or yellow on a dark ground or in black on a light ground.
The deck line was painted the same color as the hull and did not contrast. ICLL 66 I/8

Documents and Certificates:
=============================================================================================
Certificates:
Document Description
Issue Date Expire Date
Documents:
Name:
Form-A-23Apr15.pdf

Description

Form-B-23Apr15.pdf
Form-A-24APR15.pdf
Form A issued 24APR15 indicating detention release
Form-B-24APR15.pdf
Form B amended 24APR15
DNV-GL Survey Report 24APR15.pdf
Survey report issued by DNV-GL on 24APR15
OCMI Appeal Determination Letter dtd 01MAY2015.pdf
Encl(1) Alarm Printout from the MEPC 107(49) Oil Filtering Equipment.pdf
Encl(2) Oil Record Book Entries From the NOBLE DISCOVERER.pdf
Encl(3) Supplement to NOBLE DISCOVERER IOPP Certificate.pdf

Locations:
Latitude

Longitude

Time

Description

=============================================================================================
21 19.5 N
158 07.0 W
04/23/2015 09:00
BARBERS POINT HARBOR

Narrative Summary:
=============================================================================================
On April 23, 2015, attended vessel to conduct PII/ISPSII/BWE.
05 deficiencies issued (01 deficiency code 17, prior to departure and 01 deficiency code 30, detention)
03 deficiencies cleared
02 deficiencies remain outstanding
Fire Drill conducted satisfactory in steering space
Abandon ship Drill conducted satisfactory, lowered two port side lifeboats
Deficiency 1: Any Ship of 10,000 Gross Tonnage and above shall be fitted with oil filtering equipment complying with paragraph 7
of  this  regulation.  The  installed  MEPC  107(49)  oil  filtering  equipment  failed  to  process  oily  bilge  water  from  the  vessel’s  bilge
water holing tank No. 28PS with 9.8 m3 oily bilge water remaining in the tank. At each attempt to operate the oil filtering
equipment it failed with error. Ship detained to the satisfaction of the RO/RSO and Coast Guard. 30ac
Deficiency 2: After any survey of the ship had been completed no change shall be made in equipment and other items covered
by the survey. The PSCO identified that the mud pump room bilge high level alarm was inoperable. An expanded exam of the
vessel maintenance history noted a failure on 12 APR 2015 without corrective action by the crew. 17ac
Deficiency 3: After any survey of the ship has been completed no change shall be made in equip. & other items covered by the
survey. The PSCO identified that the fire dampeners installed in the emergency generator room were closed upon arrival. After
further testing of the emergency generator they were deemed inoperable. An expanded exam of the vessel maintenance history
noted a failure without corrective action taken by the crew. 10c
Deficiency 4: The bunker delivery note shall be kept on board the ship in such a place as to be readily available for inspection.
The bunker delivery note from 10MAR2015 was unavailable for inspection. 10c
Deficiency 5: The rings, lines and letters shall be painted in white or yellow on a dark ground or in black on a light ground. The
deck line was painted the same color as the hull and did not contrast. 10c
Issued Report of Inspection Form A and Form B.
Major control action taken - IMO detention.
Examination pends.
On 24APR2015, attended vessel to conduct deficiency check in company with vessel crew, Flag Administration rep, and Class
Surveyor.
00 deficiencies issued
02 deficiencies cleared (issued by Sector Honolulu under this activity)
00 deficiencies remain outstanding
Witnessed proper operation of oil filtering equipment and bilge high level alarm. Received DNV-GL class report attesting to
proper repairs also.
IMO Detention lifted at 1645 HST (0245 GMT). Removed operation control.
Examination complete.
01MAY2015: Changed activity status to "open-pending appeal decision".
Date of appeal: 27 APR 2015.
Date of response: 01 MAY 2015.
Appelant: Noble Drilling Services Inc

Appellant Relationship: Operator
04MAY2015: Uploaded the OCMI's appeal determination letter dated May 1, 2015. Mailed the original letter to the vessel's
operator. Changed activity status to "open submitted for review".

Activity Action Log:
Eff. Date Unit
Individual

Description

=============================================================================================
04/23/2015
SEC Hono
Status Changed to "Open - In Progress"
05/01/2015
SEC Hono
Status Changed to "Open - Pending Appeal
Decision"
05/01/2015
SEC Hono
.
Status Changed to "Closed - Approved
Inspection"
05/04/2015
SEC Hono
Status Changed to "Open - In Progress"
05/04/2015
SEC Hono
.
Status Changed to "Closed - Approved
Inspection"
05/04/2015
SEC Hono
.
Status Changed to "Open - Submitted for
Review"
05/28/2015
SEC Hono
Status Changed to "Closed - Approved
Inspection"

Activity Summary Report
Title:
Ltr of Determination - Blow Out Preventer Surveyor
Activity ID:
5102490
Activity Start Time:
03/30/2015 12:08:00 PM
Originating Unit:
SEC Anchorage
Owner Unit:
SEC Anchorage
Controlling Unit:
SEC Anchorage
Activity Type:
Vessel Inspection/PSC
Team Lead:
Status:
Open - Submitted for Review
Status Date:
04/13/2015
Prompt Date:
Subject POC:
Operating Organization Name
NOBLE DRILLING (U.S.) LLC
Corporation
Address
City
State
Zip
Country
13135 South Dairy Ashford Suite 800 Sugar Land
TX
77478
US

Province

Vessel Information
=============================================================================================
Vessel Name:
VIN:
Flag:
Length:
Tonnage(GRT/ITC):
NOBLE DISCOVERER
6608608
LIBERIA
571.9
Year Completed:
Vessel Type:
Propulsion Type:
1966
Offshore-MODU-Drill ships
Diesel Direct
Engine Compartment:
Fuel Compartment:
Construction:
Unknown
Unknown
Unknown

Activities Conducted:
=============================================================================================
Type
Date
Unit
Administrative Inspection
03/30/15
SEC Anchorage

Inspection Results
=============================================================================================
System
Date
Results

Inspection Results - Deficiencies
=============================================================================================
(None)

Documents and Certificates:
=============================================================================================
Certificates:
Document Description
Issue Date Expire Date
Documents:
Name:
Description
Anchorage LoD Request (DOWNEY & SIM).pdf
Letter-Regular Complement Determination - Fragomen_03Apr2015.pdf

Locations:
Latitude

Longitude

Time

Description

=============================================================================================
61 16.13942 N
149 38.29344 W
03/30/2015 12:08
US Coast Guard Sector Anchorage

Narrative Summary:
=============================================================================================
Completed Adminstrative Inspection to issue Letter of Determination (LOD). No requirements issued, cleared, or outstanding.
Rcvd attached ltr dtd 27Mar2015 requesting LOD for Blow Out Preventer Surveyors. Drafted LOD for Sp signature.

03Apr2015 - Attached OCMI LOD dtd 03Apr2015 indicates Blow Out Preventer Surveyors not members of the regular
complement of a unit as defined in 33CFR141.15(b). Mailed LOD to requesting party.
No requirements issued, cleared, or outstanding. Administrative inspection complete.
//s//
, GS12, USCG
Sector Anchorage

Activity Action Log:
Eff. Date Unit
Individual

Description

=============================================================================================
04/13/2015
SEC Anchorage
Activity Created. Status: "Open - In
Progress"
04/13/2015
SEC Anchorage
Status Changed to "Open - Submitted for
Review"

Activity Summary Report
Title:
Ltr of Determination - Rig Equip Svc Engineers
Activity ID:
5102518
Activity Start Time:
03/24/2015 12:34:00 PM
Originating Unit:
SEC Anchorage
Owner Unit:
SEC Anchorage
Controlling Unit:
SEC Anchorage
Activity Type:
Vessel Inspection/PSC
Team Lead:
Status:
Open - Submitted for Review
Status Date:
04/13/2015
Prompt Date:
Subject POC:
Operating Organization Name
NOBLE DRILLING (U.S.) LLC
Corporation
Address
City
State
Zip
Country
13135 South Dairy Ashford Suite 800 Sugar Land
TX
77478
US

Province

Vessel Information
=============================================================================================
Vessel Name:
VIN:
Flag:
Length:
Tonnage(GRT/ITC):
NOBLE DISCOVERER
6608608
LIBERIA
571.9
Year Completed:
Vessel Type:
Propulsion Type:
1966
Offshore-MODU-Drill ships
Diesel Direct
Engine Compartment:
Fuel Compartment:
Construction:
Unknown
Unknown
Unknown

Activities Conducted:
=============================================================================================
Type
Date
Unit
Administrative Inspection
03/24/15
SEC Anchorage

Inspection Results
=============================================================================================
System
Date
Results

Inspection Results - Deficiencies
=============================================================================================
(None)

Documents and Certificates:
=============================================================================================
Certificates:
Document Description
Issue Date Expire Date
Documents:
Name:
Description
Letter-Regular Complement Determination - Kongsberg Maritime Inc_27Mar2015.pdf
2015_03_16_13_29_14.pdf

Locations:
Latitude

Longitude

Time

Description

=============================================================================================
61 16.13942 N
149 38.29344 W
03/24/2015 12:34
US Coast Guard Sector Anchorage

Narrative Summary:
=============================================================================================
Completed Adminstrative Inspection to issue Letter of Determination (LOD). No requirements issued, cleared, or outstanding.
Rcvd attached ltr dtd 16Mar2015 requesting LOD for Rig Equipment Service Engineers. Sent e-mail to Ms.
answers to the following:

seeking

- Would you characterize the requested personnel as Rig Equipment Manufacturer or Representative Engineers?
- What type of automation and control systems will they service aboard the NOBLE DISCOVERER?
- Confirm the person,
, is one person. Or is there a missing comma?
- What is the nationality of each person (provide passport # if available).
27Mar2015 - Rcvd e-mailed copy of passport for each Rig Equipment Service Engineer that will be maintaining/repairing the
positioning monitoring equipment. Drafted ltr for Sp signature.
07Apr2015 - Attached OCMI LOD dtd 27Mar2015 indicates Rig Equipment Service engineers not members of the regular
complement of a unit as defined in 33CFR141.15(b). Mailed LOD to requesting party.
No requirements issued, cleared, or outstanding. Administrative inspection complete.
//s//
, GS12, USCG
Sector Anchorage

Activity Action Log:
Eff. Date Unit
Individual

Description

=============================================================================================
04/13/2015
SEC Anchorage
Activity Created. Status: "Open - In
Progress"
04/13/2015
SEC Anchorage
Status Changed to "Open - Submitted for
Review"

Activity Summary Report
Title:
Ltr of Determination - Maritime MODU Advisor
Activity ID:
5102546
Activity Start Time:
02/23/2015 1:19:00 PM
Originating Unit:
SEC Anchorage
Owner Unit:
SEC Anchorage
Controlling Unit:
SEC Anchorage
Activity Type:
Vessel Inspection/PSC
Team Lead:
Status:
Open - Submitted for Review
Status Date:
04/13/2015
Prompt Date:
Subject POC:
Operating Organization Name
NOBLE DRILLING (U.S.) LLC
Corporation
Address
City
State
Zip
Country
13135 South Dairy Ashford Suite 800 Sugar Land
TX
77478
US

Province

Vessel Information
=============================================================================================
Vessel Name:
VIN:
Flag:
Length:
Tonnage(GRT/ITC):
NOBLE DISCOVERER
6608608
LIBERIA
571.9
Year Completed:
Vessel Type:
Propulsion Type:
1966
Offshore-MODU-Drill ships
Diesel Direct
Engine Compartment:
Fuel Compartment:
Construction:
Unknown
Unknown
Unknown

Activities Conducted:
=============================================================================================
Type
Date
Unit
Administrative Inspection
02/23/15
SEC Anchorage

Inspection Results
=============================================================================================
System
Date
Results

Inspection Results - Deficiencies
=============================================================================================
(None)

Documents and Certificates:
=============================================================================================
Certificates:
Document Description
Issue Date Expire Date
Documents:
Name:
Description
Shell 2_17_15 LOD Request.pdf
Letter-Regular Complement Determination - BlankRome_25Feb2015.pdf

Locations:
Latitude

Longitude

Time

Description

=============================================================================================
61 16.13942 N
149 38.29344 W
02/23/2015 13:19
US Coast Guard Sector Anchorage

Narrative Summary:
=============================================================================================
Completed Adminstrative Inspection to issue Letter of Determination (LOD). No requirements issued, cleared, or outstanding.

Phone:

(202) 772-5964

Fax:

(202) 572-8391
[email protected]

Email:

February 17, 2015
VIA EMAIL AND REGULAR MAIL
Commander Hector L. Cintron
Chief of Prevention
U.S. Coast Guard Sector Anchorage
510 L Street, Ste. 100
Anchorage, AK 99501
Re:

Request for Determination that Maritime Advisors are not Members of the
Regular Complement of an Outer Continental Shelf Unit

Dear Commander Cintron:
On behalf of Shell Exploration & Production Company and Shell Gulf of Mexico, Inc.
(collectively “Shell”), we request an exemption from the employment restrictions pertaining to units
engaged in Outer Continental Shelf (“OCS”) activities on the basis that certain individuals are not
members of the “regular complement of the crew.” 33 C.F.R. § 141.15. Specifically, Shell requests that
the Coast Guard exempt four (4) foreign national Maritime Mobile Offshore Drilling Unit (“MODU”)
Advisors (“Maritime MODU Advisors”) from the requirement to employ U.S. citizens or resident aliens
aboard a vessel engaged in OCS activities. The following information is provided in support of this
request.
Background
Shell intends to conduct exploration drilling activities in 2015 on federally-managed OCS oil and
gas leases located a minimum of 64 miles from the coastline in the Chukchi Sea. These operations will
take place pursuant to Shell’s Chukchi Sea Revised Exploration Plan which is scheduled to occur during
the short open-water season, defined historically as approximately July through November.
Shell has, in light of its experience operating on the Alaska OCS, identified a need to employ
individuals with unique job skills during this period. Shell completed a review of its 2012 Chukchi and
Beaufort Seas OCS exploration drilling operations and concluded, among other things, that there was a
need to strengthen its maritime assurance controls for future operations. As part of this review, Shell
identified a need to more closely monitor its Alaskan contractor operations to ensure that its contractors
meet or exceed Shell standards and to ensure all operations are conducted in a safe and environmentally
compliant manner.
Consequently, a new Maritime Assurance team was developed and charged with overseeing and
executing maritime assurance tasks on board two MODUs, the Noble Discoverer and Polar Pioneer (the
1

Commander Hector L. Cintron
February 17, 2015
Page 2
“Vessels”), which are owned and operated by Shell contractors. The goal of this team and its marine
experts is to ensure that all maritime aspects of Shell’s drilling operation will be conducted in accordance
with applicable regulatory requirements, industry best practices, and Shell’s internal maritime standards.
These individuals will help to ensure that the company executes its drilling activities exceptionally well in
2015.
The Maritime Assurance team tasked with overseeing the Vessels consists of four Maritime
MODU Advisors that will work in rotating shifts aboard the Vessels to oversee operations on behalf of
Shell. The Maritime MODU Advisors are Shell employees and will be Shell’s onboard marine assurance
representatives. These are the four (4) foreign nationals for which we request the exemption from the
OCS employment restrictions
This type of Maritime MODU Advisor is not typically employed by Shell on drillships during
normal drilling operations occurring elsewhere on the U.S. OCS. However, as noted above and as
explained in more detail below, Shell has determined that the employment of these Maritime MODU
Advisors is critical to enhancing Shell’s ability to provide the necessary oversight over some of its key
contractors in order to operate safely in the Chukchi Sea this season.
Legal Requirements and Policy Guidance
An employer of personnel on any unit engaged in OCS activities must employ, as members of the
“regular complement of the unit,” only citizens of the United States or resident aliens. 33 C.F.R. §
141.15. Personnel considered part of the “regular complement of the unit” are those necessary for the
routine functioning of the unit, including marine officers and crew, industrial personnel and general
maintenance personnel. Individuals not considered part of the “regular complement of the unit” are
specialists, professionals and other technically trained personnel called in to handle emergencies or other
temporary operations, extra personnel on a unit for training, and other personnel temporarily on a unit for
specialized operations, such as construction, alteration, well logging, or unusual repairs or emergencies.
The CG-543 Policy Letter 02-01, dated February 2, 2002, provides additional guidance clarifying
the Coast Guard’s interpretations of exemptions for specialists, professionals and technically trained
personnel. According to this policy letter, the following factors should be considered in making an
employment exemption determination: (1) job description relative to the units; (2) the period of time
requested or anticipated; (3) type of operations (i.e., temporary, specialized); (4) degree of expertise or
training needed; and (5) safety considerations.
The Vessels
Shell will utilize the Maritime MODU Advisors on the following two vessels:
M/V Noble Discoverer: Self-propelled drillship owned, operated, and crewed by
Noble Drilling International GmbH. Liberian flag (IMO # 6608608).
MODU Polar Pioneer: Mobile Offshore Drilling Unit owned, operated, and crewed
by Transocean. Marshall Islands flag (IMO # 8754140).
The Vessels will be operating on the Alaskan OCS in Chukchi Sea lease blocks 6714, 6762,
6764, 6812, 6912, and 6915.

Commander Hector L. Cintron
February 17, 2015
Page 3

Personnel and Specialist/Temporary Nature of the Work Performed by the Maritime MODU Advisors
The four individuals that will serve as Maritime MODU Advisors are Mr.
, Mr.
, Mr.
, and Mr.
. These individuals are all permanent Shell
employees based in Shell’s offices in the United Kingdom and Singapore. Specific information on each
of the identified individuals is provided in Enclosure (A).
The following is a brief discussion addressing each of the factors listed in the G-MOC Policy
Letter 02-01:
Job Description Relative to the Unit: The job description for a Maritime MODU Advisor is discussed in
Enclosure (B).
The Period of Time Requested: It is anticipated that the four individuals will perform their specialized
work from approximately June 1, 2015 – November 10, 2015 when activities occur in the Chukchi Sea
OCS. This should be considered temporary in nature, for among other reasons, due to the short openwater season in Alaska.
Type of Operations: As discussed in the background section above and in Enclosure (B), the Maritime
MODU Advisors will perform highly specialized services when the MODU is operating on the Alaska
OCS. In short, the Maritime MODU Advisors will be Shell’s onboard marine assurance representatives
employed specifically to oversee contractor operations to ensure they are conducted in accordance with
applicable regulatory requirements, industry best practices, and Shell’s internal maritime standards to
ensure safe and environmentally compliant operations. Maritime MODU Advisors are neither necessary
nor normally utilized in MODU operations. They are clearly not “necessary for the routine functioning”
of the Vessels. They are neither officers nor crew of the Vessels, they will not stand watches, and they
serve no direct industrial purpose (e.g., their duties are not akin to toolpushers, drillers, roustabouts, floor
hands, crane operators. etc.), and they cannot be considered support personnel (e.g. cooks or stewards).1
Degree of Expertise or Training Needed: Each of the individuals is specifically trained and has extensive
experience performing the functions required of a Maritime MODU Advisor in the offshore Alaska
environment. The Maritime MODU Advisors are highly experienced Shell employees that possess a
specialized level of expertise and in-depth knowledge of the maritime regulatory framework, best
maritime operating practices, Shell’s internal maritime standards, and a mature HSSE culture. These
individuals would report to the Shell Manager of Maritime Assurance through the on board Shell drilling

1

For example, the Policy Letter states that a weld inspection technician aboard a pipe-lay barge to ensure quality
assurance or operate equipment that requires specialized training is not considered part of the regular crew
complement. Clearly, a weld inspection technician performing services onboard a pipe-lay barge to assure quality
or operate equipment would benefit the operations and mission of the barge. Nevertheless, because the technician is
aboard temporarily to provide specialized services, he/she is not considered part of the regular crew complement.
Another example involves drilling advisors that have been authorized for use on drill ships during specialized ultradeep drilling operations following the Deepwater Horizon incident to ensure for the overall safety of operations.
Specifically, “Wellsite Geologists” have been approved to supplement the current crew complement and not replace
any of the U.S. citizen crew. These personnel provide specialized oversight, advice, training, and mentoring of the
crew with regard to drilling operations and they do not stand any watches while onboard the Vessels. These
personnel have been approved for use up to one year at a time in the Gulf of Mexico.

Activity Summary Report
Title:
Def Check
Activity ID:
5047617
Activity Start Time:
01/05/2015 7:55:00 AM
Originating Unit:
MID Sing
Owner Unit:
MID Sing
Controlling Unit:
MID Sing
Activity Type:
Vessel Inspection/PSC
Team Lead:
Status:
Closed - Approved Inspection
Status Date:
01/28/2015
Prompt Date:
Subject POC:
Operating Organization Name
NOBLE DRILLING (U.S.) LLC
Corporation
Address
City
State
13135 South Dairy Ashford Suite 800 Sugar Land
TX

Zip
77478

Country
US

Province

Vessel Information
=============================================================================================
Vessel Name:
VIN:
Flag:
Length:
Tonnage(GRT/ITC):
NOBLE DISCOVERER
6608608
LIBERIA
571.9
Year Completed:
Vessel Type:
Propulsion Type:
1966
Offshore-MODU-Drill ships
Diesel Direct
Engine Compartment:
Fuel Compartment:
Construction:
Unknown
Unknown
Unknown

Activities Conducted:
=============================================================================================
Type
Date
Unit
Deficiency Check
01/05/15
MID Sing
Administrative Inspection
01/05/15
MID Sing

Inspection Results
=============================================================================================
System
Date
Results

Inspection Results - Deficiencies
=============================================================================================
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
1
To the satisfaction of the attending classification
11/26/2012
12/17/2014
society surveyor and/or by 03/19/2013
SYSTEM
SUBSYSTEM
COMPONENT
Operations/Management
Vessel Safety Management
Company Responsibilities/Authority
---Description--2500-ISM related deficiencies-Objective evidence revealed systematic failure/lack of preventive maintenance for main engine
caused loss of main propulsion & exhaust explosion, company audit records not available, & crewmember's unfamiliarity w/ ship
specific SMS; internal audit required, external recommended. SOLAS 74 Amend 2009 CE IX/3 & 5, ISM Code Part A/6.2 ( Code
50 a,c)
ITEM
12

COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
To the satisfaction of the attending classification
11/26/2012
12/17/2014
society surveyor and/or by 03/19/2013
SYSTEM
SUBSYSTEM
COMPONENT
Engineering
Freshwater System (jacketwater cooling)
Piping
---Description--1410-Propulsion main engine-Main engine piston cooling water is contaminated w/sludge/oil. Crew skims the oil off w/ a ladel &
bucket during rounds. Main engine ops manual states failure of the telescopic tube packing will cause dirty piston cooling water.
Provide RO report indicating current procedure/design is adequate for the service intended and reduces danger to persons.
MODU 1979 4.1.3

Inspection Results - Deficiencies
(Continued)
=============================================================================================
ITEM
COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
14
To the satisfaction of the attending classification
11/26/2012
12/17/2014
society surveyor and/or by 03/19/2013
SYSTEM
SUBSYSTEM
COMPONENT
Engineering
Diesel Engine (propulsion-direct drive)
Piping (exhaust)
---Description--1410-Propulsion main engine-Exhaust system back fires on regular basis. Chief engineer suspects this is due to change to
exhaust system in order to accommodate heli-pad installation. As a result of back-fires(one of which resulted in a stack fire
recently), main propulsion machinery & all aux machinery essential to the propulsion & safety of the unit may be compromised.
MODU 1979 7.1.3 (Code 50 )
ITEM
COMPLIANCE DATE
15b
SYSTEM
SUBSYSTEM
Operations/Management
Navigation Safety

DATE ISSUED
DATE RESOLVED
02/12/2013
12/17/2014
COMPONENT
Navigation Underway, General

---Description--The machinery should be of design and construction adequate for the industrial service the equipment is intended for and the
environmental conditions to which it will be subjected. Class to provide report attesting to satisfactory propulsion arrangement
during transit conditions.
ITEM
16

COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
To the satisfaction of the attending classification
12/19/2012
12/17/2014
society surveyor and/or by 03/19/2013
SYSTEM
SUBSYSTEM
COMPONENT
Stability
Unintentional Flooding
General
---Description--A fractured pipe was found passing through the 27- S Bilge Holding tank discharging water into the tank from an unknown
source. RO shall provide report attesting to the satisfactory repair of existing pipe internal to 27-S holding tank. MARPOL 73/78
Annex I/6.4.1 (2011 CE)
ITEM
3

COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
To the satisfaction of the attending classification
11/26/2012
12/17/2014
society surveyor and/or by 03/19/2013
SYSTEM
SUBSYSTEM
COMPONENT
Operations/Management
Pollution
Retention of Oily Mixture
---Description--2110-Oil/Oily mixtures machinery spaces-Discovered fuel oil settling tank converted by crew to a bilge water decanting tank.
Mods included installation of steam piping, steam coil in tank, & piping connected to/from bilge water system. Modification was
installed without sanction of the Administration. Provide documentation from RO of approval & update IOPP certs. MARPOL
73/78 2011 CE Annex I/6.4.2
ITEM
4

COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
To the satisfaction of the attending classification
11/26/2012
12/17/2014
society surveyor and/or by 03/19/2013
SYSTEM
SUBSYSTEM
COMPONENT
Engineering
Shafting/Propeller Arrangements
Intermediate Shaft
---Description--1410-Propulsion main engine-Vessel experienced abnormal propeller shaft vibration on Nov 22, 2012 requiring main engine
shutdown & dead ship tow to Port of Seward. CG inspection revealed vessel also experienced vibration on Nov 6, 2012 while
enroute Port of Dutch Harbor. Design should not cause undue stress in the machinery operating ranges. MODU 1979 7.1.4
ITEM
5

COMPLIANCE DATE
DATE ISSUED
DATE RESOLVED
To the satisfaction of the attending classification
11/26/2012
12/17/2014
society surveyor and/or by 03/19/2013
SYSTEM
SUBSYSTEM
COMPONENT
Engineering
Diesel Engine (propulsion-direct drive)
Crankcase
---Description--1410-Propulsion main engine-Oil mist detectors on main engine cylinders 3 & 6 have broken housings & exposed wires.
Machinery should be provided w/ automatic shut-off arrangements or alarms in the case of failures, which could lead rapidly to
complete breakdown, damage, or explosion. MODU 1979 4.2.7 (Code 50 a)
ITEM
7

COMPLIANCE DATE
To the satisfaction of the attending classification
society surveyor and/or by 03/19/2013

DATE ISSUED
11/26/2012

DATE RESOLVED
12/17/2014

SYSTEM
SUBSYSTEM
Pollution Prevention/Response Prevention Equipment

COMPONENT
Oily Mixture Discharge Fixed Piping System

---Description--1735-Pumping discharge arrangements-Noted addition of a "T" w/ a ball valve in way of vertical pipe connection inboard of
overboard discharge valve downstream of oil content meter. Installation of this arrangement could allow introduction of
unprocessed oily water to the environment. Provide RO approval for installation modification of arrangement. MARPOL 73/78
Annex I/15.2 2011 CE (Code 50 a,c)

Documents and Certificates:
=============================================================================================
Certificates:
Document Description
Issue Date Expire Date
Documents:
Name:
Description
PR 10481481 Fire Screen Doors-Singapore.pdf
27355_Survey_Report__Intermediate_survey_repair_&_modification_hull_and_machinery_installation_-_2014-05-22__Pusan.pdf
NDI_2014JUL07 IOPP w_supplement.pdf
NDI_2014DEC13 DNV_GL ISM Renewal Shipboard Audit Report.pdf
NDI_2014DEC13 DNV_GL ISPS Renewal Shipboard Audit Report.pdf
NDI_2014DEC13 DNV_GL SMC.pdf
NDI_2014DEC13 DNV_GL ISSC Full Term.pdf
4912_001.pdf
12132014 Emergency Drill Report Not Signed.pdf
12082014 Emergency Drill Report Not Signed.pdf
4_FRC_FAT Report.pdf
NDI_2014DEC17 Annual Class & Statutory Survey Statement.pdf
NDI_2014DEC17 Annual Class & Statutory Survey Statement-Narrative Annex.pdf
Approval Letter.pdf
27355 _Survey Statement _Narrative Annex_ Modifications to ship structure _20150106 _Singapore.pdf
Noble Discoverer Survey Statement.pdf

Locations:
Latitude

Longitude

Time

Description

=============================================================================================
01 16.1358 N
103 49.5 E
01/05/2015 07:55
Singapore

Narrative Summary:
=============================================================================================
16-17 Dec 2014 - CWO
and CWO
attended the MODU NOBLE DISCOVERER at JSL Mega Yard, Tuas,
Singapore at the request of the owner in order to observe and clear PSC deficiencies issued to the vessel in November of 2012
by Sector Anchorage. Met with Captain, Chief Engineer (Contract), and Mr.
(Compliance Director).to discuss the
scope of the examination and the current state of the vessel.
Guided by the form B issued Nov 2012 by Sector Anchorage, the attending inspectors reviewed the vessel statutory certificates,
third party servicing certificates, and logs for accuracy and currency. Additionally, the current DNV survey report from Korea was
available for review as well as the results of the vessel's ISM/ISPS renewal audit. Only four observations were noted on the
auditor’s  report,  These  items  dealt  mainly  with  the  fact  that  the  vessel  had  not  been  operating  since  late  2012  so  records  of drills
etc were not readily available.
Conducted tour of the vessel for familiarization. Ship's crew identified the new rescue boat that was installed during the
Singapore dry-dock and records of the installation tests were provided for review. The four lifeboats on the vessel also had their
releases replaced as per the IMO/USCG requirements. All were satisfactorily tested and documentation of testing provided to the
inspectors for review. All five generators were replaced and testing of the safety shutdowns was conducted in the presence of the
attending inspectors and DNV surveyor. The main engine was replaced in Korea and successful sea trials were conducted in
November of 2014. Initial sea trail was unsuccessful due to improper matching of propeller to hull/engine design. This was
corrected in Singapore and resulted in the successful sea trails being completed in the presence of the DNV surveyor. The SFP
in the engine room has also been replaced. New insulation throughout the engine room was installed as a result of the new
engine installation along with the exhaust system for the main engine. A walkthrough of the machinery spaces also included
inspection of the oily water collection tank that is now included on the vessel's IOPP and documented/approved by DNV. The
OWS was not fully tested in the presence of the attending marine inspectors due to the vessel being in the shipyard and inability
to take suction from the tanks as all bilge water was currently being transferred to shore. However, a cursory inspection of the
OCM including the calibration certificate was deemed satisfactory as well as alarm annunciation in the engine room and via the
Kongsberg system. The attending DNV surveyor did complete a full examination of the OWS during the IOPP renewal survey
and  no  observations  or  comments  were  noted  following  his  inspection.  (see  attached  DNV  Survey  report).  The  ship’s  master  also

identified numerous new self closing fire doors in the accommodations block and pilot house. These were replaced based on the
findings of the PSC inspection in November of 2012. A random sampling of the doors and their closures were all found to be
satisfactory. Electrical transit connections and MCT locations were inspected for the presence of dead end wires / cables and
proper installation / construction of cable transits. These were found to be in satisfactory order as well. DNV survey reports
documenting these items and their corrective actions is attached to this case for review.
The 09 remaining deficiencies were cleared after satisfactory resolution was presented to the attending inspectors and
consultation with the attending DNV surveyor in addition to discussion with Sector Anchorage. Vessel's intentions are to seek a
renewal MODU COC on the USWC upon its return. Vessel currently conducting work up training with ship's crew off the coast of
Malaysia in preparation for return to operation sometime in late 2015..
Inspection completed.
//s//
, MSSE3

Activity Action Log:
Eff. Date Unit
Individual

Description

=============================================================================================
01/05/2015
MID Sing
Activity Created. Status: "Open - In Progress"
01/14/2015
MID Sing
Status Changed to "Open - Submitted for Review"
01/28/2015
MID Sing
.
Status Changed to "Closed - Approved Inspection"

Rev. [a]
Survey statement issued
documents the result of survey
DNV GL Id No:
27355

Job Id:
472127

Name of vessel

Name of owner

IMO no.

NOBLE DISCOVERER

Noble Drilling International GmbH

6608608

Station
Singapore

Place of survey
Singapore

Survey completed
2015-01-02

Survey started
2014-08-13

Lead  s urveyor’s  n ame  
Survey team

Misc items Occasional
Reference is made to the survey statement for the job referenced above for the documentation of the result
of survey.

Vessel has fitted Sponson at the aft . relevant drawings are approved.
Witnessed the BOP elevator load testing with a test load of 1.1 times the SWL = 220 MT. Load test is
completed by one full lift of the elevator platform from the main deck upto the drill floor.
NDT - 100% was carried before and after the load test on all high load/stress area identified in the OHS
drawings. Witnessed the NDT after the load test.
Reviewed the reports and found acceptable.Issued statement of fact after satisfactory load testing of
BOP elevator.

Anti-fouling arrangements
Issued Endorsement No.2 for the IAFS.

Sides
Findings
Access opening iwo Engine room side shell on port side is cut to remove Propeller Shaft
Repaired: Engine room side shell repairs acrried with insert

Propeller arrangements
Vessel changed her propeller. Propeller fitup arrangement has been reviewed and approved by DNV GL

Auxiliary steam generator F
Aux Steam generator F internal examination, functional test carried and witnessed flaoting of safety
valves
Safety valve no. 1 F: Set pressure [bar]: 10

Hull compartments

Form No.: SUR 331

Issue: January 2014

www.dnvgl.com

© D NV GL 2 014. DNV GL and the Horizon G raphic are trademarks of DNV G L AS.

P age 1 of 9

Name of vessel
NOBLE DISCOVERER

Name of owner

DNV GL Id No:

Job Id:

Noble Drilling International GmbH

27355

472127

Void side tank 19S(VS-19S)(071-92A)
Findings
Piping penetration through inner lonitudinal bulkhead is removed
Repaired: Piping Penetration hole in the Inner lonitudinal bulkhead is now blanked with an insert
plate of 400x300 mm as identified in the repair sketch 03
Following structure found corroded and thinned
Longitudinal bulkhead between frames 36-71
Repaired: Following structure found cropped and renewed
- Longitudnal bulkhead complete between frame 36-71
Access Opening for transportation of materials into the tank made at main deck between Fr. 71 -75
Repaired: Insert is placed iwo the access opening made on main deck between frames 71-75 as
per repair sketch 13.
Post repairs NDT is carried, Reviewed the reports and found acceptable.

Void double bottom tank 13P(VS-13P)(036-055)
Findings
Bottom plating along with attached longitudinals between frames 49 -55 found diminished
Repaired: Bottom plating along with attached stiffeners between frame 49 -55 found cropped
and renewed.
Post repairs NDT was carried, reviewed the report and found acceptable
Repair sketch 14

Void double bottom tank 6P(VS-6P)(055-071)
Findings
[Void double bottom tank 6P(VS-6P)(055-071)[104.1]]
To reinforce deck and bottom plating iwo pipe penetration.
Repaired: Deck an d Bottom plating iwo pipe penetration reinforced as identified an d marked in
Repair sketch 18
Following structure found corroded and thinned below Tmin
- Inner bottom plating as identified and marked in the repair sketch 11
- Bottom longitudinal (BL) BL 7, BL8 and BL9
- Bracket attached to side shell at Fr.58 and 69
- Stiffeners attached to Inner longitudinal bulkhead at Fr. 65, 68, 69 and 70
Repaired: Cropped and renewed the following structure as per repair sketch 11
- Inner bottom plating as identified and marked in the repair sketch 11
- Bottom Longitudinals (BL) BL7, BL8, BL9 completely as per repair sketch 11
- Bracket attached to side shell at Fr.58 and 69 as per repair sketch 11
- Stiffeners attached to Inner longitudinal bulkhead at Fr. 65, 68, 69 and 70

Form No.: SUR 331

Issue: January 2014

www.dnvgl.com

P age 2 of 9

Name of vessel
NOBLE DISCOVERER

Name of owner

DNV GL Id No:

Job Id:

Noble Drilling International GmbH

27355

472127

Frames at Fr. 56-58, 60 & 61 web frames at Fr. 62, 65, and 69 found corroded and thickn ess below
minimum thickness
Repaired: Frames at Fr. 56-58, 60 & 61 and web frames at 62, 65, and 69 cropped and renewed
as identified and marked in repair sketch 09.
[Void double bottom tank 6P(VS-6P)(055-071)[104.1]]
Access opening made iwo bottom plating for carrying repairs and transporting materials between
frames 56-57, 60-61 and 63-65
Repaired: Insert placed iwo of bottom plating between frames 56-57, 60-61 and 63-65 as
identified and marked in the repair sketch 21.
Post repairs NDT carried, reviewed the report and found acceptable.

Void double bottom tank 6S(VS-6S)(055-071)
Findings
Access opening made iwo bottom plating for carrying repairs and transporting materials between
frames 63-69
Repaired: Insert placed iwo of bottom plating between frames 63 - 69 as identified and marked
in the repair sketch 21.
Post repairs NDT carried, reviewed the report and found acceptable.
Following structure found corroded and thinned below Tmin
- Inner bottom plating as identified and marked in the repair sketch 10
- Bottom longitudinal (BL) BL 7, BL8 and BL9
Transverse bulkhead at Fr.67
Repaired: Cropped and renewed the following structure as per repair sketch 10
- Inner bottom plating as identified and marked in the repair sketch 10
- Bottom Longitudinals (BL) BL7, BL8, BL9 completely as per repair sketch 10
- Transverse bulkhead at Fr.67 as per repair sketch 10
Frames at Fr. 56-61, web frames at Fr. 62, 63, 65, 67 and 69 found corroded and thickness below
minimum thickness
Repaired: Frames at Fr. 56-61 and web frames at 62, 63, 65, 67 and 69 cropped and renewed
as identified and marked in repair sketch 08.

Void space FP(SeaChestFP)(155-157) (Sea Chest)
Findings
Side shell of Fwd bow thruster shell iwo port side between frame 170 -172 found diminished
Repaired: Fwd bow thruster shell iwo port side cropped and renewed by an insert.
Post repairs NDT was carried, reviewed the report and found acceptable
Repair sketch 16

Chain locker P(CL-P)(171-174)
Findings

Form No.: SUR 331

Issue: January 2014

www.dnvgl.com

P age 3 of 9

Name of vessel
NOBLE DISCOVERER

Name of owner

DNV GL Id No:

Job Id:

Noble Drilling International GmbH

27355

472127

Following structure found below Tmin iwo chain locker (P)
- Deck plating as identified and marked in the repair sketch 05
- Longitudinal plating as identified and marked in the repair sketch 05
Repaired: Following structure cropped and renewed as identified and marked in repair sketch 05
- Deck plating 500x400mm & Longitudian plating
Postv repairs NDT was carried, reviewed the reports and found acceptable

Fuel oil side tank 21S(FO-21S)(123-130) (Well Test)
Findings
Operators decided to change the man-hole opening size for operational issues
Repaired: Replaced the manhole openings as per repair sketch 02
The following structure has thickness below Tmin.
- brackets attached to side shell
- Hopper plate with attached stiffeners
- Tank top plating with attached stiffeners
- Inner bottom longitudinal bulkhead as identified in the repair sketch 04
Repaired: - Brackets attached to side shell iwo fr. 124-127 cropped and renewed
- Hopper plate complete in the tank cropped and renewed along with attached stiffeners
- Tank top plating along with attached stiffeners cropped and renewed
- Inner bottom longitudinal plating 900mm from bottom cropped and renewed
The repairs are carried as per repair sketch 04.

Fuel oil side tank 22S(FO-22S)(118-123) (Well Test)
Findings
The following structure has thickness below Tmin.
- brackets attached to side shell
- Hopper plate with attached stiffeners
- Tank top plating with attached stiffeners
- Inner bottom longitudinal bulkhead as identified in the repair sketch 04
Repaired: - Brackets attached to side shell iwo fr. 119-122 cropped and renewed
- Hopper plate complete in the tank cropped and renewed along with attached stiffeners
- Tank top plating along with attached stiffeners cropped and renewed
- Inner bottom longitudinal plating 900mm from bottom cropped and renewed
The repairs are carried as per repair sketch 04.
Operators changed the man-hole opening size for operational issues

Form No.: SUR 331

Issue: January 2014

www.dnvgl.com

P age 4 of 9

Name of vessel
NOBLE DISCOVERER

Name of owner

DNV GL Id No:

Job Id:

Noble Drilling International GmbH

27355

472127

Repaired: Replaced the manhole openings as per repair sketch 02

Fuel oil side tank 23S(FO-23S)(113-118) (Well Test)
Findings
Operators decided to change the man-hole opening size for operational issues
Repaired: Replaced the manhole openings as per repair sketch 02

Fuel oil side tank 23S(FO-23S)(113-118) (Well Test)
Findings
The following structure has thickness below Tmin.
- brackets attached to side shell
- Hopper plate with attached stiffeners
- Tank top plating with attached stiffeners
- Inner bottom longitudinal bulkhead as identified in the repair sketch 04
Repaired: - Brackets attached to side shell iwo fr. 114-117 cropped and renewed
- Hopper plate complete in the tank cropped and renewed along with attached stiffeners
- Tank top plating along with attached stiffeners cropped and renewed
- Inner bottom longitudinal plating 900mm from bottom cropped and renewed
The repairs are carried as per repair sketch 04.

Fuel oil side tank 24S(FO-24S)(109-113) (Well Test)
Findings
The following structure has thickness below Tmin.
- brackets attached to side shell
- Hopper plate with attached stiffeners
- Tank top plating with attached stiffeners
- Inner bottom longitudinal bulkhead as identified in the repair sketch 04
Repaired: - Brackets attached to side shell iwo fr. 107, 109-112 cropped and renewed
- Hopper plate complete in the tank cropped and renewed along with attached stiffeners
- Tank top plating along with attached stiffeners cropped and renewed
- Inner bottom longitudinal plating 900mm from bottom cropped and renewed
The repairs are carried as per repair sketch 04.

Form No.: SUR 331

Issue: January 2014

www.dnvgl.com

P age 5 of 9

Name of vessel
NOBLE DISCOVERER

Name of owner

DNV GL Id No:

Job Id:

Noble Drilling International GmbH

27355

472127

Fuel oil side tank 24S(FO-24S)(109-113) (Well Test)
Findings
Operators decided to change the man-hole opening size for operational issues
Repaired: Replaced the manhole openings as per repair sketch 02

Ballast fore peak tank C(WB-FC)(171-F)
Findings
Fore peak tank transverse bulkhead at Fr 171 found diminished
Repaired: Fore peak tank transverse bulkhead at frame 171 as marked and identified in repair
sketch 16, cropped and renewed with an insert.

Sewage holding tank 16S(VS-16S)(106-141)
Findings
Access opening is made on main deck and bottom plating iwo sewage tank for working/transporting
materials into FO tanks 21, 22, 23 and 24.
Main deck access opening iwo sewage tank between Fr. 110-114 and Fr. 122-126
Bottom plating access opening iwo sewage tank between Fr. 110-114 and Fr. 123-126
Repaired: Insert placed on the access opening made on Main deck plating and Bottom plating
iwo sewage tank as identified and marked in Repair sketch 15.
Post repairs NDT carried, reviewed the NDT report and found satisfactory.

Ballast double bottom tank/Drilling fluid double bottom tank
2P(WB/Drill-2P)(106-141) (Drill Water)
Findings
Piping passing through the Forward watertight transverse bulkhead at Fr.141 is removed
Repaired: Insert placed iwo of forward watertight transverse bulkhead at Fr.141 as identified
and marked in Repair sketch 19
Post repairs NDT is carried. Reviewed the NDT report and found acceptable.

Form No.: SUR 331

Issue: January 2014

www.dnvgl.com

P age 6 of 9

DNV id. no.
27355
Job Id
472127
Name of vessel

Name of owner

NOBLE DISCOVERER

Noble Drilling International GmbH

Tank/Hold/
Space

Press.
tested

Exam.
type

Extent of
crediting

Repairs
carried out
/CC/MO
issued

(1)

(2)

(3)

(4)

Void side tank
19P(VS-19P)(071-92A
)
Void side tank
19S(VS-19S)(071-92A
)
Void side tank
20S(VS-20S)(036-071
)
Void double bottom
tank
13P(VS-13P)(036-055
)

(1 )
C = pres sure testing
s uccessfully carried
out
M = pressure testing
c redited based on
mas ter statement
(not valid for ballast
tanks)

Form No.: SUR 331

(2 )
O = O verall
C UP =
C lose-up
(partial)
C UC =
C lose-up
(c omplete)

Hard
protective
protection
coating
Type
extent

Means of
access

Local UTM
carried
out

Corrosion

Substantial
corrosion

(5)

(6)

(7)

(8)

(9)

DA

Y

N

HC

C

Coating
condition for
hard
protective
coating

Annual
examination
required?

(10)

(11)

NO
NO
NO

O

(3 )
Renewal
I ntermediate
A nnual
H ull Continuous
H /R = H ull Responsible
P WST = P assed Without
Survey/Test

Issue: January 2014

Repaired

(4 )
C C, MO = C ondition of
C lass and/or Memo to
O wner given
RE P = Findings now
repaired
N O = N o findings

www.dnvgl.com

(5 ) I f c lose up exam:
P S = P ermanent access
T S = T emporary staging
L MP = L ifts and movable
platforms
BR = Boats and rafts
D A = D irect access, no
particular provisions
C = C limbing

(6 )
R = Reduced.
Y = C arried out as part
of Close-up or additional
mapping in the
c ompartment.
(7 )
Y = Found. Always to be
reported on based on
s ufficient mapping of
the c orroded area

(8 )
H C = H ard Coating
SHC = Semi Hard
C oating
A = A nodes
SC = Soft Coating
SS = Stainless s teel
N P = N o protection

(9 )
C = Complete tank
U = U pper part
M = M iddle part
L = L ower part

Fair

N

(1 0 )
GOOD, FAIR O R POO R
For definition see ship rules.
(1 1 )
Y = A nnual survey to be
implemented/continued

P age 7 of 9

Name of vessel

Name of owner

DNV id. no.

Job id.

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

472127

Void double bottom
tank
13S(VS-13S)(036-055
)
Void double bottom
tank
6P(VS-6P)(055-071)
Void double bottom
tank
6S(VS-6S)(055-071)
Void space
FP(SeaChestFP)(155-1
57) (Sea Chest)
Chain locker
P(CL-P)(171-174)
Fuel oil side tank
21S(FO-21S)(123-130
) (Well Test)
Fuel oil side tank
22S(FO-22S)(118-123
) (Well Test)
Fuel oil side tank
23S(FO-23S)(113-118
) (Well Test)
Fuel oil side tank
24S(FO-24S)(109-113
) (Well Test)
Ballast fore peak tank
C(WB-FC)(171-F)
Sewage holding tank
16S(VS-16S)(106-141
)
Ballast double bottom
tank/Drilling fluid
double bottom tank
2P(WB/Drill-2P)(106-1
41) (Drill Water)

Form No.: SUR 331

NO

O

Repaired

DA

Y

N

HC

C

Good

N

O

NO

DA

Y

N

HC

C

Good

N

Repaired
Repaired
C

O

Repaired

PS

Y

N

HC

C

Good

N

C

O

NO

PS

Y

N

HC

C

Good

N

C

O

Repaired

PS

Y

N

HC

C

Good

N

C

O

Repaired

PS

Y

N

HC

C

Good

N

Issue: January 2014

Repaired
NO

NO

www.dnvgl.com

P age 8 of 9

Name of vessel

Name of owner

DNV id. no.

Job id.

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

472127

Ballast double bottom
tank/Drilling fluid
double bottom tank
2S(WB/Drill-2S)(106141) (Drill Water)

Form No.: SUR 331

C

Issue: January 2014

Repaired

www.dnvgl.com

P age 9 of 9

Name of v essel

NOBLE DISCOVERER

Survey Code

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Survey Name

Result

MODU.A

MODU Code annual

Complete

IOPP-A.In

Oil pollution prevention, type A intermediate

Complete

IOPP-A.A

Oil pollution prevention, type A annual

Complete

IAPP.In

Air pollution prevention intermediate

Complete

IAPP.A

Air pollution prevention annual

Complete

Survey of Machinery items
Survey
Code

Old Code/
Onb. Name

Survey Item

Result

MDETST

Propulsion diesel engine

Complete

MDEFIX

Propulsion diesel engine > Fixation arrangement

Complete

MDECAS

Propulsion diesel engine > Engine casing arrangement

Complete

MDESPC

Propulsion diesel engine > Tie rods

Complete

MDECYA

Propulsion diesel engine > Cylinder head 1

Complete

MDECYA

Propulsion diesel engine > Cylinder head 2

Complete

MDECYA

Propulsion diesel engine > Cylinder head 3

Complete

MDECYA

Propulsion diesel engine > Cylinder head 4

Complete

MDECYA

Propulsion diesel engine > Cylinder head 5

Complete

MDECYA

Propulsion diesel engine > Cylinder head 6

Complete

MDECYL

Propulsion diesel engine > Cylinder liner 1

Complete

MDECYL

Propulsion diesel engine > Cylinder liner 2

Complete

MDECYL

Propulsion diesel engine > Cylinder liner 3

Complete

MDECYL

Propulsion diesel engine > Cylinder liner 4

Complete

MDECYL

Propulsion diesel engine > Cylinder liner 5

Complete

MDECYL

Propulsion diesel engine > Cylinder liner 6

Complete

MDEPIS

Propulsion diesel engine > Piston arrangement 1

Complete

MDEPIS

Propulsion diesel engine > Piston arrangement 2

Complete

MDEPIS

Propulsion diesel engine > Piston arrangement 3

Complete

MDEPIS

Propulsion diesel engine > Piston arrangement 4

Complete

MDEPIS

Propulsion diesel engine > Piston arrangement 5

Complete

MDEPIS

Propulsion diesel engine > Piston arrangement 6

Complete

MDECRO

Propulsion diesel engine > Crosshead 1

Complete

MDECRO

Propulsion diesel engine > Crosshead 2

Complete

MDECRO

Propulsion diesel engine > Crosshead 3

Complete

MDECRO

Propulsion diesel engine > Crosshead 4

Complete

MDECRO

Propulsion diesel engine > Crosshead 5

Complete

MDECRO

Propulsion diesel engine > Crosshead 6

Complete

MDECRA

Propulsion diesel engine > Crankshaft arrangement

Complete

MDECRB

Propulsion diesel engine > Crank bearing 1

Complete

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 2 of 31

Name of v essel

NOBLE DISCOVERER

Survey
Code

Old Code/
Onb. Name

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Survey Item

Result

MDECRB

Propulsion diesel engine > Crank bearing 2

Complete

MDECRB

Propulsion diesel engine > Crank bearing 3

Complete

MDECRB

Propulsion diesel engine > Crank bearing 4

Complete

MDECRB

Propulsion diesel engine > Crank bearing 5

Complete

MDECRB

Propulsion diesel engine > Crank bearing 6

Complete

MDEMAB

Propulsion diesel engine > Main bearing 1

Complete

MDEMAB

Propulsion diesel engine > Main bearing 2

Complete

MDEMAB

Propulsion diesel engine > Main bearing 3

Complete

MDEMAB

Propulsion diesel engine > Main bearing 4

Complete

MDEMAB

Propulsion diesel engine > Main bearing 5

Complete

MDEMAB

Propulsion diesel engine > Main bearing 6

Complete

MDEMAB

Propulsion diesel engine > Main bearing 7

Complete

METBEA

Propulsion diesel engine > Internal thrust bearing, tilting pad

Complete

MDEVID

Propulsion diesel engine > Vibration dampers

Complete

MDECAM

Propulsion diesel engine > Camshaft arrangement

Complete

MDEFUO

Propulsion diesel engine > Fuel oil system

Complete

MDEHYD

Propulsion diesel engine > Valve lift hydraulic power system

Complete

MDESCA

Propulsion diesel engine > Combustion air cooler

Complete

MDEFUI

Propulsion diesel engine > Combustion air blower L

Complete

MDEFUI

Propulsion diesel engine > Combustion air blower U

Complete

MDETUR

Propulsion diesel engine > Turbocharger

Complete

MDESTA

Propulsion diesel engine > Starting system, air

Complete

CPTBEA

Propulsion thrust bearing, axial plain

Complete

INTSHA

Intermediate shaft

Complete

CPIBEA

Intermediate shaft bearing A

Complete

CPIBEA

Intermediate shaft bearing F

Complete

CPRCOU

Propulsion shaft connection, flanged

Complete

MEPDIE

Main generator diesel engine 1PO

Complete

MEPTST

Main generator diesel engine 1PO

Complete

MEPTUR

Main generator diesel engine 1PO > Turbocharger A

Complete

MEPTUR

Main generator diesel engine 1PO > Turbocharger F

Complete

MEPDIE

Main generator diesel engine 2PI

Complete

MEPTST

Main generator diesel engine 2PI

Complete

MEPTUR

Main generator diesel engine 2PI > Turbocharger A

Complete

MEPTUR

Main generator diesel engine 2PI > Turbocharger F

Complete

MEPDIE

Main generator diesel engine 3C

Complete

MEPTST

Main generator diesel engine 3C

Complete

MEPTUR

Main generator diesel engine 3C > Turbocharger A

Complete

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 3 of 31

Name of v essel

NOBLE DISCOVERER

Survey
Code

Old Code/
Onb. Name

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Survey Item

Result

MEPTUR

Main generator diesel engine 3C > Turbocharger F

Complete

MEPDIE

Main generator diesel engine 4SI

Complete

MEPTST

Main generator diesel engine 4SI

Complete

MEPTUR

Main generator diesel engine 4SI > Turbocharger A

Complete

MEPTUR

Main generator diesel engine 4SI > Turbocharger F

Complete

MEPDIE

Main generator diesel engine 5SO

Complete

MEPTST

Main generator diesel engine 5SO

Complete

MEPTUR

Main generator diesel engine 5SO > Turbocharger A

Complete

MEPTUR

Main generator diesel engine 5SO > Turbocharger F

Complete

MEPDIE

Main generator diesel engine 6F

Complete

MEPTST

Main generator diesel engine 6F

Complete

MEPTUR

Main generator diesel engine 6F > Turbocharger A

Complete

MEPTUR

Main generator diesel engine 6F > Turbocharger F

Complete

AUCPUI

Auxiliary condensate pumping unit A

Complete

AUCPUI

Auxiliary condensate pumping unit C

Complete

AUCPUI

Auxiliary condensate pumping unit F

Complete

FUOPUI

Fuel oil pumping unit (Diesel oil purifier supply, ME)

Complete

FUOPUI

Fuel oil pumping unit (Diesel oil transfer, Pump room)

Complete

FUOPUI

Fuel oil pumping unit 1 (Diesel Oil, primary for main engine)

Complete

FUOPUI

Fuel oil pumping unit 2 (Diesel Oil, primary for main engine)

Complete

FUOPUI

Fuel oil pumping unit L (Diesel Oil, Boiler)

Complete

FUOPUI

Fuel oil pumping unit U (Diesel Oil, Boiler)

Complete

FUOCOO

Fuel oil cooler (MGO Cooler for Main engine)

Complete

FUOCOO

Fuel oil cooler (MGO Heater for Main engine)

Complete

LUOPUI

Lubrication oil pumping unit (Purifier supply)

Complete

LUOPUI

Lubrication oil pumping unit P (Main engine)

Complete

LUOPUI

Lubrication oil pumping unit S (Main engine)

Complete

LUOCOO

Lubrication oil cooler A (Main Engine)

Complete

SLUPUI

Sludge pumping unit (Transfer, Main engine rooom)

Complete

SWCPUI

Sea water pumping unit A (Sewage treatment)

Complete

SWCPUI

Sea water pumping unit C (Aux. engine)

Complete

SWCPUI

Sea water pumping unit F (Sewage treatment)

Complete

SWCPUI

Sea water pumping unit P (Aux. engine)

Complete

SWCPUI

Sea water pumping unit P (Main)

Complete

SWCPUI

Sea water pumping unit S (Aux. engine)

Complete

SWCPUI

Sea water pumping unit S (Main)

Complete

SWCPUI

Sea water pumping unit S(GS) (Main engine room)

Complete

FWCPUI

Fresh water pumping unit A (LT)

Complete

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 4 of 31

Name of v essel

NOBLE DISCOVERER

Survey
Code

Old Code/
Onb. Name

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Survey Item

Result

FWCPUI

Fresh water pumping unit A (M/E Jacket)

Complete

FWCPUI

Fresh water pumping unit F (M/E Jacket)

Complete

FWCPUI

Fresh water pumping unit P (LT)

Complete

FWCCOO

Fresh water cooler (LT)

Complete

FWCCOO

Fresh water cooler (Main Engine jacket)

Complete

FWCCOO

Fresh water cooler 1 (Aux. engine AFT)

Complete

FWCCOO

Fresh water cooler 1 (Aux. engine jacket)

Complete

FWCCOO

Fresh water cooler 2 (Aux. engine AFT)

Complete

FWCCOO

Fresh water cooler 2 (Aux. engine jacket)

Complete

FWCCOO

Fresh water cooler 3 (Aux. engine AFT)

Complete

FWCCOO

Fresh water cooler 3 (Aux. engine jacket)

Complete

FWCCOO

Fresh water cooler 4 (Aux. engine AFT)

Complete

FWCCOO

Fresh water cooler 4 (Aux. engine jacket)

Complete

FWCCOO

Fresh water cooler 5 (Aux. engine AFT)

Complete

FWCCOO

Fresh water cooler 5 (Aux. engine jacket)

Complete

FWCCOO

Fresh water cooler 6 (Aux. engine AFT)

Complete

FWCCOO

Fresh water cooler 6 (Aux. engine jacket)

Complete

FWCHEA

Fresh water heater (Main engine)

Complete

SAMCUI

Starting air compressor unit, main A (Main engin room)

Complete

SAMCUI

Starting air compressor unit, main C (Main engin room)

Complete

SAMCUI

Starting air compressor unit, main F (Main engin room)

Complete

SAEARE

Starting air receivers, emergency (Aux. engine) (Machine shop)

Complete

BBFPUI

Bilge water pumping unit S (Transfer, Main E/R)

Complete

C/E - Indicates survey carried out by Chief Engineer

Conditions and Memoranda - Deleted or Postponed
CC 31

Issued:2012-12-21
Refer to PSC Report dated 2012-11-26, Deficiency 4, Code 1410, action code 17ac, and
Refer to PSC Report dated 2012-11-26, Deficiency 5, Code 1410, action code 17ac
Refer to PSC Report dated 2012-11-26, Deficiency 12, Code 1410, action code 17a
Refer to PSC Report dated 2012-11-26, Deficiency 14, Code 1410, action code 17ac
Following had been confirmed:
- The No.3 and 6 Oil mist detectors were replaced and wires were properly connected.

Status
Deleted

Before bring the Main Engine and Propulsion back to service,
- The system to be evaluated and cause of vibration to be determined, repair proposal to be
submitted to DNV for approval. Repair and testing to be inspected and witnessed by DNV
surveyor.
- The complete oil mist detection system to be calibrated and tested.
- The M/E piston cooling water system to be repaired, any change to be submitted to DNV
for approval.
Action
DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 5 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Conditions and Memoranda - Deleted or Postponed

Status

Main diesel engine for propulsion has been replaced with new one certified by DNV.
CC 32

Issued:2012-12-21
Refer to Updated PSC Report dated 2012-12-19, Deficiency 15, Code 1410, action code
50ac
The evaluation the capacity of Propulsion system on board to be submitted for review.

Deleted

Action
Main engine was replaced with new one. (MCR 6480kW /136rpm)
CC 33

Issued:2012-12-21
Refer to PSC Report dated 2012-11-26, Deficiency 9, Code 0950, action code 17a

Deleted

Owner plan to carry out further repair in shipyard, the overall inspection of EL installation
to be carried out by DNV EL surveyor before the rig leaving shipyard.
Action
New CC was issued.
CC 34

Issued:2013-03-04
Finding related to hull dent should be investigated and addressed accordingly.

Deleted

Action
The area has been repaired by inserting plates.
CA
618

Issued:2012-12-21
Refer to PSC Report dated 2012-11-26, Deficiency 3, Code 2110, action code 17ac,
Refer to PSC Report dated 2012-11-26, Deficiency 7, Code 1735, action code 17ac and
Refer to Updated PSC Report dated 2012-12-19, Deficiency 16, Code 1799, action code
50ac:

Deleted

Before the modification was brought into service, the drawing to be submitted to DNV fo r
approval, the modification shall be inspected and verified by DNV Surveyor.
The leaking pipe and source to be rectified.
Action
Updated and modified piping system was inspected at the surveyor's satisfaction in
accordance with 'as built drawing' which was submitted for DNV approval.
RR 6
Ref
1030b

Issued:2013-01-25
Bridge navigational watch alarm system (BNWAS):
Cargo vessels with gross tonnage >= 3,000 constructed before 2011-07-01 shall be fitted
with an BNWAS in compliance with MSC.128(75), not later than the first Cargo Ship
Safety Equipment Certificate (CEC) survey (initial or annual) on or after 2012-07-01.
Existing systems may be exempted from full compliance.

Deleted

Action
For the installation of BNWAS on board, new MO (memo to owner) was issued as the
flag's authority has granted the vessel to sail without an installed Bridge Navigation Watch
Alarm System (BNWAS) until 2014-10-31.
MO 3

Issued:2009-08-21
Aux. engine no. 6 crankshaft was renewed by Caterpillar service engineer. Certificate for
crankshaft was not yet provided.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Deleted

Page 6 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Conditions and Memoranda - Deleted or Postponed

Status

Action
All (6) diesel engines for aux generators have been renewed with DNV certified products.
MO 4

Issued:2010-01-20
Crankshafts, connecting rod & cylinder heads used for the rebuild of six D399 caterpillar
engines (Auxiliary Power) are non-DNV certified components

Deleted

Action
All (6) diesel engines for aux generators have been renewed with DNV certified products.
MO 7

Issued:2012-02-15
All operational tests for emergency generator was carried out and considered to be
satisfactory, however, as required by the MODU Code 1979 starting system of the
emergency generator is to be approved by the Flag admin istration. A letter/e-mail fro m the
Owner/owner representative to the flag for approval was sighted by the undersigned,
however, pending response from the Liberian Flag administration.

Deleted

Action
Liberian flag administration has issued the acceptance letter on 2014-02-19. The copy of
letter found placed on board.

Conditions and Memoranda - Given
CA
619

The updated Operating Manual as required by MODU Code is to be approved on behalf of
the Administration and is to be placed on board.

Due Date
2014-08-15

Finding(s):
[On board documentati on]
Approval of the updated Operating Manual, as required by MODU Code containing
guidance for the safe operation of the unit for both normal and envisaged emergency
conditions, was found not placed on board.
CC 35

Within the due date, the temporarily repaired side shell leaks are to be repaired
permanently.

2014-08-15

Finding(s):
[Sides]
-.Temporary repair has done on side shell leak at sponson tank no. 14 Port Fr.35.
-.Temporary repair has done with side shell doubler plate on port aft. thruster well from
Fr.39 to Fr.44
CC 36

Within the due date, leaked valve for No.24 Diesel Oil tank (starboard side) outlet to be
brough in order.

2014-08-15

Finding(s):
[Fuel oil system]
It was found that the outlet valve for No.24 Diesel Oil tank (starboard side) was leaked.
CC 37

Within given due date, the cracks found in No.2 Ballast tank (starboard side) are to be
permanently repaired.

2014-08-15

Finding(s):
[Ballast double bottom tank/Drilling fluid double bottom tank
2S(WB/Drill-2S)(106-141) (Drill Water)]
Three(3) cracks were found in No.2 Ballast Tank(starboard side) in way of below No.23

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 7 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Conditions and Memoranda - Given

Due Date

Fuel oil tank.
CC 38

Owner plan to carry out further repair in next shipyard as numerous cable installations need
to be updated referring the previous CC33, the overall inspection of EL installation to be
carried out by DNV EL surveyor before the rig leaving shipyard in Singap ore.

MO 10
Ref
106p

Annual survey of tanks and spaces due to 'No protective coating' & 'POOR coating':
The survey 'Tanks and spaces annual' applies to this vessel. The survey includes internal
overall examination. For areas with general breakdown of the protective coating, close -up
examination and thickness measurement shall be carried out to an extent sufficient to
determine both general and local corrosion levels. For areas found with substantial
corrosion extended thickness measurements shall be carried out before the survey is
credited as completed.
The following tanks are affected by this Memo:
-. No.6 Void double bottom tank (P) - Poor coating
-. No.6 Void double bottom tank (S) - Poor coating

MO 11

Bridge navigational watch alarm system (BNWAS) should be fitted on board in
compliance with MSC.128(75) not later than 2014-10-31 as per the flag's dispensation
letter indicat ing that the vessel is authorized to sail without the installation of the BNWAS
until 2014-10-31.
In the meantime, the navigation bridge shall be manned by a watch -keeping officer and a
watch-keeping rating at all times.

MO 12

Before taking the below equipment into use, the overall examination is to be performed at
the surveyor's satisfaction.
1. Two(2) auxiliary steam generators found not in used condition.
2. Hot glycol system has pending approval comments (refer to 27355-J-10409)

MO 13

Wasted hole on plating was found in way of 'Chain Locker Hatch' located in the bosun
store which will be repaired before the rig leaving the next shipyard in Singapore.

MO 14

Before taking the rescue boat davit into use, overload testing of release gear & launching
test (at 5knot) to be carried out.

MO 15

DNV drawing approval of modification regarding 'bilge system' to be placed on board for
the final verification.

2014-08-15

Survey Observations and Findings
Occasional survey for 'Hull - modification and repair' & 'Machinery modification' was carried out as followings;
**A : The hull modifications as follows were carried out while the vessel staying in the repair yard 'STX Offshore &
Shipbuilding Co.,Ltd. (Gosung)' in Korea.
Approval of WPS/Welders was verified and the welding visual and NDT(by a suitable and agreed method i.e. MT
and/or UT) were carried out during the fabrication and/or installation at the surveyor's satisfaction.
1. Demolition of the 'Ballast Double Side Tank No.1 P & S (141-171) by making perforations on outer shell (ref. no.
TAMUS475/HUYNH/27355-J-10615).
2. Extension of the sponson deck including new construction of Ballast Double Side Tank no. 14 P & S (01-55) (ref. no.
TAMUS475/HZNAL/27355-J-10577 & HUYNH/27355-J-10587, OAPUS125/HUYNH/27355-J-10631).
New construction of the tanks with associated piping and extension of the sponson deck were inspected and verified at
the surveyor's satisfaction in terms of the material used, welding with the relevant NDT according to the requirements.
DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 8 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

3. FWD & AFT deck constructions related to the foundation of smit bracket in accordance with approved drawing (ref.
no. TAMUS475/HUYNH/27355-J-10427).
4. FWD construction regarding replacement of anchors & windlass in accordance with approved drawing (ref. no.
TAMUS475/HUYNH/27355-J-10578, 10609, 10616).
5. Main deck construction underneath the new deck crane installation in way of Fr.67~Fr.74 (starboard side) &
Fr.107~Fr.104 (port side) in accordance with approved drawing (ref no.TAMUS475/HUYNH/ 27355 -J-10458).
6. Engine roo m double bottom construction relating to the replacement of the main engine in accordance with approved
drawing. (ref. no. TAMUS475/HUYNH/27355-J-10580).
7. Modification of existed No.28P Void Tank (09-14) i.e. the tank has been divided into three(3) compartments in
accordance with approved drawing (ref no. TAMUS475/HUYNH/27355-J-10560)
: 'No.28P Vo id Space', 'No.28P Sewage Ho lding Tank', 'F.W. tank for Local Fire Fighting System' / Hu ll items list has
been updated.
8. Modification of existed No.28S Void Tank (09-14) i.e. the tank has been divided into three(3) compartments in
accordance with approved drawing (ref. no.TAMUS475/HUYNH/27355-J-10560).
: 'No.28S Void Space', 'No.28S Bilge Tank', 'Waste Oil Tank'
**B. Hull structure repair : see item 'Ship hull structure' and 'Sides' in this report.
**C. Machinery modification ;
1. Main diesel propulsion engine was renewed. See item 'Propulsion driver arrangement AC' in this report.
2. Au x. d iesel engines (x 6sets) for main generators were renewed. See item 'Main electric power system' in this report.
3. Shipboard cranes were renewed. See item 'Cranes' in this report.
4. Sewage treatment plant was renewed. See item 'Sewage system' in this report.
5. Three(3) air co mpressors in main engine roo m were renewed, and one(1) Aux. air reservoir was installed in mach ine
workshop. See item 'Compressed air systems' in this report.
6. Propulsion propeller and shafting were renewed. See item 'Propeller shafting' in this report.
7. Deck machinery i.e. windlass & chain stopper were renewed. See item 'Anchoring arrangement' in this report.
8. Water based local fire fighting systems/CO2 fire extinguishing system were newly installed. See item
'Fireprevention arrangements' in this report.
9. Launching davit for fast rescue boat was newly installed. See item 'Lifeboat arrangements, conventional' in this
report.
10. Machinery list in the class status has been updated about the machinery rep lacement and new installation inclusive
others i.e. pumps, heat exchangers.

forward view

a complete view

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 9 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Operational survey plans
Radio service supplier name: Hanshin Electronic Co., Ltd.

Anti-fouling coating
At the request of the owner's representative, an occasional survey for Anti-fouling system about the replacement of
more than 25% of the existing AFS as follows.
1. Paint specification verified and proper documentation provided.
2. Name of manufacturer : Joturn AS (Chokwang Joturn Ltd.)
3. Type : Tin free self polishing anti-fouling system
4. Name of AFS & Color : SeaQuantum Ultra, Light Red/Dark Red.
After the completion of survey, International Anti-fouling System Certificate onbaord was endorsed for the 1st
endorsement of the record and 'Short term Endorsement of the Record (Form AFS 405a)' was issued accordingly.

Ship hull structure
Ultrasonic thickness measurements were taken by DNV approved company (Shin -dongyang Engineering Co., Ltd.),
verified and evaluated. A survy and UTM planning meeting with DNV surveyors, owners representatives and UTM
technicians present, was held while the vessel stay at drydock. Safety, schedule, survey requirements, scope,
communication were discussed at owner's office in STX Shipbuilding & Offshore Co., Ltd. (Gosung) in Korea on
2013-10-23.
As per UTM report no. SDY130607i, the following repairs were carried out due to finding excessive corrosion ;
**AA. Bottom plating partial replacement
1. Ballast double bottom tank/Drilling fluid double bottom tank No.2P(106-141)
- Bottom plating in way of Fr.106 to Fr.141 (between L7 and L12) was renewed / Bilge st rake plating was partly
renewed at Fr.110, Fr.114, Fr.118.
- Internal members were renewed i.e. L7 watertight Longi. girder (between Fr.106 and Fr.141), L11 Longi.
girder(between Fr.106 and Fr.122), L8/ L9/ L10/ L12 bottom longi. & L13/ L14 b ilge longi.(betwee n Fr.106 and Fr.116),
Trans.Frame Fr.110/114/122 lower half (between L11 and L15), Trans. Frame Fr.110 (between L7 and L11), Trans.
Frame Fr.114/126(between L8 and L11), Trans.Frame Fr.118(between L7 and L8)
2. Ballast double bottom tank/Drilling fluid double bottom tank No.3P(92Q-106)
- Bottom plating in way of Fr.103(500mm x 500mm) and Fr.92Q-Fr.95 (1810mm x 1500mm) was renewed.
- L7 watertight Longi. girder(between Fr.98 and Fr.106) was renewed.
3. Ballast double bottom tank/Drilling fluid double botto m tank No.3S(92Q-106)
- Bottom plating in way of Fr.101-Fr.106(between L7 and L10), Fr.95.5-Fr.99.5(fro m 6100mm off CL to L9.5),
Fr.93-Fr.95.5 (between L6(in No.3 C starboard side) and L12) was renewed.
- Internal members were renewed i.e. Longi.girder L11 (between Fr.92 and Fr.94), Trans.Frame Fr.97/100/103(between
L7 and L11), L9/L10 Longi.(between Fr.92Q and Fr.106), L8 Longi.(between Fr.103 and Fr.106)
4. Ballast double bottom tank/Drilling fluid double bottom tank No.5P(71-92A)
- Bottom plating in way of Fr.71-Fr.75(between L7 and L10), Fr.88-Fr.92A(between L6 (in No.5C port side) and L9),
Fr.87-Fr.88(between L7 and L8).
5. Ballast double bottom tank/Drilling fluid double bottom tank No.5S(71-92A)
- Bottom plating in way of Fr.71-Fr.78(between L7 and L12), Fr.86-Fr.92A(fro m 8100mm off CL to starboard side)
was renewed.
- Internal members were renewed i.e. L8/L9/L10/ L12 bottom longi. (Fr.71 to Fr.77), L11 Longi.girder half
lower(between Fr.71 and Fr.77), Trans.Frame Fr.74 lo wer half(between L8 and L11), Trans.Frame Fr.72, Trans.Frame
Fr.73/Fr.75/Fr.76 lower half(between L10 and L11).
6. Bilge tank (009-019) No.8C
DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 10 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

- Keel plating in way of Fr.10 (500mm x 500mm), Fr.13-Fr.16(2500mmx 800) was renewed.
- Pitted plate in way of Fr.10-Fr.11/Fr.12-Fr.13(starboard side), Fr.14-15/Fr.16-17(port side) was repaired by cladding
welds.
7. Fore peak tank (171-F)
- Keel plating in way of Fr.173-Fr.174(800mmx 600) was renewed.
8. Void double bottom tank No.13P(036-055)
- Bottom plating in way of Fr.35-Fr.40(fro m watertight Longi.girder to 1320mmW toward port side) &
Fr.42.5-Fr.43.5(fro m watertight Longi.girder to 1160mm toward port side) was renewed.
- Internal members were partly renewed i.e. Trans.Frame Fr.36(between L4 and L5), Diagonal Longi.girder(between
Fr.35 and Fr.36)
9. Void double bottom tank No.13S(036-055)
- Bottom plating in way of Fr.35-Fr.37(fro m watertight Longi.girder to 900mm toward starboard side),
Fr.40-Fr.46(fro m watertight Longi.girder to 2190mm toward starboard side), Fr.43-Fr.50 (3100Lmm x 2000mmW in
way of watertight Longi. girder)
- Internal members were partly renewed i.e. L8 bottom longi.(400mm) in way of Fr.47, L9 bottom longi.(4100mm) in
way of Fr.42-Fr.47, L5 bottom longi.(Fr.38 to Fr.41+400mm, Fr.43+300mm to Fr.47)
10. Bilge Tank No.27 S (019-036)
- Bottom plating in way of Fr.29-Fr.36 (from center keel girder toward starboard side, about 5600mmL x 2800mmW)
- Internal members were partly renewed in way of Fr.29-Fr.36 i.e. 1st/2nd longi.girders(Fr.29.5 to Fr.35) & floors
(Fr.30 to Fr.35) lower half.
**BB. Tank top plating partial replacement ; DB tank no.1(C) no.2(C), no.3(C), no.5(C), no.6(C).
1. Ballast double bottom tank 1C(141-167)
aa) Port side;
- fro m 100mm+L7 to L9+100mm & fro m 100mm+L4 to L5+100mm between Fr.141~Fr.143fro m L2+400 mm to port
side shell plating(Fr.155~Fr.161)
- from 100mm+L2 to side shell plating (Fr.161~Fr.164)
- from 200mm+Center to L1+100mm (Fr.152~Fr.162)
bb) Starboard side;
- from 100mm+Center to L3+100mm (Fr.141~Fr.143)
- from 100+L2 to starboard side shell plating (Fr.161~Fr.164)
cc) Port and starboard sides : between Fr.164~166 (port and stb'd side)
2. Ballast double bottom tank / drilling fluid double bottom tank 2C (Permanent Mud)(106~141)
- Whole plate on no.2(C)tank top from Fr.106 to Fr.141
3. Ballast double bottom tank / drilling fluid double bottom tank 3C (Permanent Mud)(92Q-106)
- Whole plate on tank top from Fr.92Q to Fr.106
4. Ballast double bottom tank / drilling fluid double bottom tank 5C (Permanent Mud)071-92A)
- Whole plate on tank top from Fr.71 to Fr.92A
5. Ballast double bottom tank / drilling flu id double bottom tank 6C (Permanent Mud)(036 -055) & Vo id double bottom
tank 13P/S (036-055)
- Whole plate on tank top from Fr.36 to Fr.71 (inclusive No.13 P&S Void DB tank top plating to the slopp ing plate).
The above repairs were inspected and verified at the surveyor's satisfaction in terms of the material used, welding with
the relevant NDT according to the requirements.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 11 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

After modification - FORWARD

After modification - AFT

Bottom plating renewal - sketch 1

Bottom plating renewal - sketch 2

Findings
[Transverse bulkheads]
Hull dent found in starboard aft side of side shell right above the waterline should be investigated for repair.
[Previously issued as CC 34 - now Deleted]
Repaired: Indent in side shell plating was repaired by inserting new plate and affected internal structures were
renewed accordingly.

After repair

Sides
** The following repairs were applied on side shell plating and verified by relevant NDT with attending surveyor's
satisfaction;
1) Clad welding repairs(size approx. 500mm x 500mm respectively) with NDT(MT) on pitted plate in way of no.1
Sponsons Demolition.
DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 12 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

- Port side : 1st platform - Fr.162~163, Fr.163~164 / 2nd platform - Fr.152~153, Fr.153~154, Fr.170~171 / 3rd
platform-Fr.141~142, Fr.153~154, Fr.154~155, Fr.170~171.
- Starboard side : 2nd platform - Fr.151~152, Fr.152~153, Fr.158~159, Fr.160~161, Fr.161~162, Fr.169~170,
Fr.170~171 / 3rd platform - Fr.149~150, Fr.153~154, Fr.154~155, Fr.155~156, Fr.156~157
2) Insert plate in way of port side Fr.154 (approx. 600mm x 600mm)
3) Insert plate in way of no.3 port side ballast tank Fr.103 (approx. 500mm x 500mm)
4) Insert plate in way of no.5 starboard side ballast tank between Fr.73 and Fr.74 (approx. 1100mm x 300mm)
5) Insert plate in way of engine room port side shell plate between Fr.11 and Fr.13 (approx. 2100mm x 1700mm)
Findings
-.Temporary repair has done on side shell leak at sponson tank no. 14 Port Fr.35.
[Issued as part of CC 35]
-.Temporary repair has done with side shell doubler plate on port aft. thruster well from Fr.39 to Fr.44
[Issued as part of CC 35]

Bottom
At the request of the owner's representative, the vessel's bottom survey was carried out during her staying at the
dry-dock and found to be satisfactory. Note that bilge keel p lates on port and starboard sides were cut off and removed
at the owner's decision which will not be affected to the class.

Stability
-. An occasional survey for 'Lightweight survey and Inclining experiment' was carried out in the presence of surveyor
according to the approved procedure (ref. no. TAMUS475/HUYNH/ 27355 -J-10608).
All records and measurement has been confirmed and endorsed by attending surveyor (see separate survey report of
2014-03-09 / job id. N345625-1).
-. As per the approval letter Ref no.MCANO845/JHYUN/ 27355-J-10709 (document number 13-026-NR-10-003), it
was verified that the loading co mputer software was installed on t wo(2) independent computers and the results fro m the
calculations onboard are same as for the approved test conditions. Upon completion of the verification, the loading
computer certificate (Form no. 60.00a) was issued.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 13 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Anchoring arrangement
Anchoring arrangement has been modified as followings in accordance with the approved drawing (DNV ref.
no.TAMUS471/SSRID/27355-J-10566) ;
1. Two(2) anchors were renewed with HHP type anchor (weight grade 12675kg, certified by DNV WUH-13-9158 &
9159).
2. Two(2) anchor shackles for connecting with existing chain were newly installed (certified by DNV JYN-13-0304).
3. Two(2) anchor chain stoppers were installed (certified by DNV PUS-13-56134).
4. One(1) set of Windlass was newly installed (certifiedf by DNV CHW-13-33873).
After completion of modification and installation, the anchoring test with windlass operations/brakes was carried out
during 'Sea Trials' in accordance with rule requirements and found in order.

New windlass

New anchor

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 14 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Cranes
Two(2) shipboard cranes (Port & Starboard) were renewed as followings;
1. Particulars
-. Manufacturer : LIEBHERR
-. Type : MTC 1900-60 D LITRONIC
-. Serial no. 170536(Port side) & 170533(starboard side)
-. Main hoist SWL : 50.0tonnes(Port side) & 60.0tonnes(starboard side)
2. Supporting structure
: Pedestals were newly manufactured in accordance with the approved drawing(TAMUS475/ HUYNH/ 27355 -J-10458)
and inspected during the fabrication with satisfactorily by DNV survey report no. PUS-13-55228-1/2.
3. Upon installation of the cranes on board, the safety functions and overload testing have been carried out by the
representative of the crane manufacturer in the presence of surveyor and found in order. At the owner's request,
Statement of Fact Survey (Crane Load Test) has been issued on 2013-11-22.

New crane - starboard side

New crane - port side

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 15 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Propulsion driver arrangement
Main propulsion diesel engine was replaced with new engine as following;
1. Particulars
- Manufacturer & Type : STX Engine Co., Ltd. / STX-MAN B&W 6S42MC
- Max. continuous output power : 6480kW / 136rpm
- Serial no. : SB6S42-07177
- Product Certificate no. : NV CHW-13-31181
2. After co mpletion of installation on board, the starting & safety test and running test were carried out during 'Sea Trial'
in the presence of the surveyor.(Refer to separate survey report issued on 2014-03-17 /Job id. 345625-2-1, and
supporting information NPS 27355-J-10681).

New main engine - crank case

New main engine - top view

Findings
Refer to Updated PSC Report dated 2012-12-19, Deficiency 15, Code 1410, action code 50ac
All the machinery should be of a design and construction adequate for the service within they are so intended and
should be so installed and protected as to reduce any danger to persons onboard. The design should have regard to the
marine and industrial purposes for which the equipment is intended, the working conditions and the environmental
conditions to which it will be subjected. Current propulsion arrangement does not result in sufficient speed at sea to
safely maneuver in all expected conditions without tow assistance as evident fro m statements fro m the vessels crew. RO
to provide report attesting to satisfactory propulsion arrangement during transit condition mode of operation. Report
shall include analysis of safe operation of unit in transit condition in the most severe environ mental conditions over a 50
year period.
[Previously issued as CC 32 - now Deleted]
Repaired: Class (DNV) certified main diesel engine has been newly installed. Operational test found in order.
[Propulsion diesel engine AC > Cooling system AC]
Refer to PSC Report dated 2012-11-26, Deficiency 12, Code 1410, action code 17a
Propulsion main Engine Main Engine piston cooling water is contaminated w/sludge / oil. Crew skims the oil off w/ a
ladel & bucket during rounds. Main Engine ops manual states failure of the telescopic tube packing will cause dirty
piston cooling water. Provide RO report indicating current procedure/design is adequate fo r the service on board or
make permanent repairs.
[Previously issued as CC 31 - now Deleted]
Repaired: Class (DNV) certified main diesel engine has been newly installed. Operational test found in order.
Refer to PSC Report dated 2012-11-26, Deficiency 5, Code 1410, action code 17ac
Propulsion Main Engine Oil mist detectors on main engine cylinders 3 & 6 have broken housings & exposed wires.
Machinery should be provided w/ automatic shut-off arrangements or alarms in the case of failures, which could lead
rapidly to complete breakdown, damage, or explosion.
[Previously issued as CC 31 - now Deleted]
Repaired: Class (DNV) certified main diesel engine has been newly installed. Operational test found in order.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 16 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

[Propulsion diesel engine AC > Exhaust system AC]
Refer to PSC Report dated 2012-11-26, Deficiency 14, Code 1410, action code 17ac:
Exhaust system back fires on regular basis. Chief engineer suspects this is due to change to exhaust system in order to
accommodate heli-pad installation. As a result of back-fires (one of which resulted in a slack fire recently), main
propulsion machinery & all aux machinery essential to the propulsion & safety of the unit may be compromised.
Provide RO report of exhaust adequacy.
[Previously issued as CC 31 - now Deleted]
Repaired: Class (DNV) certified main diesel engine and six(6) aux. diesel engines have been newly installed.
Operational tests found in order.

Propulsion torque and thrust transmission arrangement
Findings
Refer to PSC Report dated 2012-11-26, Deficiency 4, Code 1410, action code 17ac:
Propulsion main engine Vessel experienced abnormal propeller shaft vibration on Nov 22, 2012 requiring main engine
shutdown & dead ship tow to Port of Seward. CG inspection revealed vessel also experienced vibration on Nov 6, 2012
while enroute Port of Dutch Hbr. Crew ind icated cause to be loose nuts/bolts connecting intermediate shaft to propeller
shaft flange & loss of two of four pedestal bearing mounting bolts respectively. Efforts to reduce/eliminate vibration
(tightening & welding nuts/bolts at flange & reinstalling pedestal bearing mounting bolts produced negative results.
Special consideration should be given to the design, construction and installation of propulsion machinery systems so
that any mode of their vibrations should not cause undue stresses in the machinery in the normal operating ranges.
[Previously issued as CC 31 - now Deleted]
Repaired: Class (DNV) certified main diesel engine / shafting / propeller have been newly installed.
Operational test found in order.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 17 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Propeller shafting
** Propeller and shafting were renewed as per the approved drawing (ref. no. TAMUS471/SSRID/ 27355 -J-10456).
1. Propeller product certificate no. NV PUS-13-53668
2. Propeller shaft product certificate no. NV PUS-13-54761-1
3. Intermediate shafft product certificate no. NV PUS-13-54761-2
4. Coupling bolts product certificate no. NV PUS-13-54761-3
After completion of new installation, the operational test found in order and no sea -water ingress/L.O. leak was
observed.

Shafting with main engine

Propeller

Propeller shaft (aft.)
Propeller shaft bearing wear down measured at bottom after repair [mm]: 0
Propeller shaft bearing wear down measured at top after repair [mm]: 1.8

Rudder arrangement
Heel bearing clearance measured upon survey maximu m [mm]: 1.4
Stern bearing clearance measured upon survey maximu m [mm]: 2.9

Main electric power system
Main electric power generation diesel engines were replaced with new ones (except the generators).
1. Particulars
-. Manufacturer & type : Caterpillar Inc., Lafayette / 3512
-. Output & rated speed : 1101kW x 1200rpm
-. Serial nos. : LLB00137, LLB00138, LLB00139, LLB00140, LLB00141, LLB00142.
-. Product certificates no. : N.V. NYK-13-5162, 5163, 5164, 5165, 5166, 5167.
DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 18 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

2. After completion of installation, the shipboard testing was carried out in accordance with the rule requirements and
found to be satisfactory.

Forward engine room view

New Generator Engine

Sea chests
Sea and sanitary valves examination date: 2014-05-15

Compressed air systems
1. Three(3) main air compressor were newly installed in the main engine room.
-. Manufacturer : Sperre Industri AS
-. Type : HL2/160, serial no.1601617, 1601618, 1601619
-. Drawing approval : DNV Type approved (no. M-12474)
-. DNV Product certificate no. : N14000ZY, N14000ZZ, N1400100.
After the completion of new installation, the compressed air charging test/main diesel engine starting test were carried
out as per the requirement and found to be satisfactory.
2. Auxiliary air reservoir certified by NV PUS-13-55741 was newly installed in 'Machine Workshop'.

New Air Compressors

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 19 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Bilge water system
Findings
Missing alarm installation;
Bilge system alarm missing on existing bilge well in 'main engine room, generator room, machine shop, compressor
room, service pump room, mud pump room & warehouse lower, drill water pump room'. Furthermore audible alarm
found not working.
Repaired: Missing bilge level high alarms were repaired and tested satisfactorily.

Oily bilge water system
Findings
Refer to Updated PSC Report dated 2012-12-19, Deficiency 16, Code 1799, action code 50ac:
The condition of the ship and it's equipment shall be maintained to confirm with the provisions of the present
convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable
threat of harm to the marine environment. A fractured pipe was found passing through the 27-S bilge holding tank
discharging water into the tank from an unknown source. RO shall provide report attesting to the satisfactory repair of
existing pipe internal to 27-S holding tank.
[Previously issued as CA 618 - now Deleted]
Repaired: Modified piping & system was inspected in accordance with 'as built drawing' at the surveyor's
satisfaction. (Drawing was submitted for DNV approval, but approved drawing is not placed on board.)
Refer to PSC Report dated 2012-11-26, Deficiency 7, Code 1735, action code 17ac:
Pumping discharge arrangements -Noted addition of a T w/ a ball valve in way of vertical pipe connection inboard of
overboard discharge valve downstream of oil content meter. Installat ion of the arrangement could allow introduction of
unprocessed oil water to the environment. Provide RO approval for installation modification of arrangement.
[Previously issued as CA 618 - now Deleted]
Repaired: Modified piping & system was inspected in accordance with 'as built drawing' at the surveyor's
satisfaction. (Drawing was submitted for DNV approval, but approved drawing is not placed on board.)
Refer to PSC Report dated 2012-11-26, Deficiency 3, Code 2110, action code 17ac:
Oil/Oily mixtures machinery spaces -Discovered fuel oil settleing tank converted by crew to a bilge water decanting
tank. Mods included installation steam piping, steam coil in tank, & piping connected to/from bilge water system. Aft er
survey of the ship has been completed, no change shall be made in structure, equipment, systems, fitting , arrangements
or material covered by the survey without the sanction of the Administration, except the direct replacement of such
equipment & fittings. Provided documentation from RO of approval & update IOPP certificate / From A as
appropriate/necessary
[Previously issued as CA 618 - now Deleted]
Repaired: Modified piping & system was inspected in accordance with 'as built drawing' at the surveyor's
satisfaction. (Drawing was submitted for DNV approval, but approved drawing is not placed on board.)

Sewage system
The following sewage treatment plant was newly installed and operational test found working in order.
-. Manufacturer : Severn Trent De Nora
-. Type : Omnipure Model 5556 (USCG approval no. 159.015/0010060/0)
-. Serial no. : 13-5556-D028112.

Fire prevention arrangements
1. Water based local fire extinguishing systems were newly installed in 'Main Engine Room' and 'Generator Engine
Room' respectively (ref. no. TPKKR161/MHKI/27355-J-10621).
2. CO2 fire extinguishing system for Main Engine scavenge air space was newly installed (ref. no.
TAMUS475/HUYNH/27355-J-10590).
3. CO2 fire extinguishing system for Halliburton Room was newly installed (ref. no.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 20 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

MPKKR/161/HYDOH/27355-J-10660).
3. Upon installation of the system, on-board testing has been carried out and found to be satisfactory.

Fire water system
Fire water monitor was tested and found working in order.

Fire water monitor tested

Helicopter deck foam fire extinguishing system
Helicopter deck foam fire extinguishing system spraying was tested and found working in order.

Heli deck foam spraying test

Escape routes
New installation of Emergency Escape from Main Engine Room to Sack Room was provided in accordance with the
approved drawing (ref. no. 27355-J-10569 & 10609). Self closing fire door(type approved) was fitted as same fire
integrity standards on the doorway entrance from Main Engine Room.

Life-saving appliances
1. The following fast rescue boat launching arrangement was newly installed.
-. Manufacturer of davit : NOREQ AS
-. Type & Serial no. : NPDS 3500H & 133328
-. Type approval : MED-B-7554
-. Associated hull construction for the davit foundation was modifed in accordance with approved drawing (ref. no.
TAMUS475/HUYNH/27355-J-10568)
2. Upon installation of new davit, the overload testing of davit (except on -load release gear has been carried out and
DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 21 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

found to be satisfactory.
3. Before taking the davit into use, launching test (at 5knot) to be carried out (Refer to MO in th is report 'Condit ions and
Memoranda - Given').

Lighting arrangement
Findings
Search light for rescue boat launching davit found missing.
Repaired: Search light for rescue boat launching davit was installed.

NOx emission prevention
It was verified that the following EIAPP cert ificates of diesel engines were placed on board in con nection with the new
installation of the diesel engines.
1. for Main Propulsion : cert. no. EIAPP-1261-4-A issued by DNV under the flag authority (Liberia)
2. for Main Generator : cert. no. 85941/2/3/4/5/ 6-13HH issued by GL under the flag authority (Liberia)
3. for Crane Operation : cert. no. 68918-13HH issued by GL under the flag authority (Liberia)

Electric power system
Findings
Refer to PSC Report dated 2012-11-26, Deficiency 9, Code 0950, action code 17a:
Electric Equipment in general-Observed multiple dead ended wires & improper wire splices throughout main engine
room. Electrical installations should be such that the safety of personnel & unit fro m electrical hazards will be assured.
[Previously issued as CC 33 - now Deleted]
Repaired: Partly repaired, and New CC was issued.

Hull compartments
Void side tank 19P(VS-19P)(071-92A)
Findings
No sounding pipe installed.
Repaired: Finding was repaired.

Void side tank 19S(VS-19S)(071-92A)
Findings
1) Open hole on sloped bottom in way of Fr.79 close to new crane foundation)
2) No sounding pipe installed
Repaired: Findings were repaired.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 22 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Void side tank 20P(VS-20P)(036-071)
Findings
No sounding pipe installed
Repaired: Finding was repaired.

Void side tank 20S(VS-20S)(036-071)
Findings
1) Buckled bracket on Fr.44
2) Trans. bulkhead forward found opened towords no.19 void tank.
3) No sounding pipe installed
Repaired: Findings were repaired.

Void double bottom tank 13P(VS-13P)(036-055)
Findings
Bottom plating found partly corroded.
Repaired: Corroded bottom plate and longitudinal girder were repaired as followings;
- Bottom plating in way of Fr.35-Fr.40(from watertight Longi.girder to 1320mmW toward port side) &
Fr.42.5-Fr.43.5(from watertight Longi.girder to 1160mm toward port side) was renewed.
- Trans.Frame Fr.36(between L4 and L5), Diagonal Longi.girder(between Fr.35 and Fr.36) were partly
renewed.
Partial deformation on floors Fr.37, Fr.38, Fr.40, Fr.51 was found.
Repaired: Deformed areas were repaired and reinforced by stiffners at the surveyor's satisfaction

Void double bottom tank 13S(VS-13S)(036-055)
Findings
Bottom plating and longitudinal girders found partly corroded.
Repaired: Corroded bottom plate and long. girders were repaired as followings;
- Bottom plating in way of Fr.35-Fr.37(from watertight Longi.girder to 900mm toward starboard side),
Fr.40-Fr.46(from watertight Longi.girder to 2190mm toward starboard side), Fr.43-Fr.50 (3100Lmm x
2000mmW in way of watertight Longi. girder) was renewed by inserting plate.
- L8 bottom longi.(400mm) in way of Fr.47, L9 bottom longi.(4100mm) in way of Fr.42 -Fr.47, L5 bottom
longi.(Fr.38 to Fr.41+400mm, Fr.43+300mm to Fr.47) were p artly renewed.
1) Slight deformation on hopper trans. web was found in way of Fr.48/49/50/51/ 52/ 53.
2) Partly buckled floor was found in way of Fr.37 (lower part).
Repaired: The findings were repaired and reinforced by stiffners at the surveyor's satisfac tion.

Void double bottom tank 6P(VS-6P)(055-071)
Annual inspection MO ref.106P has been implemented for this tank since overall examination found that tank internal
was corroded and coating condition is rated overall poor.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 23 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Void double bottom tank 6S(VS-6S)(055-071)
Annual inspection MO ref.106P has been implemented for this tank since overall examination found that tank internal
was corroded and coating condition is rated overall poor.

Lubrication oil double bottom tank 27P(LO-27P-Dirty)(019-036) (Dirty)
Pitted area was repaired by clad weld ing with NDT(MT) in way of Fr.26, 2400mm fro m center line (port side, 300mm
x 300mm).

Oily bilge water double bottom tank 8C(Bilge-8C)(009-019)
Findings
Corroded keel plating and pitted plate were found.
Repaired: Following repairs were carried out and relevant NDT found in order
- Corroded keel plating in way of Fr.10 (500mm x 500mm), Fr.13 -Fr.16(2500mmx 800) was repaired by
inserting plate
- Pitted plate in way of Fr.10-Fr.11/Fr.12-Fr.13(starboard side), Fr.14-15/Fr.16-17(port side) was repaired by
cladding welds.

Ballast double side tank 7P(WB-7P)(106-141)
Findings
No sounding pipe installed.
Repaired: Finding was repaired.

Ballast double bottom tank 1C(141-167)
Findings
Tank top plating found partly corroded.
Repaired: Partly corroded tank top plate was renewed ;
aa) Port side;
- from 100mm+L7 to L9+100mm & from 100mm+L4 to L5+100mm between Fr.141~Fr.143from L2+400mm
to port side shell plating(Fr.155~Fr.161)
- from 100mm+L2 to side shell plating (Fr.161~Fr.164)
- from 200mm+Center to L1+100mm (Fr.152~Fr.162)
bb) Starboard side;
- from 100mm+Center to L3+100mm (Fr.141~Fr.143)
- from 100+L2 to starboard side shell plating (Fr.161~Fr.1 64)
cc) Port and starboard sides : between Fr.164~166 (port and stb'd side)
- Deformed long. girder plating in way of Fr.141(port side)
- Buckled girder plating in way of Fr.166 to Fr.167
- Substaintial corrosion was found on tank top plating.
Repaired: - Partly deformed and buckled area was repaired by inserting plate.
- Corroded tank top plating was repaired by inserting plate.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 24 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Ballast fore peak tank C(WB-FC)(171-F)
Findings
- Centerline bulkhead found partly buckled
- Fr.175-Fr.176 heavily corroded at bottom
Repaired: Findings were repaired.
Keel plating found partly corroded.
Repaired: Corroded keel plating in way of Fr.173-Fr.174 (800mm x 600mm) was renewed by inserting plate.

Ballast double side tank/Drilling fluid double side tank 10S(WB/Drill -10S)(071-92A)
(Drill Water)
Findings
No sounding pipe installed.
Repaired: Finding was repaired.

Ballast double bottom tank/Drilling fluid double bottom tank
2C(WB/Drill-2C)(106-141) (Permanent Mud)
Findings
Buckled docking brackets (13 locations) were found in way of center long. girder.
Repaired: Buckled docking brackets were repaired by inserting plates (Fr.136 P/S sides, Fr.132 P/S sides,
Fr.128 P/S sides, Fr.124 P/S sides, Fr.120 P side, Fr.112 P/S sides, Fr.108 P/S sides).
Tank top plating found corroded.
Repaired: Corroded tank top plate was renewed (Fr.106 to Fr.141).

Ballast double bottom tank/Drilling fluid double bottom tank
2P(WB/Drill-2P)(106-141) (Drill Water)
Findings
Bottom plating and longitudinal girder found partly corroded.
Repaired: Corroded bottom plating and longitudinal girders were repaired as following ;
- Bottom plating in way of Fr.106 to Fr.141 (between L7 and L12) was renewed / Bilge strake plating was pa rtly
renewed at Fr.110, Fr.114, Fr.118.
- L7 watertight Longi. girder (between Fr.106 and Fr.141), L11 Longi. girder(between Fr.106 and Fr.122),
L8/L9/L10/L12 bottom longi. & L13/L14 bilge longi.(between Fr.106 and Fr.116), Trans.Frame
Fr.110/114/122 lower half (between L11 and L15), Trans. Frame Fr.110 (between L7 and L11), Trans. Frame
Fr.114/126(between L8 and L11), Trans.Frame Fr.118(between L7 and L8)

Ballast double bottom tank/Drilling fluid double bottom tank
3C(WB/Drill-3C)(92Q-106) (Permanent Mud)
Findings
Tank top plating found corroded.
Repaired: Corroded tank top plating was renewed (Fr.92Q to Fr.106).

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 25 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Ballast double bottom tank/Drilling fluid double bottom tank
3P(WB/Drill-3P)(92Q-106) (Drill Water)
Findings
Bottom plating and longitudinal girder found partly corroded.
Repaired: Corroded bottom plating and longitudinal girder were renewed as followings;
- Bottom plating in way of Fr.103(500mm x 500mm) and Fr.92Q-Fr.95 (1810mm x 1500mm) was renewed.
- L7 watertight Longi. girder(between Fr.98 and Fr.106) was renewed.

Ballast double bottom tank/Drilling fluid double bottom tank
3S(WB/Drill-3S)(92Q-106) (Drill Water)
Findings
Bottom plating and longitudinals, trans. frame found partly corroded.
Repaired: Corroded bottom plating and longitudinals, trans. frame were repaired as followings;
- Bottom plating in way of Fr.101-Fr.106(between L7 and L10), Fr.95.5-Fr.99.5(from 6100mm off CL to L9.5),
Fr.93-Fr.95.5 (between L6(in No.3 C starboard side) and L12) was renewed.
- Longi.girder L11 (between Fr.92 and Fr.94), Trans.Frame Fr.97/100/103(between L7 and L11), L9/L10
Longi.(between Fr.92Q and Fr.106), L8 Longi.(between Fr.103 and Fr.106) were renewed.

Ballast double bottom tank/Drilling fluid double bottom tank
5C(WB/Drill-5C)(071-92A) (Permanent Mud)
Findings
Tank top plating found corroded.
Repaired: Corroded tank top plate was renewed (Fr.71 to Fr.92A).

Ballast double bottom tank/Drilling fluid double bottom tank
5P(WB/Drill-5P)(071-92A) (Drill Water)
Findings
Bottom plating found partly corroded.
Repaired: Corroded bottom plate was repaired as following;
- Bottom plating in way of Fr.71-Fr.75(between L7 and L10), Fr.88-Fr.92A(between L6 (in No.5C port side)
and L9), Fr.87-Fr.88(between L7 and L8).

Ballast double bottom tank/Drilling fluid double bottom tank
5S(WB/Drill-5S)(071-92A) (Drill Water)
Findings
Bottom plating and longitudinal girders, trans. frame found partly corroded.
Repaired: Corroded bottom plate and long. girders, trans. frame were repaired as followings;
- Bottom plating in way of Fr.71-Fr.78(between L7 and L12), Fr.86-Fr.92A(from 8100mm off CL to starboard
side) was renewed.
- L8/L9/L10/L12 bottom longi. (Fr.71 to Fr.77), L11 Longi.girder half lower(between Fr.71 and Fr.77),

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 26 of 31

Name of v essel

NOBLE DISCOVERER

Name of owner

DNV id. no.

Job Id.

Noble Drilling International GmbH

27355

345625

Trans.Frame Fr.74 lower half(between L8 and L11), Trans.Frame Fr.72, Trans.Frame Fr.73/Fr.75/Fr.76
lower half(between L10 and L11) were renewed.

Ballast double bottom tank/Drilling fluid double bottom tank
6C(WB/Drill-6C)(036-055) (Permanent Mud)
Findings
Tank top plating found corroded
Repaired: Corroded tank top plate was renewed (Fr.036 to Fr.055).

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY, TEL.INT.: +4767 57 99 00, TELEFAX: +47 67 5799 11
Form No.: 40 9
Iss ue: June 2012

Page 27 of 31

Name of v essel

Name of owner

DNV id. no.

Job id.

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

345625

Ballast side tank
14P(001-036)
Ballast side tank
14S(001-036)
Ballast double side tank
7P(WB-7P)(106-141)
Ballast double side tank
7S(WB-7S)(106-141)
Ballast double side tank
8P(WB-8P)(92Q-106)
(Auxiliary)
Ballast double side tank
8S(WB-8S)(92Q-106)
(Auxiliary)
Ballast double bottom tank
1C(141-167)
Ballast fore peak tank
C(WB-FC)(171-F)
Ballast aft peak tank
C(A-009)
Sew age holding tank
16P(VS-16P)(106-141)
Sew age holding tank
16S(VS-16S)(106-141)
Sew age holding tank
17P(VS-17P)(092Q-106)
Sew age holding tank
17S(VS-17S)(092Q-106)
Sew age holding tank
18P(VS-18P)(092A-092Q)
Sew age holding tank
18S(VS-18S)(092A-092Q)
Sew age holding tank
28P(B)(009-012)
Ballast double side
tank/Drilling fluid double side
tank
10P(WB/Drill-10P)(071-92A)
(Drill Water)
Ballast double side
tank/Drilling fluid double side
tank
10S(WB/Drill-10S)(071-92A)
(Drill Water)

O

Intermediate

NO

DA

HC

C

Good

N

O

Intermediate

NO

DA

HC

C

Good

N

O

Intermediate

Repaired

DA

R

HC

C

Good

N

O

Intermediate

NO

DA

R

HC

C

Good

N

O

Intermediate

NO

DA

R

HC

C

Good

N

O

Intermediate

NO

DA

R

HC

C

Good

N

O

Intermediate

Repaired

DA

R

HC

C

Fair

N

O

Intermediate

Repaired

DA

R

HC

C

Good

N

O

Intermediate

NO

DA

HC

C

Good

N

O

Intermediate

NO

DA

HC

C

Fair

N

O

Intermediate

NO

DA

HC

C

Fair

N

O

Intermediate

NO

DA

HC

C

Fair

N

O

Intermediate

NO

DA

HC

C

Fair

N

O

Intermediate

NO

DA

HC

C

Fair

N

O

Intermediate

NO

DA

HC

C

Fair

N

O

Intermediate

NO

DA

HC

C

Fair

N

O

Intermediate

NO

DA

R

HC

C

Good

N

O

Intermediate

Repaired

DA

R

HC

C

Good

N

Det Norske Veritas AS, VERITASVEIEN 1, N-1322 HØVIK, NORW AY, TEL.INT. +47 67 57 99 00, TELEFAX +47 67 57 99 11
Form No. 40.9

Issu e April 2005

Page 29 of 31

Name of v essel

Name of owner

DNV id. no.

Job id.

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

345625

Ballast double side
tank/Drilling fluid double side
tank
11P(WB/Drill-11P)(055-071)
(Drill Water)
Ballast double side
tank/Drilling fluid double side
tank
11S(WB/Drill-11S)(055-071)
(Drill Water)
Ballast double side
tank/Drilling fluid double side
tank
12P(WB/Drill-12P)(043-055)
(Drill Water)
Ballast double side
tank/Drilling fluid double side
tank
12S(WB/Drill-12S)(043-055)
(Drill Water)
Ballast double side
tank/Drilling fluid double side
tank
9S(WB/Drill-9S)(92A-92Q)
(Drill Water)
Ballast double bottom
tank/Drilling fluid double
bottom tank
2C(WB/Drill-2C)(106-141)
(Permanent Mud)
Ballast double bottom
tank/Drilling fluid double
bottom tank
2P(WB/Drill-2P)(106-141)
(Drill Water)
Ballast double bottom
tank/Drilling fluid double
bottom tank
2S(WB/Drill-2S)(106-141)
(Drill Water)
Ballast double bottom
tank/Drilling fluid double
bottom tank
3C(WB/Drill-3C)(92Q-106)
(Permanent Mud)

O

Intermediate

NO

DA

R

HC

C

Good

N

O

Intermediate

NO

DA

R

HC

C

Good

N

O

Intermediate

NO

DA

R

HC

C

Good

N

O

Intermediate

NO

DA

R

HC

C

Good

N

O

Intermediate

NO

DA

R

HC

C

Good

N

O

Intermediate

Repaired

DA

R

HC

C

Fair

N

O

Intermediate

Repaired

DA

R

HC

C

Good

N

O

Intermediate

CC 37

DA

HC

C

Good

N

O

Intermediate

Repaired

DA

HC

C

Fair

N

R

Det Norske Veritas AS, VERITASVEIEN 1, N-1322 HØVIK, NORW AY, TEL.INT. +47 67 57 99 00, TELEFAX +47 67 57 99 11
Form No. 40.9

Issu e April 2005

Page 30 of 31

Name of v essel

Name of owner

DNV id. no.

Job id.

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

345625

Ballast double bottom
tank/Drilling fluid double
bottom tank
3P(WB/Drill-3P)(92Q-106)
(Drill Water)
Ballast double bottom
tank/Drilling fluid double
bottom tank
3S(WB/Drill-3S)(92Q-106)
(Drill Water)
Ballast double bottom
tank/Drilling fluid double
bottom tank
4P(WB/Drill-4P)(92A-92Q)
(Drill Water)
Ballast double bottom
tank/Drilling fluid double
bottom tank
4S(WB/Drill-4S)(92A-92Q)
(Drill Water)
Ballast double bottom
tank/Drilling fluid double
bottom tank
5C(WB/Drill-5C)(071-92A)
(Permanent Mud)
Ballast double bottom
tank/Drilling fluid double
bottom tank
5P(WB/Drill-5P)(071-92A)
(Drill Water)
Ballast double bottom
tank/Drilling fluid double
bottom tank
5S(WB/Drill-5S)(071-92A)
(Drill Water)
Ballast double bottom
tank/Drilling fluid double
bottom tank
6C(WB/Drill-6C)(036-055)
(Permanent Mud)

O

Intermediate

Repaired

DA

O

Intermediate

Repaired

O

Intermediate

O

R

HC

C

Good

N

DA

HC

C

Good

N

NO

DA

HC

C

Good

N

Intermediate

NO

DA

HC

C

Good

N

O

Intermediate

Repaired

DA

R

HC

C

Fair

N

O

Intermediate

Repaired

DA

R

HC

C

Good

N

O

Intermediate

Repaired

DA

HC

C

Good

N

O

Intermediate

Repaired

DA

HC

C

Fair

N

R

Det Norske Veritas AS, VERITASVEIEN 1, N-1322 HØVIK, NORW AY, TEL.INT. +47 67 57 99 00, TELEFAX +47 67 57 99 11
Form No. 40.9

Issu e April 2005

Page 31 of 31

Rev. [1]
Narrative annex issued *
DNV GL Id No:

Job Id:

27355

472127

Name of vessel

Name of owner

IMO no.

NOBLE
DISCOVERER

Noble Drilling International GmbH

6608608

Station

Place of survey

Survey started

Survey completed

Singapore

Singapore

2014-08-13

2015-01-02

Lead surveyor’s name
Survey team

Misc items Occasional
This is to confirm that the following has been carried out:

Surveys
Survey Code Survey Name

Result

AFS.O

Anti-fouling system – Endorsement of the record -

Complete

HS.Sa

Hull items

Part-held

MISC.O

Miscellaneous item occasional - -Modifications to the aft hull structure
-Repairs to the hull
Change of Propeller/Sea trial

Complete

-Deletion of PE comments , MS
-Verification /test of OWS & piping for drains from Driller's deck Issuance of Loading Computer certificate
-Modifications to Bilge water/sludge system,
Verification of ESD as per approved drawing
-Modification to FO & Ballast Water system
Verification of replacement of 2off W/tight doors
-RR7
Deletion : Rehooking of allL/Boats + Load test on Onload release gear+
Davits
-Load test of BOP
Elevator
-Inspection of
fabricated High pressure air piping & Hydraulic piping to Drill floor .
-Test of new Fast Rescue Boat
-Installation of new Quck closing valves.
AUSBOI

Auxiliary steam generator F

Complete

Survey of Hull items
Survey
Code

Onboard
Name

Survey Item

Result

HULEXA

Void side tank 19P(VS-19P)(071-92A) examination

Complete

HULEXA

Void side tank 19S(VS-19S)(071-92A) examination

Complete

HULEXA

Void side tank 20S(VS-20S)(036-071) examination

Complete

Notw thstanding anything to the contrary stated in the classif cation documentation for the present vessel DNV GL reserves the right to in tiate a
suspension procedure before finally suspending class.
*) Issued latest 7 days after completion-date, containing information regarding the survey. Possible restrict ons regarding the use of the vessel is
documented in the survey statement.
Form No.: 40.7a
Issue: January 2014
www.dnvgl.com
© DNV GL 2014. DNV GL and the Horizon Graph c are trademarks of DNV GL AS.

Page 1 of 6

Name of vessel

Name of owner

DNV GL Id No:

Job Id:

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

472127

Survey
Code

Onboard
Name

Survey Item

Result

HULEXA

Void double bottom tank 13P(VS-13P)(036-055)
examination

Complete

HULEXA

Void double bottom tank 13S(VS-13S)(036-055)
examination

Complete

HULEXA

Void double bottom tank 6P(VS-6P)(055-071) examination

Complete

HULEXA

Void double bottom tank 6S(VS-6S)(055-071) examination

Complete

HULEXA

Void space FP(SeaChestFP)(155-157) (Sea Chest)
examination

Complete

HULEXA

Chain locker P(CL-P)(171-174) examination

Complete

HULEXA

Fuel oil side tank 21S(FO-21S)(123-130) (Well Test)
examination

Complete

HULPTS

Fuel oil side tank 21S(FO-21S)(123-130) (Well Test)
pressure test

Complete

HULEXA

Fuel oil side tank 22S(FO-22S)(118-123) (Well Test)
examination

Complete

HULPTS

Fuel oil side tank 22S(FO-22S)(118-123) (Well Test)
pressure test

Complete

HULEXA

Fuel oil side tank 23S(FO-23S)(113-118) (Well Test)
examination

Complete

HULPTS

Fuel oil side tank 23S(FO-23S)(113-118) (Well Test)
pressure test

Complete

HULEXA

Fuel oil side tank 24S(FO-24S)(109-113) (Well Test)
examination

Complete

HULPTS

Fuel oil side tank 24S(FO-24S)(109-113) (Well Test)
pressure test

Complete

BTKEXA

Ballast fore peak tank C(WB-FC)(171-F) examination

Complete

HULEXA

Sewage holding tank 16S(VS-16S)(106-141) examination

Complete

BTKEXA

Ballast double bottom tank/Drilling fluid double bottom tank Complete
2P(WB/Drill-2P)(106-141) (Drill Water) examination

BTKEXA

Ballast double bottom tank/Drilling fluid double bottom tank Complete
2S(WB/Drill-2S)(106-141) (Drill Water) examination

HULPTS

Ballast double bottom tank/Drilling fluid double bottom tank Complete
2S(WB/Drill-2S)(106-141) (Drill Water) pressure test

Deleted or Postponed Condition of authority(CA), Condition of class(CC),
Memo to owner(MO), Retroactive requirements(RR)

Status

CC
35

Deleted

Issued:2014-05-15
Within the due date, the temporarily repaired side shell leaks are to be
repaired permanently.
Action

Form No.: 40.7a

Issue: January 2014

www.dnvgl.com

Page 2 of 6

Name of vessel

Name of owner

DNV GL Id No:

Job Id:

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

472127

Deleted or Postponed Condition of authority(CA), Condition of class(CC),
Memo to owner(MO), Retroactive requirements(RR)

Status

Finding(s) repaired in this survey:
[Sides]
-.Temporary repair has done on side shell leak at sponson tank no. 14 Port
Fr.35.
Permanent repairs carried on sponson tank. Detailed reporting can be
found at the tank level
-.Temporary repair has done with side shell doubler plate on port aft.
thruster well from Fr.39 to Fr.44
Permeanet repairs are carried on port aft thruster well between fr.
39-44. Detailed report are available at tank levels

CC
36

Issued:2014-05-15
Within the due date, leaked valve for No.24 Diesel Oil tank (starboard side)
outlet to be brough in order.

Deleted

Action
Finding(s) repaired in this survey:
[Fuel oil system]
It was found that the outlet valve for No.24 Diesel Oil tank (starboard side)
was leaked.
No. 24 Diesel oil tank (S) valve replaced with new one.

CC
37

Issued:2014-05-15
Within given due date, the cracks found in No.2 Ballast tank (starboard
side) are to be permanently repaired.

Deleted

Action
Finding(s) repaired in this survey:
[Ballast double bottom tank/Drilling fluid double bottom tank
2S(WB/Drill-2S)(106-141) (Drill Water)]
Three(3) cracks were found in No.2 Ballast Tank(starboard side) in way of
below No.23 Fuel oil tank.
Cracks iwo joining area between hopper plating and inner bottom
plating is now repaaired by changing the complete hopper plate and
inner bottom plating along with attached longitudinals iwo FO tank 23
between frames 115-118.
Refer to repair sketch 04 for details

Form No.: 40.7a

Issue: January 2014

www.dnvgl.com

Page 3 of 6

Name of vessel

Name of owner

DNV GL Id No:

Job Id:

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

472127

Deleted or Postponed Condition of authority(CA), Condition of class(CC),
Memo to owner(MO), Retroactive requirements(RR)

Status

CC
38

Issued:2014-05-15
Owner plan to carry out further repair in next shipyard as numerous cable
installations need to be updated referring the previous CC33, the overall
inspection of EL installation to be carried out by DNV EL surveyor before the
rig leaving shipyard in Singapore.

Deleted

CA
619

Issued:2014-05-15
The updated Operating Manual as required by MODU Code is to be approved
on behalf of the Administration and is to be placed on board.

Deleted

Action
Approved Operations Manual(Rev 8), Approved dated 2014-12-17 was
sighted on board.
Finding(s) repaired in this survey:
[On board documentation]
Approval of the updated Operating Manual, as required by MODU Code
containing guidance for the safe operation of the unit for both normal and
envisaged emergency conditions, was found not placed on board.
Operations Manual, (Rev 6)Approved by DNV Houston dated 201405-15 was sighted on board.

RR 7
Ref
1036

Issued:2013-07-09
Lifeboat / rescue boats on-load release mechanisms:
Not later than the first scheduled dry-docking after 2014-07-01, but not
later than 2019-07-01, lifeboat and rescue boat on-load release
mechanisms not complying with LSA Code paragraphs 4.4.7.6.4 to
4.4.7.6.6 shall be replaced with equipment that complies with the LSA
Code.
Ref. SOLAS reg. III/1.5.

Deleted

Action
Hooks + On load release mechanisms for L/boats #1-4 were renewed with
LSA compliant ones. Load test carried out with satisfactory results.

MO
10
Ref
106p

Issued:2014-05-15
Annual survey of tanks and spaces due to 'No protective coating' & 'POOR
coating':
The survey 'Tanks and spaces annual' applies to this vessel. The survey
includes internal overall examination. For areas with general breakdown of
the protective coating, close-up examination and thickness measurement
shall be carried out to an extent sufficient to determine both general and
local corrosion levels. For areas found with substantial corrosion extended
thickness measurements shall be carried out before the survey is credited
as completed.
The following tanks are affected by this Memo:
-. No.6 Void double bottom tank (P) - Poor coating
-. No.6 Void double bottom tank (S) - Poor coating

Deleted

Action

Form No.: 40.7a

Issue: January 2014

www.dnvgl.com

Page 4 of 6

Name of vessel

Name of owner

DNV GL Id No:

Job Id:

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

472127

Deleted or Postponed Condition of authority(CA), Condition of class(CC),
Memo to owner(MO), Retroactive requirements(RR)

Status

Void DB tank 6P&S were sand blasted and hard coated completely under the
guidence of paint manufacturer, coating condition restored to Good.

MO
11

Issued:2014-05-15
Bridge navigational watch alarm system (BNWAS) should be fitted on board
in compliance with MSC.128(75) not later than 2014-10-31 as per the flag's
dispensation letter indicating that the vessel is authorized to sail without the
installation of the BNWAS until 2014-10-31.
In the meantime, the navigation bridge shall be manned by a watchkeeping officer and a watch-keeping rating at all times.

Deleted

Action
BNWAS : Furuno BR-500 was installed by the mfg's representative & tested
with satisfactory results. Type Approval Certificate-A12230 /2011-02-24
issued by DNV Pusan was sighted on board.

MO
12

Issued:2014-05-15
Before taking the below equipment into use, the overall examination is to
be performed at the surveyor's satisfaction.
1. Two(2) auxiliary steam generators found not in used condition.
2. Hot glycol system has pending approval comments (refer to 27355-J10409)

Partially
Deleted

Action
1. #1 (F) : Aux Steam Generator was opened up, internally inspected :
satisfactory.

MO
13

Issued:2014-05-15
Wasted hole on plating was found in way of 'Chain Locker Hatch' located in
the bosun store which will be repaired before the rig leaving the next
shipyard in Singapore.

Deleted

Action
Chain locker repaired by inserts & inspected

MO
14

Issued:2014-05-15
Before taking the rescue boat davit into use, overload testing of release
gear & launching test (at 5knot) to be carried out.

Deleted

Action
New , Type approved Rescue boat ,compliant with LSA Code was installed,
tested with satisfactory results.

Form No.: 40.7a

Issue: January 2014

www.dnvgl.com

Page 5 of 6

Name of vessel

Name of owner

DNV GL Id No:

Job Id:

NOBLE DISCOVERER

Noble Drilling International GmbH

27355

472127

Deleted or Postponed Condition of authority(CA), Condition of class(CC),
Memo to owner(MO), Retroactive requirements(RR)

Status

MO
15

Deleted

Issued:2014-05-15
DNV drawing approval of modification regarding 'bilge system' to be placed
on board for the final verification.
Action
Bilge system: Modifications carried out were inspected per Approved Dwg #
1599-60003, , rev 3 and considered satisfactory.

Form No.: 40.7a

Issue: January 2014

www.dnvgl.com

Page 6 of 6

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close