WELCOME
PUBLIC INFORMATION SESSION
for the PTH 59N and PTH 101 Interchange, Active
Transportation Crossing of PTH 101 (for pedestrians,
cyclists or other non-motorized modes) and
Associated Road Improvements

PLEASE TAKE & COMPLETE A COMMENT SHEET
WEDNESDAY, SEPTEMBER 24, 2014
5:00 P.M. - 8:00 P.M.

PROJECT BACKGROUND
 The Province of Manitoba has approved the full interchange project at
PTH 59N and PTH 101 in the current five-year Highway Capital Program.
 The Province of Manitoba has announced the provision of a grade
separated AT crossing of PTH 101 as part of this project.
 An update to the design is required to incorporate changes to Manitoba
Infrastructure and Transportation (MIT) design standards and practices,
as well as to accommodate development that has occurred in the area.
 The purpose of this project is to ensure the functional design of the
interchange meets today’s standards and future operating requirements

2

PROJECT BACKGROUND
 The original design for the PTH 59N and PTH 101 interchange was
completed in the mid 1990’s and reviewed in 2011.
 The current configuration, which includes two traffic signal controlled
intersections, is the 1996 construction detour that was designed to be in
place on an interim basis to allow future construction of the interchange.
 The existing layout is unusual, and operational and safety issues have arisen
at the two intersections since their construction, and conditions continue to
deteriorate.
 As traffic volumes have increased, the intersection layout has reached the
end of its effective service life.

3

DESIGN BUILD
 MMM Group Ltd. has been hired to prepare a functional design report,
initiate public engagement and assist with the procurement process and
construction overview contract to complete the project.
 This project will be delivered as a “design build” contract. Rather than the
more common “design, bid, build” construction contract.
 A design build contract engages a single construction firm or consortium
to complete final design by adhering to the functional design and then
complete the construction.

4

5

FUNCTIONAL DESIGN
The following six boards present the details of the various components of the functional
design.
New interchange at PTH 59N and PTH 101 and
realignment of PTH 101 in the vicinity of the
interchange



An upgraded intersection at PTH 59N and PR 202
(north of the interchange), with a traffic signal and
turning lanes and allow for a future interchange



Allow for six lanes on PTH 101 and build six lanes on
PTH 59N between PTH 101 and PR 202



Active Transportation Crossing of PTH 101 at Raleigh/
Gateway Street corridor



Closure of accesses along PTH 101 and PTH 59N and
hard surfacing of selected Service roads



Realignment of Knowles Avenue with Headmaster
Row



Allow for future realignment of Wenzel Street

PR

20
2



59
Rd
.

PT
H

Fa
rm

10
1

Ra
lei
gh

St
.

Ga

tew

ay

Rd

.

PT
H

Wenzel St.

Pr
itc
ha
rd

He
ad
ma
ste
r

Ro
w
PT
H
Kn
ow
les

Av
e.

10
1

6

PTH 59N AND PTH 101
PT
H5
9N

PT
H

 The interchange will
accommodate future traffic
(flow/count) projections by
allowing the free flow of
vehicles on both PTH 59N and
PTH 101.

10
1

 PTH 59N will be elevated over
PTH 101.

PT
H1
01

ACTIVE TRANSPORTATION
Bridge
 A bridge over
PTH 101 with
seven-metre
clearance.
 Does not
preclude the
R.M. to build
a bridge in the
future.

7

8

ACTIVE TRANSPORTATION
Through-Pass
 A “through-pass”
where PTH 101 is
elevated above grade.
The “through-pass”
option would include
enough space for
emergency vehicle
access and active
transportation crossing.

Infrastructure and Transportation

9

PTH 59N AND PR 202
PR

20
2

 The addition of traffic lights at
the intersection of PTH 59N and
PR 202 will improve traffic flow
and safety at the intersection.
The design will accommodate a
future interchange.

PT
H

Wenzel St.

59
N

PTH 59N

KNOWLES AVE. AND
HEADMASTER ROW
 Knowles Avenue will be realigned
to intersect with PTH 59 at
Headmaster Row creating a four
legged intersection.

PTH
59N

He
ad
ma
ste
rR
ow

10

Kn
ow
les

Co
un
try
sid
eW
ay

Av
e.

ACCESS CLOSURES AND SERVICE
ROAD UPGRADES

11


Fa
rm

Ro
ad

Proposed closure
of Wenzel St. and
Camsell Ave. at
PTH 59N and
median cross-over

rm
Fa

10
1

Proposed closure
of De Vries Ave.
at PTH 101

Proposed
interchange
upgrades to
PTH 101 and
PTH 59N

PT
H5
9N
La
gim
od
ier
eB
lvd
.

Proposed closure
of Knowles Ave.
and PTH 59N

Wenzel Street

Mc

Gr

eg

or

PT
H

Ro

ad

Proposed closure
of Sperring Ave.
at PTH 101

Proposed closure
of Pritchard and
McGregor Farm Rd.
Access to PTH 59N
and median cross-over

59
N

Proposed intersection
PRGL¿FDWLRQVDW37+135

PT
H

Pr
itc
ha
rd

Proposed extension
of Headmaster Row

PT
H

10
1

Upon consolidating
access to PTH 59N and
PTH 101 the service
roads which will
provide access to these
highways will be hard
surfaced.

12

PROPERTY IMPACTS
Vr
ies
Av
e.

10
1

N

Rd
.

He
ad
ma
ste
r

Ro
w
Kn
ow
les

PT
H

PTH
59N

PT
H

59

10
1

PT
H

10
1

Wenzel St.

PT
H

20
2

Pr
itc
ha
rd
Fa
rm

PT
H

PR

De

10
1

Kn
ow
les

Av
e.

LEGEND:
EXISTING PROPERTY LINE
PROPOSED ROW
PROPOSED ROAD
PROPOSED ROAD LANE LINE

PROPERTY IMPACTS:
LESS THAN 10m AFFECTED
10m-15m FROM BUILDING
GREATER THAN 15m TO BUILDING

Av
e.

13

PROPERTY IMPACTS

20
2
PR

N

Rd
.

PT
H

59

Wenzel St.

PT
H

10
1

He
ad
ma
ste
r

Ro
w
Kn
ow
les

PT
H

10
1

Av
e.

LEGEND:
EXISTING PROPERTY LINE
PROPOSED ROW
PROPOSED ROAD
PROPOSED ROAD LANE LINE

M
OR

GA
VE
PROPERTY IMPACTS:
LESS THAN 10m AFFECTED
10m-15m FROM BUILDING
GREATER THAN 15m TO BUILDING

EG
GR
MC

RD.

SP

ER

RIN

ARM
OR F
Pr
itc
ha
rd
Fa
rm

FA
R

.

REG

RD

.

MCG
PT
H1
01

14

PROPERTY IMPACTS
FA
R

M

RD

.

d.
lR
Hil
ds
Bir
EG

OR

N
59

He
ad
ma
ste
r

PT
H

PT
H

59

10
1

59
N

Rd
.

Wenzel St.

PT
H

N

PR

Pr
itc
ha
rd
Fa
rm

20
2

MC

GR

H
PT

Ro
w
Kn
ow
les

PT
H

10
1

Av
e.

LEGEND:
EXISTING PROPERTY LINE
PROPOSED ROW
PROPOSED ROAD
PROPOSED ROAD LANE LINE

PROPERTY IMPACTS:
LESS THAN 10m AFFECTED
10m-15m FROM BUILDING
GREATER THAN 15m TO BUILDING

Br
ick
er

Av
e.

PROJECT TIMELINE
MAY - JUNE
2014

 Background
Work

JULY - AUGUST /
SEPTEMBER 2014

 Stakeholder
Engagement

15

JULY - SEPTEMBER
2014

SEPTEMBER
2014

 Develop
Functional Design

 Public Information
Session

(including transportation
related organizations,
active transportation
advocates, City of
Winnipeg, RM of East
St. Paul and Brokenhead
Ojibwa Nation)

 Functional
Design Report
Completion

JUNE 2014 MAY 2015

 Design Build
Contractor
Procurement
Documents

2015 - 2018

 Project
Construction

16

CONSTRUCTION DETAILS

C-D ROAD

SB

-W

A.T. CROSSING

B

RA

MP

SB-WB RAMP

McGREGOR FARM

SPERRING AVE

ROAD

BENHAM WAY

W

B-N

B

RA

MP

SPERRING AVE

NB-WB RAMP

PTH 101

PTH 101
C-D ROAD

WB-SB RAMP

SB-WB RAM

P

C-D ROAD

3

NB-EB RAMP

DE VRIES AVE

6%5$0

3

PTH 101

1A

1B

AD
C-D RO

RALEIGH ST

SB-EB RAMP

EB

2B

-S

B

P

M

PTH 59N

(%1%

B

-E

NB

B

-N

EB

2A

RA

LAGIMO

DIERE

BLVD

NB-EB

RAMP

MP

CONSTRUCTION DETOUR PLAN - STAGE 1
LEGEND:
PTH 101 - STAGE 1 CONSTRUCTION DETOUR
PTH 59N - STAGE 1 CONSTRUCTION DETOUR
TEMPORARY SIGNALIZED INTERSECTION

P

M

RA

HEADMASTER ROW

RA

17

CONSTRUCTION DETAILS

C-D ROAD

SB

-W

A.T. CROSSING

B

RA

MP

SB-WB RAMP

McGREGOR FARM

SPERRING AVE

ROAD

BENHAM WAY

W

B-N

B

RA

MP

SPERRING AVE

NB-WB RAMP

PTH 101

PTH 101
C-D ROAD

WB-SB RAMP

SB-WB RAM

P

C-D ROAD

3

NB-EB RAMP

DE VRIES AVE

6%5$0

3

PTH 101

1A

1B

AD
C-D RO

RALEIGH ST

SB-EB RAMP

EB

2B

-S

B

P

M

PTH 59N

(%1%

B

-E

NB

B

-N

EB

2A

RA

LAGIMO

DIERE

BLVD

NB-EB

RAMP

MP

CONSTRUCTION DETOUR PLAN - STAGE 2
LEGEND:
PTH 101 - STAGE 2
PTH 59N - STAGE 2 CONSTRUCTION DETOUR
TEMPORARY SIGNALIZED INTERSECTION

P

M

RA

HEADMASTER ROW

RA

THANK YOU
Thank you for attending, Please fill out a
comment form before you leave.
If you have any further questions please contact
Chris Baker, 204-943-3178, [email protected]

18

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close