Repairs and Maintenance

Published on January 2017 | Categories: Documents | Downloads: 53 | Comments: 0 | Views: 251
of 18
Download PDF   Embed   Report

Comments

Content

REPAIRS AND MAINTENANCE
TOPIC – SURVEY AND REPORT ON BUILDING IN DISTRESS

Presented by: Gauri Patil Under guidance: Prof. Rahul Chutake

ABOUT BUILDING IN DISTRESS……….
Distress
sadden, grief


- Trouble, pain, hardship,

FACTORS LEADING TO DISTRESSED BUILDING •Faulty design •Faulty construction material and workmanship •Faulty use , miss use or loading •Lack of maintenance •Age of construction •Sub grade changes •Atmospheric – thermal, light, moisture, radiation, wind chemical •Below ground – seismic activity, moisture, vibrations from neighbor, chemicals •Incidental – fire, flash floods, cyclone etc.


WHY BUILDING SURVEY AND STATUS REPORT?
To maintain building in good condition to increase its life. Exact details of distress at columns/beams/slabs (cover or

core) 25%-50%-75% shown in colors. Useful for loan application to bank, useful for insurance claim.
 Members can understand the exact status/condition of their property  Helps contractors to understand the exact nature and sources of distress

     

before touching the structure for repairs, so chances of increasing the work/cost is minimal. Even owner can visualize the extent of repairs during work It has remedial measures Estimated repair cost and priorities can be decided On the strength of authentic reports even after some years if problem arises one can contact consultants or contractor for rectifications Consultants involvement in repairs (proper planning-systematic/methodical repairs) improves the work

INTRODUCTION………BUILDING SURVEY
 BUILDING DIAGNOSTICS/SURVEY IS A HOLISTIC PROCESS OF DATA

COLLECTION REGARDING CONDITIONS, DETECTION AND ANALYSIS OF FAULTS/ABNORMALITY/DEFECTS IN BUILDING MATERIALS AND FABRICS.


N O T O N LY A C C U R A C Y O F T H E S U R V E Y I IM P O R TA N T ; E Q U A LLY I P O R TA N T I S M S A C C U R A T E , S C I N T I C & C O N C I E P R E S E N TA T I N O F D A TA I T H E FO R M O F T H E E FI S O N R E P O R T.

BEFORE BUILDING SURVEY…..
Obtain building permit for survey Set of architectural and structural drawings Data collection Name of project Location Age Year of construction etc. Form a group and work allocation 

CHECK LIST BEFORE SURVEY 1.Measuring tape 2.Camera 3.Pen, pencil, etc. 4.Notebook and questionnaire
5. 

MINIMUM REQUIREMENTS FOR ASSESSMENT OF DEFECTS & THEIR CAUSES

•PRESENT CONDITION •ORIGINAL DESIGN APPROACH •ENVIRONMENT AND CONTAMINATION •CONDITIONS DURING CONSTRUCTION •HISTORY OF STRUCTURE •FUTURE USE •INTENDED USE, DESIGN LIFE & SERVICE LIFE •REQUIRED PERFORMANCE CHARACTERISTICS •LONG TERM PERFORMANCE OF PROTECTION OR REPAIR WORKS. •ADDITIONAL PROTECTION & MONITORING •NUMBER & COST OF SUBSEQUENT REPAIR CYCLES •COST & FUNDING OF ALTERNATIVE PROTECTION OR REPAIR OPTIONS, INCLUDING FUTURE MAINTENANCE & ACCESS COSTS •PROPERTIES & METHODS OF PREPARATION OF EXISTING SUBSTRATE •APPEARANCE OF PROTECTED OR REPAIRED STRUCTURE.

A N A LY S I , I T E R PR TA T I N & R E P O R T I G S N O N

CHOOSE REPAIR & REMEDIATION OPTION : •DO NOTHING FOR NOW/ MONITOR •RE-ANALYSE STRUCTURAL CAPABILITY •PREVENT OR REDUCE FURTHER DETERIORATION •IMPROVE, STRENGHTEN OR REFURBISH ALL OR PART •RECONSTRUCT ALL OR PART •DEMOLISH ALL OR PART

IDENTIFY PRINCIPLE OF REPAIR APPROPRIATE TO THE REPAIR & REMEDIATION OPTION

DEFECTS IN CONCRETE 1.PROTECTION AGAINST INGRESS 2.MOISTURE CONTROL 3.CONCRETE RESTORATION 4.STRUCTURAL STRENGTHENING 5.PHYSICAL RESISTANCE 6.RESISTANCE TO CHEMICALS

REINFORCEMENT CORROSION 7.PRESERVING OR RESTORING PASSIVITY 8.INCREASING RESISTIVITY 9.CATHODIC CONTROL 10.CATHODIC PROTECTION 11.CONTROL OF ANODIC AREA

CHOOSE A METHOD

•APPROPRIATE TO TYPE AND CAUSE OR COMBINATION OF CAUSES AND TO THE EXTENT OF DEFECTS •APPROPRIATE TO FUTURE SERVICE CONDITIONS •APPROPRIATE TO PROTECTION OR REPAIR OPTION CHOOSEN •COMPLIANCE WITH THE PRINCIPLE CHOOSEN •AVAILIBILITY OF PRODUCTS THAT COMPLY WITH STANDARDS

CHOOSE MATERIALS WHICH COMPLY WITH THE STANDARD

•CHARACTERISTICS FOR ALL INTENDED USES •CHARACTERISTICS FOR CERTAIN INTENDED USES •CHARACTERISTICS MAY BE CONSIDERED FOR SPECIFIC APPLICATIONS • RECORD OF PROTECTION OR REPAIR WORKS THAT HAVE BEEN CARRIED OUT •INSTRUCTIONS ON INSPECTION OR MAINTAINENCE TO BE UNDERTAKEN DURING REMAINING DESIGN LIFE.

SET OUT INSPECTION & MAINTENANCE REQUIREMENTS

6

SURVEY REPORT

EXECUTIVE SUMMARY: GIVE A CLEAR AND VERY CONCISE ACCOUNT OF THE MAIN POINTS, MAIN CONCLUSIONS AND MAIN RECOMMENDATIONS. PROJECT INTRODUCTION: THIS IS THE FIRST PART OF THE REPORT PROPER. USE IT TO PAINT THE BACKGROUND TO ‘THE PROBLEM’ AND TO SHOW THE READER WHY THE REPORT IS IMPORTANT TO THEM. GIVE YOUR TERMS OF REFERENCE (IF NOT IN THE TITLE SECTION) AND EXPLAIN HOW THE DETAILS THAT FOLLOW ARE ARRANGED. WRITE IT IN PLAIN ENGLISH. Remember…………INTRODUCTION ≠ ABSTRACT IDEALLY FOR A BUILDING SURVEY REPORT IT MUST CONTAIN: •BUILDING NAME: •LOCATION: •BACKGROUND INFORMATION: •DATE/DATES OF SURVEY: •GIVE LEGEND/ ZONING IDEA FOR CROSS REFERENCING



SURVEY REPORT




THE REPORT SHOULD COVER THE FOLLOWING :



 EXECUTIVE SUMMARY  PROJECT INTRODUCTION  VISUAL SURVEY  REVIEW OF DRAWINGS     

FINDINGS TECHNICAL TESTS TECHNICAL ANALYSIS COST ANALYSIS STRATEGY FORMATION/ ADVICE REFERENCE MATERIAL PROJECT PROGRAM

PHOTOGRAPHS
IMPORTANT FACTOR OF SURVEY



STRUCTURE IS THOROUGHLY SURVEYED & PHOTOGRAPHS ARE TAKEN IN ORDER TO ASSESS THE SITUATION IN DETAIL.



A BRIEF SUMMARY OF THE POINTS (TYPES OF STRUCTURAL & NONSTRUCTURAL DISTRESS) NOTED DURING THE SURVEY.

M a rk p o si o n ti and angl of e ca m e ra i n d ra w i g fo r n fu tu re re fe re n ce .

PHOTO TAGS
PHOTOGRAPH NO: E.G ABCD-NN/N COULD BE ALPA-NUMERIC BASED ON THE SYSTEM FOLLOWED DATE: ON WHICH THE PHOTOGRAPH IS CLICKED LOCATION: E.G EXTERNAL WALL ZONE: IF APPLICABLE CODE: BASED ON SYSTEM EG STRUCTURAL/NON-STRUCTURAL COMMENTS: IF DESIRED



SURVEY REPORT
DOCUMENTATION OF SURVEY

STRUCRURE ORGANIZATION

BUILDING EXTERIOR ROOFING

PLUMBING

BUILDING INTERIOR

CAMPUS ELECTRICAL

VISUAL SURVEY REPORT: BASED ON EARLIER REPORTS

REPORT: TECHNICAL DATA & CONCLUSION
TECHNICAL TESTS: NUMBER OF TEST COULD BE PERFORMED DURING BUILDING SURVEY. THE REPORT MUST CONTAIN ALL FINDINGS. TECHNICAL ANALYSIS & CONCLUSION: IT IS IMPORTANT TO EXTRACT ‘INFORMATION’ FROM ‘DATA’. REPORT MUST CONTAIN THE ANALYSIS & FINDINGS. COST ANALYSIS : COST ANALYSIS COULD BE PART OF THE REPORT. WORK OUT THE FINANCIAL IMPLICATIONS/FEASIBILTY & SUGGEST ALTERNATIVES. INCLUDE BENEFIT & COST ANALYSIS IF THE EXPERTISE IS AVAILABLE. CONCLUSION & RECOMMENDATIONS: SHOULD BE PRECISE & TO THE POINT. OUTLINE FUTURE STEPS. GIVE OPTIONS…. ENCLOSURES: •MEASURED DWGS IF ANY. •PROJECT PROGRAM •SPECIFICATIONS OF MATERIALS. •METHODOLOGY

PROJECT PROGRAMME
ID T as k N am e

D u r a ti o n Q tr 4 , 2 0 0 6 Q tr 1 , 2 0 0 7 O c to b e r 2 0 0 6 N o ve m b e r 2 0 0 6 D ec em be r 20 0 6 J an u a ry 2 0 0 7 F eb rua r 2023 26 29 1 4 7 1013 16 1922 25 28 1 4 7 1013 16 1922 25 2831 3 6 9 12 15 1821 24 2730 2 5 8 2 0 d ays 1 d a y 1 0 /2 7 1 0 /2 7 1 0 /3 0 1 0 /3 1 2 d a ys 2 d a ys 8 d a ys 1 1 /3 1 1 /1 0 1 1 /1 5 1 1 /9 1 1 /1 4 1 1 /1 6 1 1 /1 1 1 /2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B u i l d i n g R e p a ir s & M a in 6e3n daa ycse t n
B u ildin g C o n d t io n S u rv e y S ite & L o c a ti o n S tu d y S tu d y o f D r a w i n g s V is u a l In s p e c ti o n T e c h n ic a l T e s ts P rim a r y In f o r m a t io n C o lle c t d anys 5 io

C o o r d i n a ti o n fo r s p e c ia l5tedsats ys A n a l ys i s o f te s t r e p o r ts 3 d a ys R e p a ir s M e t h o d o lo g y & S t2 adt a ys r e gy F o r m a ti o n o f R e p a i r s S tr a d agys 2 te y C o s t A n a ly s is 2 d a ys C o s tin g fo r g e n e r a l r e p a i1 d a y rs C o s tin g fo r s p e c i a l r e p a i rs d a y 1 F in a l R e p o r t R e fe re n c e M a te r i a ls E xe c u ti o n p la n R e p a ir s E x e c u tio n 3 d a ys 2 d a ys 1 day 4 3 d ays

1 1 /1 7 1 1 /1 7 1 1 /2 0 1 1 /2 0 1 1 /2 1 1 1 /2 2

1 1 /2 3 1 1 /2 3 1 1 /2 4 1 2 /1 1 2 /1 5 1 /3 1 1 /3 0 1 2 /1 4 1 /2 1 /2 3

T re a ti n g C r a c k s i n th e W a l l 5 d a ys s T re a ti n g S tr u c tu r a l C r a c k s 1 0 d a y s W a te r p r o o fi n g to T e r r a c e 1 3 d a y s D ra i n a g e S ys te m re s tr u c tu1r 5n d a y s i g

THANK YOU……

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close