TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

DATE

TRANSMITTAL No.

MANUFACTURER`S CERTIFICATE OF COMPLIANCE

02-jul-15

06 10 00- 1

REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS TO:

FROM:

U.S. ARMY CORPS OF ENGINEERS PERU PROJECT OFFICE

CONTRACT No.

SPECIFICATION SEC. No.

06 10 00

  ( X)  ( )

W91278-13-D-0012 Task Order 0003

 Avenida Encalada, Cuadra 17 Monterrico Lima, Perú

CHECK ONE:

PARTENÓN E.I.R.L

Jr. Miguel Grau Nº 1380 Barrio Partido Alto, Tarapoto, Perú PROJECT TITLE AND LOCATION

CHECK ONE: THIS TRANSMITTAL IS FOR: ( ) FIO ( X ) GOV`T APPROVAL

CONS CONSTR TRUC UCTI TION ON OF FY-1 FY-13 3 NAM NAMRU RU-6 -6.. REP REPLA LACE CE ENTO ENTOMO MOLO LOGY GY BUIL BUILDI DING NG,, BUI BUILD LDIN ING G IQIQ-2. 2. IQU IQUIT ITOS OS - PER PERÚ. Ú.

ITEM

DESCRIPTION OF ITEM SUBMITTED

MFG. OR CONTR.

No.

CONTRACT REFERENCE

No

 RO  ROUGH CARPENTRY

CAT. CURVE

OF

DOCUMENT

DRAWING OR

COPIES

BROCHURE NO. b 

a

1

ROOF TRUSSES

REMARKS

THIS IS A NEW TRANSMITTAL TRANSMITTAL THIS IS A RESUBMITTAL OF TRANSMITTAL

FOR CONTRACTOR USE CODE

SPEC.

DRAWING

PARA. No.

SHEET No.

VARIATION

CE USE CODE

c

d

e

f

g

SD-02

2

3.1.6

N/A

A

h

I certify that the above submitted items have been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated

MANUEL LOZA MOLINA

Quality Control Manager  NAME AND SIGNATURE OF CONTRACTOR SECTION II - APPROVAL ACTION ENCLOSURES RETURNED

NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY

SHEET __ 1 __ OF __ 1 ___ 

SHOP DRAWINGS

ROOF TRUSSES

FOR

DATE

i

 

SHOP DRAWINGS

ROOF TRUSSES

Submitted By: MANUEL LOZA

Jr. Miguel Grau Nº 1380, Barrio Partido Alto - Tarapoto - Perú

STEEL TUBING

ROOF TRUSSES

STEEL TUBING

ROOF TRUSSES

Submitted By: MANUEL LOZA

Jr. Miguel Grau Nº 1380, Barrio Partido Alto - Tarapoto - Perú

TRUSSES STEEL TUBING THICKNESS

STEEL SHEETS

ROOF TRUSSES

Submitted By: MANUEL LOZA

Jr. Miguel Grau Nº 1380, Barrio Partido Alto - Tarapoto - Perú

2 MM AND 4 MM THICK FOR  STEEL SHEETS

WORK PLAN

ROOF TRUSSES

Submitted By: MANUEL LOZA

Jr. Miguel Grau Nº 1380, Barrio Partido Alto - Tarapoto - Perú

OVERHANG CONSTRUCTION WORK PLAN

1. INTRODUCTION

-

Work plan for the construction of the overhang of the entomology building lo cated in Iquitos will define the working procedures of the staff during the implementation of activities. Health and safety requirements has been reviewed as well as the corresponding specifications in order to perform this plan under safety regulations.

2. PLAN DESCRIPTION

-

The working area of the overhang construction will be located on the building's roof, trusses will arm on the floor and rise to be assembled on the roof the work force, taking the necessary precautions. Before the start work •

Inspect and evaluate the work area before starting work to identify hazards that are in the work area.



Will be identified work areas (yellow ribbons, carrier tapes and signage) and internal circulation with adequate signage (workers).



Informative and preventive signaling will be installed to the countries of entry and exit of personnel to the work area, they will be used as evacuation routes.



Manual tools, electric tools, PPE and others before transferring them items to be inspected tools.



Electrical installations necessary for this work, its location, position, industry conditions and capacity voltage equipment will be identified.



Be available necessary contingency equipment (first aid kit) in case of incidents occur.

During the execution of work •

Depending on the location of the work, if there is a risk to external workers and lower levels are considered a worker lookout.



Constant monitoring of Risk Prevention and field management will be taken.



All pedestrian traffic route must be identified and free of obstacles.

Considerations at the end of work •

All materials, tools or equipment used should be returned to storage in a clean condition or stored in areas designated for that purpose, protecting them from damage by weather or other hazards.

3. WORKS TO BE PERFORMED : -

Elements to be installed, will be: a.

Roof trusses.

b. Overhang roofing panels.

-

The procedure of the installation will be as follows : a.

Metal deck have to be properly installed before began trusses works.

b. All trusses will assembled before to be mounted at the roof. c.

This work must be fully completed before starting the installation work of TPO.

d. To avoid hazards in activities for fixation of bolts in facades those works will be performed with scaffolding or stairs according the case, including lifelines, harness and PPE.

4. MATERIALS & TOOLS A. TOOLS -

Drill.

-

Manual tools.

-

Scaffolding only for longer perimetral sides of building.

-

Stairs for short sides which do not fit scaffolding.

B. MATERIALS -

Calaminon DR (metal roofing panel).

-

Standard ridge cap.

-

Gutter.

-

Steel channel for supports.

-

Rectangular tube.

-

Perforated metal sheet D100

-

Glyplac RH sheet.

-

Others.

5. PREVENTION MEASURES -

Prevention measures assumed during the overhang construction are: •

Safety meetings.



Personal protective equipments according to the activity performed.



Defining the work area with ribbons of danger and / or meshes.

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close