Savings

Published on May 2016 | Categories: Types, Brochures | Downloads: 56 | Comments: 0 | Views: 446
of 2
Download PDF   Embed   Report

Comments

Content

`

Improving Your Bottom-Line
Waste (MT) Transport/pallet (RM) Toll/trip (KA) Total trip (18pallet/trip) (KA) Treatment by KA (RM) GES cost for treatment (RM)** Chemicals (30% of waste) (MT) No of pallet 50 50 15 4 590 2100 15 65 Client to pay KA (RM) Client to pay GES (RM) Total (RM) Incineration + Transport and toll(KA) Savings (RM) 41,660 63,340 105,000 124,310 19,310 (18%)

**GES cost for treatment varies based on type of sludge, quantity and client’s location




GES undertakes to ensure that all wastes are disposed in accordance with EQ (Scheduled Waste) Regulations 2005. Your responsibility ends at waste storage – We manage it until disposal and the receipt of relevant legal documentation.
Approximately 15% Savings minimum

For any Inquiries, Please Contact

Incineration route does no good for the environment (It’s completely destructive – A ZERO sum game) Did the planet betray us or did we betray the planet? - An inconvenient truth

….. We help minimizing the Global Warming Potential

What we do
We are in the business of working with our clients to identify all waste streams emanating from their industrial process – provide waste management strategy from generation, storage, minimization and packaging in accordance with environmental legislation.

Our Proven Solutions
Sludge

On-Site Treatment

Who need our services?
Any industry that generates waste classified as “industrial waste” and cannot be disposed in any municipal land-fills and normally waste contains of Oil & Grease (O&G), Total Organic Compound (TOC) and/or heavy metals that exceed the permissible limits.
Packaging

How does this benefit the waste generator?
We are able to chemically treat the waste using our proprietary chemicals to reduce the Oil and grease (O&G), Total Organic Compound (TOC) and/or Heavy Metal content. This allows the waste to be disposed in manners other than incineration i.e. solidification/secured land-fill etc. The price differential (savings) is shared with the generators.

Disposal (Kualiti Alam)

Landfill

Solidification

We Preserve the Environment
The ‘GE Solution’ Landfill route is a natural waste treatment process that will allow for landfill rehabilitation and render the land useable over time.

Invoice and Payment Options 1. Client to pay Kualiti Alam (KA) and balance pay to General Environmental Solution (GES)
= Treatment cost by GES – Client pays KA [Treatment Cost by KA (after on-site treatment) + Transport + Toll]

Among Clients Benefited From Our Services

2. Client to pay General Environment Solution (GES) and GES pay to Kualiti Alam for total cost of treatment

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close