16. Mv&Lv Switchgear Test Report

Comments

Content

Contractor

Owner

Main Subcontractor

PROJECT NAME: Khabat Thermal Power Plant Units 1&2
OWNER: Ministry of Electricity of Kurdistan Regional Goverment
CONTRACTOR: POSCO Engineering & Construction Co. Ltd.
MAIN SUBCONTRACTOR: GAMA Power Systems Engineering &
Contracting Inc.
PROJE REFERENCE NO:
Re
v
A

Revision
Date

Description

15.09.2015

For Review

Revision History
Created by
Checked by
A.E. AKMAN

Emission Status

Return
Status

B. GÖKCE

Vendor doc No.:

Vendor Logo

Approved by

Document Code :

Title, Subtitle

AC PANEL
TEST REPORT

Format
A4

Rev. A

Date
15.09.2015

Lang.
En

Date
15.09.2015

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N°

MV & LV SWICTHGEAR
TEST REPORT

CLIENT N°
REV.

SH/OF
2/4
0

SUMMARY:
1.

SWITCHGEAR BUSBAR TESTS ...............................................HATA! YER İŞARETİ TANIMLANMAMIŞ.3

2.

SWITCHBOARD BUSBAR CONTINUITY TEST........................HATA! YER İŞARETİ TANIMLANMAMIŞ.4

KESİR Müh. Elektrik
Şti.
Date
Name
Signature

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N°

MV & LV SWICTHGEAR
TEST REPORT

SH/OF
3/4

CLIENT N°

0

REV.

1. SWITCHGEAR BUSBAR TESTS

Project No:

Area/Unit:

Project Title:

System/Sub System:

Equipment Desc..:

Equipment Tag No:

Type:

Serial Number:

Manufacturer:

Rated Voltage:

Cross Section of Busbar:

Length of Busbar:

Temperature:

Humidty:

INSULATION RESISTANCE
U-N
Before HIPOT After HIPOT

V-N
Before HIPOT
After HIPOT

W-N
Before HIPOT

After HIPOT

HIGH POTENTIAL TEST
Duration

PHASE U
Leakage
Test Voltage
Current

PHASE V
Leakage
Test Voltage
Current

PHASE W
Leakage
Test Voltage
Current

15 sec..
30 sec..
60 sec..
120 sec..
BUSBAR CONTACT RESISTANCE TEST
Applied Current:
L1
Measured Contact Resistance:

KESİR Müh. Elektrik
Şti.
Date
Name
Signature

L2

L3

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N°

MV & LV SWICTHGEAR
TEST REPORT

SH/OF
4/4

CLIENT N°

0

REV.

REMARKS
TEST EQUIPMENT
MANUFACTURER

TYPE

SERIAL NUMBER

CALIBRATION DATE

2. SWITCHBOARD BUSBAR CONTINUITY TEST

Circuit designation
From

To

Busbar conductivity, µΩ
L1

L2

KESİR Müh. Elektrik
Şti.
Date
Name
Signature

L3

N

E

Result

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close