190_230306.xls

Published on January 2017 | Categories: Documents | Downloads: 44 | Comments: 0 | Views: 585
of 2
Download PDF   Embed   Report

Comments

Content

DOCUMENT TRANSMITTAL ADVICE
KAHRAMAA CONTRACT: GTC/5/2004 (SIEMENS) QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE VI - PART 1 Forwarded To: M/s. Consortium GTC/5/2004 (SIEMENS) P. O. Box 24385 Doha, Qatar, Fax: +974 43 69 642 Attn. Mr. Michael Blohs Senior Project Manager Cc. Mr. Badr Khalil Al-Jaidah Head of Electricity Projects, KAHRAMAA P. O. Box 41 Doha, Qatar, Fax: +974 48 45 191
Document No.
05-4 00-SIE-18/4006

Total Pages: 1 + 01

Transmittal Number EFC-SIE/Ph6/DTA/06/190 Type of Status
A - Approved (Issue as AFC*) B - Approved Except as Noted (Issue as AFC* with incorporated comments) C - Approved Except as Noted & Resubmit D - Not Approved E - As Built F - For Information G - Superseded H - See Remarks *AFC = Approved For Construction
Description
66 kV XLPE Cable Accessories (Straight and Insulated joints) Make Elastimold for Vendor Approval

Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Remarks:

Rev.
0

Your DTS Ref.
SIE-GTS5/DTS/COM 398 (Received Date : 16.03.2006)

Status
B

Comments Sheet attached Originator’s Signature Designation Momcilo Mrvic Project Director Date Wednesday, March 22, 2006

Please acknowledge receipt by returning one signed copy of this sheet (or fax confirmation to be attached). Receiver’s Signature Designation Date

: FRE
Bulevar Mihaila Pupina 12 11070 Belgrade, Serbia and Montenegro P.O. Box 20 Tel.: (+381) (11) 310 1200 Fax: (+381) (11) 311 2447 [email protected] Sarweystrasse 3 70191 Stuttgart, Germany P.O. Box 10 14 54 Tel.: (+49) / 711 / 8995-0 Fax.: (+49) / 711 / 8995-459 [email protected]

P.O. Box 4769, Doha, Qatar Tel.: +974 478 571, Fax: +974 478 572 [email protected]

6728A02/206368018.xls.ms_office/1/24/2014

Page 1/2

Transmittal Number: EFC-SIE/Ph6/DTA/06/190 Item No. 1. Document No. 05-4/00/SIE/18/4006 Rev. 0 66 kV XLPE Cable Accessories (Straight and Insulated joints) Make Elastimold for Vendor Approval

COMMENTS 1. Testing - Please confirm that Elastimold will perform factory acceptance tests for accessories according to KM requirements - Please confirm that the joints will be included in the type test loop of the 66 kV cable Unit System Please confirm that in all documents the units will be according to the metric system. Drawings Please submit proper detailed drawings for approval in a separate DTS KM requires the following details to be observed in these drawings: '- Table of components with quantities and materials - Show details of connection of copper wire screen and lead sheath and the through connection in the straight joint - Show details of shield break in the insulating joint - Provide copper tube details and thickness of copper and supporting housing - Provide details of the filling compound and the filling process - Provide manufacturing quality plan

CONSORTIUM REPLY: Reply to Point 1 Reply to Point 2 -

2.

3.

6728A02/206368018.xls.ms_office/1/24/2014

Page 2/2

Sponsor Documents

Recommended

No recommend documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close