TRIM: PRW-101015601-103CS1P
/ LPN-101015601-101CS1P
INSULATION: P
0-50%
39
SPLIT RANGE
38
PV
0012 A
PV
0012 B
+
1"
1"-LPN-101015001-101CS1P-N
FC
CL300
3607
3/4"
34
D
33
03
3/4"
D
3/4"
1-1/2"G3"
14,05 03
1/4"
32
31
29
30
FB
NOTE 1 LO
0.2%
4"-LPF-101015302-101CH2F-N
3593
NOTE 3
NOTE 1
29
LO
FB
NOTE 2
03
3/4"
PZV
0003 A
V
+
4"x3"
NOTE 7
CL300
3"x1-1/2"
101-SP-0058
3/4"
1-1/2"G3"
14,05
28
+
27
3/4" V
26
03
PZV
0003 B
+
4"x3"
NOTE 7
03
CL300
25
3"x1-1/2"
24
23
M
40"
03
3/4"
LC
FB
NOTE 1
LO
FB
NOTE 1
3"-PRW-101015006-101CS1P-N
2" V
E
CL300
2"
LV
0008
+
18
3"x1-1/2"
3"-WST-101015001-101CS1P-N
17
3/4"
16
D
1-1/2" 3"x1-1/2"
FC 03
CL300
3/4"
W
LY
0008
3/4"
PI
0064
3"-WST-101015001-101CS1P-P
HIGH LEVEL
OVERRIDE
LC
0008 B
D
LC
0008 A
H
HPT
3/4"-PRW-101015015-101CS1P-N
L
ZC
0010
NOTE 3
LI
0032
24
22
NOTE 6
21
20
L3B
18
LL
LG
0031
03
2"
S
MIN.
L3A
8" ID
4"
CL300
A
H
03
11
10
L1A
3/4"
3"-WST-101015001-101CS1P-N
3
2
1
D
FC
CL300 03
3/4" D
3"-BFW-101015301-101CS1P-P
03
INST.
PIPING
9
D
1300 mm
2"
2"-OSW-101015303-101CS1P-N
CL300
3569
NC
2"-PRW-101015010-101CS1P-N
1-1/2" 3"x1-1/2"
12
4"-PRW-101015002-101CS1P-P
4"-PRW-101015002-101CS1P-P
PIPING INST.
2"
1/4"
INST.
PIPING
3/4"-PRW-101015011-101CS1P-N
8
7
6
5
4
3/4"-OSW-101015304-101CS1P-N
3
2
1"x3/4" 3/4" 1"x3/4"
NC
ORIGINAL SIGNED IN PROJECT FILE
1
03
OSW
03
05-APR-2011
AFC
AFC: APPROVED FOR CONSTRUCTION
NPS / STG
AVS / HPR
HS
02
22-DEC-2010
AFC
AFC: APPROVED FOR CONSTRUCTION
JGT / STG
AVS / HPR
HS
STRIPPED SOUR WATER
01
18-MAY-2010
AFC
AFC: APPROVED FOR CONSTRUCTION
IRG / FCB
RDP / HPR
HS
FROM B.L.
00
23-DEC-2009
IFD
IFD: ISSUED FOR DESIGN
MCG / FCB
RDP / HPR
HS
REV
DATE
COMPANY
STATUS
DS101-TRJR-480040
3399
GENERAL HOLDS
HOLDS
1- EACH INSTRUMENT TAG NUMBER IS PREFIXED BY 101 (EX 101-TT-0001). THIS DRAWING IS VALID FOR TWIN LP HDS: UNITS 101 AND 102.
2- FOR GENERAL NOTES, SYMBOLS AND DETAILS SEE DRAWINGS SA-JER-DSAAA-TRJR-480001 THROUGH SA-JER-DSAAA-TRJR-480022.
3- ALL LINES CONNECTED TO OSW DRAINS SYSTEMS SHALL BE GRAVITY FLOW DESIGNED.
5- ALL LINES CONNECTED TO OSW DRAINS SYSTEMS SHALL BE GRAVITY FLOW DESIGNED.
1- BLOCK VALVE SHALL BE INSTALLED WITH STEM IN OR BELOW THE HORIZONTAL POSITION.
2- MECHANICAL LINK.
3- MAKE CONNECTION ON TOP OF PIPE.
4- DES PRESS: PRESSURE: 15 barg, AND HALF VACUUM (HV) AT 150º C.
5- ENSURE THAT NOZZLES FOR LEVEL TRANSMITTERS AND LEVEL GAUGE ARE AT THE HORIZONTAL ELEVATION.
6- FOR NOZZLES DETAILS, ALIGNMENT AND HEIGHT OF LEVEL INSTRUMENTS SEE MECHANICAL DRAWING.
7- SET PRESSURE OF PZV-0003 HAS BEEN READJUSTED BASED ON A DISTANCE FROM UPPER TL OF D-0004 TO PZV. THIS DIFFERENCE OF ELEVATION SHOULD NOT
BE HIGHER THAN 10 m.
03
NOTE 4
This document is the property of SATORP and shall not be disclosed to third parties or reproduced without permission of the owner.
UTILITIES IDENTIFICATION
GENERAL NOTES
4- DRAIN VALVE ON EQUIPMENT AND/OR PIPING SHALL BE INSTALLED FLANGE O FLANGE OR AT MINIMUM DISTANCE FROM THE EQUIPMENT/PIPING TO BE DRAINED.
DRUMS
TYPE
HEIGHT
DIAMETER
OP. PRESS.
OP. TEMP.
DES.PRESS.
DES.TEMP.
15
13
INST. PIPING
3"x1-1/2"
3780
V 3/4"
1/4"
3"-BFW-101015301-101CS1P-H
WASH WATER
TO 101-G-0002-A/B
14
+
15
16
NOTE 5
FV
0015
4
23
MIN.
LT
0032
2"
FY
0015 A
5
25
MIN.
ZC
0011
FT
0015
3/4"
26
3/4"
L2A
3/4"
27
19
9
6
29
L1B
2"
7
3/4"-LPF-101015303-101CH2F-N
6513
NOTE 5
10
HC
0049
28
17
LT
0008
UC
8
29
1/4"
12
FC
0015
30
101-D-0004
2"
2"-PRW-101015014-101CS1P-P
FY
0015 B
31
PC
0012
CL300
1/4"
13
11
PT
0012
32
L2B
NC
14
33
INST. PIPING
1"
15
34
3"-WST-101015001-101CS1P-P
19
3/4"
PIPING INST.
2"
CL300
50-100%
SPLIT
RANGE
0-50%
3592
NOTE 3
D
3/4"
35
29
NC
PIPING INST.
2"x1"
2"
20
1"-LPF-101015301-101CH2F-N
NNF
3/4"
22
21
FC
TSO
CL300
03
36
1/4"
+
NC
D
1"
37
101CS1P
101CH2F
27
+
NO POCKETS 1"-LPN-101015001-101CS1P-N
35
101CS1P
101CH2F
37
36
38
PY
0012
50%-100%
POS.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
DESCRIPTION
FIRE WATER
SERVICE WATER
COOLING WATER
POTABLE WATER
DEMI WATER
N.A.
N.A.
N.A.
HP STEAM
MP STEAM
LP STEAM
HP CONDENSATE
MP CONDENSATE
LP CONDENSATE
BFW
PLANT AIR
INSTRUMENT AIR
N.A.
REF. DWG POS.
101-153
101-152
101-153
101-151
101-151
101-151
101-154
101-154
19
20
21
22
23
24
25
26
27
28
29
30
31
32
DESCRIPTION
N.A.
FUEL OIL
FUEL GAS
N.A.
N.A.
N.A.
CLOSED DRAIN
N.A.
L.P. NITROGEN
H.P. FLARE
L.P. FLARE
SOUR/ACID FLARE
PILOT GAS
AUX COOLING WATER
REVISION MEMO
PREPARED BY
CHECKED BY
APPR/AUTH BY
REF. DWG
101-155
JUBAIL EXPORT REFINERY
PIPING AND INSTRUMENT DIAGRAM
101-158
DISTILLATION AND HYDROTREATING
LOW PRESSURE HYDRODESULPHURISATION TRAIN 1
WASH WATER BREAK TANK