PROJECT: PROPOSED 2-STOREY RESIDENTIAL BUILDING
SUBJECT: PROJECT SCHEDULE & BUDGETARY COSTS
DATE: JUNE 8, 2015
ITEM/DESCRIPTION
Division 1 - General Requirements

·         1
·         2
·         3
·         4
·         5
·         6
·         7
·         8
·         9

-

Summary
Price and Payment Procedures
Administrative Requirements
Quality Requirements
Temporary Facilities and Controls
Product Requirements
Execution Requirements
Facility Operation
Facility Decommissioning

Division 2 - Site Construction

·        1 - Basic Site Materials and Methods
·         2 - Site Remediation
·         3 - Site Preparation
·         4 - Earthwork
·         5 - Tunneling, Boring and Jacking
·      6 - Foundation and Load-Bearing Elements
·         7 - Utility Services
·         8 - Drainage and Containment
·         9 - Bases, Ballasts, Pavements and
Appurtenances
·         10 - Planting

SCHEDULE
DURATION

START

COST
FINISH

ITEM COST

WT%

ITEM/DESCRIPTION
Division 3 - Concrete

·         1
·         2
·         3
·         4
·         5
·         6
·         7

-

Basic Concrete Materials and Methods
Concrete Forms and Accessories
Concrete Reinforcement
Cast-In-Place Concrete
Cementitious Decks and Underlayment
Grouts
Mass Concrete

Division 4 - Masonry

·         1 - Basic Masonry Materials and Methods
·         2 - Masonry Units
·         3 - Stone
Division 5 - Metals

·        
·        
·        
·        

1
2
3
4

-

Basic Metal Materials and Methods
Structural Metal Framing
Ornamental Metal
Expansion Control

Division 6 - Wood and Plastics

·        1 - Basic Wood and Plastic Materials and
Methods
·         2 - Rough Carpentry
·         3 - Finish Carpentry
·         4 - Architectural Woodwork
·         5 - Plastic Fabrications

DURATION

SCHEDULE
START

FINISH

COST
ITEM COST
WT%

ITEM/DESCRIPTION
Division 7 - Thermal and Moisture Protection

·         1 - Basic Thermal and Moisture Protection
Materials and Methods
·         2 - Damproofing and Waterproofing
·         3 - Thermal Protection
·         4 - Shingles, Roof Tiles, and Roof Coverings
·         5 - Roofing and Siding Panels
·         6 - Membrane Roofing
·         7 - Flashing and Sheet Metal
·         8 - Roof Specialties and Accessories
·         9 - Fire and Smoke Protection
Division 8 - Doors and Windows

·         1 Methods
·         2 ·         3 ·         4 ·         5 ·         6 ·         7 ·         8 -

Basic Door and Window Materials and
Metal Doors and Frames
Wood and Plastic Doors
Windows
Skylights
Hardware
Glazing
Glazed Curtain Wall

DURATION

SCHEDULE
START

FINISH

COST
ITEM COST
WT%

ITEM/DESCRIPTION
Division 9 - Finishes

·        
·        
·        
·        
·        
·        
·        
·        
·        

1
2
3
4
5
6
7
8
9

-

Basic Finish Materials and Methods
Plaster and Gypsum Board
Tile
Terrazzo
Ceilings
Flooring
Wall Finishes
Acoustical Treatment
Paints and Coatings

Division 10 - Specialties

·         1 - Visual Display Boards
·         2 - Louvers and Vents
·         3 - Grilles and Screens
·         4 - Service Walls
·         5 - Wall and Corner Guards
·         6 - Fireplaces and Stoves
·         7 - Fire Protection Specialties
·         8 - Protective Covers
·         9 - Partitions
·         10 - Storage Shelving
·         11 - Exterior Protection
·         12 - Telephone Specialties
·         13 - Toilet, Bath, and Laundry Specialties
·         14 - Wardrobe and Closet Specialties

DURATION

SCHEDULE
START

FINISH

COST
ITEM COST
WT%

ITEM/DESCRIPTION
Division 11 - Equipment

·         1 - Maintenance Equipment
·         2 - Vehicle Service Equipment
·         3 - Solid Waste Handling Equipment
·         4 - Water Supply and Treatment Equipment
·         5 - Hydraulic Gates and Valves
·         6 - Fluid Waste Treatment and Disposal
Equipment
·         7 - Residential Equipment
·         8 - Unit Kitchens
Division 12 - Furnishings

·         1 - Fabrics
·         2 - Furnishings and Accessories
·         3 - Furniture
Division 13 - Special Construction

·        
·        
·        
·        
·        

1
2
3
4
5

-

Building Modules
Lightning Protection
Security Access and Surveillance
Detection and Alarm
Fire Suppression

Division 14 - Conveying Systems

·         1 – Scaffolding

DURATION

SCHEDULE
START

FINISH

COST
ITEM COST
WT%

ITEM/DESCRIPTION

DURATION

SCHEDULE
START

FINISH

COST
ITEM COST
WT%

Division 15 - Mechanical

·         1 - Basic Mechanical Materials and Methods
·        
·        
·        
·        

2
3
4
5

-

Process Piping
Fire Protection Piping
Plumbing Fixtures and Equipment
Refrigeration Equipment

Division 16 - Electrical

·         1
·         2
·         3
·         4
·         5
·         6

-

Basic Electrical Materials and Methods
Wiring Methods
Electrical Power
Transmission and Distribution
Low-Voltage Distribution
Lighting

CONTINGENCIES
PREPARED BY:

SIGNATURE OVER PRINTED NAME

SIGNATURE OVER PRINTED NAME

PROGRESS REPORT
% ACCOMPLISHED

ACTUAL WT%

PROGRESS REPORT
% ACCOMPLISHED
ACTUAL WT%

PROGRESS REPORT
% ACCOMPLISHED
ACTUAL WT%

PROGRESS REPORT
% ACCOMPLISHED
ACTUAL WT%

PROGRESS REPORT
% ACCOMPLISHED
ACTUAL WT%

PROGRESS REPORT
% ACCOMPLISHED
ACTUAL WT%

SIGNATURE OVER PRINTED NAME

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close