I.GENERAL REQUIREMENTS
item materials unit quantity Unit cost Labor cost
Sub-total Total
1 Mobilization/demobilization lot 1 Lumpsum 20,000
2 Municipal & subdivision permit *may not necessarily be included in the
bill of materials
3 Construction bond *may not necessarily be included in the bill of
materials
4 Inspection fee *may not necessarily be included in the bill of material
s
I.EARTH/SITE
Item Materials unit quantity Unit cost Labor cost
Sub-total total
1 Layout, clearing & grubbing lot 1 Lump
sum 20,000.00 20,000.00
2 Excavation Cu.m 5,397 300
16,191.00 16,191.00
3 Backfilling Cu.m 5,269 350
18,441.50 18,141.50
4 Soil poisoning Sq.m 224.5
200 449,000.00 449,000.00
5 Hauling Cu.m 0
.128 300 384.0
0 384.00
item materials unit quantity Unit cost Labor cost
Sub-total total
1 Portland cement bags 443.236 200 80.00 280.00 124,106.08
2 Sand Cu.m 27.711 900 360.00 1,260.00 34,915,86
3 Gravel Cu.m 55.42 950 380.00 1,330.00 73,708.60
item materials unit quantity Unit cost Labor cost
Sub-total total
1 6 chb pcs 5,765.89 12 4.8 16.8 96866.952
2 4 chb pcs 1,274.286 9 3.6 12.6 16056.0036
3 Portland cement bag 53.08 225 90 315 16720.2
4 Sand ELF 4 1300 1304 5216
IV. TILES ( Flooring & Wall Venner)
1 materials unit quantity Unit cost Labor cost
Sub-total total
200mm x 200mm Ceramic tiles pcs
2 300mm x 300mm VynilFlr. Tiles Pcs
3 100mm x 900mm Vynilflr. Tiles (wood Design) Pcs
V.STEEL WORKS
item materials unit quantity unitcost Labor cost
Sub-total Total
1 10mmØ 6m Def. RSB pcs 877 136.00 54.40 190.40 166,980.80
2 12mmØ 6m Def. RSB pcs 47 196.00 78.40 274.40 12,896.8
3 16mmØ 6m Def. RSB pcs 466 368.00 147.20 515.20 240,083.2
VI.HARDWARES
Item Materials unit quantity Unit cost Labor cost
Sub-total total
1 Main Door Lockset Pcs 1 4,319.75 1,727.9 8, 400
8, 400
2 Dead Bolt Pcs 3 1, 100 440 1, 540 4, 620
3 Door Knob Pcs 15 600 240 840 12,600
4 Door Hinges Pcs 42 400 160 560 23,520
VII. CEILING
item materials unit quantity Unit cost Labor cost
Sub-total total
1 10mm x 4 x 8 Gypsum Board Ordinary Pcs 15 322.85 129.14
451.99 6, 779.85
2 10mm x 4 x 8 Gypsum Board Moisture Resistant pcs 16 538.20
215.28 753.48 12,005.68

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close