Contractors Requirements

Published on October 2021 | Categories: Documents | Downloads: 0 | Comments: 0 | Views: 20
of 3
Download PDF   Embed   Report

Comments

Content

 

Daniel Ross  

NT1310 HW6

Contractors Requirements: The contractor must be certified to install the infrastructure components bein pro!ided and sho" proof thereof# The contractor must be an authori$ed reseller of the net"or%in and infrastructure components quoted and sho" proof thereof# &ll "or% "ill be super!ised b' a Reistered Communications Distribution Desiner (RCDD) durin all phases of the installation# The RCDD must be a!ailable on site to technicians and installers an' time the "or% is bein done# *urpose: The purpose of the lab installations is to pro!ide a functional specification for a net"or% s'stem+ includin cablin and components and required net"or% de!ices# The intent of this is also to pro!ide adequate details and criteria for the desin on this technolo' net"or% s'stem# The contractor shall pro!ide cables+ net"or% equipment+ and components necessar' to construct an interated local area net"or%in infrastructure# The contractor shall be responsible for the installation of the technolo' net"or% s'stems as defined in the Cable *lant# This document pro!ides specifications to be used to desin the installation of a net"or%in infrastructure and associated equipment# The contractor shall furnish all labor+ materials+ tools+ equipment+ and reasonable incidental ser!ices necessar' to complete an acceptable installation#

Wor% ,ncluded: Wor% shall include all components for both a hori$ontal and riser data cable plant from "or%stations outlet termination to "ire-room terminations# &ll cable plant components+ such as outlets+ "irin-termination bloc%s+ rac%s+ patch cables+

 

intellient-hub equipment and "ireless access points "ill be furnished+ installed+ a and tested b' this contractor# The data cable plant is desined to support a .iabit /TT computer net"or%# The data cablin plant and components shall carr' a manufacturersupported 10-'ear performance "arrant' for data rates up to 1 .iabit# The scope of the "or% includes all acti!es needed to complete the "irin described in this document and the dra"ins that "ill be made a!ailable durin the mandator' "al%- throuh# The installation shall be in accordance "ith the requirements of the National lectrical Code+ state and local ordinance+ and reulations of an' other o!ernin bod' ha!in  urisdiction#  urisdict ion#

,ntent: This net"or% cable s'stem desin "ill pro!ide the connecti!it' of multiple microcomputers+ printers+ and terminals throuh a local area net"or% Ne" 2uildin R/* en!ironment# ach desinated net"or% interface outlet "ill ha!e a capacit' to support the a!ailable protocols+ as'nchronous 100 and 1000bps thernet+ 4 and 16bps To%en Rin+ /DD,+ and others throuh the net"or% cablin and topolo' specified#

Cable *lant: ach cable shall be assined a unique cable number# ,n the telecommunications room+ the contractor shall install four separate color-coded patch panels# ach "all plates information outlet shall use different patch panel+ and the "allplate information outlets "ill be documented usin the patch panels color and the patchpanel number# Data bac%bone cablin &N5,T,&-768-c compliant 870nm laser-optimi$ed 70197 micron multimode fiber-optic cable net"or% is to be the bac%bone bet"een the

 

equipment room and an' telecommunications room# &ll telecommunication room shall ha!e 4 strands of multimode fiber-optic cable bet"een the telecommunications room and equipment room# &ll fiber must be /DD, and 10002ase-5- compatible# &ll fibers "ill be terminated usin 5C-t'pe connectors# The optical patch panel "ill be confiured to the amount of strands terminated at each location# Testin of optical-cables "ill be done usin ;ptical-TDR meter# 2iddin *rocess: &ll "or% is to be completed based on the dates from the areed schedule

2iddin *rocess: &ll "or% is to be completed based on the dates from schedule i!en# Dates on the schedule "ill include "al%-throuh dates+ bid submission dates+ and e<pected proect-start and completion dates# =uestions and comments are "elcomed# *rospecti!e contractors are requested to please submit these questions in "ritin# &ll bids must be submitted in triplicate# ach bid is to list labor+ material+ and hard"are costs in an itemi$ed fashion# The detail is to include itemi$ed unit pricin+ cost per unit+ and e<tended prices for each of the material and hard"are components as "ell as the specific labor functions# & cost+ per outlet+ to add or delete outlet locations is to be included in the pricin format# This cost is not to include an' chanes in hard"are or patch-panel quantities# There is also to be a scope of "or% pro!ided that details all of all the functions to be pro!ided b' the contractor for the proect#

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close