Productivity Rate: Cut, Bend and Place RSB (30.0 kgs./ manday)
Steelman
Laborer
Sub-Total
TOTAL FOR REINFORCING STEEL BARS
IV
FORMWORKS & SCAFOLDING: TWO (2) USE
Materials
100 - 2" x 3" x 12' Coco Lumber
20 - 2" x 2" x 10' Coco Lumber for Bracing
1/4 thk. 4' x 8' Ordinary Plywood
#4 CWN
#2 CWN
#1 CWN
600.00
67.00
12.00
15.00
5.00
5.00
bd.Ft
bd.Ft
shts.
kgs.
kgs.
kgs.
2.00
2.00
day/s
day/s
125.44
sq.m.
75.00
6.50
1,330.00
236.00
60.00
16.00
10.00
bags
cu.m.
pcs.
pcs.
length
length
kgs.
6.00
6.00
day/s
day/s
244.70
sq.m.
75.00
8.00
bags
cu.m.
8.00
8.00
day/s
day/s
Sub-Total
Labor
Carpenter
Laborer
2.00
2.00
Sub-Total
TOTAL FOR FORMWORKS AND SCAFOLDING
V
MASONRY WORKS
V - 1. CHB Laying
A. Materials
Portland Cement
Washed Sand
4" x 8' x 16" CHB
6" x 8' x 16" CHB
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
#16 G.I. Tie Wire
Sub-Total
B. Labor
STEEL WORKS
Roof Frame
A. Materials
L 50mm x 50mm x 4.5 mm
L 38mm x 38mm x 4.5 mm
L 25mm x 25mm x 4.5mm
50 x 100 x GA. 14 C-PURLINS
Plain Round Bar 10mm dia. X 6.0mm Sagrod
Welding Rod
Primer, Zinc Chromate
3/4" x Thk. Marine Plywood (Facia Board)
Sub-Total
Equipment Rental, Fuel & Oil
One (1) Unit Welding Machine
Diesel: 16.00 liter/day
Lubricant: 0.25 liter/day
Sub-Total
TOTAL FOR STEEL WORKS
VII
CEILING WORKS
A. Materials
Double Metal Furring x 16'
Single Metal Furring x 16'
Metal Furring Clip
3/16" dia. X 1" Blind Rivets
1" Concrete Nails
2" x 2" x 3/16" Wall Angle Frame
2" x 2" x 3/16" Carrying Channel
1/4'' thk. Ordinary Plywood
Sub-Total
B. Labor
DOORS AND WINDOWS
DOORS
D - 1, (1.0m x 2.10m) Hollow Core Flush Type Hinged Door
with on 150mm Hard Wood Jamb (Good Lumber)
D - 2, (0.60m x 2.10m) Hollow Core Flush Type Hinged Door
with on 150mm Hard Wood Jamb (Good Lumber)
Lockset (High Quality Doorknob)
(3-1/2" x 3-1/2") Loose Pin Hinges
W - 1, (2.40m X 1.20m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.
2.00
sets
5,820.00
11,640.00
W - 2, (1.20m X 1.20m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.
4.00
sets
4,000.00
16,000.00
W - 3, (0.60m X 1.20m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.
2.00
sets
1,950.00
3,900.00
W - 5, (0.60m X 0.60m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.
1.00
sets
1,100.00
1,100.00
W - 6, (0.40m X 0.60m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.
2.00
sets
900.00
1,800.00
Sub-Total
34,440.00
B. Labor
B.1. Instalation of Windows (Productivity Rate: 1.95 sq. m./
man-day
Skilled Worker
Laborer
ELECTRICAL WORKS
XII. A. Interior Rough in
A. Materials
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Sub-Total
XII. B. Electrical Wires
A. Materials
3.5mm2 THW Stranded
PVC Clamp
Flexible Tube 3/4" dia
Electrical Tape (Big)
2.00
box
10.00
80.00
3.00
pcs.
m
pcs.
4.00
4.00
2.00
4.00
5.00
8.00
1.00
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
1.00
1.00
3.00
set
set
set
Sub-Total
XII. C. Electrical Fixtures
A. Materials
Energy saving flourescent Bulb, 35 watts
Energy saving flourescent Bulb, 18 watts
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Ligthing Outlet ( 4" Porcelain Receptacle)
Entrance Cap #1" dia.
Panel Box. Flush Type, 4 Branches
Circuit Breaker, 40 A 2P
Circuit Breaker, 20 A 2P
Sub-Total
B. Labor
Electrician
Laborer
6,445.00
7.00
7.00
Sub-Total
TOTAL FOR ELECTRICAL WORKS
day/s
day/s
1.00
1.00
350.00
260.00
2,450.00
1,820.00
4,270.00
20,925.00
XIII
PAINTING WORKS
A. Materials
Surface Primer (Red Oxide)
Concrete Putty
Concrete Neutralizer
Polituff
Roof Paint Baguio Green
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Paint Brush 4"
Paint Brush 2"
Paint Roller 7" with Pan
Lettering Brush 1"
Lettering Brush 1/2"
Sub - Total
XIV - 3 Plastering
A. Materials
Portland Cement
Washed Sand
Sub - Total
B. Labor
Productivity Rate: 8 sq. m./ man-day
Mason
Laborer
XIV - 4 Concrete & Rebars works for Fence
Quantity take off:
Column
Wallfooting
Footing
Length - 0.25m
Length - 14.00m
Length - 0.80m
Width - 0.25m
Width - 0.30m
Width - 0.80m
Height - 2.30m
Thick - 0.10m
Thick - 0.20m
Qty - 6
Qty - 1
Qty - 6
Vol. - 0.8625 cu.m. Vol - 0.42 cu.m.
Vol. - 0.768 cu.m.
A. Materials
Portland Cement
Washed Sand
Washed Gravel
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
#16 G.I. Tie Wire
3.00
3.00
Sub - Total
B. Labor
Mason
Laborer
Sub - Total
TOTAL FOR FENCE /WALL
XV
PROJECT SUPERVISION
Project Supervision
TOTAL FOR PROJECT SUPERVISION
XVI
FACILITIES/AMENITIES
Blackboard
Heigth = 1.20m , Width = 0.025m , Length = 1.50m ; made of
6mm thick plywood with 25mm x 50mm wood frame with
paint.
Office Table with Chair
Height = 0.82m , Width = 0.70m , Length = 0.90m ; made of
12mm thick plywood on wooden frame with at least one (1)
drawer.
Child's Tables
Height = 0.50m , Width = 0.60m , Length = 1.20m made of
12 mm thick plywood with 25mm x 50mm wooden frame.
Child's Chairs
Height = 0.60m , Width = 0.30m , Length = 0.30m made of
12mm thick plywood with 25mm x 44mm wooden frame.
Low shelves (0.90m - 3 layers X 2.50m.)
Sub-Total
TOTAL FOR BASIC FACILITIES/AMENITIES
XVII PROJECT SIGNAGE
Project Signage
1.00
1.00
TOTAL FOR PROJECT SIGNAGE
9,000.00
31,501.00
31,501.00
lot
unit
7,500.00
7,500.00
7,500.00
A
DIRECT COST
Material Cost
Equipment Rental
Labor Cost:
a. Skilled
b. Unskilled