Republic of the Philippines
MUNICIPALITY OF PIO V. CORPUS

Province of Masbate

BILL OF QUANTITIES
ITEM
NO.
I

ITEM DESCRIPTION

QUANTITY

UNIT

80.00

sq.m.

100.00
1.00
7.00

bd. ft.
kgs.
kgs.

1.00
1.00

day/s
day/s

29.55

cu.m.

3.00

day/s

5.00

cu.m

2.00

day/s

1.00

lot

0.50

gals.

1.00

day/s

15.46

cu.m.

140.00
8.00
16.00

bags
cu.m.
cu.m.

7.00
7.00

day/s
day/s

No. of
Crew/
Labor

RATE PER
DAY/ UNIT
COST

TOTAL

SITE WORKS
I - 1. Clearing and Lay-out
A. Materials
25 - 2" x 2" x 12' Coco Lumber
Nylon #0.80
3" CWN

17.00
300.00
70.00

1,700.00
300.00
490.00
2,490.00

1.00
2.00

350.00
260.00

350.00
520.00
870.00

6.00

260.00

4,680.00
4,680.00

350.00

1,750.00
1,750.00

260.00

3,120.00
3,120.00

1,600.00

800.00
800.00

260.00

260.00
260.00
13,970.00

270.00
850.00
900.00

37,800.00
6,800.00
14,400.00
59,000.00

350.00
260.00

4,900.00
10,920.00
15,820.00
74,820.00

Sub-Total
B. Labor

Productivity Rate: 26.67 sq. m./ man-day
Carpenter
Laborer
Sub-Total
I - 2. Structural Excavation
Column Footing, Wall Footing & Septic Vault
A. Labor

Productivity Rate: 1.64 cu. m./ man-day
Laborer
Sub-Total
I - 3. Embankment:
Filling, Grading & Compaction
A. Materials
Filling Materials
Sub-Total
B. Labor

Productivity Rate: 1.50 cu. m./ man-day
Laborer

6.00

Sub-Total
I - 4. Soil Poisoning
A. Materials
Termite Solution
Sub-Total
B. Labor
Laborer

1.00

Sub-Total

TOTAL FOR SITE WORKS
II

CONCRETE WORKS
Wall Footing, Columns & Footings, Floor Slab, Lintel Beams.
Roof Beam and Septic Tank
A. Materials
Portland Cement
Washed Sand
Washed Gravel
Sub-Total
B. Labor

Productivity Rate: 0.3 cu. m./ man-day
Mason
Laborer
Sub-Total

TOTAL FOR CONCRETING

2.00
6.00

III

REINFORCING STEEL BARS
Wall Footing, Columns & Footings, Floor Slab, Lintel Beams,
Roof Beam and Septic Tank
A. Materials
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
#16 G.I. Tie Wire
Hacksaw Blade
Sub-Total
B. Labor

1,436.84

Kgs.

197.00
35.00
55.00
15.00
10.00

length
length
length
kgs.
pcs.

729.29
186.48
521.07

135.00
210.00
350.00
70.00
70.00

26,595.00
7,350.00
19,250.00
1,050.00
700.00
54,945.00

7.00
7.00

day/s
day/s

2.00
4.00

350.00
260.00

4,900.00
7,280.00
12,180.00
67,125.00

1.00

Lot
17.00
17.00
420.00
70.00
70.00
70.00

10,200.00
1,139.00
5,040.00
1,050.00
350.00
350.00
18,129.00

350.00
260.00

1,400.00
1,040.00
2,440.00
20,569.00

270.00
850.00
21.00
24.00
135.00
210.00
70.00

20,250.00
5,525.00
27,930.00
5,664.00
8,100.00
3,360.00
700.00
71,529.00

350.00
260.00

8,400.00
6,240.00
14,640.00

270.00
850.00

20,250.00
6,800.00
27,050.00

350.00
260.00

11,200.00
8,320.00
19,520.00
132,739.00

Productivity Rate: Cut, Bend and Place RSB (30.0 kgs./ manday)
Steelman
Laborer
Sub-Total

TOTAL FOR REINFORCING STEEL BARS
IV

FORMWORKS & SCAFOLDING: TWO (2) USE
Materials
100 - 2" x 3" x 12' Coco Lumber
20 - 2" x 2" x 10' Coco Lumber for Bracing
1/4 thk. 4' x 8' Ordinary Plywood
#4 CWN
#2 CWN
#1 CWN

600.00
67.00
12.00
15.00
5.00
5.00

bd.Ft
bd.Ft
shts.
kgs.
kgs.
kgs.

2.00
2.00

day/s
day/s

125.44

sq.m.

75.00
6.50
1,330.00
236.00
60.00
16.00
10.00

bags
cu.m.
pcs.
pcs.
length
length
kgs.

6.00
6.00

day/s
day/s

244.70

sq.m.

75.00
8.00

bags
cu.m.

8.00
8.00

day/s
day/s

Sub-Total
Labor
Carpenter
Laborer

2.00
2.00

Sub-Total

TOTAL FOR FORMWORKS AND SCAFOLDING
V

MASONRY WORKS
V - 1. CHB Laying
A. Materials
Portland Cement
Washed Sand
4" x 8' x 16" CHB
6" x 8' x 16" CHB
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
#16 G.I. Tie Wire
Sub-Total
B. Labor

Productivity Rate: 6.0 sq. m./ man-day
Mason
Laborer

4.00
4.00

Sub-Total
V - 2. Plastering
A. Materials
Portland Cement
Washed Sand
Sub-Total
B. Labor

Productivity Rate: 8 sq. m./ man-day
Mason
Laborer
Sub-Total

TOTAL FOR MASONRY WORKS

4.00
4.00

VI

STEEL WORKS
Roof Frame
A. Materials
L 50mm x 50mm x 4.5 mm
L 38mm x 38mm x 4.5 mm
L 25mm x 25mm x 4.5mm
50 x 100 x GA. 14 C-PURLINS
Plain Round Bar 10mm dia. X 6.0mm Sagrod
Welding Rod
Primer, Zinc Chromate
3/4" x Thk. Marine Plywood (Facia Board)

1.00

lot

54.00
32.00
2.00
28.00
8.00
20.00
2.00
5.00

pcs.
pcs.
pcs.
pcs.
pcs.
kgs.
gals.
pcs.

900.00
700.00
380.00
650.00
310.00
75.00
850.00
1,150.00

Sub-Total
B. Labor
Welders
Laborer

48,600.00
22,400.00
760.00
18,200.00
2,480.00
1,500.00
1,700.00
5,750.00
101,390.00

10.00
10.00

day/s
day/s

2.00
3.00

350.00
260.00

7,000.00
7,800.00
14,800.00

10.00
10.00
10.00

day/s
day/s
day/s

1.00
16.00
0.25

850.00
60.00
200.00

8,500.00
9,600.00
500.00
18,600.00
134,790.00

68.72

sq.m.

27.00
27.00
54.00
4.00
3.00
18.00
6.00
24.00

pcs.
pcs.
pcs.
box
kgs.
pcs.
pcs.
pcs.

120.00
110.00
7.00
250.00
90.00
60.00
160.00
440.00

3,240.00
2,970.00
378.00
1,000.00
270.00
1,080.00
960.00
10,560.00
20,458.00

6.00
6.00

day/s
day/s

2.00
2.00

350.00
260.00

4,200.00
3,120.00
7,320.00

6.00
6.00
6.00

day/s
day/s
day/s

1.00
16.00
0.25

850.00
60.00
200.00

5,100.00
5,760.00
300.00
11,160.00
38,938.00

19.05

sq.m.

5.38

sq.m.

Sub-Total
Equipment Rental, Fuel & Oil
One (1) Unit Welding Machine
Diesel: 16.00 liter/day
Lubricant: 0.25 liter/day
Sub-Total

TOTAL FOR STEEL WORKS
VII

CEILING WORKS
A. Materials
Double Metal Furring x 16'
Single Metal Furring x 16'
Metal Furring Clip
3/16" dia. X 1" Blind Rivets
1" Concrete Nails
2" x 2" x 3/16" Wall Angle Frame
2" x 2" x 3/16" Carrying Channel
1/4'' thk. Ordinary Plywood
Sub-Total
B. Labor

Productivity Rate: 32.5 sq.m./ man-day
Installers
Laborer
Sub-Total
Equipment Rental, Fuel & Oil
One (1) Unit Welding Machine
Diesel: 16.00 liter/day
Lubricant: 0.25 liter/day
Sub-Total

TOTAL FOR CEILING WORKS
VIII

DOORS AND WINDOWS
DOORS
D - 1, (1.0m x 2.10m) Hollow Core Flush Type Hinged Door
with on 150mm Hard Wood Jamb (Good Lumber)
D - 2, (0.60m x 2.10m) Hollow Core Flush Type Hinged Door
with on 150mm Hard Wood Jamb (Good Lumber)
Lockset (High Quality Doorknob)
(3-1/2" x 3-1/2") Loose Pin Hinges

2

sets

4,829.00

9,658.00

1

sets

4,000.00

4,000.00

2
9

sets
sets

1,000.00
150.00

2,000.00
1,350.00
17,008.00

2

day/s
day/s

350.00
260.00

700.00
520.00
1,220.00

Sub-Total
B. Labor

B.1. Installation of Doors (Productivity Rate: 2.69 sq. m./ manday
Carpenters
Laborer

2

Sub-Total

1.00
1.00

WINDOWS

13.67

sq.m.

W - 1, (2.40m X 1.20m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.

2.00

sets

5,820.00

11,640.00

W - 2, (1.20m X 1.20m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.

4.00

sets

4,000.00

16,000.00

W - 3, (0.60m X 1.20m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.

2.00

sets

1,950.00

3,900.00

W - 5, (0.60m X 0.60m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.

1.00

sets

1,100.00

1,100.00

W - 6, (0.40m X 0.60m) Clear Glass Jalousie Window on
Standard Aluminum Housing on 100mm Aluminum Jamb & Iron
Window Grilles - 10mm dia. Plain Round Bars.

2.00

sets

900.00

1,800.00

Sub-Total

34,440.00

B. Labor

B.1. Instalation of Windows (Productivity Rate: 1.95 sq. m./
man-day
Skilled Worker
Laborer

7.00
7.00

day/s
day/s

90.78

sq.m.

1.00
1.00

350.00
260.00

2,450.00
1,820.00
4,270.00
56,938.00

450.00
400.00
220.00
220.00
450.00
2.00
1.00

16,200.00
10,000.00
1,100.00
2,200.00
900.00
2,600.00
200.00

Sub-Total

TOTAL FOR DOORS & WINDOWS
IX

ROOFING WORKS
A. Materials
#26 x 10' Corr G.I. Sheets (Premium Class "A")
#26 x 8' Corr G.I. Sheets (Premium Class "A")
#26 Pre-Fabricated Ridge Roll 8' (Premium "A")
#26 Pre-Fabricated Gutter 8' (Premium "A")
Roof Sealant
Tex Screw
Blind Rivets

36.00
25.00
5.00
10.00
2.00
1,300.00
200.00

shts.
shts.
pcs.
pcs.
lit.
pcs.
pcs.

Sub-Total

33,200.00

B. Labor

Productivity Rate: 3.63 sq. m./ man-day
Installers/Welders
Laborer

5.00
5.00

day/s
day/s

1.00

Lot

2.00
2.00

pcs.
sets

4.00
4.00
6.00
4.00
10.00
2.00

length
length
length
pcs.
pcs.
pcs.

2.00
3.00
1.00
2.00
3.00
1.00

pcs.
pcs.
pcs.
pcs.
pcs.
pint

2.00
3.00

350.00
260.00

3,500.00
3,900.00
7,400.00
40,600.00

1,000.00
235.00

2,000.00
470.00
2,470.00

450.00
305.00
225.00
45.00
115.00
50.00
160.00
145.00
69.00
187.00
76.00
100.00

1,800.00
1,220.00
1,350.00
180.00
1,150.00
100.00
320.00
435.00
69.00
374.00
228.00
100.00
7,326.00

Sub-Total

TOTAL FOR ROOFING WORKS
X

PLUMBING WORKS
X-1 Plumbing Fixtuers:
A. Materials
Pail Flush Type Toilet Bowl
4" x 4" PVC Floor Drain
Sub-Total
X-2 Sewer Line:
A. Materials
4" x 3.0m dia. PV Pipe
3" x 3.0m dia. PV Pipe
2" x 3.0m PV Pipe
2" dia. X 900 PVC Bend Elbow
4" dia. X 900 PVC Bend Elbow
4" dia. X 450 PVC Bend Elbow
4" x 3" Wye
2" dia. PVC P-Trap
4" dia. PVC Clean Out Plug
4" dia. X 4" dia. PVC Wye
3' dia. X 90 deg. PVC elbow
Solvent Cement
Sub-Total

X-3 For Water Line:
A. Materials
Wallhung Lavatory with Faucet and Supply Pipe
1

/2" x 3.0m HDPE Pipe
1
/2" dia. Gate Valve
1
/2" Coupling
1
/2" 90 deg. Bend Elbow
1
/2" Tee
1
/2" Female Threaded Adoptor
1
/2" Faucet, Hosebib, Brass
Teflon Tape

1.00
10.00
1.00
1.00

sets
length
pcs.
pcs.

4.00
3.00
2.00
2.00
3.00

pcs.
pcs.
pcs.
pcs.
rolls

2,500.00
89.00
358.00
25.00
25.00
45.00
50.00
150.00
20.00

Sub-Total
B. Labor
Plumber/ Mason
Laborer

4,468.00
4.00
4.00

2.00
2.00

350.00
260.00

2,800.00
2,080.00
4,880.00
19,144.00

30.00
95.00
100.00

6,000.00
285.00
300.00

Sub-Total

TOTAL FOR PLUMBING WORKS
XI

TILE WORKS
A. Materials
8" x 8" Unglazed Tiles
White Cement / Tile Groute
Tile Trim

2,500.00
890.00
358.00
25.00
100.00
135.00
100.00
300.00
60.00

5.00
200.00
3.00
3.00

sq.m.
pcs.
kls.
pcs.

Sub-Total

6,585.00

B. Labor

Productivity Rate: .625 sq. m./ man-day
Mason
Laborer

4.00
4.00

day/s
day/s

1.00

Lot

12.00
7.00
1.00
1.00

pcs.
pcs.
length
pc.

1.00
1.00

350.00
260.00

1,400.00
1,040.00
2,440.00
9,025.00

40.00
30.00
150.00
100.00

480.00
210.00
150.00
100.00
940.00

3,850.00
12.00
17.00
30.00

7,700.00
120.00
1,360.00
90.00
9,270.00

400.00
175.00
215.00
80.00
200.00
75.00
90.00
550.00
300.00
285.00

1,600.00
700.00
430.00
320.00
1,000.00
600.00
90.00
550.00
300.00
855.00

Sub-Total

TOTAL FOR TILE WORKS
XII

ELECTRICAL WORKS
XII. A. Interior Rough in
A. Materials
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Sub-Total
XII. B. Electrical Wires
A. Materials
3.5mm2 THW Stranded
PVC Clamp
Flexible Tube 3/4" dia
Electrical Tape (Big)

2.00

box

10.00
80.00
3.00

pcs.
m
pcs.

4.00
4.00
2.00
4.00
5.00
8.00
1.00

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

1.00
1.00
3.00

set
set
set

Sub-Total
XII. C. Electrical Fixtures
A. Materials
Energy saving flourescent Bulb, 35 watts
Energy saving flourescent Bulb, 18 watts
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Ligthing Outlet ( 4" Porcelain Receptacle)
Entrance Cap #1" dia.
Panel Box. Flush Type, 4 Branches
Circuit Breaker, 40 A 2P
Circuit Breaker, 20 A 2P
Sub-Total
B. Labor
Electrician
Laborer

6,445.00
7.00
7.00

Sub-Total

TOTAL FOR ELECTRICAL WORKS

day/s
day/s

1.00
1.00

350.00
260.00

2,450.00
1,820.00
4,270.00
20,925.00

XIII

PAINTING WORKS
A. Materials
Surface Primer (Red Oxide)
Concrete Putty
Concrete Neutralizer
Polituff
Roof Paint Baguio Green
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Paint Brush 4"
Paint Brush 2"
Paint Roller 7" with Pan
Lettering Brush 1"
Lettering Brush 1/2"

374.70
4.00
3.00
4.00
1.00
6.00
6.00
6.00
2.00
6.00
6.00
2.00
2.00
1.00
1.00
1.00
6.00
4.00
2.00
4.00
1.00
1.00
5.00
10.00

Sandpaper #100
Sandpaper #80

sq.m.
gals.
gals.
gals.
gals.
gals.
gals.
gals.
gals.
gals.
gals.
pints
pints
pints
pints
pints
gals.
pcs.
pcs.
set
set
set
pcs.
pcs.

700.00
400.00
350.00
600.00
500.00
400.00
500.00
450.00
500.00
450.00
110.00
110.00
110.00
110.00
110.00
250.00
60.00
40.00
60.00
91.00
45.00
30.00
60.00

Sub-Total
B. Labor
Painter
Laborer

24,716.00
7.00
7.00

day/s
day/s

21.00

sq.m.

2.00
3.00

350.00
260.00

4,900.00
5,460.00
10,360.00
35,076.00

20,000.00

20,000.00
20,000.00

260.00

2,080.00
2,080.00

270.00
850.00
135.00
70.00
21.00

3,240.00
8,500.00
3,375.00
350.00
5,796.00
21,261.00

Sub-Total

TOTAL FOR PAINTING WORKS
XIV

FENCE/WALL
Length - 14.00m
Height - 1.50m
Area - 21 sq.m.
A. Materials
Steel Gate (See plans for details)

1.00

unit

7.20

cu.m.

2.00

day/s

12.00
10.00
25.00
5.00
276.00

bags
cu.m.
length
kgs.
pcs.

Sub-Total
XIV - 1 Excavation
Footing and Wall footing
Quantity take off:
Footing
Length - 0.80m
Width - 0.80 m
Height - 1.00m
Qty. - 6
Vol - 3.84 cu.m.

2,800.00
1,200.00
1,400.00
600.00
3,000.00
2,400.00
3,000.00
900.00
3,000.00
2,700.00
220.00
220.00
110.00
110.00
110.00
1,500.00
240.00
80.00
240.00
91.00
45.00
150.00
600.00

Wallfooting
Length - 14.00m
Width - 0.30m
Height - 0.80m
Qty. -1
Vol - 3.36 cu.m.

A. Labor
Productivity Rate: 1.64 cu. m./ man-day
Laborer

4.00

Sub - Total
XIV- 2 CHB laying
A. Materials
Portland Cement
Washed Sand
10mm dia. x 6.0m RSB
#16 G.I. Tie Wire
4" x 8' x 16" CHB
Sub-Total

B. Labor
Productivity Rate: 6.0 sq. m./ man-day
Mason
Laborer

1.00
1.00

day/s
day/s

42.00

sq.m.

9.00
1.00

bags
cu.m.

2.00
2.00

day/s
day/s

2.05

cu.m.

19.00
2.00
3.00
40.00
10.00
5.00

bags
cu.m.
cu.m.
length
length
kgs.

5.00
5.00

day/s
day/s

1.00
60.00

Lot
days

1.00

Lot

1.00

5.00
5.00

350.00
260.00

1,750.00
1,300.00
3,050.00

270.00
850.00

2,430.00
850.00
3,280.00

350.00
260.00

2,100.00
1,560.00
3,660.00

270.00
850.00
900.00
135.00
210.00
70.00

5,130.00
1,700.00
2,700.00
5,400.00
2,100.00
350.00
17,380.00

6.00
6.00

350.00
260.00

10,500.00
7,800.00
18,300.00
89,011.00

1.00

450.00

27,000.00
27,000.00

set

1,500.00

1,500.00

1.00

unit

3,001.00

3,001.00

6.00

unit

1,000.00

6,000.00

30.00

unit

400.00

12,000.00

3.00

sets

3,000.00

Sub - Total
XIV - 3 Plastering
A. Materials
Portland Cement
Washed Sand
Sub - Total
B. Labor
Productivity Rate: 8 sq. m./ man-day
Mason
Laborer
XIV - 4 Concrete & Rebars works for Fence
Quantity take off:
Column
Wallfooting
Footing
Length - 0.25m
Length - 14.00m
Length - 0.80m
Width - 0.25m
Width - 0.30m
Width - 0.80m
Height - 2.30m
Thick - 0.10m
Thick - 0.20m
Qty - 6
Qty - 1
Qty - 6
Vol. - 0.8625 cu.m. Vol - 0.42 cu.m.
Vol. - 0.768 cu.m.
A. Materials
Portland Cement
Washed Sand
Washed Gravel
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
#16 G.I. Tie Wire

3.00
3.00

Sub - Total
B. Labor
Mason
Laborer
Sub - Total
TOTAL FOR FENCE /WALL
XV

PROJECT SUPERVISION
Project Supervision

TOTAL FOR PROJECT SUPERVISION
XVI

FACILITIES/AMENITIES
Blackboard
Heigth = 1.20m , Width = 0.025m , Length = 1.50m ; made of
6mm thick plywood with 25mm x 50mm wood frame with
paint.
Office Table with Chair
Height = 0.82m , Width = 0.70m , Length = 0.90m ; made of
12mm thick plywood on wooden frame with at least one (1)
drawer.
Child's Tables
Height = 0.50m , Width = 0.60m , Length = 1.20m made of
12 mm thick plywood with 25mm x 50mm wooden frame.
Child's Chairs
Height = 0.60m , Width = 0.30m , Length = 0.30m made of
12mm thick plywood with 25mm x 44mm wooden frame.
Low shelves (0.90m - 3 layers X 2.50m.)
Sub-Total
TOTAL FOR BASIC FACILITIES/AMENITIES

XVII PROJECT SIGNAGE
Project Signage

1.00
1.00

TOTAL FOR PROJECT SIGNAGE

9,000.00
31,501.00
31,501.00

lot
unit

7,500.00

7,500.00
7,500.00

A

DIRECT COST
Material Cost
Equipment Rental
Labor Cost:
a. Skilled
b. Unskilled

605,331.00
29,760.00
101,900.00
82,680.00
819,671.00

Sub-Total A
B

INDIRECT COST
OCM & Profit (17%)
VAT (5%)

139,345.00
40,984.00

Sub-Total B
TOTAL (A+B)

180,329.00
1,000,000.00

TOTAL ESTIMATED COST

1,000,000.00

Prepared:

Approved:

ENGR. KERWIN JAY C. CONDOR
Engineer III

HON. ALLAN T. LEPASANA
Municipal Mayor

Reviewed & Checked:

ENGR. JUVY S. CHING
Municipal Engineer

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close