Question 1.1.(TCO 4) MRP is a process that would be most applicable in which situation?(Points : 5)
o Planning requirements for repair parts for production equipment in a manufacturing plant
o Planning requirements for safety stocks of finished goods in a distribution center
o Planning requirements for bicycle seats in a bicycle production plant
o A and C
o None of the above
Question 2.2.(TCO 4) The longest lead time path in the BOM is the(Points : 5)
o time bucket.
o planning horizon.
o time window.
o cumulative lead time.
Question 3.3.(TCO 4) A master production schedule shows the following information.
Using a lot-for-lot rule, what is the MPS quantity for Period 1?(Points : 5)
o 90
o 80
o 100
o 40
Question 4.4.(TCO 4) Which of the following is not included in the information about the inventory records file for an item?(Points : 5)
Comments
Content
GSCM 530 DeVry Week 3 Quiz Latest
GSCM530
GSCM 530 DeVry Week 3 Quiz Latest
GSCM 530 DeVry Week 3 Quiz Latest
Question 1.1.(TCO 4) MRP is a process that would be most applicable in which situation?(Points : 5)
o Planning requirements for repair parts for production equipment in a manufacturing plant
o Planning requirements for safety stocks of finished goods in a distribution center
o Planning requirements for bicycle seats in a bicycle production plant
o A and C
o None of the above
Question 2.2.(TCO 4) The longest lead time path in the BOM is the(Points : 5)
o time bucket.
o planning horizon.
o time window.
o cumulative lead time.
Question 3.3.(TCO 4) A master production schedule shows the following information.
Using a lot-for-lot rule, what is the MPS quantity for Period 1?(Points : 5)
o 90
o 80
o 100
o 40
Question 4.4.(TCO 4) Which of the following is not included in the information about the inventory records file for an item?(Points : 5)