we were required to give the cost of construction of a house and give a competitive bid conforming to the current market trends in Paksitan. this is the Data on which our project was based upon.
Comments
Content
Variable Rates of Contractors, Materials & Architect
Contractor Items
Unit Option 1
Excavation for foundation Plain cement concrete for foundation Reinforce cement concrete for foundation Masonary upto plinth beam RCC 1:2:4 Plinth beam Masonary ground floor (above plinth beam) Masonary first floor (above plinth beam) Plaster internal wall External plastor Ceiling plastor RCC 124 Column RCC Lintal RCC slab RCC 124 Stair case Steel reinforcement with placing and fixing Roof top screeding 1:2:4 with GI mesh Plumbing (covered area) Pipe fittings (water, sui gas, sewerage pipes) Electric (covered area) (labor cost) Wire fittings (ordinary, high voltage) Lacqour wood polish Emulsion paint + enamel paint (wall + ceiling) Enamel paint (ceiling) Weathershield paint (exterior) CFT CFT CFT CFT CFT CFT CFT SFT SFT SFT CFT CFT CFT CFT KG SFT SFT SFT SFT SFT SFT SFT SFT SFT 6 85 120 110 125 115 120 15 20 18 125 125 125 160 63 40 8 35 9 15 21 2 2 2
Electricity fittings Switch socket Chandelair set Light fittings (wall lights including bulb) Tube lights (complete set) Electricity main board (with circuit breakers) Ceiling fans Exhaust fans Bathroom fittings Shower set Basic amenities set Accessories set (mirror, towel hangers, soap shelf etc) Bathtub Bathroom tiles (8 cm. * 12cm.) (for walls) Bathroom tiles (8 cm. * 12cm.) (for floor) Paint Lacqour wood polish Enamel synthetic paint (ceiling) Emulsion paint (wall) Weathershield paint (exterior) Accessories Gas Heater (servant quarter) Gas Heater (auto-ignition) Gas Geyser (40 gallons) Cooking range (5 burner + oven) Air conditioner (split unit, heat & cool) (1.5 Ton) Wood work
Per point Per set Per unit Per unit Per unit Per unit Per unit
33 7500 1250 330 2950 2375 720
Chinese Chinese Chinese Philips Chinese Parwaz (craze) Parwaz (window type)
Per set Per set Per set Per set Per mtr. Per mtr.
2200 3900 1800 1890 290 290
Super Asia Forte Master Super Asia Forte Forte
3200 3600 1200 330 330
Per gallon Per gallon Per gallon Per gallon
1075 650 1550 3400
ICI ICI ICI ICI
1075 650 1550 3400
Per unit Per unit Per unit Per unit Per unit
850 5900 10500 22100 27000
Pakistani Canon SSG Care GREE
11000
Wooden main door (including locks) Wooden washroom doors (including locks) Wooden doors (including locks) Wooden cabinets (bedroom & t.v. lounge) Wooden cabinets (kitchen) Aluminium windows wih grills Window panes (glass plain) Main Gate Overhead water tank (200 gallon) Floor marbles (for terrace and porch) Floor tiles (18 inch by 18inch) Kitchen counter marbles
Per unit Per unit Per unit SFT SFT Per sq. mtr Per sq. mtr Per sq.ft Per unit Per sq. ft Per sq. ft SFT
6500 1650 2220 260 300 400 29 350 5760 80 250 350
Local Manufactured Local Manufactured Local Manufactured Local Manufactured Local Manufactured Local Manufactured Al-Karam Glass Local Manufactured Local Manufactured Local Manufactured Local Manufactured Local Manufactured -
35 4160
-
Architect fee
2% of total cost of construction
Note: The yellow coloured boxes are the options selected by our group, based on price or quality consideration.
Aluminium windows wih grills Window panes (glass plain) Main Gate (1 gate) Overhead water tank (200 gallon) Floor marbles (for terrace and porch) Floor tiles (18 inch by 18inch) Kitchen counter marbles
Per sq. mtr Per sq. mtr Per sq.ft Per unit Per sq. ft Per sq. ft SFT
400 35 350 5,760 80 250 350
Local Manufactured Khwaja Glass Local Manufactured Local Manufactured Local Manufactured Local Manufactured Local Manufactured
Construction Material Cost Total Cost (Contractor cost + Material cost + Plot price)
Total Direct Materials
DIRECT LABOR Excavation for foundation Plain cement concrete for foundation Reinforce cement concrete for foundation Masonary upto plinth beam RCC 1:2:4 Plinth beam Masonary ground floor (above plinth beam) 90,000 80,325 61,236 33,680 11,500 90,000
5,385,384
Masonary first floor (above plinth beam) Plaster internal wall External plastor Ceiling plastor RCC 124 Column RCC Lintal RCC slab RCC 124 Stair case Steel reinforcement with placing and fixing Roof top screeding 1:2:4 with GI mesh Plumbing (covered area) Pipe fittings (water, sui gas, sewerage pipes) Electric (covered area) (labor cost) Wire fittings (ordinary, high voltage) Lacqour wood polish Emulsion paint + enamel paint(wall + ceiling) Enamel paint (ceiling) Weathershield paint (exterior)
Total Direct Labor
MANUFACTURING OVERHEAD Architect fee (2%) Land 174,336 1,900,000
1,431,413
Total Manufacturing Overhead
2,074,336
Cost of House Manufactured
8,891,133
INCOME STATEMENT(Rs)
Sales Revenue Less: Cost of House Beginning inventory Cost of house Manufactured Cost of house Available for sale less:Ending Inventory Total Cost of House Sold 9,780,245