Ibs Student Jit-Lean

Published on November 2022 | Categories: Documents | Downloads: 2 | Comments: 0 | Views: 37
of 5
Download PDF   Embed   Report

Comments

Content

 

JUST-IN-TIME JUST -IN-TIME AND AND LEAN SYSTEMS

1

 

JUST-IN-TIME JUST -IN-TIME AND LEAN SYSTEMS

INTRODUCTION DELL COMPUTER, A MASS CUSTOMISER OF LAPTOPS, DESKTOPS AND SERVERS SOLD $51 MILLIONS A DAY IN 2007 FROM $1 MILLION A DA DAY IN 1996- ANNU ANNUAL AL REVENUE IN 2007 IS $51 BILLLION. DELL HAS 33 TOP SUPPLIERS SUPPLYING 90% OF ITS GOODS; SUPPLERS WEB SITES MEASURE UPTO DELLS STANDARD. DELL LINKS SUPPLIERS WEBSITES TO ITS WEB SITE TO ENABLE SUPPLIERS TO KNOW CUSTOMER ORDER PLACEMENT AND DESPATCH DESPATCH COMPONENTS TO DELLS WAREHOUSES DIRECTLY IN TEXAS, IRELAND AND MALAYASIA. SUPPIERS MANAGE THEIR MANUFACTURING AND WAREHOUSING AND REPLENISH DELLS WAREHOUSES; DELL PAYS PAYS SUPPLIERS WHEN COMPONENTS ARE USED. DELL USES A SOFTWARE F FACTORY ACTORY PLANNER TO MANGE THE FACTOR FACTORY Y SCHEDULE SO THAT MACHINES ARE BUILT WHILE PARTS NEEDED FOR THE NEXT 2 HOURS ARE BEING SHIPPED FROM SUPPLIERS HUBS. THE HUB HAS 15 MIN. TO CONFIRM THAT IT HAS T THE HE PARTS AND 1 HR. 15 MIN. TO SUPPLY THE PARTS TO THE PLANT. DELLS EFFICIENT OPERATIONS ARE CARRIED OVER TO ITS SERVICE PROVIDERS AND USED TO LOWER COST AND REDUCE LEAD TIME. BY CAREFULLY CAREFULLY USI USING NG ITS SUPPLY CHAIN EFFICIE EFFICIENTL NTLY Y DELL OPERA OPERATES TES MORE EFFICIENTL EFFICIENTLY Y THA THAN N ANY OTHER COMPUTERCOMPANY.

2

CONTD.

 

JUST-IN-TIME AND LEAN SYSTEMS INTRODUCTION

IF WE ANAL ANALYSE YSE THE PROCESS AND THE RESU RESULLTS SIM SIMUL ULT TANEOUSL ANEOUSLY Y WE COME ACROSS ACROSS ACTIVITIES WHICH COULD BE DISPENSED WITH OR INACTIONS WHICH COULD HAVE CAUSED DELAYS WHICH COULD HAVE BEEN AVOIDEDAV OIDED- THESE ARE WA WAST STAGES. AGES. IN ORDER ORD ER TO DO B BETTE ETTER R WE HAVE TO ELEMI ELEMINA NATE TE W WAST ASTAGES AGES OR REDUNDANCIES. THIS MAY REQUIRE A RELOOK IN TO THE PROCESS. A FRESH NEW APPROACH MAY HAVE TO BE EVOLVED, THE ORGANISATIONAL CULTUTURE MAY MA Y HAVE TO BE CHANGED.

3

 

JUST-IN-TIME AND LEAN SYSTEMS JIT/LEAN LOGIC

M/C

UNREALISTIC SCHEDULE

BREAK DOWN

LACK OF TRAININ G

VARIABLE PROCESSING TIME

BEHAVIORAL/MANAGERIAL CONSTRAINTS

IMADEQUATE INFORMATION

DEFECTIVE

POOR QUALITY

MATERIAL

BOTTLENECKS

4

 

JUST-IN-TIME AND LEAN SYSTEMS JIT/LEAN LOGIC

5

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close