Introduction to RBS 6000 Family

Published on June 2016 | Categories: Documents | Downloads: 302 | Comments: 0 | Views: 1812
of 15
Download PDF   Embed   Report

description of RBS 6000 Family cabinet

Comments

Content

Introduction

RBS 6000 Survey

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

1

RBS 6201 and BBS 6201 Installation

The New Vision
RBS 2206

RBS 2216

RBS 3206

RBS 3216

RBS 6201

RBS 3106

RBS 2106

RBS 3116

RBS 2116

RBS 6102

RBS 6101

RBS 3107

RBS 2308

RBS 3308
RBS 2111

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

RBS 6301

2

RBS 6601

RBS 6201 and BBS 6201 Installation

RBS 3418

RBS 3518

RBS 6000 Brief Overview
RBS 6102
RBS 6102 is the large outdoor macro RBS providing a complete
radio site including transport equipment, site power, 4U transport
equipment and battery backup. The cabinet can house up to two
radio shelves, two battery strings, thus designed for high capacity
demands.

RBS 6101
RBS 6101 is the small outdoor macro RBS. The cabinet can house
one radio shelf and has space for power and transport. The RBS
6101 can also be used as a site support cabinet when Main-Remote
is used. RBS 6101 can fit high capacity multistandard MR with power
and battery back-up to the entire MR RBS.

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

3

RBS 6201 and BBS 6201 Installation

RBS 6000 Brief Overview
RBS 6102
RBS 6201 is an indoor cabinet that can house two radio shelves as
well as the transport equipment and site power supply needed for an
entire RBS site. Thus, this is a complete site for high capacity
demands integrated into one cabinet. The cabinet is containing two
radio shelves that provides flexible radio capacity.

RBS 6601

RBS 6601 is a very small indoor main unit that can be inserted into
standard 19” racks already deployed at the site.
19” Plug-in Main Unit.

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

4

RBS 6201 and BBS 6201 Installation

RBS 6000 Brief Overview
RRU
Radio Remote Units, RRU are the naming of the radio designed to be
mounted near the antenna to minimize the feeder loss, which gives
drastically reduced site power consumption. The baseband controlling
the RRU can be deployed either in macro enclosures (E.G RBS 6101,
6301 or in the 19” RBS 6601.

RBS 6301
RBS 6301 can be used as a low capacity macro, a very compact
high capacity main unit for single standard or multi standard mainremote sites or as a micro.

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

5

RBS 6201 and BBS 6201 Installation

RBS 6000 Radio Modules
DPU
DPU
DC
DC

E1
1-2
E1
1-2

E1
3-4

E1
3-4

Site
LAN

Site
LAN
EC
EC
GPS
GPS
Debug
Sync
Debug
Sync
F
O
I

F
O
I

TN link
Test

TN link
Test

Sec
DPU

Sec
DPU

Eth
STM
-1

Eth
STM
-1

GSM

1
RU
1
RU

RU
2

RU
2

3
RU

3
RU

RU
4

RU
4

RU
5

RU
5

RU
6

RU
6

DUG 01
E1/T1

DXU

RUG
2 TRX/SCPA

DUG 02
IP

RUS
6 TRX/MCPA

DRU

DPU
DPU

DC

DC

WCDMA

E1
1-2
E1
1-2

E1
3-4
Site
LAN

E1
3-4

EC

Site
LAN
EC

GPS

GPS

Debug
Sync

Debug
Sync
F
O
I

F
O
I

TN link
Test
Sec
DPU

TN link
Test
Sec
DPU

Eth
STM-1

Eth
STM
-1

RU1
RU2

1
RU

RU3

RU
2

RU4

3
RU

RU5

RU
4

RU6

RU
5
RU
6

RUS

DUW

BB

RU

FU

BB

RUW

DPU
DC

E1
1-2
E1
3-4

LTE

Site
LAN

EC

GPS
Debug
Sync

F
O
I
TN link
Test
Sec
DPU
Eth
STM
-1
1
RU
RU
2
RU
3
RU
4
RU
5
RU
6

DUL

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

6

RUS

RBS 6201 and BBS 6201 Installation

DUS

RUS

RBS 6000 Unit Positions
143.5cm
Radio Units
GSM/WCDMA/LTE
Transmission
Module
Site Power

Cooling

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

7

RBS 6201 and BBS 6201 Installation

RBS 6000 FAMILY
HARDWARE COMPONENTS

Radio Unit for GSM (RUG)





Half the size from predecessor
SCPA based
2 TRX
TX Output power* @ ARP
Uncombined
Combined
TCC



800/900
1800/1900
48W / 46,8dBm 43W / 46,3dBm
22W / 43,3dBm 19W / 42,8dBm
85W / 49,3dBm 76W / 48,8dBm

RX
sensitivity** @ ARP
800/900
Single Branch
2WRD
4WRD

Static
-113,1dBm
-115,9dBm
-118,5dBm

TU50
-112,4dBm
-117,2dBm
-120,6dBm

Static
-113,5dBm
-116,3dBm
-118,9dBm

TU50
-112,8dBm
-117,6dBm
-121,0dBm

1800/1900
Single Branch
2WRD
4WRD



EDGE evolution ready

* Antenna Referance Point
** Timing Unit.
© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

9

RBS 6201 and BBS 6201 Installation

Radio Unit for WCDMA (RUW)


Extremely compact



4 carriers



20MHz IBW



TX output power @ ARP




RX sensitivity @ ARP
(3GPP & w ASC)




60 W total

-128,9dBm

Future Proof, designed for HSPA evolution

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

10

RBS 6201 and BBS 6201 Installation

Multi Standard Radio Unit (RUS)
 Multistandard support

– GSM, WCDMA and LTE

 4 carriers (single or mixed mode supported)
 IBW
̶
̶
̶

20 MHz for WCDMA and LTE single mode
10 MHz for GSM single mode
15 MHz for Mixed Mode

 Output Power @ ARP

– 60W on all bands (4x20W on GSM*)

 Output power and carrier flexibility
– HW activation licenses

 RX sensitivity @ ARP



– -128,9dBm (WCDMA, 3GPP, w ASC)

Statistical Gain Maximizes utilization of the MCPA HW
capabilites

 Future Proof Prepared for
– EDGE Evolution, HSPA Evolution, LTE,...
 Built in ASC/TMA support and built in VSWR

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

11





Allow 80 W during short periods of the time (GSM 2x40)
Average output power = 60W
Minimizes performance degradation in configurations
with power overbooking

RBS 6201 and BBS 6201 Installation

Digital Unit for GSM (DUG)
Prepared for the future



Supports multistandard
Main Unit

Capacity




Up to 12 TRX
Half the size of predecessor
Multiple digital units (TG-sync)

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

12

RBS 6201 and BBS 6201 Installation

Digital Unit for WCDMA (DUW)
Baseband
ATM & IP
Main Unit
Multiple Digital Units
Hardware HSPA Evolution ready







© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

13

MIMO and 64QAM downlink
16QAM uplink
Interference cancellation
Multi-carrier
Continuous packet connectivity
Multistandard ready

RBS 6201 and BBS 6201 Installation

Digital Unit for LTE (DUL)

Prepared for high peak rates



2x2 MIMO
64QAM DL & UL

Prepared for the future





Supports for LTE System Architecture Evolution
Supports for multiple digital units & redundancy
Multistandard ready
Main unit

Capacity




Up to 1000 users
Up to 300Mbps throughput DL
Up to 100Mbps throughput UL

IP transmission capability




All IP architecture with full non-blocking connectivity
100/1000BASE-T
SFP slot for 1000BASE-X

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

14

RBS 6201 and BBS 6201 Installation

© Ericsson AB 2009

2/038 13-LZU 108 7592 Uen Rev A

15

RBS 6201 and BBS 6201 Installation

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close