Medford School District Proposed Security Projects
April 15, 2013
School site security is a priority with the Medford School District to protect students, staff and the community. Several security upgrades were implemented during the bond upgrades including: Building access restrictions, security system upgrades, installation of site security cameras, door hardware upgrades, window coverings, and the addition of site gates and fencing. Security audits were recently conducted with the site Administrators, Directors, Facilities Manager, NTS Manager and Custodial Supervisors. Independent site security audits were also conducted by the Medford Police Department. The information from these audits was used to compile this report. School security standards reviewed included: 1. Maintain a 6 foot fence completely around the school fields. Parking lot access will remain open. 2. All perimeter fencing gates are to remain locked during school hours. 3. All perimeter landscaping should not exceed 18” tall; trees should be trimmed to 8 feet. 4. Each site should have a primary entry point that can be supervised by the School’s Office. All other access points should be locked during school hours. 5. School’s office staff should have clear visibility to the front parking lot. 6. Classrooms should not enter into public access areas. 7. All classrooms should have door hardware that can be locked from inside the classroom. 8. All classroom and gathering area windows should have window coverings or means to obsure visual view from the exterior. 9. An effective announcing and reporting systems and procedures to notifiy staff and response agencies should be in place. 10. Cameras at all major building access points and parking lots should be in place. 11. Adequate security lighting for interior and exterior of school campus. 12. All visitors must check in and wear District issued identification.

The following recommendations primarlily address the physical facilities. District security policies and procedures will be addressed separately. Security upgrades and systems to be considered district wide: 1. 2. Installation of emergency notification buttons. Provide exterior labels for classrooms. Number all exterior doors with numbers on both the interior and exterior sides. Install mirrors to increase visibility at entrances and hallways. Increase directional signage where needed. Have all interior fire doors shut during a lockdown. Install cameras on school buses. Provide each site an emergency kit. Community/staff awareness training. Review of site monitors needed for security (before and after school)

3. 4. 5. 6. 7. 8. 9.

10. Increased training for both police and fire personnel at school sites. Because of funding and scheduling limitations, security projects have been prioritized and scheduled into three main phases.

PHASE I:
Total for Phase I projects is $1,157,000. District Wide: Emergency notification buttons. Estimated cost: $167,000. Howard Elementary: Fire and security system upgrade Estimated cost: $98,000. North High School: Install front fence/barrier structure to restrict access to front office door. Estimated cost: $140,000. McLoughlin Middle School: Renovate entry and lobby area. Estimated cost: $65,000. Griffin Creek Elementary School: Renovate building to secure student areas and restrict public access. Estimated cost: $245,000.

Hoover Elementary School: Renovate access areas to create a secured central campus. Estimated cost: $245,000. Kennedy Elementary School: Renovate office area to create single access point. Estimated cost: $99,000. Fencing Upgrades: Hedrick Middle School: Increase fencing at gym area. Howard Elementary School: Add front fencing to secure classrooms 1, 2 and 6. Jackson Elementary School: Replace rod Iron fence between gym and main building with 6 foot fence. Jacksonville Elementary School: Add front fence off from cafeteria to main building to provide secure passage for students. Jefferson Elementary School: Add 6 foot fence with street improvement. Lone Pine Elementary School: Add front fencing at main entry. Replace 4 foot fence with 6 foot at soccer field. Ruch School: Add fencing around school and grounds to improve security. Washington Elementary School: Add fencing and a gate north of the media center. Estimated cost for fencing projects: $98,000.

PHASE II:
Total for Phase II projects is $651,000. District Wide: Camera system upgrades. Estimate cost: $200,000. Central High School: Install window to main corridor to provide more visibility at entry. Estimated cost: $20,000. Hedrick Middle School: Move office reception counter to hall. Estimated cost: $28,000. Abrahan Lincoln Elementary School: Security alarm system upgrade. Estimated cost: $18,000. Move office reception counter to access hall. Estimated cost: $42,000. Griffin Creek Elementary School: Security alarm system upgrade. Estimated cost $20,000. Hoover Elementary School: Security alarm system upgrade. Estimated cost $18,000.

Jacksonville Elementary School: Security alarm system upgrade. Estimated cost $18,000. Field fence upgrade to 6 foot. Estimated cost: $48,000. Jefferson Elementary School: Security alarm system upgrade. Estimated cost: 18,000. Lone Pine Elementary School: Install window to office hall to monitor site access. Estimated cost: $35,000. Ruch School: Security alarm system upgrade. Estimated cost $18,000. Office reconfiguration to provide visibility and restricted access. Estimated cost: $120,000. Washington Elementary School: Securty alarm system upgrade. Estimated cost: $18,000.

PHASE III:
Total for Phase III projects is $338,000. District Wide: Access control system-card readers at exterior entry doors. Estimated cost: $208,000. Camera system upgrades Estimated cost: $130,000.

MSDEC Campus/Central High School:
815 S. Oakdale Avenue CAMPUS INFORMATION Year of Original Construction Major Renovation Site Size (acres) Building Size (square feet) Classrooms Grades Enrollment Capacity Facilities Projects: Site Perimeter: Site is open to the public with only select areas fenced. The athletic fields and stadium are completely fenced. The path to the gym and stadium is open to the public. School perimeter doors are secure during school hours. Cafeteria door is open on occasions due to tenant use in the building. Central High: Single access point at front entry. All other access doors are locked. Adjust office reception counter to have direct hall access. This will require window and work surface modifications. Estimated cost: $20,000. Recommend having students travel from the cafeteria to the back of gym to avoid open public areas when accessing gym. NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Security Cameras to be added at entry with large monitor. Estimated cost $7,000. Add access control to main entry points. Estimated cost $22,000. Emergency notification system. Estimated cost $15,000. 1931 2010 19.20 251,721 40 9-12 246 986

School Perimeter:

Access Point: Modifications:

Total estimated security upgrades for Central High/MSDEC: $64,000.

North High School:
CAMPUS INFORMATION

1900 N. Keene Way, Medford, OR

Year of Original Construction Major Renovation Site Size (acres) Building Size (square feet) Teaching Stations Grades Enrollment Capacity Facilities Projects: Site Perimeter: School Perimeter:

1967 2007-2011 61.31 234,121 82 9-12 1,728 2,021

Site has 6 and 4 foot fence around perimeter. Site has open public access to parking lots and athletic fields. The perimeter of school structures are secured during school hours except for the front entry and areas near the Child Development Center. Front entry point is at the administration building. Entry also exists from the back parking lot between the gym and cafeteria buildings. This entry is gated but students have kept the gates open allowing access. Install a front fence/ barrier structure to restrict access to front office door. Reviewing design options that will enhance the look of the front entry. Add fencing at CDC building. Estimated cost: $140,000.

Access Point:

Modifications:

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Add large monitor at entry $4,000. Add access control to weight room and east doors. Estimated cost $6,000. Emergency notification will be installed. Estimated cost $15,000.

Total estimated security upgrades for North Medford High: $165,000.

North High School:

Entry structure to direct traffic into office Existing 6’ fence

Fence and gates to secure Child Development Center

South High School
CAMPUS INFORMATION

1551 Cunningham Ln, Medford, OR

Construction Completion Site Size (acres) Building Size (square feet) Teaching Stations Grades Enrollment Capacity

2010 38 255,000 90 9-12 1,818 2,218

Facilities Projects: Site Perimeter: Site has 6 foot fence around the perimeter of athletic fields. Parking lots are open to the public. Back loading/ green house area is open to the public. School perimeter has rod iron fencing between structures to close off the campus courtyard. Access points exist at the front entry and from the back parking lot. The fence structure between the back parking lot and main campus is left open during the day. It is not practical to close rod iron gates to back parking lot due to the amount of student traffic. Recommend adding a campus monitor at the back gate location.

School Perimeter:

Access Point:

Modifications:

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Add large monitor at entry $4,000. Access Control system is adequate. Install phone at concessions stand and green house. Emergency notification will be installed. Estimated cost $18,000.

Total estimated security upgrades for South Medford High: $22,000.

Hedrick Middle School:
1501 E. Jackson Street, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Teaching Stations Grades Enrollment Capacity Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: Site has 4 and 6 foot fence around field perimeter. School perimeter doors are secure during school hours. Single access point at front office entry. Public can enter building without going into office space. Move office reception counter to hall. This will require a window and work surface modifications. Estimated cost: $28,000. Upgrade perimeter fence to 6 foot. Estimated cost $24,000. NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Security Cameras to be added at entry with large monitor. Estimated cost $7,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $15,000. 1955 11.00 158,990 44 7-8 956 1,085

Total estimated security upgrades for Hedrick Middle School: $86,000

McLoughlin Middle School:
320 W. Second Street, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Teaching Stations Grades Enrollment Capacity 1926 9.80 161,072 42 7-8 840 1,035

Facilities Projects: Site Perimeter: Site has 6 foot fence around field perimeter. Staff parking has 6 foot fence that is locked during school hours. School perimeter doors are secure during school hours. Single access point enters an unsupervised hall. Install a new entry door that will direct all pedestrian traffic into the office area. This will also require counter and workstation modifications. Estimated cost: $65,000.

School Perimeter: Access Point: Modifications:

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Security Cameras to be added at entry with monitor. Estimated cost $7,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $15,000.

Total estimated security upgrades for McLoughlin Middle School: $99,000.

McLoughlin Middle School:

Abraham Lincoln Elementary School:
3101 McLoughlin Dr., Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity 1996 19.98 63,438 26 K-6 475 564

Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: Site has 6 foot fence around perimeter. School perimeter doors are secure during school hours. Single access point at front entry. Visitors can walk past office. Move office reception counter to access hall. This will require window and work surface modifications. Estimated cost: $42,000.

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is not adequate. Estimated cost to replace system $18,000. Add cameras to exterior and interior. Estimated cost: $35,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000.

Total estimated security upgrades for Abraham Lincoln Elementary: $112,000.

Griffin Creek Elementary School:
2430 Griffin Creek Road, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity 1902 8.98 54,930 26 K-6 602 564

Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: Site has 6 foot fence around perimeter. School perimeter doors are secure during school hours. Multiple access points through front parking lot. Redirect all student activity to center of campus. Renovate building to provide secure passages from classrooms to cafeteria that restrict public access. Design options are being reviewed to create secure passages for students and enhance the front entry point of the school. Estimated cost: $245,000.

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is not adequate. Estimated cost to replace system $20,000. Add cameras to exterior and interior. Estimated costs: $4,500. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000.

Total estimated security upgrades for Griffin Creek: $286,500.

OPSIS Architecture – Medford School District Security Assessment Griffin Creek Floor Plan – Level One

Griffin Creek Elementary School:

Hoover Elementary School:
2323 Siskiyou Blv, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: Site has 4 foot fence around perimeter. School perimeter doors are secure during school hours. Single access point at front entry. Add 6 foot fence around perimeter. Move the doors for classrooms 11, 12, 13 and 14 to the campus interior. Reconfigure the front entry to have reception counter access front entry hall. Estimated cost: $245,000 1958 7.00 53,611 28 K-6 627 607

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is not adequate. Estimated cost to replace system $18,000. Add cameras to exterior and interior. Estimated cost: $35,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000.

Total estimated security upgrades for Hoover Elementary: $315,000.

Hoover Elementary School:

Replace 4’ fence with 6’ fence

Replace 4’ fence with 6’ fence Add enclosed door 6’ Fence

Renovate office and front entry

Move classroom doors to back of building

OPSIS Architecture – Medford School District Security Assessment Hoover Floor Plan

Hoover Elementary School:

Howard Elementary School:
286 Mace Road, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: Site has 6 foot fence around perimeter. School perimeter doors are secure during school hours. Single access point at front entry. Classrooms 1, 2 and 6 enter into public areas. Add rod iron fencing corridor infront of Classroons 1, 2, and 6 to enclose into the core campus. Estimated cost: $12,000. 1972 3.03 59,530 28 K-6 475 607

NTS Projects: Security Alarms: Security Alarm system and fire alarm is not adequate. Estimated costs to replace security system $18,000 and $80,000 for the fire alarm. Add cameras to exterior and interior. Estimated cost: $4,500. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000.

Security Cameras: Access Control: Notification:

Total estimated security upgrades for Howard Elementary: $131,500.

Howard Elementary School:

6’ Rod iron fence

Jackson Elementary School:
713 Summit Ave, Medford, OR CAMPUS INFORMATION Year of Construction/Renovations Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity Facilities Projects: Site Perimeter: Site has 6 foot fence around field perimeter. There is a 4 foot rod iron fence between the gym and main building. School perimeter doors are secure during school hours. Single access point at front entry. Replace the 4 foot rod iron fence with a 6 foot fence between the gym and main building. Estimated cost: $14,000. 2009 4.52 55,804 18 K-6 443 390

School Perimeter: Access Point: Modifications:

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Add cameras to exterior and interior. Estimated cost: $9,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000.

Total estimated security upgrades for Jackson Elementary: $40,000.

Jackson Elementary School:

Replace 4’ with 6’ rod iron fence

Jacksonville Elementary School:
655 Hueners Lane, Jacksonville, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity Facilities Projects: Site Perimeter: School Perimeter: Site has 4 foot fence around perimeter. School perimeter doors are secure during school hours. Students enter public access area when leaving the cafeteria. Single access point at front entry. Add 6 foot chainlink fence around field perimeter. Add 6 foot rod iron fence from cafeteria doors to hall door just left of front entry. This will keep students in a secure area traveling to and from the cafeteria. Estimated cost: $58,000 1954 10.25 57,561 22 K-6 409 477

Access Point: Modifications:

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is not adequate. Estimated cost to replace system $18,000 Add cameras to exterior and interior. Estimated costs: $35,000 Add access control to main entry points. Estimated cost $12,000 Emergency notification will be installed and phone system replaced. Estimated cost $13,000

Total estimated security upgrades for Jacksonville Elementary: $136,000.

Jacksonville Elementary School:

Add 6’ fence

6’ Rod iron fence

Jefferson Elementary School:
333 Holmes Avenue, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity 1955 13.14 52,943 24 K-6 494 520

Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: Site has 6 foot fence around perimeter except for future Holly Road access. School perimeter doors are secure during school hours. Single access point at front entry. Add 6 foot fencing along Holly Road after construction. Temporary fence is currently installed. Estimated cost: $10,000. Fence has been funded by the City of Medford.

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is not adequate. Estimated cost to replace system $18,000 Add cameras to exterior and interior. Estimated costs: $35,000 Add access control to main entry points. Estimated cost $12,000 Emergency notification will be installed and phone system replaced. Estimated cost $13,000

Total estimated security upgrades for Jefferson Elementary: $78,000.

Jefferson Elementary School:

Existing 6’ fence 6’ Fence after road project is completed.

Kennedy Elementary School:
2860 N. Keene Way Drive, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: Site has 6 foot fence around perimeter. School perimeter doors are secure during school hours. Multiple access points through front and side parking lots. Secure all student activity to campus center. Create secure passages from classrooms to cafeteria that restricts public access. Design options are being reviewed to create secure passages for students and enhance the front entry point of the school. Modify front office and add hall doors and fencing to create a one access point. Estimated cost: $99,000 1977 10.12 54,788 30 K-6 488 650

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Add cameras to interior. Estimated cost: $9,000 There are too many exterior doors to make access control effective at this site. Emergency notification will be installed and phone system replaced. Estimated cost $13,000

Total estimated security upgrades for Kennedy Elementary: $121,000.

OPSIS Architecture – Medford School District Security Assessment Kennedy Floor Plan – Level One

Kennedy Elementary School:

Lone Pine Elementary School:
3158 Lone Pine Road, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity Facilities Projects: Site Perimeter: School Perimeter: Access Point: . Modifications: Site has 6 foot fence around perimeter except around soccer field to gym/cafeteria building. School perimeter doors and fence gates are secure during school hours. Single access point at front entry. Front entry area is wide open to entruders. Install front fencing to direct pedestrian traffic into office space. Move office reception counter to access hall. This will require window and work surface modifications. Install 6 foot fence around soccer field and gate to playground. Estimated cost: $55,000 1926 9.22 73,458 24 K-6 603 520

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Add cameras to exterior and interior. Estimated costs: $9,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000.

Total estimated security upgrades for Lone Pine Elementary: $81,000.

Lone Pine Elementary School:
Secure front entry with fence/gates

Rod Iron

Replace 4’ fence with 6’ fence

Existing 6’ fence

Oak Grove Elementary School:
2838 Jacksonville Highway, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Camera System is adequate. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000. Site has 6 foot fence around perimeter. School perimeter doors and fence gates are secure during school hours. Single access point at front entry. None at this time. Estimated cost: $00 1891 12.50 59,355 24 K-6 508 520

Total estimated security upgrades for Oak Grove Elementary: $17,000.

Roosevelt Elementary School:
1212 Queen Anne Ave., Medford, OR CAMPUS INFORMATION Year of Construction/Renovations Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity 2009 4.50 51,002 18 K-6 405 390

Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Add cameras to playground and interior. Estimated cost: $20,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000. Site has 6 foot fence around perimeter. School perimeter doors are secure during school hours. Single access point at front entry. None at this time. Estimated cost: $00

Total estimated security upgrades for Roosevelt Elementary: $37,000.

Ruch School:

156 Upper Applegate Road, Jacksonville, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity 1913 11.86 34,590 15 K-6 189 325

Facilities Projects: Site Perimeter: Site has 6 foot fence around perimeter except for the section between the church and school. School perimeter doors are secure during school hours. Multiple public access points to classrooms. Increase fencing around school perimeter and front access. This would direct all access to front office. Estimated cost: $120,000

School Perimeter: Access Point: Modifications:

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is not adequate. Estimated cost to replace system $18,000. Add cameras to exterior and interior. Estimated cost: $35,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed and phone system replaced. Estimated cost $13,000.

Total estimated security upgrades for Ruch: $198,000.

Ruch School:

Existing 6’ fence

Washington Elementary School:
610 South Peach Street, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity 1931 6.42 58,146 26 K-6 437 564

Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is not adequate. Estimated cost to replace system $18,000. Add cameras to exterior and interior. Estimated cost: $35,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000. Site has 6 foot fence around perimeter. Section in front of Head Start area is 4 foot. School perimeter doors are secure during school hours. Single access point at front entry. Add 6 foot fencing and gate to secure playground at Media Center. Estimated cost: $4,000.

Total estimated security upgrades for Washington Elementary: $74,000.

Washington Elementary School:

Replace 4’ fence with 6’ fence. Add gate.

Existing 6’ fence

Wilson Elementary School:
1400 Johnson Street, Medford, OR CAMPUS INFORMATION Year of Original Construction Site Size (acres) Building Size (square feet) Available Teaching Stations Grades Enrollment Capacity 1958 10.56 49,972 25 K-6 446 542

Facilities Projects: Site Perimeter: School Perimeter: Access Point: Modifications: Site has 6 foot fence around perimeter. School perimeter doors are secure during school hours. Single access point at front entry. Add gate near head Sart area into playground. Estimated cost is $1,500

NTS Projects: Security Alarms: Security Cameras: Access Control: Notification: Security Alarm system is adequate. Add cameras to exterior and interior. Estimated cost: $35,000. Add access control to main entry points. Estimated cost $12,000. Emergency notification will be installed. Estimated cost $5,000.

Total estimated security upgrades for Wilson Elementary: $53,500.

District Wide Security Upgrade Projects: Facilities Projects, District Total: $1,172,500 NTS Projects, District Total: $ 944,000 Total for both Facilities and NTS projects District wide: $2,116,500

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close