Pre-painting Steps Plaster
New masonry surfaces must be allowed to cure completely. Allow 28 days as the curing time for new masonry surfaces.

Cleaning
Surface should be free from any loose paint, dust or grease. Growth of fungus, algae or moss should be removed by wire brushes and water. In case of areas having excessive dampness, please use Asian Paints DampBlock to limit further dampness. When the underlying surface exhibits chalkiness, in spite of thorough surface cleaning, use Asian Paints Exterior Sealer.

Filling Cracks
For filling cracks up to 3mm use Asian Paints Crack Seal.

Filling For Holes & Dents
In case of dents and holes, use Asian Paints Wall Putty or a mix of white cement and fine sand in the ratio of 1:3.

PAINT APPLICATION PROCESS
APPLICATION CODE THINNER DILUTION % APPLICATION VISCOSITY1 RECOATING PERIOD

STEP 1 SANDING STEP 2 METAL PRIMER (METAL) / DECOPRIME ST (MASONORY) / WOOD PRIMER (WOOD) STEP 3 KNIFING PASTE FILLER (METAL / WOOD) WALL PUTTY (MASONORY) PUTTY KNIFE STEP 4 SANDING STEP 5 METAL PRIMER (METAL) / DECOPRIME ST (MASONORY) /

SAND THE SURFACE WITH EMERY PAPER 180 AND WIPE CLEAN 0005 BRUSH 4 - 10 0359 0007 WATER 0016 OR 1354 MTO SAND THE SURFACE WITH EMERY PAPER 180 AND WIPE CLEAN 0005 MTO* 0359 SPRAY 12 - 15 SPRAY 20 - 25 BRUSH 4 - 10 BRUSH 30 - 40 6 - 8 HRS REQUIREMENT REQUIREMENT 4 - 6 HRS BASED ON BASED ON 6 - 8 HRS MTO* SPRAY 12 - 15 SPRAY 20 - 25 BRUSH 30 - 40 6 - 8 HRS

WOOD PRIMER (WOOD) STEP 6 SANDING STEP 7 FIRST COAT PREMIUM GLOSS EMULSION BRUSH/ROLLER/SPRAY STEP 8 SECOND COAT PREMIUM GLOSS EMULSION BRUSH/ROLLER/SPRAY

0007 SAND THE SURFACE WITH EMERY PAPER 320 AND WIPE CLEAN

0001 MTO* 0026

BRUSH 8 - 10 SPRAY 15 - 20

BRUSH 55 - 60 6 - 8 HRS SPRAY 22 - 25

0001 MTO* 0026

BRUSH 8 - 10 SPRAY 15 - 20

BRUSH 55 - 60 6 - 8 HRS SPRAY 22 - 25

1. As measured through a Ford cup. 2. Recoat period is quoted for 25°C and 50% Relative Humidity, these may vary under different conditions. * Mineral Turpentine Oil

Here the steps to using Asian Paints Aquadur PU Interior: Step 1
Cleaning: Sand the surface using Sand paper No. 180 followed by Sand Paper No. 320 or 400 and wipe the surface clean.

Step 2
Staining : Apply AQUADUR WB Stains, if required, by ragging. Allow to dry for 2 hours. Do not sand the stain coat.

Step 3
Sealing: Apply 2 coats of AQUADUR WB Clear Basecoat for Interior and Exterior by spray or brush or roller with 5-10% thinning with potable water. Give an inter coat interval of about 5 hrs. Sand with sand paper no. 320/400 between coats and before application of top coats.

Step 4
Finishing: Apply 2 coats of AQUADUR WB Clear Glossy Topcoat for Interiors or AQUADUR WB Matt Clear Topcoat for Interiors by spray or brush or roller with 5-10% thinning with potable water with an inter coat interval of about 5 hrs.

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close