PROGRESS REPORT (3rd Week Jan 2015)
PROJECT:
Proposed One Block of 6-Storey Executive Suites with Commercial Space on Lot 3493, BTD, Jalan Tun Razak, Bintulu
Schedule

Activity

On-going
Progress

Plastering

Man
power
20

Skim Coat

4

Electric Wiring
ELV
Housekeeping /
Demobilization
Plumbing

4
4
3
2

Excavation on Retaining Wall, New Store
Room (12mx16m)
Internal Plumbing 4th Floor

Dewatering on
Basement
Lift Core
Water tightness on
internal Building

1

Wall plastering, Crack repair

Crack Sprinkler Tank
Fencing
Main Drainage
aircond
Window subframe

Planned

Wrapping handrail roof
garden
Plastering on Hose
Reel Room
Screeding on pump
room
Cement Skim Coat RC
Plinth
Internal plastering 5th

Pre-Successor
Activity

Percentage
Left Side70%
Front- 90%
Back-80%
Right- 65%
Unconfirme
d

2nd Floor
3rd floor

Repairing crack
Housekeeping on
waste pipe (avoid
blockage)

7
2
4

Successor Activity

Ideal Thickness: 5-7mm in single coat
Onsite thickness: 2-3mm with removed small particles
Render Supplier responded the chalkiness of render due to insufficient
thickness. With current 2-3mm with removed small particles, there
would be potential crack defect after exposure to sun.
Main progress on typical room

-insufficient detail on laundry room (Refer to Ruth)
-Request catalogue for all plumbing fixture etc.
-completed temporary divert RWDP and waste pipe to external
surrounding
-warning Plastering worker on damage incident on pipe plug)
Mud Flow on entrance after storm rain 16/1/2015

Lift installation
Sealing some windows with plywood+silicon
(Location: Lift motor Room, lift lobby,
switchboard room), Lift Installation,
Switchboard Room

*leaks another place after first PU injection
Pending thin plywood from Hardware

Pending Structural Repair for investigation report
level
Pending arrival of precast drain (estimation a month)
Drainage problem (sitting lounge)

Bricklayering
ID Drawing
Bricklayering 5017
on toilet

Remark

5017, 4014, 3021,3022, sitting lounge toilet
(1025, 2024, 3023, 4018, 5018)

2
Plastering->Wall Painting -> Hose Reel
Piping -> Hose Reel Drum (critical on 5th
floor)
Bricklayering
->Plastering

Floor screeding

15%

Pending contractor action
No further action from both contractors since memo on 1/1/2015

PROGRESS REPORT (3rd Week Jan 2015)
PROJECT:
Proposed One Block of 6-Storey Executive Suites with Commercial Space on Lot 3493, BTD, Jalan Tun Razak, Bintulu
floor
Lintel /stiffener on
3021/3022
Bricklayering on 4th
floor corridor in replace
hitching waterproofing
Toilet screeding and
wall plastering
Painting

Mark level on flooring
(GF-meeting Room)
Concreting on toilet
floor 3011
Additional beam or
lintel support for FG
15/16/17/18
Coring 5th floor Soil
Pipe
Ceiling Gypsum Board
on first floor

Coring switch board
room opening
Opening for exhaust
fan for switch board
room + toilet Roof
Garden + lift motor
room
Inspection on Staircase
2
Hacking parapet wall
Roof Garden

Remove loading bay
Housekeeping
wastage

Rendering -> Mock
Up Sample

-After CNY
-For ground floor, current external wall (without rendering) is ideal for
painting(commented by TBS Tang).

Discrepancy between old and new drawing
Seek CHT
Consultant advice,
EOT drawing

Final
ID
Drawin
g,
M&E
Inspec
tion,
M&E
As
built
drawin
g
Exchange 6’’ Coring
bit at Hua Chang
Enquiry model of exhaust fan.
any subframe for the exhaust fan.

#Fadzil
Pendin
g final

PROGRESS REPORT (3rd Week Jan 2015)
PROJECT:
Proposed One Block of 6-Storey Executive Suites with Commercial Space on Lot 3493, BTD, Jalan Tun Razak, Bintulu
EOT
design
Ceiling Evenness
Basement

Outstanding report- welding report (ff), crack report (structural repair), water tightness building report, render defect report, cement
sand screed report

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close