qryAllProjectsAndCCO

ProjectNo C427920 C464610 S467810 p457710 C376610 C329147 C329149 C242510 C329146 C393340 C395410 C394710 C329144 C459110 A468583 C329145 A468584 C329148 C444010 B00570 C442910 C435610 C457610 C369650 C329134 C329135 C329137 C329138 C369510 C369520 C329119 C369640 C329139 C329142 C329143 H83110 H83210 C329127 C444110 C455611 C98530 C194921 CS319710 C377910 P400210 C427520 G121810 C470920 C384010-A P402310 C429610

Title ConstructionCost Traffic Signal Prioritization process Tassafaronga Recreation Facility Improvements $480,695.00 International Blvd. Demolition projects $205,000.00 Brookfield, Dimond, Monclair Branch Libraries Improvements $390,000.00 Caldecott Trail $650,000.00 RHS bounded by Campus Drive, Mountain Blvd, Knoll Ave, and Access (83-013) $1,100,000.00 RHS Bounded by Mountain Blvd, Bernves Ct, Terrabella Wy and Redwood Rd $2,040,000.00 (SB 83-502) Bay Trail to Lake Merritt Bicyle Pedestrian Bridge $12,000,000.00 SS Rehab bounded by Casle Parkway, Skyline Blvd, Haverhill Dr, Scarborough$6,410,000.00 Dr Glen Echo Trash Net Con Agra - 23rd, Series B $2,000,000.00 Cryer Building & Dock Improvements $2,500,000.00 RHS Bounded by Joaquin Miller Rd, Rubin Dr, Burdeck Dr and Highway 13 (SB $4,100,000.00 56-06) Radio Tower Emergency Generator & New Permanent Shelter Improvements $1,000,000.00 APL Communications Facility Improvements $270,000.00 RHS Bounded By 21st Ave, 17th Street, 24th Ave, and 27th Ave (Sub-Basin 60-06) 911 Facility Police and Fire Emergency Radio Improvements RHS bounded by Hwy 13, Reinhard Dr, 39th Ave, and Aliso Ave (83-501) $1,300,000.00 San Pablo Ave/West St & San Pablo Ave/W Grand Ave $290,000.00 Golden Gate Branch Library Exterior Window Replacement $165,000.00 Bonham Way Stair Path Repairs $151,625.00 Golden Gate Recreation Center $6,000,000.00 Durant Park Improvements $670,000.00 Citywide Street Resurfacing II $3,000,000.00 SS Rehab Bounded by Broadway, Golden Gate Ave, And Contra Costa Road $913,780.00 SS Rehab Easements Between Clarendon Crescent And Sunnyhills Road $548,780.00 SS Rehab Easements Between Margarido Dr and the Area of Ostrander Road and $238,340.00 Broadway Terrace SS Rehab in Easement by Gunn Dr and Moore Dr, in Larry Ln , and Easement by $375,030.00 Larry Lane Caldecott Tunnel Settlement Projects 1 - 6, 17 $1,822,000.00 Caldecott Projects 9 and 14. $1,170,000.00 Sanitary Sewer Flow Monitoring and Modeling Citywide Street Resurfacing $4,000,000.00 RHS Bounded by Park Road, Longridge Road, and Lake Shore Ave (Sub-Basin $6,179,123.00 54-12) SS Rehab in 20th St from Harrison St to Broadway and in West Grand from San $2,200,000.00 Pablo to Wood St RHS Bounded by Park Blvd, Hollywood Ave, Sunnyhills Rd, and Brighton Ave (54-16) $4,000,000.00 Seismic Retrofit-Leimert Blvd Bridge - PE Phase $6,708,425.00 Seismic Retrofit-23rd Ave Bridge - PE Phase $10,985,000.00 City Parks & Facilities Sewer Lateral Installation of New Traffic Signal at the Intersection of Bancroft Ave & 94th Ave $350,500.00 The Rehabilitation of Sanitary sewers at Lakeside Park Boat House $145,155.00 42nd Ave & High St Access Improvements $9,549,000.00 Latham Sq. Streetscaping $1,900,000.00 Seismic Retrofit of Adeline Street Bridge $4,100,000.00 Children's Fairyland Entry Improvement $375,000.00 Foothill - Melrose - High St Streetscape 2010-2012 HSIP Cycle 4: Hegenberger Road $654,900.00 Replacement of Embarcadero Bridge over Lake Merritt Channel $17,500,000.00 Rainbow Rec Center Lake Merritt Floating Island Pilot Project 14th Avenue Streetscape Project $4,687,467.00 Foothill / Seminary Streetscape

Page 1

qryAllProjectsAndCCO

C274390 C394010 C393910 P414210 C393811 C393710 C470910 C244811 G313170 P444930 C455610 C423710 C329133 C312810 s467610 G381112 C227230 C458910 C371810 C461810 C428610 C428510 B00560 G444210 C329132 G427410 C254430 C346810 C241610 C277110 C347110 G381114 G381113 C312010 C312310 C312410 C312510 C167640 C316230 C329131 C270210 C268310 C284540 C329120 G313110 C329128 C329129 C329130 C316220 P188450 C369630 C389410

ADA Improvements at Woodminster $350,000.00 Bellevue Dr Entry Improvements - Measrue DD Series B $700,000.00 Lakeside Green Street Project (Snow Park/Harrison/20th St.) - Measure DD $8,500,000.00 Perlta/MLK Pilot Projects $3,661,000.00 Lake Merritt Bellevue Ave Improvements & Paths $1,200,000.00 Sailboat House Shoreline Improvements $4,500,000.00 Rainbow Rec Center Sausal Creek Restoration Project in Dimond Park $1,880,500.00 7th Street Phase II $2,500,000.00 Temescal and Lion Pool ADA Upgrades On-Call Sanitary Sewers Emergency Projects FY 2013-14 Bushrod Park Tot Lot Re-surface $58,100.00 Sanitary Sewer Rehab in Easement Between Thornhill Dr and Cabot Dr. and in Gouldin Rd. RHS - Rehab Bounded by Golf Links Rd, Encina Way amd Calandria Ave (SB 85-012) 5844 Bancroft demolition $54,500.00 Glascock Street Railroad Crossing Improvement Project RHS 20th St San Pablo Ave Telegraph Ave Alice St and 12th St Sub-basin 52-05 $4,582,000.00 Part 2 CPUC 130 Railroad Crossing Improvements Pedestrian Safety Improvement Project $673,900.00 RHS at 57th Ave between San Leandro St and International Blvd RHS - Dennison St., Embarcadero, King St. and Federick St $700,000.00 RHS MacArthur Blvd, Maple Ave, Barner Ave, Frye St Sub-basin 80-102 Linden Park Improvements $250,000.00 Stormwater Treatment Units (Tree Wells) SS Rehab esmt bet Delmont Ave & Edgemoor Pl, Majestic Ave &Laird Ave,Modesto St & Madera Ave Various Streets Resurfacing and Bikeway Facilities Piedmont Pines Utility Undergrounding Phase I & II $1,450,000.00 Seismic Retrofit of Coliseum Way Bridge - Construction Phase $2,891,978.11 12th Street Reconstruction $36,470,412.08 10th Street Bridge at the Lake Merritt Channel Seismic Retrofit of Hegenberger Rd Bridge - Construction Phase $4,668,774.16 Fruitvale Ave Sidewalk Improvements - Phase 3 Chapman and Lancaster Streets Sidewalk Improvements - Phase 2 RHS - Rehab Bounded by Lochard, Edgemont, Kerrigan (SB 85 - 232) $2,211,316.00 RHS - Shattuck Ave, 66Th St, Telegraph Ave and 59Th St (SB 50-10) RHS - Rehab Bounded by Lincoln, MacArthur, Rhoda, Coolidge (SB 80-113) $3,122,400.00 RHS - Mountain Blvd., Greenridge Dr., Long St., Keller Ave. (SB 85-502) MacArthur Blvd Street Improvement $4,754,600.00 2007-2009 HSIP Cycle 2: Countdown Ped Heads HSIPL-5012 (097) Rehabilitation of SS and SD Easement of York & Erie St, SS in Easement by Wellington St and Eaement by Brig CIP 2005-06 Broadway Signal Interconnect & Integration with Transportation Management $815,022.88 Center (ITS) RHS - Rehab Bounded by San Leandro Blvd., Edes Ave. and 85th Ave. (SB 85-101) $3,609,183.18 Peralta Hacienda Park - De Anza Trail Historic Core Linkage $821,337.82 On Call Sanitay Sewer Emergency Projects FY 2011-2012 $391,516.39 7th St, West Oakland Transit Village $3,745,341.69 SS Rehab Rosedale Bounded by Foothill and Santa Rita SS Rehab in Easement Bounded by 42nd Ave Carrington, Bridge Ave and 16th Ave SS Rehab Easement By Elinora and Reinhardt 2007-2009 HSIP Cycle 2: Left Turn Phasing HSIPL-5012 (096) $239,813.58 Sanitary Sewer Large Pipe Cleaning Citywide Street Rehabilitation and Reconstruction Phase II Citywide Bikeway Improvements Project $282,143.40

Page 2

qryAllProjectsAndCCO

C369914 C428011 C435410 P233282 P318410 P294110 C376210 C390710 C366920 C457110 C464560-1 C391510 C329124 C370610 C377710 C96110 C370510 G427020 G427040 G427210 C390010 C378010 C317510 C346710 C267620 G375710 C346910 C366930 G427030 P330910 G384910 G340910 G388410 P233271 C357010 C329410 C244850 C244860 C244890 C250110 C253910 C379110 C243610 C245510 C38300 C384010 C243910 C38510 C244711 C244310 C244410 C38410

Roadway Edge Restoration Near 7280 Woodrow Drive Citywide Curb Ramps and Sidewalk Repair Foothill Streetscape Phase II Foothill Streetscape Phase I $4,008,800.40 66th Avenue Streetscape Improvement $1,921,228.25 Oakland Army Base Bldg. Demolition Project Safe Routes to School (SRTS) 2/Federal: Bret Harte Mid; Manzanita Community; Peralta Ele; Pacific Boychoir; L 73rd Avenue Stormwater Trash Separator (CDS Unit) $791,978.11 Coliseum Transit Village Infrastructure & Snell Street Sanitary Sewer Root Foaming FY 2012-13 Latham Square - Pilot BART 17th St Gateway SS Rehab Easement Mastland Dr and Ascot Dr ONCALL CITY WIDE SIDEWALK REPAIRS $1,575,846.85 Morcom Rose Garden $1,237,880.79 RHS - E.24th St., 17th Ave., E.14th and 13th Ave., Phase I $5,000,665.00 ON CALL CITYWIDE CURB RAMP REPAIRS AND 30 YEAR TRANSITION PLAN $1,044,000.00 Hegenberger Road Bridge Over UPRR $315,443.00 Oakport St. Bridge $82,456.20 West Oakland Youth Center $6,677,652.92 Lakeshore Avenue Complete Streets Project $913,620.52 Feather River Camp - Roadway Paving & ADA access path $217,222.88 On-Call Citywide Sidewalk Repair FY 07-08 $1,464,043.00 Seismic Retrofit of Campus Dr. Bridge - Construction Phase $901,177.41 Tidewater Sanitary Sewer Pump Station Replacement Fruitvale Alive Streetscape $2,939,680.82 Seismic Retrofit-Park Blvd Viaducts - Construction Phase $1,750,586.63 Coliseum BART Plaza and Pedestrian Areas $1,148,724.76 E. 8th Street Bridge $407,509.35 Railroad Ave. Improvements - Phase II (Louisiana to 98th Ave.) $767,558.00 Maxwell Park Upgrades Safe Routes To School (SRTS) 1/Federal: Franklin Ele; Frick Mid; Lakeview Elm; Lafayette Ele; Hoover Ele; Pe San Antonio Park Lighting 23rd Avenue Street Improvement $2,189,235.13 Safe Routes To School (SR2S) 7/State: Oakland Tech High; Castlemont Community $394,288.31 of Smalll Schools Cesar Chavez Park Improvements $1,792,057.37 Butters Canyon Restoration Design and Management Plan $0.00 Lion Creek Restoration Project $551,079.00 Garber Park Restoration $12,000.00 Sidewalk Condition and ADA Survey $1,208,250.00 SS Rehab in an Easement between Gravatt and Alvarado $114,611.47 Main Library Second Start Relocation, Ph.1 $190,922.00 Derby Avenue to Lancaster Street, Oakland Waterfront Trail $1,503,596.48 Raimondi Park Renovation $4,675,975.64 SS Rehab Easemt Grand/Walker Lake Merritt Nature Center Stormwater Trash Separator $264,878.00 Alameda Ave, Oakland Waterfront Trail $520,125.00 SD in 41st Ave./E15 TO E17 Studio One Art Center Haz. Mat Abatement $190,567.00 66th Ave. Gateway $734,633.03 Environmental Remediation, Oakland Waterfront Trail $2,588,000.00 SS Rehab Golf Links Rd.

Page 3

qryAllProjectsAndCCO

C244610 C378012 C244710 C243710 C269110 C271310 C376810 C271110 C270310 C37700 C270110 C377211 C269910 C269810 C269510 C269410 C269170 C269161 C37800 C267110 C259410 C260110 C378011 C260910 C261010 C269160 C262410 C269130 C267210 C267310 C267610 C377610 C268410 C256511 C262310 C241511 C268510 C232610 C234910 C234930 C236310 C39110 C239652 C232410 C390610 C39010 C252310 C253010 C253710 C387510 C239651 C228610

East Oakland Sports Center $20,282,271.28 Feather River Camp - Water System Improvements $104,951.02 Studio One Art Center Rehabilitation $8,755,856.34 Lancaster St. to Fruitvale Bridge Trail, Oakland Waterfront Trail $355,000.00 Citywide Sidewalk Repair FY 06-07 Oakland Zoo - Measure K $591,000.00 Leveling the Playing Fields, Phase II (Owen Jones, Poplar, Brookdale & Central Resrvr) ACTIA Pedestrian Streetscape Funding CIP 2005-07 Citywide Guardrail Program $47,251.34 Parkg Lot Parks & Rec Bld CIP 05-06 Pedestrian Countdown Signals City Stables Roof TS HAZARD ELIMINATION PROGRAM 05-07 Traffic Signal Operation Citywide $0.00 TS - 73rd Ave/Garfield Ave, International Blvd/7th Ave $340,452.00 CIP 05-06: TS - Piedmont Ave / Linda Ave $152,785.00 On-Call Citywide Sidewalk Repair FY 07-08 Contract B $884,981.25 On-Call Citywide Sidewalk Repair FY 07-08 (Contract B) SS Rehab Easement,Jordan/Frye RHS - Alice St., Fallon St., 12th St. and 2nd Ave. $3,614,547.00 Sheffield Village Recreation Center ADA Improvements $618,524.00 SS Rehab in Underhills Rd $271,974.51 Feather River Camp - Sanitary Sewer & ADA Access Improvements $49,205.85 SS Rehab in Various Locations II (5 locations) $321,789.00 RS along Lakeshore Ave Between Mandana Blvd and Walavista Ave $1,509,619.25 On-Call Citywide Sidewalk Repair FY 07-08 (Contract A) $733,754.13 SS Rehab in Various Easement Locations off Outlook Avenue and Buena Ventura $234,290.00 Avenue, off Edenvale Place a On-Call Citywide Sidewalk Repair FY 06-07 $994,941.90 RHS - Coolidge Ave., Montana St., Brookdale Ave. and Berlin Way $2,844,626.16 RHS - International Blvd., 62nd Ave., San Leandro St. and 66th Ave. $1,887,879.26 Sanitary Sewer and Storm Drain Pump Stations Upgrades (STUDY) 25th Street Mini Park $489,486.76 RHS - bounded by Jones Ave., 98th Ave. and Edes Ave. $1,277,612.00 Solar Power & Energy Efficiency @ MSC & I $3,703,645.00 SS Rehab - Tartan, Elinora, Colgett, Crestmont, Redwood Malonga Center for the Arts HVAC/Electrical Upgrade Neighborhood Traffic Safety Program 05-06 CIP Traffic Signal - International Blvd @ 21st Avenue Citywide Street Resurfacing and Slurry Sealing FY06-07 $4,949,424.22 ACTIA Street Resurfacing SS Rehab Golden Gate Avenue $43,000.00 SS Rehab 98th Av/Birch $135,450.00 Museum Renovation Phase 2 $3,674,000.00 CIP Traffic Signal - International Blvd @ 4th Avenue $559,474.55 Install a storm water trash separator at the intersection of 21st and Harrison $604,000.00 SS Rehab Hearst-Lincoln/Laguna $93,970.00 SS Rehab in an Easement between Morgan and Carlsen $54,324.80 Exeter Drive Retaining Wall and Storm Drain Imrpovement Construction $211,554.50 Retaining Wall @ 6691 Shepherd Canyon Rd $223,923.37 The Park Blvd Bike and Pedestrian Trail Museum Renovation Phase 1.5 $4,550,000.00 SD Improvement in Ridgemont Drive $31,146.00

Page 4

qryAllProjectsAndCCO

C224510 C227210 C39210 C227310 C227410 C232510 C227810 C268610 C229110 C229210 C229310 C230610 C231410 C231410C C227710 C38710 C253810 C242117 C242212 C275019 C242311 C242115 C242312 C242114 C38700 C38610 C242710 C242810 C243010 C243110 C274220 C241810 C268910 C269010 C278810 C279010 C389510 C242116 C241711 C243310 C38910 C241910 C242010 C38810 C388010 C242113 C241611 C314110 C328310 C37110 C323510 C321710

Memorial Park $643,421.00 RHS - Telegraph Ave., 24th St., Lee St., Harrison St., and 12th St. $4,215,379.65 SS Rehab High-Pampas/Hwy 580 $146,766.91 RHS - Midvale Ave., I-580 FWY, Laurel Ave., & Carlsen St. $2,443,626.23 RS Beaumont Ave from East 32nd Ave to I-580 FWY Area $174,796.49 CIP TRAFFIC SIGNAL PROJECTS 04-05: Bancroft Avenue @ 57th Avenue & Trask $213,635.00 Street RHS Shetland Ave, Malcolm Ave, Scotia Ave, and Skyline Blvd. Area $1,708,415.00 Neighborhood Traffic Safety Program CIP 03-04 TS - Mountain Blvd @ SR13 Northbound Ramps, San Pablo Ave / 65th $384,047.00 St CIP TRAFFIC SIGNAL PROJECTS 04-05: 14th Ave and 19th Ave @ E.29th St $194,280.00 CIP Traffic Signal - MLK Jr. Way @ 53rd Street Railroad Avenue Improvements Ph I 85th Ave to Louisiana St. $899,886.00 Grizzly Peak Blvd. Guardrail Project $28,065.00 Citywide Guardrail Project $195,172.75 RHS - bounded by Franklin St., 3rd St., Broadway, and 11th St. $2,325,956.85 RHS of SubBasin 83-521 SS Rehab in an Easement between Delmont and Oakdale $121,661.00 Lake Merritt Pergola / Colonnade Renovation $319,000.00 Historic Restoration of the E. 18th Street Pier Overlook $1,421,179.71 FIRE HOUSES-OSHA REPAIRS Park and Street Inmprovements for the Municipal Boathouse and Lakeside Drive $4,269,667.39 East 18th Street Gateway $850,000.00 Lakeshore Ave. Ped/Bike Improvements $4,803,172.99 Lakeside Park Central Control Irrigation Upgrade $156,163.00 SS Rehab Pleasant Valley SS Rehab Btwn Lawlor & Burr Sts Brooklyn Basin, Oakland Waterfront Trail Brooklyn Basin to Embarcadero Cove, Oakland Waterfront Trail Cryer Site, Oakland Waterfront Trail $1,763,196.21 Union Point Park $4,718,295.47 Museum ADA Ramp $329,159.00 Children's Fairyland Improvements, Measure DD CIP: 06-07 TRAFFIC SIGNALS (Mountain & La Salle) $195,000.00 CIP 05-06 Citywide TS - High St / Santa Rita St $584,916.50 SD Improvement on London Road near Jordan Road $55,025.00 SS Rehab Wild Currant Way $108,330.00 Oakland Airport Intelligent Transportation System Project $896,467.96 Cleveland Cascade $252,252.00 Measure DD Stormwater Treatment Units $475,000.00 Park Street Triangle Study, Oakland Waterfront Trail SS Rehab Patterson $158,458.00 Municipal Boathouse Rehabilitation Project (Project No. C241911) $11,486,336.01 Sailboat House Balcony Repair $102,861.00 SS Rehab Rhoda $109,737.64 Various Streets and Roads Preventive Maintenance (State ARRA) $1,444,429.15 Lakeside Park Fire Hydrant Project $344,449.43 12th Street Median-Tree Removal $43,930.00 CIP 07-09 Disabled Parking Zone Program Fire Station No. 18 $6,887,652.32 SS Rehab in Burkhulter Park Rockridge Library Teen Center $263,418.14 On Call Bridge Repair Project $684,327.03

Page 5

qryAllProjectsAndCCO

C319710 C318710 C318010 C317810 C317610 C316510 C316310 C371110 C371210 C275016 C371510 C311410 C219557 C376310 C198210 C312210 C316110 C371710 C315910 C371410 C313610 C313620 C313710 C313910 C329113 C375910 C352920 C329111 C36400 C36310 C36210 C35900 C36610 C35300 C366410 C352910 C35200 C35100 C35000 C34900 C34700 C35500 C329122 c296850 C329114 C37000 C329116 C329118 C36500 C329121 C329112 C329123

Adeline Street Bridge Repair $647,769.69 City Wide Inventory of Stairs and Paths CIP 07-08 Pedestrian Countdown Signals Pedestrian Streetscape Program (FY07-09) $474,000.00 Citywide Street Resurfacing and Slurry Sealing (Prop 1B) $3,570,671.17 Roadway Restoration Between 7257 and 7293 Skyline Boulevard $82,165.00 Citywide On-Call Curb Ramp Project, FY 08/09 $537,263.00 Citywide Traffic Signal Operations TS Modernization Downtown Oakland Senior center, Upgrades $40,000.00 Foothill Blvd - Frick Middle School $60,000.00 Bella Vista Restroom Storm Drainage Urgent Citywide Projects $22,000.00 Citywide Curb Ramp and Sidewalk Repair Project $912,617.60 Council Chamber and Hearing Room Upgrades RHS - MacArthur, 64th Ave, Simson St, and 72nd Ave. (SB 84-104) $3,522,561.00 Citywide Traffic Signal Timing Program $200,000.00 Pedestrian Streetscape Program (FY09-11) $150,000.00 Neighborhood Traffic Safety Program Neighborhood Traffic Safety Program 2009-11 $0.00 CIP 2007-08 Citywide Traffic Signals $841,436.00 CIP 2007-08 TS International Blvd/50th Ave & Citywide Guardrails $351,722.34 CIP 2008-09 Traffic Signal Installations & Modifications $976,265.11 City of Oakland Traffic Management Center Project $318,300.41 The On-Call Sanitary Sewers Emergency Projects FY 08-09 $340,384.57 Restoration of Trail above North Oakland Sports Field $306,815.47 Willie Wilkins Park Improvements $217,600.00 SS Rehab Along Mandana Blvd and Easement Adjacent to Paloma Ave $115,015.00 SS Rehab Potomac/Easemt Carmel SS Rehab Telegraph $51,494.00 SS Rehab at Sunkist / Hillmont $4,325.43 SD Conduit #18 Diaz Pl SS Rehab Redwood, Willis, Norton $101,404.00 SS Rehab E 11th betw Miller Sunshine Court Street Improvement $800,000.00 Sobrante Park Improvement Project $283,814.23 SS Rehab 66th Avenue SS Rehab Shattuck betw 59th-55 SS Rehab E 18th betw 6th-7th SS Rehab Carlson, Paramount Arroyo Viejo Rec Cent Acc Broadway Sidewalk Repair SS Rehab in the Easement by Lincoln Ave. and by Melvin Rd. $234,477.91 1936 84th Avenue SS Rehab Easement Between Saroni Drive and Ridgewood Drive $80,700.00 SS Rehab Madrone Ave/Pampas SS Rehab in the Easement By Knowland Park $506,111.14 SS Rehab Easement of Colton Blvd, Easement Between Doncaster Pl & Valley View $235,718.00 Rd and Mandana Blvd SS Rehab 21st., 33rd. St. $48,749.00 SS Rehab Easement 99Th Ave & Stearns Ave, Easement Cherokee and Lawlor St SS Rehab at the Easement of Oak Knoll $473,279.00 SS Rehab in Easement Sayre Dr. & Paso Robles Dr. and between Chamber Dr. & $206,006.00 Saroni Dr.

Page 6

qryAllProjectsAndCCO

C329125 C369910 C369620 C36900 C36710 C369911 C279410 C335210 c275028 C275120 C276510 C276710 C275023 C279310 C376710 C329510 C329530 C329540 c329610 C333210 C311210 C276810 C275011 C274251 C274252 C274270 C274290 C274370 C275027 C275010 C336010 C275012 C275013 C275014 C275018 C34800 C275021 C274410 C285210 C334010 C282870 C282890 C282891 C282892 C282860 C376410 C282850 C290810 C290811 C291210 c296820 c296840

SS Rehab Easement Bet Moore and Aiken, Saroni Dr and Arrowhead and Glencourt $316,877.00 dr and Homewood Dr On-Call Roadway & Slope Restoration 09-10 $478,410.30 Citywide Street Rehabilitation and Reconstruction Phase I $5,705,719.27 SS Rehab Broadway Terr/Taurus SS Rehab Castle Park Way/e $28,859.60 On-Call Citywide Emergency Roadway Repairs Contract, Fiscal Year 2010-11 $897,930.50 SS Rehab Heather Ridge & Thornhill Dr Area $154,390.00 CityRacks VI $69,425.00 Temescal Pool, locker rooms renovation Martin Luther King Jr. Library Renovations - PH 1 $523,550.00 Arroyo Viejo Recreation Center Projects $80,352.00 DeFremery House Roof Replacement $35,000.00 Garden Center Field House $35,943.00 SS Rehab Heron Dr & Amy Dr. Area Owens Jones Field $725,000.00 Josie De La Cruz Park Syn Field Josie De La Cruz Park: Master Plan Josie De La Cruz Park: Fruitvale Field $323,407.69 Lincoln Square Pk - Alice St. Recr. Corridor (syn field) $839,258.00 Asian Branch Library Restroom 107th and Sheldon Roadway and sidewalk repair Fremont Pool Security Fence Minor CIP Firestation 1 Rollup Door Montclair (2) Tot Lots Resurfacing $285,000.00 Wade Johnson Park Tot Lot Lakeside Park Edoff Bandstand $248,674.40 Arroyo and Rainbow Tot Lots $114,000.00 Clinton Park Rec Center ADA Upgrades Mosswood Recreation Teen Center Lake Merritt Boating Center, Floating Dock Replacement Emergency Repair of Shepherd Canyon Sinkholes (near Tiffany Lane and Banning Drive) Roof Replacement/Repairs at various Fire Stations $261,800.00 Minor CIP, Main Library Fire Alarm Upgrade $116,999.79 Malonga Casquelourd Center for Art $225,800.00 FIRE STATIONS FLOOR TILES REPLACEMENT $185,188.00 SS Rehab 36th Street Discovery House Roof & Flooring Replacement $41,445.00 81st Ave Branch Library $9,027,082.21 34 Oval Road Slide Lake Chabot Golf Course Cart Barn $1,068,165.87 SS Rehab in an Area Bounded Blair Ave. and Wood Dr. $643,830.78 SS Rehab in four Locations $138,247.00 SS Rehab in an easement bounded by Glenbrook Dr., Beechwood Dr., and Romany $207,432.00 Rd SS Rehab in Easements bounded by Jean St and Elwood Ave $327,103.00 SS Rehab on Harbor View Between Carson & Huntington St and in the Easement $102,374.00 Between Elbert & Glendora S Various Streets and Roads Rehabilitation (ARRA) $3,412,248.58 Stabilize Firetrail Behind Castle Drive to Protect Existing Sanitary Sewer Line - Phase $497,178.05 A Leveling Playing Fields $733,444.62 Leveling the Playing Field - Brookdale $185,000.00 Sidewalk Improvement at RR Crossing at 66th and 69th 173 Hunter, Transitional Housing Rehab/Repairs 3501 Adeline, Transitional Housing Rehab/Repairs

Page 7

qryAllProjectsAndCCO

C274222 ADA Emergency Shelter Improvements - Lincoln Sq. Rec. Center $70,000.00 C284510 Peralta Hacienda Hist. Park Ph. 3B - Activity Center $512,665.00 C282813 SS Rehab along Easement bet Evergreen Ln & Slater Ln $160,419.00 C336020 SD Rehab - Shepherd Canyon $628,999.61 C336630 Permanent Roadway Restoration Between 7257 and 7293 Skyline Boulevard $432,240.80 C338710 Hardy Park Restroom $102,412.32 C394910 Derby to Lancaster Security-Lighting, Oakland Waterfront Trail $35,000.00 C395010 Fruitvale to High Street, Oakland Waterfront Trail $1,364,854.79 C282861 On-Call Sanitary Sewers Emergency Projects FY 06-07 C282812 SS Rehab along Alvarado Rd near Slater Ln $152,243.50 C310610 CityRacks V C282815 SS Rehab along El Centro, Trestle Glen, Fleet $119,720.00 C282816 SS Rehab in an Easement between Marr Ave and Blair Ave C282817 SS Rehab in Mark St between Hood St and North End $183,000.00 C282819 SS Rehab in El Centro Ave between Park Ave and Dimond Park $121,429.40 C282820 SS Rehab along the 2 Easement Locations $246,920.00 C282840 SS Rehab in an Easement Between Skyline Blvd and Oakwood Dr $143,780.00 C282811 SS Rehab along Easement between Evergreen Ln. & Alvarado Rd. $275,888.00 B246430 Broadway Median Improvements $265,316.70 93400 Columbia Gardens Irriga. 97110 Demo Bldgs Chinatown 97110/C00200 Chinatown Tank Removal 97360/G22210 RHS 54-07 Grand Avenue B05070 Lakeview Park Restroom Renovation $63,098.43 B05080 Sobrante Park Renovation B05110 Lake Merritt Path and Retaining Wall Repair $307,113.00 B05110-A Repair of Lake Merritt Path 96950/C10100 SS Rehab Richmond Blvd, Panama $59,539.41 B05130 Lake Merritt Maintenance Road Rehabilitation $107,575.00 96920/G22100 RHS 54-01 1st Ave. B246610 Broadway at 28th Street Traffic Signal Installation $129,064.00 B246741 Shepherd Canyon Soccer Field Parking Lot $127,029.00 B246820/247120 Irrigation system w/Park Blvd. Strip fro $207,764.28 B247132 Joaquin Miller School Pathway B273310 Maxwell Park Concept Plan Development $780,000.00 97370/G22300 Rehab 54-08 Rand, Beacon 97380/G22400 RHS 54-11 SC, Jean St. 97390/G22500 RHS 54-17 Moraga Avenue 97400/G22600 RHS 83-303 Calaveras Ave B05120 Sailboat House Parking Lot Resurfacing (Lake Merritt) $122,216.00 95330 SS Rehab Aster 82 & El Monte C02110 RS 40th Street $1,419,834.00 94390 Brookdale Renovation 94390a Brookdale Park Lighting 94540INF Renov Bath @ Main Library 94900 Housewives Market $378,855.00 94910/POO900Housewives Ph. I. Comp. 95100 Mosswood Park Renovation 95110INF Traf Signal 10 & Adeline 96990 SS Rehab San Leandro 39 & 40 95275 Str Imp Douglas @ Hale $123,352.00 97420/G22800 RS Lakeshore I

Page 8

qryAllProjectsAndCCO

95340 OCC Garage Renovations 95490/C11500 Handicap Access Improv. 95510/C11700 MSC Building #5 96710 SS Rehab 84th & 85th Ave. 14th 96720/C09600 SS Rehab 87th, 88th, 89th, 90th 96770/C09800 SS Rehab 78th & Parker Ave. 96800/C10000 SS Rehab 74th,75th,76th Ave 96810 SS Rehab 89 Ave btn B & D 96910/G22000 RHS 84-05 Olive, 78th. 95130 Poplar Rec. Center B04510 MSC Storm Drain Replacement B00900 Council District 5 Pay-Go Projects B01000 Council District 6 Pay-Go Projects B01000T Intersection Improv.Seminary/Outlook/… B01100 Council District 7 Pay-Go Projects B01200 Council District At-Large Pay-Go Projects B03100 Columbian Garden Comm. Center B03300 Lake Merritt Wetlands Restoration: Phase 1 B03710 Joaquin Miller Parking Lot 97410 El Monte, Tree Moving B04310 MSC Inlet Filters B00630 Madison Park Interim Renovation B04910 West Oakland Multi Purpose Center, Exterior Siding Replacement B05060 Ren to Estuary Park Restrooms at Lakeview b273520 ARROYO VIEYO RECORDING STUDIO B273610 Elmhurst Library Restroom Addition B273712 Chinese Garden Bldg. Improvements C00800 Broadway Streetscape Between West Grand Avenue and 24th Street C00810 Asbestos Wk @ Swan's Market C00910 RS Lakeshore Ave. C198610 Permit Enforcement and Records Tracking System (PERTS) B03800 Redwood Bowl Parking Lot 99680 Signals Harrison, Pearl 93390 Street Imp Eastmont 97430/G22900 RS 98th-99th. Plym. 97630 Webster Bike signs 97720/C10200 SS Rehab Armour-Gouldin 97730/C10300 SS Rehab Bay Street 97770/C10700 SS Rehab 104th.,105th. 97800 Hoover/Foster Area II 97810/C11900 H. J. Kaiser Concess. 97990/C13600 Montclair Plaza B00800 Council District 4 Pay-Go Projects 99660 Lincoln Resurfacing B00700 Council District 3 Pay-Go Projects A122010 SD Santa Rosa and Mariposa A123610 SS Rehab 7th St. to Fallon B00210 SS Rehab E 17th St sewer extension B00310 SS Rehab Esmnt Behind 1049 Hubert Rd B00500 Council District 1 Pay-Go Projects B00520 Bushrod Park Streetscape Improvements B00530 Linden Park Tot Lot Upgrade

$139,900.00

$172,639.00

$43,761.00

$120,000.00

$80,000.00 $0.00 $336,587.00 $70,000.00 $209,108.50 $80,524.50 $180,201.25 $50,000.00 $316,471.60 $490,000.00 $2,403,353.12 $300,000.00

$477,611.00 $9,867.00 $18,839.00

$130,325.00 $83,973.00 $18,850.00

$385,553.00 $169,621.58

Page 9

qryAllProjectsAndCCO

B00600 Council District 2 Pay-Go Projects 97410/G22700 RS Grand Avenue 98040/G21200 Fontaine Slope Stabilization 74080b H.J.Kaiser Switchbd 93940/G24500 Temescal Pool Rehab 73100 SS Pump Stat. 73rd Ave. 73470 Jasper P. Driver Plaza 73860/C02400 SS Rehab 10th, 11th, & 12th 73880/C02600 SS Rehab Coolidge Ave. 73890/C02700 SS Point Repairs - Grand 73970/C02900 SS Rehab E.12th. Street 74070 SS Rehab E16 St Miller & 25 Ave 321030 Lathum Square Demolition 74080a H. J. Kaiser Phase II 90590 SS Rehab in Colby & McAuley St. 74130 SS Rehab Ext. E. 23rd St. 74150/C09200 SS Rehab 34th Street 74410 Peralta Hacienda Tanks 74550/C33500 SS Rehab in Wood & 9th Sts. 74710/C17800 Franklin Garage Panels 75240/G21600 RHS 81-202 Mac Arthur 75480 Museum Climate Control I 75980/C12600 Convention Center Signs 76260 OCC Code Compliance 74080 H.J.Kaiser Conv Cent I 90040/C05000 Oakland Feather River 87930/C04900 Oakland Museum Ramps 87995 Medical Hill Garage 88000 Waterproofing Paramount 88130INF SS Rehab E17th @ 3rd & 4th Ave. 88370 SS Rehab Redwood Road 87530 Woodminster Amphitheater 87535 Woodminster Seats 89810INF Museum Parking Control 71050 Medau Place Connection 89855 OGS Fuel Tanks 79590 Preservation Park Street 90080 Telegraph Plaza 90120 Traf Signals @ Franklin 90190 SS Rehab 21,Filbert,Curtis 90450 SS Rehab Calif St btn Maple Laurel 90470 SS Rehab 45,47,48 Ave,E12-Bond 90480 SS Rehab E23 St & 26 Ave 90560 SS Rehab Wood St btn 10 & 12 St 90570 SS Rehab at Chestnut, misc. 90580 SS Rehab Claremont & Oak Grove 89840 Modern Elev 1&2 91570 SS Rehab Foothill & Seminary 90650 SS Rehab Harrison W of Bayo 90660 SS Rehab Athol btn Wayne, Newton 90670 SS Rehab Michigan, Sunkist, Fld 90690/G21900 RS 98th Avenue

$1,036,760.00 $69,283.00

$46,000.00 $387,889.34

$289,134.00

$877,766.00 $32,400.00

$4,608,000.00

$158,449.00 $107,128.00

Page 10

qryAllProjectsAndCCO

90950 Street Imp Hoover/Foster 91420 Grizzly Peak Blvd 91530 SS Rehab Douglas, Hale, 95, 96 etc 91540 Chinatown Parking Lot 2 78460/G24200 Lions Pool II 91560 SS Rehab 20 Ave E17-E14 90620/C09000 SS Rehab Kansas St. 91580 SS Rehab 56th & 61st San Pablo 91590 SS Rehab 23 Ave, Hughes, Logan. 92650 92740-1 CE Oakland NCR Improvemnt 92820 Coliseum Landscaping 92820INF Coliseum Ctr Signage 93180 Allendale Resurfacing 93370/G25400 Fremont Pool 93380 Signal @ Oakland & I-580 91550 SS Rehab 87, 88, Holly, Iris 85800 SS Rehab Masonic & Broadway Ter C02200 SS Rehab Virden/Harbor View 800250 City Hall West EQ Demo 80490 Armour Drive-Erosion 81510/G27100 E. Oakland Sports Cntr. 83100/G20400 High St. Rechan. 83820/C06500 SD Mountain Blvd. 84320 Preservation Park 84640 Astro Park 85530/C06800 SD Lowell - Adeline 90640/C09100 SS Rehab on E. 10th Street 85680 SS Rehab 99,100,103,Bryon 90630 SS Rehab Minna Allendale-Penn 85860INF Museum Wall Repair 86280/C03600 Oakland Museum Carpets 86305 Defremery Park 86590 Redwood Rd Skyline/Cre 86650 SD Easement Outlook & Ney 86950 Snake Road Stabilization 87520 Lion's Pool Renovation 90610 SS Rehab Delaware btn Maple & L 79060 Alice Arts Center 85550/C06900 Broadway Sidewalk Repair C190710 Pershing & LaSalle Area Sewer Rehabilitation C166710 Citywide Curb Ramp Inventory C183510 SS Rehab Ney Ave C184020 Matching Funds for Federally Funded Projects C184710 Golf Links Rd Retaining Wall C184810 Grizzly Peak Slide Stabilization Near Clarmont Ave. C186810 Grizzly Peak Washout Repair C187310 Eastlake Drainage Impvmt C188510 CIP 01-03 Citywide Pedestrian Safety Program C181410 Franklin Garage Elevator Replacement C189610 Emergency Storm Drains - Citywide C17911 Oakland Museum Renov.-Ph 1

$159,847.00 $174,500.00 $269,811.00

$70,005.00 $14,419.00 $17,136.00

$100,996.00 $26,023.00

$1,308,712.00

$419,800.00 $179,735.00 $464,366.00

$30,570.00 $190,000.00 $250,440.00 $68,800.00 $34,581.04 $130,000.00 $97,004.00 $695,376.00 $354,415.00 $15,000.00 $239,583.00

Page 11

qryAllProjectsAndCCO

C192010 C192020 C192110 C192410 C193010 C193210 C193310 C193610 C194210 C188610 C170810 C02000 C167610-A C167610-B C167620 C167630 C167650 C16800 C16810 C183410 C170710 C194610 C171110 C171510 C17170 C17180 C17500 C176910 C17700 C17900 C17910 C169310 C214510 C199410 C199510 C200610 C208210 C208410 C211910 C212010 C213710 C194310 C214110 C40510 C214810 C214820 C214840 C214850 C214870 C219510 C219510-B22 C219530

Upgrade Current Version of Oracle Applications Oracle Applications Upgrade and Support CEDA Loan Servicing & Tracking Application Replacement. GIS Parcel Layer Updates Sun Server Installation Transition Automated Collections Functions to Alternate Platform Transition Business License Tax Functions to New Platform Oak. Museum Dust Collection System $248,295.00 Vegetation Management SS Repl Sonoma Way from 22nd Ave. to Dead End $24,260.00 On-call Services Contract $500,000.00 SS Rehab Kerrigan-Lochard Palm Villas Streetscape $946,533.75 Landscape Median MacArthur 90 & 94th Av International Blvd Street Improvement $4,200,000.00 MacArthur Blvd Street Improvement $2,652,000.00 14th Avenue Street improvement Golf Links Road $500,835.90 D/W..Mod.GolfLinks $17,311.08 Restoration of Virgo Road $75,278.29 SS Rehab at 1 Castle Park Way $42,730.00 NCR - Miscellaneous Improvements SS Rehab Various Locations (Florida, Madeline, Locarno, Oak, Longridge, Skyline) SS Rehab Oak St between 9th and 11th Street Resurfacing $2,000,000.00 Street Rehabilitation $1,463,462.00 Franklin Garage Lighting Storm Drain System Master Plan SD Grizzly Peak/Skyline Oak. Museum Renovation $101,879.53 Museum Landscaping Tree Wk. $15,359.00 Traffic Signals various locations $405,051.80 T/S Installation Int'l Blvd. @ 27th Ave $111,636.00 Transportation Management Center $158,576.89 SS Rehab Brentwood and Melvin $58,592.56 SS Rehab in Pinehaven and Valley View $72,780.00 SD Miles Av. @ Clifton St. Drainage Improvement $61,058.00 SS Repair at 6831 Thornhill $163,643.00 SS Rehab in Wood Drive $186,664.00 SS Rehab in E.15th St. from 18th Ave. to 19th Ave. $22,817.00 City Stables Wall Replacement $47,436.00 HVAC and Fire Safety Improvements at 150 Frank Ogawa Plaza $396,552.00 T S Project Intl' Blvd @ 53 Ave Fire Station #20 $2,002,949.00 Oakmore Stairs Rehabilitation $327,808.00 Rehabilitation of the Trestle Glen Stairs $338,909.00 Rehabilitation of Eucalyptus Paths and Stairs $243,380.13 Rehabilitation of Margarido Paths and Stairs $113,570.00 On Call Stair/Path Repairs On-Call Sewers and Storm Drains Construction FY 02-03 $350,000.00 SD Improvement at 6943 Buckingham Blvd $35,000.00 On Call Sewers and Storm Drains Emergency Projects $1,201,021.52

Page 12

qryAllProjectsAndCCO

C219540 SD Improvement Buena Vista C213720 City Stables: New Paddocks & Haybarn C196610 Garfield Park Renovation C166310 Edes Avenue Sidewalk and C&G from 105th to Bergedo C194710 Laurel Streetscape C194950 11th Street Sidewalk Improvement C194960 Telegraph Avenue Streetscape Improvements Phase I C195010 Alice Arts Charter School C195410 Recreation Center Kitchens Renovation Projects C195610 Cinderella Creek Watershed Improvement C195620 Peralta Creek Bridge C196110 Temescal Pool Filtration Replacement Proj C198910 Cameron Stanford House, Exterior Repair & Retrofit C196510 San Antonio Park Renovation C198410 Replace mobile and portable 800MHz radio equipment C196710 Peralta Hacienda Hist. Park Ph. 3A Landscape Improvements C197010 Greenman Field Renovations/Carter Gilmore Sports Complex C197210 Joaquin Miller Park Nursery Sheds C197220 Joaquin Miller Park Playground Design bui C197230 Joaquin Miller Park Cascade Landscaping C197310 Carmen Flores Community Center C197810 Mayor Pay-Go Projects C198010 Upgrade Master Control Facility C194510 NCR - Miscellaneous Improvements C196410 Franklin Recreation Center Restroom, ADA Modification C136310 SS Rehab Easement 39th Ave/Merra St. C167610 Streetscape Int'l & Macarthur Improvement Project C12320/C23710 Flashing Signal Modifi. C12345 Melrose Branch Library C12900 Piedmont Ave Parinkg Fac C12910 Piedmont Parking Lot Ph II C12910a Piedmont Parking Lot Signs C134810 SS Rehab Lawton Vic. Mendocino C134910 Replacement of SS Pipe/62nd St. C119210 Duck Pond Sewer Lift Station C136110 SS & SD Replacement in MacArthur btwn Fruitvale and Canon C11900 Kaiser C.C. Concessions C136410 Rehab. Skyline Blvd. Traffic Signal C13700 Oak. Museum Humidity C137110 On-Call Curb Ramp (FY 00-01) C137120 Const. Curb Ramps & Sidewalks/Oakland C137420 Fox Oakland Theatre Marquee Renovation C138610 SS Rehab in Comstock Easements C138710 SS Rehab Bywood Dr., Wellington St., Laguna Dr., Rosemount Rd. C14010 Emergency Miscellaneous C14010-99-A SD Repair 8955 Golf Links Rd C135410 SS Rehab behind 3060 Butters Dr C10400 SS Rehab Howe-40th & Pleasant Valley C02500 SS Rehab 8th Ave. & Ivy Dr. C02810 SS Rehab Calandria/Margarita C04800 Oakland Mus Loading Dock C05600 Lakeshore Garage Lighting

$712,540.84 $181,474.00 $235,773.50 $1,799,684.44 $353,889.00 $1,272,797.13 $1,580,708.00 $331,850.00 $47,600.00 $777,586.51 $595,740.05 $1,056,729.59 $2,485,951.72 $48,044.00 $162,601.01 $106,619.79 $1,573,118.00

$309,837.00 $9,800,000.00

$38,692.00 $6,200.00 $97,260.00 $69,985.00 $225,000.00 $657,645.40 $556,431.00 $165,502.00 $163,630.96 $679,146.00 $118,112.00

$271,971.94 $0.00 $88,258.00 $104,031.00

Page 13

qryAllProjectsAndCCO

C06000 Kitchener Court $167,335.40 C06200 Sayre Drive Slope $206,740.00 C07310 Lake Merritt Algae Treatment Program $0.00 C08930 RS Main Lake from Harrison to W Grand Ave $2,167,309.00 C122610 Willow Park Restroom C09900 SS Rehab in 77th Avenue C14010-99-C Storm Drain Const. Colton Blvd. @ Gaspar C10900 Rockridge Temp. Lib. C11200 Alice Arts Center $7,234,771.30 C11200a Alice Arts Cntr/Debris C11210 Alice Arts Waterproofing C11510 ADA Accommodations C11510E Construction of Wheelchair Ramps C11530 Construction of Wheelchair Ramps thru-out $62,625.00 C11710 Municipal Bldg. No 5 $39,115.90 C11800/G88100 G reeman Field Renovations $324,242.60 C09500 SS Rehab Bergedo Drive C160010 Speed Zone Survey C159310/160210 Traffic Signals @ Intl' Blvd & 25th Ave + Broadway/Broadway Ter and Traffic Signal $381,024.95 Mod at Broadway/College C159410 Inter Improv. @ MacArthur Blvd./Richards C159710 NTSP Circles and Barriers $503,000.00 C194810 Facade Improvement Program (FIP) C194920 Broadway Phase III: 17th to 20th Street Streetscape Improvement Project C219560 SD Improvement near 5985 Buena Vista Ave $105,873.50 C222210 CIP for Traffic Signal Installation (7th/Franklin) $469,699.77 C222220 Pedestrian Improvements Chinatown C14010-99-B SD Repl Girvin near Stockbridge $26,000.00 C239611 Oakland Museum Renovation & Roof Repair $12,679,750.00 C158910 Traffic Circles, Islands, and Barriers $272,398.50 C160110 T/S International Blvd. @ 103rd -104th $469,699.57 C160210 Traffic Signal at Broadway/Broadway Ter and Traffic Signal Mod at Broadway/College C160410 Golf Links Rd Guardrail Project C161830 ON CALL SERVICES 2003-2004 C16210 Kaiser Convention Center Ph4 $952,668.26 C165210 RHS 63rd St., Occidental St., 61st., Adeline St., 59th St., San Pablo Ave. Area $1,598,106.00 C165910 SS Rehab Easement off La Cresta Ave between E38th / Hampel $209,083.00 C166110 29th Avenue Gateway Improvements $640,327.82 C166210 Courtland Avenue - Construction of Curb and Gutter $240,978.00 C237710 SD La Cresta Ave from Hampel to E 38th Streets $222,000.00 C15300 SS Rehab.57th,58th, Arlington C219550 Study of Underhills Road Drainage and Street Overlay C14010-99-E SD Construction in Colton Blvd at Gasper C14010-99-F Repl & Cleaning - SD@ Crestmont &Samoia $33,700.00 C141910 SD Improvement, Parker & Hillmont $159,716.00 C142810 Saroni Drive Land Slide $72,148.00 C143910 Fire Station No. 8 $3,099,428.00 C144410P ADA Improv. To 1520 Lakeside Drive C148410 SS Video Inspection of Sewer along 29th Ave C148610 SS Rehab Grande Vista/E27th $74,043.50 C159310 Traffic Signal at International Bl/25th Ave C151910 Splash Pad Park Renovation Streetscape Im $1,029,608.45 C15900 SS Rehab in Brown Avenue

Page 14

qryAllProjectsAndCCO

C15700 C157910 C158010 C15810 C158110 C158210 C158310 C158810 C1401099C C15100 G28400 G26910-2 G26910P G27100 G271610 G272020 G272910 G273910 G27700 G56200 G283010 G258110 G28500 G28600 G286010 G287610 G29500 G297010 G297510 G297610 G278210 G250710 G234510 G235410 G235910 G23800 G23810 G24000 G24600 G24950 G26910-1 G250510 G266610 G250910 G251010 G251110 G251210 G251310 G254110 G25600 G25800 G297910

SS Rehab Aileen, 54th, 55th St RHS MacArthur, 39th Ave, Reinhardt and Madrone St. Area RHS MacArthur Blvd., 73rd Ave., Sunkist, 75th Ave. Area SS Rehab Glenwood /Florence RHS Crest Ave, Michigan Ave, 82nd Ave & MacArthur Blvd Area RHS School, Rhoda, Steinmetz & Maple Streets Area Sewer Rehabilitation RHS Vallejo, 67th, San Pablo Ave and 59th St. Area Neighborhood Traffic Safety Program (NTSP) SD 2275 Arrowhead Drive SS Rehab Storm Easmt Armour Dr Sailboat House Accessing Ld.Paint/AsbtsRem.Peralta-2 Peralta Hacienda Pk.Phase 2 Market St. Bike Lanes, 57th-MacArthur Pedestrian Countdown Signals - OTS, PS0508 Emergency Generator 5050 Colesium Way, MSC Building #4 B'way SW Project: Phase II --14th & B'way Transit Center Streetscape Chabot Tennis Court Estuary Park 40th Street MacArthur Transit Hub Bike Lane Restriping 2002-03 TDA Sequoia Lodge Rehab Shepherd Canyon Park RR SMART Corridors, Rapid Bus Project CityWide Street Resurfacing Rehab 85-304 and 305 6721 Armour Drive 2300 Arrowhead 6868 Balsam Way Revive Chinatown Ped-Oriented Improvements Tot Lot Resurfacing Coliseum Transit Hub Streetscape AC TRANSIT FTA - Broadway Transit Priority RABA Street Resurfacing East Oakland Restrooms SS Rehab in Oakport Street McConnel Field Live Oak Pool Rehab. Brookfield Rec. Center Ld.Paint/AsbtsRem.Peralta-1 Lincoln Square Junk Boat Renovation Lower Grand Avenue Pedestrian and Transit Bulb-Outs Project Clinton Park Tot Lot Lawn Bowling Roof Live Oak Pool Dimond Recreation Center Deck Repair Dunsmuir Electrical Repair Safe Route To School, Cycle 4 Project Rotary Nat Sci Center RR Redwood Heights Rec 1829 Gaspar Drive

$1,589,083.00 $116,761.00 $1,344,705.00 $1,438,300.28 $1,515,408.00

$46,461.00 $583,445.55 $30,000.00 $190,000.00 $598,680.00 ($347,831.71) $112,630.00 $246,480.52 $1,961,925.81 $0.00

$4,808,190.38

$60,000.00 $139,204.00 $2,762,094.92 $108,564.63 $1,757,837.02 $1,029,000.00 $148,633.00

$893,014.99 $1,536,000.00 $49,454.00 $446,535.17 $369,745.14 $285,050.00 $115,000.00 $396,056.00 $263,900.00 $40,000.00 $323,522.20 $35,500.00 $906,029.66

Page 15

qryAllProjectsAndCCO

G250410 G323110 G297710 G31000 G310710 G310810 G310910 G31110 G31800 G319910 G30800 G320020 G30710 G339610 G34000 G34430 G34440 G34450 G38100 G381111 G427010 C91010 G320010 G299110 G23000 G298010 G298110 G298210 G298510 G298610 G298710 G298810 G30900 G299010 G297810 G299210 G299310 G299410 G299510 G30000 G30011 G305010 G30510 G30600 G298910 C99410 D06320 C97110 C97210 C97510 C97610 C98220

Estuary Park (BCDC Improvements) Lake Merritt Bird Islands - Phase 2 3455 Dwight Way RS Railroad Ave McKillop Slide Repair (East 29th Street) Claremont Ave 200 feet E of Alvarado 545 Dwight Place RHS Sanitary Sewers 54-06 Park/MacArth RS Birch, 104th Tunnel Rd Hazard Mitig. Project RS 73rd 559 16th St - Henry J. Robinson Multi-Service Center (HJRMSC) RS Lakeshore Phase II Citywide Street Resurfacing FY 2007-2008 (Cycle 3) Traffic Signals Park Imprv.@ Toler Hts. Elem. Sc 98th Ave. Imprv. Unit III Padding replacement @ Toler Heights

$456,006.26 $155,833.00 $3,847,355.48 $88,300.00 $147,228.00

$110,375.00

$2,514,124.00 $1,672,405.16 $61,380.00 $148,747.00 $4,055,634.14

Glascock/Lancaster Sidewalk Improvements $760,000.00 West Grand Bridge Preventive Maint $552,057.00 Storm Drain Repair at Vic Clarewood Mathilda Clevelaland: Rehab/Repairs of 14 transitional housing units plus the office and the dining hall 7155 Marlborough Terrace $64,650.00 Veterans Memorial Bldg $1,968,969.27 6200 Block Skyline Blvd $628,810.00 7967 Skyline Blvd $438,965.00 7589 Hansom Drive Larry Lane $622,050.00 2120 Mastlands Drive $98,000.00 7180 Thorndale Dr $177,063.00 Tunnel Road Landslide (1/4 mile West of Hiller Drive) $92,914.00 RS Northern Relief Sewer $1,337,613.72 Claremont Ave NE of Alvarado (3/4 mile East of Alvarado) $85,735.00 Elverton Drive near Thorndale Shepherd Cny. Two Sinkholes $9,000.00 Thornhill at Heather Ridge $280,919.00 6227 Westover Drive $212,944.00 6245 Westover Drive RS Mount/Brann Bridge Preventive Maintenance Program $3,000,000.00 Safe Routes to School, Sixth Cycle $320,896.50 RS Basin 50/Miles $772,685.00 RHS 54-03 Lakeshore/Merri 1365 Alvarado SS Rehab between Westwood Way and Thorndale $41,820.00 S. Pablo Signal - 14th to Emeryville $412,938.00 Inter. Improv @ Lakeshore Ave/Hanover Ave Inter. Improv. @ Alice St/12th St. SD in Leona Street $424,000.00 SD in Denny Street $55,125.00 On- Call StreetOn Call Street Design

Page 16

qryAllProjectsAndCCO

C98710 C98720 C96910 C99310 C96710 C99520 C99530 C99581 C99610 C99810 C99910 D03410 D06010 G230130 C99010 C95710 C91110 C91710 C91810 C92010 C92110 C39310 C92210 C40110 C97010 C95410 G01420 C95810 C96010 G230720 G23110 G23200 G232110 C96210 C96310 C96410 C94210 G212710 D06310 G174710 G199010 G20200 G20200a G20200b G20300 G20510 G170430 G21020 G166810 G212730 G21330 G21700

Street Hazard Elimination $100,000.00 Street Hazard Elimination $400,000.00 Install GPS time units @ 38 TS locations $48,380.00 SS Rehab Kempton Avenue between Stanley Place and Fairmount Ave. $50,000.00 Inter. & Crosswalk Imprv. Park & E. 33rd Asilomar Drive Land Slide $95,616.00 Roadway Slide Repair (Citywide fund) Emergency Construction of Perm. Imp. Restoring Washout Near 2333 Tunnel Rd. Magellan Drive Land Slide Marlborough Terrace Landslide $157,379.00 SS Rehab Barrows and Holman Road Grand Ave Bicycle Ped/Park Phase I $300,742.20 14th & Broadway Transit Ctr. $1,133,782.10 Montclair Recreation Center Renovation $538,379.00 Storer Ave Median Repair RS Adeline St from 60th to 61st Streets (Relief Sewer 21-2.0) $100,000.00 Restrpg.Foothill & Bancroft $27,866.44 Storm Drain MacArthur Boulevard near Telegraph Avenue $96,000.00 SS Rehab between 98th and Cherokee $103,900.00 SS Rehab Esmt near Harbord & Wood Rehab sewer pump station in Fallon Street between 8th and 9th Streets $34,799.63 SS Rehab Sunset Ave. SD Extension Phaeton Drive SB 140 Traffic Signals Mt. Blvd./Moraga & Intl. Blvd./62nd Ave. $302,014.00 Cross Culvert Removal at Rudsdale St and 79th Ave. $175,000.00 Martin Luther King Plaza $15,984,001.00 RHS High St, Hwy 880, 56th Ave, and North of Coliseum Way Area Sewer Rehabilitation $823,540.00 SS Rehab: Shattuck, 63rd Avenue and Adeline (Sub-Basin 21-03) and the construction $2,048,465.00 of a relief sewer in Adeli Peralta Hacienda Hist. House - Interpretive Exhibit RS Basin 50 College $900,009.00 Jones Field Renovation $219,785.00 Pedestrian Safety Project $336,799.72 RHS Crest, 82nd, Golf Links & Blandon Road Area $2,261,128.23 RS 14th Ave at E 12th St., E 26th St. and E 29th St. Area Sewer Relief $443,162.50 Cross Culvert Removal at Holly St and 81st Ave $175,000.00 SS Rehab Saroni and Paso Robles Dr $46,420.20 Citywide Sidewalk Repair $1,954,525.00 San Pablo Signal Inter. 53rd to Berkeley $196,121.00 Eastlake Stcape & Pedes Enhacement Projec $2,130,931.25 Oakland Bay Trail: Mandela Parkway $1,630,995.38 98th. Ave Bldg Demo 98th. Ave Tank Removal 98th. Avenue Unit I $3,530,882.50 Storm Conduit Armour Dr Bus Stop Relocation $103,924.00 Grand Avenue Bulbouts $410,976.00 Const. Wheelchair Ramps $141,794.25 Curb Ramps -- Phase V $572,741.50 Citywide Sidewalk Repair $1,937,299.00 98th Ave. Imprv. Unit II $3,879,456.91 Gunn Drive Restoration $91,860.00

Page 17

qryAllProjectsAndCCO

G217410 MacArthur Blvd Bikeway (Lakeshore Ave to High St) G218610 Technology Literacy G219210 Safe Routes to School 2nd Cycle Proejct G220210 Rockridge Greenbelt G221210 Bella Vista Park Renovation G56700 Bike Sgns/Lk Merritt,Shor G21000 Colby St. / Cons. w/c G136510 Bancroft Foothill Bike Lanes G04600 Neighborhood Commercial Revitalization (NCR) Program Funds G118810 TCI/K-TOP Dev-Miscellaneous Grants G121410 City Stables Project G121410A City Stables Sewer Lateral G121410B City Stables Restroom/Concessions Bldg. G122510 Eastmont Mall Transit Center G122710 State Grant For Seismic Retrofit for Stations 1, 10 & 12 G123310 Const. "E" from St.-91st to 92nd Avenue G170510 Jackson St Operational Improvements - SR260 Deficiency Plan G134010 West Oakland Bay Trail G230110 Montclair Park Pathway Improvement G136960 Martin Luther King Jr. Plaza Park G137820 Mosshouse Renovation at Mosswood Park G139010 Cypress Resurfacing Project G140540 Seismic Retro Fire Station 21 G161120 Willow Park Renovation G166410 Fruitvale Streetscape & Multi-Modal Trans G166420 Fruitvale Streetscape Project G166510 West MacArthur Blvd Rehabilitation G166610 Rehab of MLK Jr Way G132900 San Pablo Ave Median Project PX0400015 Off Site Impvmts @Greenly D. & Edwards Av P02400 Broadway Auto Row P128820 Relocation of Ex. Announcement Board and Const. of Merchant Kiosks P128820/T24571 Relo of Bd & Const. Of Kiosk P130130 Broadway at I-880 Public Art Project P130191 Uptopwn Art Park Improvements P130610 Downtown Capital Support P131610 8th St. Streetscape Improv. @ Acorn P131620 Acorn-Prescott Neighborhood Improvements, Phase 2 G53910 SS Rehab Shepherd Canyon Pk P188440 Sanitary Sewer Root Foaming FY 2010-11 H92510 73rd Avenue Street Improvements to Coliseum Amtrak Station T245620 Fox Courts P233285 E. 18th Street Streetscape P241410 Main Library Teen Zone P247710 Leona quarry P260210 Oakland Historic District Demarcation P260220 DeFremery Pool and House Renovations P283941 Fruitvale Plaza P289310 150 Frank Ogawa Plaza 3rd Floor Office Modifications P132740 Uptown Project H78020 Const.Conc.Stair - Westview H54940/C11520 City Wide Wheelchair Ramp Phase 2

$150,000.00 $313,907.00 $712,384.00 $1,124,773.88

$93,000.00

$132,225.00

$200,816.00 $592,606.00 $289,141.78 $471,963.00 $554,983.52 $265,004.00 $728,336.00 $1,711,233.36 $1,660,000.00 $554,375.00 $1,016,261.40 $870,024.96

$181,236.51 $336,922.40 $344,124.00 $958,718.00 $1,779,939.06 $403,960.00 $2,238,481.95 $2,102,626.78 $485,500.00 $463,846.20 $67,900.00 $60,000.00

$138,023.00 $534,914.00

Page 18

qryAllProjectsAndCCO

H56410 H57610 H57917 H57920 H64130 H64220 H67810 H95010 H78010 H92710 H82910 H83910 H87610 H87710 H87910 H87920 H88010 H89910 P333720 H72010 W833 P317020 TBDLibElect TBDLind TBDMainLib W03191 W609 W610 W618 TBD00002 W708 TBD00001 W836 W844 W847 W877 W960 X03047 X03635 X03759 Z0000 W626 P41680 H38500 P337310 P338110 P338310 P338510 P353210 P353410 P38000 tbd2

Telegraph & Alcatraz San Leandro Street Rehabilitation Arroyo Viejo Creek Restoration at Arroyo Viejo Park, Phase II Arroyo Viejo Creek at Oakland Zoo Oakwood Drive Land Slide Exeter Slide West View Drive Land Slide Traffic Signal Mod. Foothill @ 42nd Westview Drive Concrete Stairs Redwood Rd Slide Repair Seismic Retrofit-Hegenberger Road Bridge - Design Phase Franklin Rec Access. Renov Hegenberger Road/73rd Avenue Rehabilitation Embarcadero Bay Bicycle Trail East 12th Street/San Leandro Street Realignment E.12th/San Leandro Realignment Seventh Street Resurfacing Snake Road Stabilization Mosswood Tot Lot (Kaiser) Del Monte Off Site Imprv. High Street Sewer Replacement due to Caltrans Bridge Retrofit Brookfield Library Renovations Electrical Work @ Various Libraries Linden Park Tot Lots Resurfacing Main Library Modifications Montclair Golf Course Retaining Wall Grizzly Peak Slide Repair Golf Links Road Retaining Wall Parcel T6 Soil Remediation Coliseum Garden Replacement Park (Developer Project) Doolittle Gateway Bertha Port Mini Park 6010 Castle Drive 700 Panoramic Way Slide 23rd Avenue and Foothill Blvd. Shepherd Canyon Parking Lot Picardy Drive Street Resurfacing (near 5717 Picardy Drive) Concrete Stairs ROW B/Westview Dr. North Lakeshore/Grand ACFC Study SD Mountain Blvd. / Golf Links Road City Hall Original Plans Eastmont Precinct Broadway Bldg. Facade Renv. San Pablo Ave. Resurfacing Melrose Library Improvements Malonga Casquelourd Center Improvements Jefferson Square Park Chinese Gardens Wallace Street Building Demolition Fremont Pool Improvement Lateral Stability Bracing of Broadway Bld OPL - Fiber Optic

$36,280.38 $766,123.44 $114,320.00 $78,278.00 $136,990.50 $161,161.00

$607,324.00 $11,180,000.00 $46,550.00 $3,839,277.16 $546,582.15 $1,177,816.00 $813,423.40 $90,000.00 $1,777,048.02 $1,220,000.00 $12,355.00

$329,694.51

$1,600,000.00 $1,667,167.00 $200,000.00

$108,000.00

$0.00 $250,000.00 $11,553,605.00 $1,518,710.21 $2,128,301.52 $172,103.00 $939,799.93 $459,337.85 $219,226.13 $199,938.55 $386,685.82 $35,177.00

Page 19

qryAllProjectsAndCCO

P41000 P331910 P44110 P45100 P45100-1 P83000 PP0000 PX01109-90 PX01781-93 PX01909-92 PX02029-92 P39100 G94810 H00710 G86900 G87100 G91220 G93910 G94610 G94720 G94730 G82900 G94800 G79110 G95300 G95310 G95510 G95810 G96700 G96910 G98110 H00310 H54910 G94730B G65110 G56700a G56900 G57103 G63400 G63500 G63600 G63700 G64410 G86810 G64800 H02100 G65200C G65210 G65400 G65410 G65510 G65610

Jail Intercom System Oak Knoll Demolition Tr. Signal @ 98th & Holly Broadway Auto Row St.Imprv. Broadway Auto Row Signs N. Oakland Regional Sports Ctr. Pepsi Play Park Street Improvement - Tract 5818 Elverton Drive Sanitary Sewer Ex. Phase 2 Storm Drain in Skyline Blvd. Sewer Main Extension in Estates Drive Rotunda Bldg. Renovation Wall Panel Repai Estuary Pk.Earthquake Rep. City Hall Repair 1990/91 Flashing Beacons 1990/91 Signal Mod. Rockridge Branch Library C. Greene Lib. Seismic Ret. H.J.K.Plaster Repairs AsbestosAbt.CityHallWest Asbt.Abmt/Demo Brdway.Pl.Bd Fire Station # 26 Estuary Park E.Q. Repairs FAU Traffic Signals Lakeside Park Bandstand EQ RPR Lakeside Park Bandstand Peralta Chimney Reps. San Pablo/35th St Traff State Grant For Seismic Retrofit for Station 24 J. Miller Park Site Renv. City Hall E.Q.Damage Assess Paramount Theatre Const. of Wheelchair Ramps Asbt.Abmt/Demo City Pl.Blds Chabot Clubhouse Renov. Install Bike Rt Signs Lucky/A's Baseball Field Arts Gallery Tenant Improvmnts Hazard Elimination Hazard Elimination Hazard Elimination Pedestrian Signal,Grand Ave E. Oak Sen. Center 1990/91 Guardrail Elimin. Tennis Court Resurfacing Clean-up of Various Prop. Ballp./Renv.Franklin,etc. BllField Ren. Allendale,etc Asbestos L.Merrit Park/Sailboat Renov. J. Miller Community Center Morcom Rose Garden

$180,000.00 $40,901.00 $1,914,979.88 $17,000.00 $336,861.61

$46,520.00 $22,244.93 $3,745,180.00 $19,375.00 $253,479.25 $578,710.84 $877,947.00 $75,000.00 $514,854.57

$2,750.00

$392,658.24 $226,760.00 $189,648.43 $196,357.00 $1,043,817.25 $122,673.00 $169,225.13 $373,866.00

$1,975,189.00 $237,896.26 $173,672.00 $402,725.00 $948,719.80 $278,948.90 $1,138,397.15 $478,255.00

Page 20

qryAllProjectsAndCCO

G74010 Feather River G74410 Old Redwood Rd. G75100 Hazard Elimination G64600 Bushrod Pk.Ballfield Imprv. H13663 Dimond Pk. Erosion Control H00330 ParamountTheater H98210 Rehabilitation of Sanitary Sewers and Slide Repair at 6491 Ascot Dr(295/97) P02000 Oak. Pub. Library Children's Rm. Renovation H12373 Bushrod Rec. Center H12400 Oakland Museum Renv. Ph. 2 H12973 W. Oakland Youth Devl. Center H13463 Raimondi Field Improvements H13573 Mosswood Park Restroom Imprv. H98120 Citywide School Signs, Striping and Pavem H13575 Mosswood Site Work H96110 Citywide Curb Ramps -- Ph IV H14463 Defremery Pool Filtration H17410/H17810 G uardrail Instal. Fire Area H17410x Oakland Hills Delineator H18410 Veterans Building Renov. H24010 Seismic Retrofit-Hegenberger, Broadway-Patton & Hamilton Bridges H33010 Wid. Charing Cr.& Drury Rd. H34310 Broadway Rehab/Resurf. H38410 SS Rehab E14th @ 22nd & 42nd Av. C92110-A Rehab. Of pump/Fallon Street H13574 Mosswood Electrical Improv H11712 Woodminster Cascades Renov. H03610 CBD/Hegenberger/73rd Signal H07410 Rotary Nature Center H10110 San Antonio Park Rehab. H11000 W. Oakland Senior Center H11112 Chinese Garden,PH-III H11212 Montclair Pond ETC. H11313 C. Flood Soccer Field H11412 Fruitvale Field Renov. H98130 Wheelchair Ramps thru-out Oakland Phase3 H11610 Tassafaronga Gymnasium H43010 Tr.Sig.Modification Project H11910 Morcom Rose Garden H12012 Laney Tennis Ct. Renovation H95110 HESP-Traffic Signal Mod.-Telegraph Ave H95410 The Extension of 3rd Street H95510 Panoramic Way - Fontaine St Slide Repairs H95610 Monterey Blvd Slide Repair H95810 Bancroft Ave. Street Rehabilitation H95910 35th Ave & Redwood Rd. Rehabilitation H96010 RTSOP II - Traffic Signal Mod. Pr H11513 Greenman Field Ren. C65120 RHS Market, 45th, and West Area C57210 SS E 29th,Brookdale,Atwell Av C57510 SS 4th, 6th Avenues C57610 SS 29th,17th Streets

$574,339.00 $270,466.02 $72,348.00 $111,628.20 $363,270.00 $67,942.00 $274,750.00 $1,762,695.00 $605,628.17 $2,243,343.61 $698,388.23 $68,636.00 $499,926.16 $42,195.00 $328,100.00 $286,010.00 $259,355.57 $267,598.30 $1,934,064.12 $722,483.22 $1,360,809.35 $1,119,918.80 $46,001.00 $52,461.00 $170,000.00 $413,228.00 $94,292.00 $245,011.00

$226,200.00 $199,361.87 $420,206.00 $1,108,714.00 $524,671.00 $398,000.00 $58,748.00 $612,407.95 $341,760.00 $950,000.00 $2,270,394.86 $901,720.00 $333,564.99 $1,257,913.50 $124,185.91 $59,600.00 $63,518.50

Page 21

qryAllProjectsAndCCO

C57710 C58660 C58670 C64820 C64910 C66510A C65110 C56910 C65210 C65720 C65810 C65910 C66010 C66110 C66210 C52510 C65010 C55730 C65610 C52810 C52910 C53310 C53410 C53810 C54110 C54210 C57110 C55720 C57010 C56010 C56211 C56310 C56410 C56510 C56610 C56710 C56810 C58680 C55510 C90010 C61410 C61510 C61810 C62210 C62840 C63510 C63710 C63910 C66510 C64110 C60610 C64410

SS Ignacio,Vicksburg,Gordon Fire Sta.4&13 Seismic Retro Fire Stations 10,12,17 & 23 Dredge-Glen Echo,Lk.Merritt SS Rehab Easement Btw Armour & Thornhill Grdg-Shepherd Canyon Prkg. 55th,MLK,41st,Market Area Sewer Rehabilitation SS Lawton,Oak Grove Av RHS 27th, FWY 580 and Harrison Area "E" Street Extension Tr. Signal @ 4 Locations SS Rehab Santa Rita, 40th, E 14th St SS Rehab 46th & Chestnut Sts SS Rehab 29th, 33rd Av SD Improvement High St Near Coliseum Way RS Park Blvd,Mountain To Scout SS Jordan Rd/London Rd Verdese Carter Park Impr. Montclair Village Pkg. Lot RHS 98th,San Leandro Crk,Swan Wy San Antonio Park Head Start SS Esmt Near Kitchner Ct RS Lakeshore-Laney/Interceptor SS Genoa St Bet 52/56 Av Fire station #3 Veterans Bldg. Pkg. Lot SS Magee Av Debris Removal @ Galbraith SS Harbor View,Vales Av SS Rehab 38th, 58th Av & Foothill Bl Inter. & Crosswalk Imrpv. 6300 Moraga Ave SS Claremont,Gravatt Dr SD Madison/12th Sts SS 80th Av SS A ST, 91st AV SS Rehab 96th,103rd,104th,106th Avs FS 6,16,19,27 T. Signal Telegraph/24th SD Vic Lyman Rd, Tiffin & Harding SS Broadway & 41st St Med.Mods. Tompkins & Carson SD Swainland @ Ruthland SD Cochrane bet Sherridan Installation of New Street Light Luminair SS Rehab 60th, 64th, 66th Av SS Rehab Easement off Hanly Rd Traffic Signal Installation at 3 location Shepherd Canyon Rd Realign. SS Rehab Easement Off Golf Link Rd SS Rehab Easement In Dimond Park S.D. Clean-Up Hill Area

$338,215.00 $1,098,675.00 $1,295,902.26 $87,476.00 $67,784.00 $1,722,060.00 $241,126.00 $1,220,950.00 $54,092.00 $182,762.87 $74,978.50 $111,520.00 $781,933.09 $164,028.00 $993,638.00 $301,754.54 $362,148.60 $105,962.74 $57,677.94 $2,048,448.00 $124,195.20 $2,140,856.50 $401,308.02 $143,360.32 $99,864.00 $251,545.20 $102,821.00 $0.00 $67,088.00

$146,001.00 $755,545.00 $376,379.43 $62,977.00 $30,812.10

$307,123.00 $61,613.00 $97,210.49 $51,885.00 $367,000.00

Page 22

qryAllProjectsAndCCO

c64630 C64700 C64710 C64810 C65310 C65410 C65510 C92510 C59610 C58690 C58692 C58694 C58695 C58900 C58910 C59010 C59310 C61210 C59510 C60710 C59620 C59710 C59810 C59910 C60110 C60130 C60310 C60410 C52410 C59410 C43910 C45210 C45310 C45410 C45510 C456810 C456910 C423910 C424310 C443710 C43410 C41810 C43920 C439610 C44010 C44020 C44110 C44210 C44310 C52610 C424410 C39910

Traffic Signal at Mountain Boulevard at Village Square Lincoln Ave Traffic Signal Installation Lincoln Av. Tr. Signals $18,227.00 SD Lake Merritt Dredging RHS Golf Link,FWY580-Oakland Zoo $1,213,270.19 RS in Fruitvale Ave from Lynde to Mac Arthur $1,500,000.00 RS Fruitvale Av/E19th-E29th St $754,529.30 SD System Study SS Rehab E 11th, 10th, E 17th, & 9th $671,654.00 Police Admin Bldg. Seismic Retrofit - PH1 $7,473,314.00 PAB Basement Locker Room Renovation Police Admin Bldg. Fire Life Safety Upgrade $770,138.16 PAB Locker Room Renovations $1,360,735.00 EOC/FDC Generator Bldg. $322,242.00 Emergency Operations Center $6,037,133.76 Phase II Warning Sirens RHS - Lakeside, 13th, Alice and Harrison $2,781,141.00 RHS Warren, Swainland, Ruthland $930,786.25 RS Fruitvale,E9th/E14th Sts $444,170.00 SS Rehab Esmt off Elbert St $0.00 SS Rehab E. 17th St, 10th Ave; Bayview Avenue and 9th Avenue (Sub Basin No.$865,625.71 59-02) RS 8th 11th Av $171,307.00 RHS Edes,105th,San Leandro Crk $1,577,599.28 SD At Pinewood Rd & Mountain Bl Const. of AC Undulation $40,599.90 Const. of AC Undulation-II $103,893.00 SD StormCon.Armour&Gouldin $22,210.00 SS Rehab 12th/Jefferson St $0.00 SD Improvement Seminary,Avenal,Elizabeth $91,287.97 RS Telegraph @ 31st St $105,788.00 Ettie St. Pump Station Renovation SB 140 Traffic Signals $54,719.00 S.S. Rockridge Boulevard $88,131.00 Thermal Street SS Rehabilitation SD Improvement Portal Av $27,969.00 Piedmont Library Relocation $196,099.23 450 Lancaster Structural Emergency Repair 915-939 66th Avenue Site Demolition $1,094,589.75 Citywide Storm Water Trash Separator Study $150,000.00 711 71st Avenue Demolition Project $161,300.10 H.J.K. Earthquake Damage RS E 10th-Embarcadero $1,784,378.02 Ettie Street Pump Station (371 / 550) $2,391,545.00 Creed Road Stair Path Repairs $76,850.00 Unity Bldg Hazard Abatemt $99,999.00 1672-4 - 7th St Haz Abate RHS Subbasin 85-013 $717,565.50 RHS Subbasin 50-15 $430,061.40 RS Basin 82 $486,859.00 RHS Westover & Bagshotte Dr $1,314,859.87 High Street and Alameda Avenue Trash Separators $768,233.14 RS Basin 80 35 $254,459.74

Page 23

qryAllProjectsAndCCO

C39410 C394610 C39510 C395311 C395911 C39610 C396810 C39710 C45010 C398910 C41910 C40010 87694 C40500 C40600 C40910 C409210 C41210 C41710 C44410 C39800 C51100 C47810 C47910 C48610 C48710 C48810 C48910 C49110 C49110a C443610 C51010 C47510 C51210 C51310 C51910 C52010 C52220 C52230 C52240 C52310 C49500 C58650 C45810 C45920 C46110 C57810 C58110 C58210 C58610A C58610S C47710

SS Rehab Thornhill-Westwood/Gouldin Livingston Pier & 10th Avenue Marina, Oakland Waterfront Trail SS Rehab in Weldon Avenue Cryer Beach Clean-Up Shepherd Canyon Park, Creek Improvement RHS S.S. 52-10 Various Streets and Roads Rehabilitation Phase II RHS Basin 50 SB 140 Traffic Signals Foothill Blvd/64th Ave Traffic Signal Demo. Fed. Miller Bldg. SB 140 Traffic Signals CityHall West Reroofing Asbestos USPS E. 14th St. Oak. Museum Garage Noise Abatement SS Rehab Chimes Creek Rehabilitation of the Castlemont Stairs SS Rehab 11th St between Broadway SD in Telegraph Avenue RHS Subbasin 84-002 SS Rehab High St/Brookdale Lake Chabot Golf Course/Geotech RS 35th Av/Foothill/MacArthur Montclair Golf Course S.S. Rehab 7th St. & Bay SS Rehab Easement Bet Golf Links/Alvingrm SS Rehab - Easement of Clemens Street SS Rehab - Scout Street SS Rehab - Whittle Avenue S.S. Rehab in Whittle Avenue 3050 International Blvd. Demolition S/S.E.9th(35-36)E10th(7-8) RHS Davenport/MacArthur/Thompkins SD Claremont Avenue S.S. Alma Pl., Holman RHS Bancroft Av,74th,79th,Ney RHS Butters Rd & Warren Bl RS Rettig Av,Guido St,Bennet RHS Redwood,Warren,Jordan Wisc RHS Redwood,Warren,Jordan Wisc RHS San Leandro,85th,Nimitz,Heg Oakland Animal Shelter Fire Sta.25,29 Seismic Ret. S.S. Rehab 64th & 63rd Avenues Asian Branch Library SD in Carrington Street SS Rehab 63rd,55th,Poirier Streets SS Rehab Easement Golden Gate/Cross Rd RS 25th/26th Av at E27th St Fire Sta.#15 Haz. Mat. Abt. Fire Sta.15-Seismic Retro. RS 35th av,E 9th,Foothill

$60,137.00 $354,000.00

$50,000.00 $451,765.80 $1,219,225.59 $43,199.00 $1,303,532.20 $126,500.00 $12,951.00

$29,852.00 $378,190.00 $40,000.00 $1,093,803.00 $25,051.00 $119,464.32

$339,603.90 $59,529.50 $412,262.36 $28,400.00 $542,547.00 $728,324.59 $947,822.00 $268,468.27 $590,780.00 $4,460,721.20 $499,617.00 $64,237.00 $839,049.00 $299,483.95 $366,598.90 $12,304.73 $599,372.35 $901,741.20

Page 24

qryAllProjectsAndCCO

C58640 C47610 C46210 C46310 C46410 C464410 C47110 C47210 C47310 C47410 C64210 C58620 C79720 C81810 C78340 C78410 C78510 C79110 C79310 C79410 C79510 C78110 C79710 C78061 C79910 C80010 C80110 C80510 C81010 C81110 C81110-A C74610 C79610 C76720 C74810 C74820 C74910 C75010 C75210 C75610 C76110 C76510 C78310 C66610 C82010 C64010 C77010 C77110 C77410 C77420 C78020 C78050

Fire Sta.5&18 Seismic Retro $541,430.00 RHS MacArthur/Camden/Lily $954,829.35 Main Lake Sewer Cleaning SB 140 Traffic Signals $49,036.00 SB 140 Traffic Signals Brookfield Library Electrical Improvements RHS Nimitz,105th,Douglas,Elm $482,797.00 RS Macarthur / 73rd/Arthur/64th $1,047,697.00 RHS Skyline/Redwood/Campus/Denton $290,576.04 RHS 55th,Hillen,Birdsall/Morgan $928,306.50 Improvement of Stearns Ave $161,898.42 Fire Station # 24 $2,044,494.91 Video- 29th Ave. Sewer SD Erosion Repair at Rosecrest Bancroft Median Phase II $1,477,241.67 Hyde Street Extenstion $185,820.96 SS Rehab Fairfax-Montecello/Frances $147,435.00 RHS Skyline, Elysian Fields, Golf Links Rd. $275,339.00 RS MLK Jr. Way from Clay Street to 6th Street Area $2,053,387.00 RHS Merriwood, Mountain Blvd & HWY 13. $1,544,756.03 Cross Culvert at Van Buren Ave and Lee Street $275,000.00 AC Transit Curb Ramp Project $180,200.00 RHS 29th Ave, E 14th St, 28th Ave Area $2,276,961.62 On-Call Sidewalk Repair & Curb Ramp Work FY 05-06 RS 14th Ave between 31st and MacArthur; in MacArthur Blvd between 14th Ave and $850,200.00 Ardley Ave; in Woodruff Av RS Curran Ave, School St, and Wilson Ave Area $2,160,061.75 SS Rehab Golf Links; Fontain St; 98th Ave and MacArthur Blvd (Sub-Basin 80-011) $1,606,812.87 Three Signal Installation $200,886.00 SD Repair Proctor and Florence $32,000.00 RS Dimond Park $1,061,090.00 Hydroseeding in Dimond Park See Project C74510 (E 27th, 25th, Foothill and E25th Project) $0.00 RHS 27th, Sausal Creek, I-580 and Grande Vista. $692,421.00 SS Rehab Broadway Tr & Golden Gate $43,406.70 Traffic Islands at 90th Ave & 38th Ave. $39,700.00 Intersection/Crosswalk Improvements $59,587.00 SS Rehab MacArthur, 35th and Deering. $402,902.00 RS Webster St from 9th to Embarcardro $1,220,763.39 Telegraph/Claremont & MacArthur $147,409.48 North Hill Fire Station $1,022,316.00 SD Improvement 62nd Av-E14th & E16th Sts $283,874.00 SD Improvement Alvarado Via Amito $13,186.00 Bancroft Median Imprv.Ph. 1 $1,623,018.90 SAD Old Tunnel Rd & Skyline Bl $0.00 SS Rehab Esmt Btw Leimert/Oakview $33,160.00 Telegraph/59th St. Traffic Signal Install Pavement Restriping $61,245.00 Tr. Signal-MLK & 59th St. $80,000.00 SD Replacemt Oak Hill Rd SD & Slope Work at Oak Hill Road $646,911.00 City Wide Sidewalk Repair $1,991,621.30 Rubber Sidewalk Pilot Project $424,000.00

Page 25

qryAllProjectsAndCCO

C78060 C76610 C87700 C81310 C84210 C84300 C84312 C84412 C84515 C84615 C84700 C83710 C87200 C83412 C88200 C88412 C88414 C88810 C88810P C89310 C89510 C89610 C86500 C82690 C82110 C82610 C82620 C826201 C82630 C82640 C82650 C82660 C84110 C82670 C76710 C82910 C82921 C82930 C82940 C82950 C82960 C83120 C83310 C8266610 C69610 C68010 C68110 C68210 C68610 C68810 C68910 C69310

On-Call Sidewalk Repair FY 04-05 SD 73rd Ave Via Bantry KTOP Broadcast and Lighting Systems RS Dimond Ave and Sloan to Dimond Park Area SD Girvin Dr/E of Eldeberry Temescal Library Emergency Flood Repair Temescal Branch Library G. Gate Library - Seismic Retro. & ADA Melrose Branch Library Seismic & ADA McClymonds High School Pool Renov. Montclair Library Addition SS Rehab Ogawa Plaza Oakland Main Library Mezz. Rest. Lakeside Park Bandstand Otis Spunkmeyer Asbestos and lead removal Charles Greene Library ADA Transition Plan Arroyo Viejo Inclusive Program SS Rehab Esmt 60/61st Av-Camden/McAr Storm Drain Repair At 24th and Peralta Intersection Improv. Park Blvd/Hampel/… Peralta Hacienda Historical House Exterio ORA Coliseum Shoreline Project T. S. Grand Avenue @ Wildwood Montgomery Ward (Cesar Chavez Education Center) Fruitvale Transit Village Project Tyrone Carney Airport Gateway - 98th Hegenberger Gateway Airport Gateway - Doolittle Airport Gateway - Access Road SS Rehab Harbord-Morreth/Dilwich Coliseum BART Area Plan Emerg Repair S Broadway Tr @ Golden Gate Renovations to Oakland Jail Museum Handicap Access ADA Improv. Oakland Main Library Temescal Pool Disabled Access Upgrade ADA Improvements to Dimond Park Alice Arts Ctr ADA Improvements Jefferson Sq & F.M. Smith Rec Centers Sanborn Park Improvements DUPLICATE - Foothill Streetscape RS 35th Av/Calif to Atlas 14th Ave.& Beaumont & E.31 13th St. & Alice t. E. 14th St. & 8th Ave. SD improvement Esmt Aquarius Wy/Brdwy Tr SS Rehab MacArthur Btw Canon/Dimond SD Improvement of Leona St Tr.Signal-Harrison & 7th St

$411,273.00 $453,739.00 $650,470.50 $612,851.00 $74,010.00 $1,709,809.00 $1,991,175.69 $2,054,211.95 $827,172.74 $380,848.00 $80,252.00 $1,015,195.00 $134,130.00 $73,830.25 $9,500,529.00

$60,000.00 $17,995.00 $55,000.00 $34,942,475.00

$3,777,521.26 $2,434,070.04 $49,761.07

$154,251.79 $479,075.00 $211,164.50 $134,177.79 $378,799.00 $286,621.00 $369,678.10 $692,168.00 $3,000,000.00 $673,381.00 $67,726.71 $38,612.57 $51,653.20

$59,958.00 $113,060.00

Page 26

qryAllProjectsAndCCO

C70410 C69510 C67310 C76810 C69710 C74510 C69910 C70010 C70020 C70030 C70210 C69410 C74210 C66620 C66710 C66710L C74014 C74018 C74047 C74054 C74055 C67810 C74200 C67610 C92710 C93710 C93730 C94010 C66710M C66810 C66910 C69810 C74055A C71410 C72910 C73110 C73210 C70610 C73310 C72610 C73510 C71710 C73010 C71610 C73710 C71310 C71210 C70910 C73810 C73910 C74310 C70710

Slide Repair 6989 Pinehaven RS Shepherd Canyon Road between Snake and Banning Drive. SS Rehab in Easement off Nairobi Place Lake Chabot Creek Restoration (550/00)* RHS E12th St/20th Av to Munson RHS E27th, 25th Ave, Foothill and E 25th. RHS Redwood, Atlas, Mac Arthur RHS Shepherd Canyon, Snake, Saroni RHS Westover, Carlsbrook, Skyline, and Girvin TV Shepherd Canyon Sewer Basin SD 57th Street from McCall to Dover Tr.Signal-San Leandro & 81 Service Center #5 Demo SAD Tunnel & Skyline (Fund 560/03) SS Rehab Liner in MH @ 4314 Atlas Av MH Liner 4314 Atlas Av City Hall Pl.Asbestos Abmt. Lateral Bracing-Broadway Bl Entry @ Oakland City Ctr/12th St. Station Plaza Building Seismic Upgrade Plaza Building Renovation Const-Dimond Parking Lot Muni Service Ctr #5 Demolition SS Rehab Easement off 3322 Butters Drive SD Balsam Way and Slope Repair Drury Rd. Restoration Slide Drury Road/Besito SD Improvement 1707 Gouldin Rd SS Rehab MH Liner 4314 Atlas Av SS Rehab Easement Off McIntyre St SD Repair Montclair Golf Course SD Elliot St/E33rd to E34th St Budget and Finance SD Improvement Hiller/North & Treasure Hill RHS Seneca, MacArthur, Stearns Area SD Vic Mountain Blvd SD Westfield Way Oakland Police 911 Facility SS Rehab Michigan-Sunkist/Partridge Lincoln Sq. Rec. Bldg. SS Rehab Wood St (E)N of 8th St SS Rehab Easement 103 Ave and San Leandro St SS Rehab behind 1053 Underhills Rd SS Rehab slipout @ 6815 Oakwood Dr SS Rehab Emt Glenarms/Mountain Bl SD North-Hill Court Super Kmart D/W & Alameda SD at 8491 Golf Links Rd SS Rehab Emt Behind 1415 W. View Dr Traffic Islands-8 Locations Signal Mod.-Alameda & High SD Improvement Esmt off Outlook Av

$66,564.47 $1,200,000.00 $665,918.00 $855,500.00 $1,426,216.00 $1,038,730.00 $1,070,247.00 $854,050.00 $100,000.00 $65,320.00 $846,088.00

$27,514.00 $1,729,616.62 $1,482,610.00 $2,308,209.00 $388,644.04 $44,480.00 $577,078.25

$32,800.00 $153,329.45 $449,732.00 $21,898.00 $2,384,435.00 $158,667.22 $2,818,454.69

$111,644.80 $20,000.00 $88,678.09 $20,075.25 $16,609.00 $96,113.00 $119,065.00 $20,302.78

Page 27

qryAllProjectsAndCCO

C71010 C73920 C71110 C70810

SD at St.Andrews Rd. Traffic Islands at 5 locations Citywide RS Mandana Bl-Lakeshore/Paloma Av SD at Sayre Dr

$63,430.70 $135,021.00 $358,838.00 $11,382.00

Page 28

qryAllProjectsAndCCO

ProjectAddress WorkScope Citywide Anaylsis and revision of the City's Traffic Signal Installation Prioritiza 975 85th Avenue, Oakland, CA, 94612 Kitchen renovation, electrical system upgrades, hazardous material 9409, 9415, 9431, and 9437 International Blvd. Demolition of derelict buildings. varies Various improvements to Brookfield, Dimond and Monclair Branch L North Oakland Sports Field This project is to improve and expand an existing trail from North O Bounded in Campus Dr., Mountain Blvd., and Knoll Ave Rehab sewer mains by pipe expanding Area bounded by Mountain Blvd, Bernves Ct, Terrabella WyThe andproposed Redwoodwork Rd consists, in general, if the rehabilitation of 8" to Spanning from Lake Merritt Channel over the Union Pacific Planning, Railroad tracks design and & construction the Embarcadero of the to new connect bridgeto the Oakland Wa Area Bounded by Casle Park Wy, Skyline Blvd, Haverhill Dr, The and proposed Scarborough workDr consists, in general, if the rehabilitation of 8" to Mouth of Glen Echo Creek At Lake Merrit ( Harrison & Grand) Installation of a trash net at the mouth of Glen Echo Creek. Require From the Union Point Park/Con Agra property line to the Lonestar/Park Property Acquisition, Street Bridge Design property & Construction line of the Oakland Waterfr 1899 Dennison Street Building programming, public outreach and rennovation design. Bounded by Joaquin Miller Rd, Miller Rd, Rubin Dr, BurdeckThe Dr and proposed Highway work 13consists, in general, if the rehabilitation of 8" to Gwin and Seneca Reservoirs Design-build services for upgrades to Police and Fire Communicatio 1111 Broadway Replace UPS system, upgrade ventilation and cooling, provide conn The Rehabilitation Of Sanitary Sewers In The Area Bounded The By proposed 21st Avenue, work 17th consists Street, of24th the rehabilitation Avenue, Andof 27th 20,805 Avenue linear (Sub fee 7101 Edgewater Drive, Oakland, CA 94621 Design-build services for upgrades to Police and Fire Communicatio Bounded by HWY 13, Reinhardt St., 39th Ave.. And Aliso Ave. Reahbilitate approximately 14584 feet long Sanitary Sewer main pip Intersection of San Pablo Ave & West St; and San Pablo Ave San & W. Pablo Grand Ave/West Ave St - Modify intersection geometry by sidewalk e 5606 San Pablo Av., Oakland, CA 94608 Evaluation, repair and / or replacement of all exterior windows, as re City ROW stiar path adjacent to #3629 Grand ave. ascending Replace to Mira broken Vista Ave. concrete stairsand landings, add handrails both sid 1075-62nd Street Evaluate existing facilities, complete construction documents based 675 29th Street Improvements to existing park including new playground and tot lot, Citywide BROADWAY, GOLDEN GATE AVE, AND CONTRA COSTA Rehab ROAD, approximately BUENA VISTA 5240 AVE LF-8" diameter sanitary sewer pipe, and Clarendon Crescent And Sunnyhills Road Rehabilitation through pipe expansion of approximately 3500 LF of S Area of Ostrander Rd and Broadway Terrace, in the Easement Rehabilitation by Margarido through Dr pipe expansion of approximately 2620 LF of S Larry Lane and easement by Gunn Drive Replacing approx. 810 LF of ex. 8" SS with " HDPE pipe, 823 LF of On Tunnel Rd from City limit to Kay Overcrossing and on Broadway Project 1from - signal Brookside modification; Av to Kay bikeOvercrossing lane improvement; new sidewal Broadway and Keith to Broadway and Brookside Roadway realighnment to implement traffic calming measures. Rea Citywide Sanitary sewer flow monitoring and hydraulic modeling. Citywide PCC - curb & gutter and sidewalk repair, installation of ADA curb ra The Rehabilitation of Sanitary Sewers Bounded by Park Road, ThisLongridge project is part Road, of And a citywide Lake Shore sanitary Ave sewer (Sub-Basin rehabilitation 54-12)progra 20th St Between Harrison St and Broadway and in West Grand Rehab Ave 1036 Between LF ofSan 66" pipe, Pablo376 AveLF and of Wood 58" pipe, St 1200 LF of 73" pipe Bounded by Park Street.Hollywood Avenue, Sunnyhills Road Rehab and Brighton of sewer Avenue. mains by pipe expanding. Leimert Blvd Bridge is between Park Blvd and Clemens Rd,Bridge over Sausal Seismic Creek. Retrofit Project 23rd Ave Bridge is near 12th St, over UPRR. Bridge Seismic Retrofit Citywide Assess and improve sewer laterals at City facilities Intersection of Bancroft Ave and 94th Ave Installation of fully actuated traffic signals, ADA ramps, and crosswa Lakeside Park Boat House The proposed work consists, in general, of rehabilitating 591 linear 42nd Ave, Alameda Ave, High St, Coliseum Way, E. 8th St, Right Oakport of Way St, Howard Acquisition St, & Phase Jensen for St, the under Realignment I-880 and extension On Broadway and Telegraph between 15th and 16th St. Improvement of intersections of 15th and 16th Streets with Broadwa On Adeline Street just North of 3rd St. Siesmic Retrofit of Bridge Lake Merritt, Bellevue Dr., Oakland, CA Fairyland entry improvements - new pathway, ADA access, site ligh Foothill from Congress Ave to Cole Street Construction of bulbouts, medians, planting trees and streetlighting, Hegenberger Road at Edes Ave, Baldwin St, Hamilton St, 73rd Goal Ave-International is to improve traffic Blvd safety. Scope is to install signal standards Embarcadero west of Highway 880, over Lake Merritt Channel Bridge Seismic Replacement

In the Glen Echo Arm of Lake Merritt. Opposite a storm drain The outfall proposed at 22nd filtration St. unit will be one crescent-shaped floating wet 14th Avene Streetscape Project Involving Bulbouts, Green Space, and Trees. The Project is located on Foothil Blvd between 62nd Ave and This Brookdale is a Design Ave. Build TheProject. second portion It includes of the reconfigure Streetscape roadway is on Sem layo

Page 29

qryAllProjectsAndCCO

3300 Joaquin Miller Road Lakeside Park Snow Park/ Harrison/ 20th St. MLK and Peralta Street Lake Merritt Retaining Walls around Lake Merritt

ADA Improvements at the Woodminister Amphitheater Improvements to Bellevue Dr. -and Lakeside Park entry in addition Snow Park and Lake Merritt Park expansion and improvements alo On MLK the improvement includes re-striping of the roadway from W 1) Parking improvements on Bellevue Avenue from Lakeside Garde Evaluate retaining walls around Lake Merritt and provide recommen

Sausal Creek in Dimond Park at Wellington Avenue. Restoration of 745 linear feet of Sausal Creek in Dimond Park; inclu On 7th Street from Peralta to Wood Street Reduce No of lanes from 2 lanes each way to 1 lane each way. Cre Temescal 371 45th St Oakland, CA 94609; Lion 3860 Hanly Replace Rd, Oakland, ADA pool CA lift. 94602 Path of travel improvements. City Wide Repair sanitary sewer pipes and structure city-wide based on emerg 560 59th Street Remove existing sand from Play Area and install Poured In Place R Easement between Thornhill Drive and Cabot Drive and in Gouldin The proposed Road between work consists, Alhambra in general, Avenueof and theArmour rehabilitation Drive of 1,45 Area Bounded by Golf Links Rd., Encina Way and Calandria Rehabilitation Ave. approximately 16,400 LF sanitary sewer pipes 8" and 5844 Bancroft Avenue Demolition of derelict building. 23rd /29th Avenue at Glasscock Street Railroad Crossing Safety Improvements including railroad warning l Area bounded by 20th St, San Pablo Ave, Telegraph Ave, Alice Replacing St and1,400 12th St. Lf ex 6" to 24" sanitary sewer pipes with HDPE, lin Broadway and Embarcadero; Fruitvale and San Leadro Project is a state grant to improve pedestrian safety at railroad cros Various Locations Implement improvements at intersections to improve pedestrian saf 57th Ave and International Blvd Rehab approximately 2,649 LF-10" to 15"" diameter sanitary sewer Dennison St., Embarcadero, King St. and Federick St Rehab approximately 4000 LF-8" diameter and 500 LF -10" diamete Area Bounded by MacArthur Blvd, Maple Ave, Barner Ave and Rehab Frye approximately St 15,850 LF-8" diameter and 1,795 LF -10" diam 41st and Linden New synthetic turf for park and other improvements Various sites in West Oakland (Ettie Street Watershed) Construction of six stormwater treatment tree well units designed to Easement between Delmont Ave & Edgemoor pl, Majestic Ave Rehab & Laird approx. Ave, 1015 and Modesto LF , 673 LF St & and Madera 420 LF Ave Sanitary Sewer pipes Citywide PCC - curb & gutter and sidewalk repair, installation of ADA curb ra Ascot Dr. PG&E utility undergrounding up Ascost from Mountain Blvd. to Skyli Coliseum Way Bridge over Damon Slough at the entrance of Bridge Coliseum/ Seismic Areena retrofit. Complex. 12th Street from E18th to Oak Remove all existing infrastructure; construct new six lane boulevard Lake Merritt Channel at 10th Street Remove culverts along Lake Merritt Channel at 10th Street; constru Hegenberger Road Overhead over San Leandro St., UPRR, Bridge BART, Seismic & Snell Retrofit St. Fruitvale Avenue, between E.7th to Alameda Avenue This is the third portion of project G381111, containing only Fruitvale Lancaster Street between Glascock and Chapman Streets. This And Chapman is the second Street portion between of project Lancaster G381111, to thecontaining dead end only (at UPRR Chap Lochard, Edgemont, Kerrigan Rehabilitating approx 21,080 LF of sanitary sewer pipe. Rehab sew Bounded by Shattuck Avenue, 66th Street, Telegraph Avenue Rehabilitation and 59th Street approximately 15,640 LF of 8", 12" and 15" diameter Lincoln, MacArthur, Rhoda, Coolidge Rehabilitating approx. 23,170 8" diameter sewer pipes, rehab the st Mountain Blvd, Greenridge Dr, Keller Ave, Long St. Campus Rehab Dr. approx. 8,980' ex 8" SS to 10" HDPE, 2,780 ex 12" SS to 14 MacArthur Blvd from 73rd Ave to 77th Ave, 89th Ave to 90th Project Ave and includes 106th Ave new to bulb-outs; Durant Ave sidewalk, curb, and gutter; gateway Countdown Ped Heads at 14 intersections. Install pedestrian countdown signal heads and retrofit countdown m Easement Between York St and Erie St, Easment by Wellington Install St 160 and lf Easement 12" HDPE by SD Brighton pipes, rehab St 100 lf 8" SS with HDPE, reh 250 Frank Ogawa Plaza, interface with many intersections citywide Goal is to improve the mobility, accessibility, safety and security of t San Leandro Blvd., Edes Ave. and 85th Ave. Rehab approx.14,500 LF of 8" SS and 75 structures. Peralta Hacienda Historical Park Design and construct a trail connection and an outdoor classroom a Citywide Repair sanitary sewer pipes and structures based on the City-wide e 7th Street between Union and Peralta St Construction of bulbouts and raised medians, new street lighting, in Rosedale Ave bounded by Foothill Blvd. and Santa Rita St. Rehab of 3,219 lf of ex. 8" SS, rehab sewer structures and reconne Bridge Ave & 42nd Ave. Rehab of 2,882 lf of ex. 8" SS, rehab sewer structures and reconne Easement by Elinora Avenue and Reinhardt Drive Rehab of approx. 2,617 LF ex. 8" SS, rehab sewer structures and re Left Turn Phasing - W. Grand Ave/Market St, MacArthur Blvd/Fruitvale Install signal Ave, mast Market arm standards, St/55th St signal controller, service panels, 20th st and Harrison St from Broadway to 23rd St Cleaning and CCTV large pipe approximately 2695 linear feet of 60 Citywide PCC - curb & gutter and sidewalk repair, installation of ADA curb ra Citywide The Citywide Bikeway Improvements Project will complete key segm

Page 30

qryAllProjectsAndCCO

7280 Woodrow Drive The proposed work consists of 40CY of Structure excavation,17ton Citywide The proposed work consists, in general, consist of approximately 51 On Foothill between Austin and 35th Ave Construction of bulbouts and medians, installation of streetlights, tre On Foothill Blvd. Between 35th Ave and High Street Construction of bulbouts and medians, installation of streetlights, tre 66th Avenue from San Leandro St to International Blvd New streetscape - bulbouts, sidewalk, curb, gutter, AC paving, traffi Oakland Army Base The abatement of materials, removing of soil and demolition of thre Bret Harte Midddle School, Manzanita Community School, Peralta Constructing Elementary pedestrian School, bulb Pacific outs and Boychoir ADA-compliant School, Lacurb Escuela ramps, Bilin a 73rd and Bancroft or 73rd and International Install a storm water trash separator at the intersection of 73rd and Snell Street between 69th and 71st, 70th Street between Snell The and proposed Hawley, work andconsists, 71st Street in general, betweenof Snell construction and Hawley. of pedestria City Wide Perform root foaming approximately 220,000 LF 8" dia pipe and app Latham Square - Telegraph between 17th St and BroadwayPhase I: The Pilot Project scope is to design and install surface pain BART 17th St entry between Telegraph & Broadway Renovate BART entry plaza, extending improvemetns to sidewalks Easement Between Mastlands Dr and Ascot Dr Replacing aprox. 250 LF ex 8" CMP and 990 ft ex clay pipe with 8" H Sidewalk repairs at various City locations Work Orders 1 through 5 700 Jean Street Various improvements to the Rose Garden, including lighting, ADA E24th St, 17th Ave, E 14th and 13th Ave. (Sub-basin 58-10)Rehab 26,508 LF 8"; 1,561 LF 10"; 216 LF 12"; 361 LF 14"; 663 LF Repair or replacement or construction of new Curb Ramps On Hegenberger Road Over the UPRR Sealing bridge deck, replacement of joint material and repair of con On Oakport St. close to 66th Ave. Bridge deck sealing, repair of railing and apving AC approaches 3233 Market Street Renovation of an existing building for a new Teen Center Lakeshore at Lakepark Avenue and MacArthur Blvd. Design of pedestrian plaza, bus bulbout, and pedestrian bulbout at t Quincy, CA Project separated into 3 bid packages. 1) Improve well water system Citywide In general, the proposed work consists of the repair of official tree-r Campus Drive above Redwood Road Bridge Seismic Retrofit Citywide Tidewater Pump Station Replacement On Fruitvale Between 12th Street and Coloma Street Construction of bulbouts, sidewalk and curb & gutter, decorative cro Park Blvd Viaducts 1, 2, 3 near Highway 13. Bridge Seismic Retrofit Oakland Coliseum BART Improvements to amenities located between 72nd and 69th Avenue E. 8th Street at 7th Street Seal bridge deck, patch spalled concrete at the underpass Railroad Ave. between Louisiana & 98th Ave. Regrade roadway, provide new pavement section throughout w 9" A Maxwell Park Upgrades to front grass area, railings, picnic tables, safety lighting a San Pablo/Brockhurst St (Hoover Elementary), Market St/18th Install St (Lafayette bulb-outs at Elementary), seven intersections Grand Av/MacArthur located along Blroutes (Lakeview to five Ele s 1701 E. 19th Street Security Lighting for Park 23rd Avenue from E. 12th Street to Foothill Blvd Removal and replacement of sidewalk, curb, gutter; new bulb-outs; Broadway & 40th Av (Oakland Technical High School); MacArthur Improve Bl pedestrian from 82ndsafety & 90th and Av access, (Castlemont and encourage Community use of Small of public Sc Foothill Blvd at Bridge Avenue Develop park improvement concept plan and cost estimate; comple Butters Canyon Project to generate restoration plan in coordination with a local com Lion Creek Crossings Park (between 66th and 69th AvenueThe at San Lion Leandro Creek Project Street) creates 1.5 acres of creek and tidal wetland Garber Park Project to restore a 10-acre section of Garber Park. Garber Park is Citywide The project will survey all the sidewalk in the City of Oakland for sid Easement between Gravatt and Alvarado Replacement of approx. 725 LF of 10" SS, 252 LF of 8" SS by Open 125 14th Street Space reconfiguration to create room for Adult Literacy Program. Derby Avenue & Lancaster Street Construct a new structural trail along the Estuary, behind 333 Lanca 1800 Wood St. Renovation of playing fields and park. Easemt Grand/Walker Perkins Street & Bellevue Avenue, near Lake Merritt NatureInstallation Center of a continuous deflection separator (CDS) unit collectin 3000 block of Alameda Ave. Demolish the existing waterside street improvements to provide for 41st Ave./E15 TO E17 365 - 45th Street Asbestos and Lead-based paint abatement for Studio One Art Cent 66th Ave & Zhone Way Construct an outlook at the Zhone Way/66th Ave. & Oakport interse Various Environmental remediation along the Oakland Waterfront Trail from Golf Links Rd.

Page 31

qryAllProjectsAndCCO

9161 Edes Avenue Design and build a sports center. The project includes a natatorium Quincy, CA Improve existing well water and filtration system. This project is onl 365-45th Street Complete Rehabilitation of the existing 20,000 s.f. wood-framed, bri 400 Lancaster St. Widen the existing trail behind 400 Lancaster and connect to the pro Citywide - 391 locations Repair of tree damaged sidewalks 9777 Golf Links Road New Signage, Improvements to the Wallaroo Exhibit and the Chimp Poplar 3131 Union; Owen Jones 5000 Redwood rd. and Central Field Reservoir Improvements 29th St. at three fields: Poplar, Owen Jones and Centra To be determined by CEDA/Redevelopment Agency. Capital Improvement Program, 2005-2010, Pedestrian Streetscape Citywide Conduct warrant for guardrails installation, install guardrails to minim

Citywide Locations Installation of pedestrian countdown devices at existing traffic signa 13560 Skyline Blvd Tear off & install new roof on main house and caretakers quarters. Citywide On-going program. Scope: traffic signal upgrades and modification Citywide Retime traffic signals to facilitate efficient traffic flow Citywide 73rd Ave/Garfield Ave (C333010) and International Blvd/7thInstall Ave (C269510) new traffic signals to improve traffic, bicycle, and pedestrian s Piedmont Ave and Linda Ave Installation of new traffic signal to improve safety for vehicular traffic Districts 4, 5, 6, and 7 Repair of sidewalks, curbs, and gutters damaged by official city tree District 4,5,6,7 In general, the proposed work consists of repairing official tree-relat Easement,Jordan/Frye Alice Street, Fallon Street, 12th Street and 2nd Avenue Rehab 15,000 LF of 8" SS and 75 structures. 247 Marlow Dr ADA improvements to path of travel, rec building and park areas. N Underhills Rd from Grosvenor Pl to Sunny Hills Rd Rehabilitation of 1,960 lf of 8" Sanitary Sewer Quincy, CA Relocate leach field, add grease interceptors in kitchen and make A Easement between: Merritt Ave and Wesley Ave, Ney Ave and Replace Outlook ex 968 Ave,LF Glenbrook SS to 10" and HDPE Yorkshire, and ex.Grand 1965 LF and SS walker. to 8" HDP On S LakeShore Avenue between Mandana and Portal St. Replace ex. 730 LF SS to 21.5" OD HDPE and ex 1520 LF SS to 18 Contract A - District 1,2,3 In general, the proposed work consists of repairing official tree-relat 6510 Outlook Ave, 2802 68th Ave, 3924 Edenvale Ave Replacement of 1,700 lf of 8"SS with 10" HDPE by pipe expanding t Citywide In general, the proposed work consists of repairing official tree-relat MacArthur Boulevard, Montana Avenue, Pleitner Avenue, Nicol Rehabilitation Avenue, Berlin of 19,011 Way,lineal & Curran feet of Avenue existing 6-inch, 8-inch, 10-inch Area bounded by San Leandro St, Seminary, International Blvd Sewer and and 66th manhole Ave rehabilitation; easement adjacent to San Leand Citywide Plan for the upgrade of the City's sanitary sewer and storm drain pu 25th Street and MLK Improvements to an existing park will include the addition of two chi Jones Ave, 98th Ave and Edes Ave Rehab 16,000 LF of 8" SS and 80 structures. Various Locations 1428 Alice Street Citywide International Boulevard @ 21st Avenue Citywide Citywide 98th Av/Birch 1000 Oak Street International Boulevard @ 4th Avenue 21st Street and Harrison Street Hearst-Lincoln/Laguna Easement btwn Morgan and Carlsen 6601 Exeter Drive 6691 Shepherd Canyon Road Park Blvd between Leimert and Monterey Blvd. 1000 Oak Street Ridgemont Drive

Replacement of sanitary sewer lines near 4100 Redwood Rd., 1205 Modify mechanical and electrical systems for Studio One's classes. On an as requested/needed basis, traffic control and calming devic Install a new traffic signal to improve pedestrians, bicycles and vehi The project will rehabilitate streets by slurry sealing approximately 4 The project consists of resurfacing approximately 14 centerline mile Remove and replace, or pipe expand 387 LF of EX. 6" SS pipe 360/360/1070lf-8"pipe/16"liner/21"liner Improvements to: Classroom, education entry @ 10th Street, 1st flo Install a new traffic signal for vehicles, pedestrians and bicycle safet Install a storm water trash separator at the intersection of 21st and H 908lf-8"vcp Rehabilitation of 590 LF of 8"SS and 5 structures Repair of erosion and construction of new storm drain pipes. ReConstruction of a Failed Retaining Wall Create Bike and Pedestrian Trail linking the Oakmore and Montclair Renovate restrooms on 1st and 2nd floors, move security offices to Existing storm drain pipe outfall to open space. Divert drainage to e

Page 32

qryAllProjectsAndCCO

1447 Mandela Parkway Construction of an open space landscaped area that acknowldeges Area Bounded by Telegraph Ave, 24Th St, Lee St, HarrisonReplace/rehab St and 20Th St. of approximately 30,350 lf of SS lines in Subbasin 52 High-Pampas/Hwy 580 699/2726lf-8"vcp/8"liner Midvale Ave., I-580 FWY, Laurel Ave, & Carlsen St Rehab 14,580 LF of 8" SS and 68 structures. Beaumont Ave. from E30th St. to E. 33rd St. Relief sewer along Beaumont Ave. from E30th St. to E. 33rd St. Bancroft Avenue @ 57th Avenue & Trask Street New Traffic Signal Shetland Ave, Malcolm Ave, Scotia Ave, and Skyline Blvd. Rehab 13,789 LF of 8" SS and 75 structures. Citywide Improvements On going traffic improvements at railroad crossings including signs, Mountain Boulevard @ State Route 13 Northbound Ramps Install (near Park a new Blvd traffic - Scout signal Road) to improve traffic safety. The intersection 14th Avenue @ E.29th Street and 19th Avenue Installation of new traffic signal to improve traffic, pedestrians and b Martin Luther King Jr. Way @ 53rd Street Installation of new traffic signal to improve traffic, pedestrians, and b RR Ave. from 85th Ave. to Louisiana St. Raise the road, construct new sidewalks and storm drainage improv Grizzly Peak Boulevard Install 300 feet of guardrail per City Council request-See C231410C Grizzly Peak Bl, Snake Rd, Marlborough Ter, Golden Gate Tot Removal Lot, Hillmont/Altamont of existing damaged guardrail, installation of new metal be Franklin St, 3rd St, Broadway, and 11th St Rehab 8,635 LF of 8" SS, 277 LF of 10" and 428 LF of 14" SS and 6

Easement between Delmont and Oakdale Replacement of 810 LF of 8" by open trench and 10 appurtenant str Embarcadero & Grand Avenue Renovation and re-roofing of the historic pergola/colonnade. Lakeshore Avenue and East 18th Street Reconstruct the Historic East 18th Street Pier Overlook Various Fire Stations 1. Station 15 replace concrete apparatus apron. 2.Stations 4,6,26,2 On Lakeside Drive from 14th Street to Madison Street. Site Municipal improvement Boathouse work around site improvements. the Municipal Boathouse. Renovation of 4 acres of p East 18th Street from Lakeshore to Park Avenue Construct gateway and streetscape improvements along E18th Stre Lakeshore Avenue and East 18th Street On Lakeshore Ave, reduce from 4 lanes to 2 lanes , add Class 2 bik 666 Bellevue Avenue Retrofit existing irrigation systems in Lakeside Park with a (compute Pleasant Valley Btwn Lawlor & Burr Sts 1551 Embarcadero East Connect the Waterfront Trail from the Marine Max facility to the Exe 1601-1817 Embarcadero East Improvements to the existing trail with ammenities from the Brookly 1899 Dennison St. Construct a new park north of Union Point Park and south of the Cr 2311 Embarcadero Improvement for a new 6-acre park along the waterfront. Park elem 1000 Oak Street Demolish existing planter at 3rd floor terrace outside cafeteria and i 699 Bellevue Ave. Various improvements including new pavilion, expanded puppet the Mountain Boulevard and La Salle Avenue. Install a new traffic signal for pedestrians, bicycles and vehicular tra High Street at Santa Rita Street Installation of new traffic signal to improve traffic, pedestrians and b 2842 London Road Construction of 160lf of 12"SD to connect storm drain pipes. Wild Currant Way Rehab of 561 LF Sewers and structures. Along Hegenberger and 98th Avenue between I880 and theThe Airport. project is funded by energy efficiency Grant through the Environ 453 Merritt Avenue Phase 1 to restore Cleveland Cascade; install hand railing and guar 27th and Valdez, 22nd and Valley Install CDS units at locations designated by the Environmental serv Park St. Triangle Analyze bike, ped, railroad and vehicular traffic in the Park St. Trian Patterson 1520 Lakeside Drive Rehabilitation of the historic boathouse building core and shell. Upo 568 Bellevue Avenue in Lakeside Park (Lake Merritt) Replace balcony Rhoda 751lf-8"vcp Perform base repair and crack sealing preparatory treatments, pefo 666 Bellevue Avenue Installation of pipeline system, new fire hydrants and related work in 12th Street at the Lake Merritt channel Removal, disposal, and protection of trees Citywide Install and maintains disabled parking zones (DPZ) or blue zones in 1700 50th Avenue Construction of a new replacement fire station on the same site of t Burkhulter Park 5366 College Avenue Create dedicated teen area inside library. City Wide Caltrans conduct bi-annual inspection of all City of Oakland bridges

Page 33

qryAllProjectsAndCCO

On Adline Street at 3rd Street Repair of Abutments and replacing Expansion Joints Citywide The stairs and paths in the City are being surveyed by trained volun Citywide Install pedestrian countdown signal devices at existing signalized in Citywide Capital Improvement Program, 2007-12, Pedestrian Streetscape Pr Citywide PCC work: repair and replace sidewalk, driveways, curb and gutter, between 7257 and 7293 Skyline Boulvard and above 6770 Oakwood Temporary Drive emergency roadway opening and permanent restoration Citywide Construction of 230 curb ramps, plus ancillary repairs to adjacent si Citywide. Signal timing coordination projects being implemented along:1. 98th Citywide Provide new or upgrade of traffic signals with state-of-the-art techno Oakland Senior Center, 200 Grand Avenue Replace the heavy double doors for ADA. Upgrade the electrical sys Foothiil Blvd between 61st Ave and 69th Ave Convert Foothiill Blvd between 61st Ave and 69th Ave to a road diet 2631 11th Avenue Construct new restroom building in park. A restroom needs to be b 6201 Buena Vista Installation of app. 250 LF of curb and gutter from 6210 to 6241 Bue Citywide 280 concrete curb ramps (all types) and the replacement of 28,000 1 Frank H. Ogawa Plaza (City Hall) Upgrade, replace and retrofit audio visual equipment in both the Co MacArthur, 64th, Simson St, 72nd Ave (SUB-BASIN 84-104) Rehab of approximately 25,000 linear feet of sanitary sewers Citywide Ongoing traffic signal timing and coordination program. Citywide The program funds streetscape elements that improve pedestrian s Citywide The Neighborhood Traffic Safety Program (NTSP) encompasses tra Citywide. Program covers all city streets and not just residential Traffic neighborhoods Safety Section as inprojec TSD conducts title may research suggest. and investigation in Seminary Ave/Avenal Ave, International Blvd/36th Ave, Piedmont To install Ave/Linda 3 new traffic Ave, Ped signals Countdown and modify Signals. existing pedestrian signal International & 50th Ave, Citywide Guardrail Installations, and C313620 Guardrail Install On-Call. a traffic signal at International Blvd/50th in Caltrans Fruitvale Ave/School St (north), Foothill Blvd/34th-Coolidge Install Ave, High a traffic St/Porter signal St, at San 3 intersections Leandro St/Seminary to improve Ave, safety Webster for vehicula St/1 Citywide The project is the second phase of the city's traffic management ce Citywide Emergency Repair sanitary sewers citywide. North of EBMUD reservoir site, near 6253 Fairlane Drive Restore the roadway north of EBMUD reservoir cul-de-sac. Restore 9700 'C' Street Design new tot lot along C Street for the purchase/installation of new Along Mandana Blvd and Easement Adjacent to Paloma Ave Rehab/Repalcing approx. 830 LF 8" dia ex. Sewer pipe with 10" dia Potomac/Easemt Carmel Telegraph Sunkist / Hillmont 287lf-8"pipeEP Conduit #18 Diaz Pl Redwood, Willis, Norton 1,745lf-10"ciplp,Gelco E 11th betw Miller Sunshine Court - Crossing International Blvd and 76th Ave The work includes removal and replacement of roadway, installation 470 El Paseo Drive Install new restroom structure and new accessible pathways from P 66th Avenue Shattuck betw 59th-55 E 18th betw 6th-7th Carlson, Paramount 7701 Krause Avenue

Easement between Whittle Ave. & Lincoln Ave. and Easement Rehab between approx. Melvin 1,420 Rd. LF&ex. Braemar 8" SS pipe Rd. with 10" HDPE, rehab sewe

Easement between Saroni Drive and Ridgewood Drive Rehabilitate 757' of sewer pipe Madrone Ave/Pampas In the easement by Knowland Park Rehab of approx. 2,265 linear feet of sanitary sewers pipes by pipeEasement of Colton Blvd, and Easement Between Doncaster Replacing Pl & Valley approximately View Rd, and 1633 on Mandana LF of sewer Blvd pipe, btwn installing Calmerapproxim & Palom 21st., 33rd. St. Easement behind 99Th Ave and Stearns Ave, Easement behind Rehab 2525 of approx. Cherokee 1,255 Ave LF and ex.by 8"9530 SS, rehab Lawlor sewer St structures and re Easement of Oak Knoll from Sage Rd and adjacent to St Andrew Replacing Rd. approx. 975' of ex. 12" dia CMP with new 14" dia HDPE p Easement between Saroni Dr and Chamber Dr and Easement Replacing between approx. Paso Robles 1,220 ex Dr8" and SSSayre pipe with Dr 10" HDPE, rehab sewer

Page 34

qryAllProjectsAndCCO

Easement Between Moore Dr & Aitken Dr, Easement Between Rehab Saroni approx. Dr &1,170 Arrowhead LF of saninatry Dr, and Easement sewer, reconnect Betweenhouse Glencourt sewe D Citywide Roadway and Slope Restoration Citywide PCC - curb & gutter and sidewalk repair, installation of ADA curb ra Broadway Terr/Taurus Castle Park Way/e Citywide Restoration of public roadways and appurtenant structures in City ri Between Heather Ridge Way and Thornhill Dr. Rehab 1,016 LF of SS and structures Citywide Install 300+ bicycle racks citywide with an emphasis on commercial Temescal Pool Minor renovations to men's and women's locker rooms. 6833 International Blvd. Renovations and ADA improvements to the existing library facility. Arroyo Viejo Recreation Center Various items. Priority 1-Remodel kitchen to meet Health Departme Defremery Recreation Center Roof replacement Garden Center Refurbish and revarnish wood walls, and paint Between Amy Dr. and Heron Dr. Rehab 602 LF of SS and structures 5000 Redwood Rd. Softball Field Imrpovements including new drainage, irrigation, sod, 1635 Fruitvale Avenue Synthetic Turf field complete. Design / Construct recreational eleme 1635 Fruitvale Avenue Develop a master plan for the park. 1635 Fruitvale Avenue Construct a basketball court, provide loop walk path inside park, p 250 10th Street Develop a plan for the "Alice Street" right-of-way with an artificial tur 388 9th Street, Suite 190 Provide secured direct access from library to existing shared public Intersection of 107th and Sheldon Repair Roadway and replace sidewalk and curb and gutter at Inters Fremont Pool-4550 FoothillBlvd Installation of new security fence around the perimeter of the pool a Firestations various Replace firestation doors due to improper functioning 6300 Moraga Avenue Remove sand from existing two tot lots, replace with rubber surfacin 1250 Kirkham Street Installation of new Kaboom! Tot lot 666 Bellevue Avenue New ADA ramp for the Edoff Bandstand located at Lakeside Park Arroyo - 7701 Krause Avenue Rainbow -5800 Arroyo International - Create Boulevard new tot lot with new play equipment and resilient su 655 International Blvd. ADA upgrades to existing facility, inlcuding upgrading one set of bat 3612 Webster Street, Mosswood Park, Oakland Replace Floors throughout the center; Replace Drapes in dance stu Lake Merritt Boat Dock Repair and replace three floating lanuch docks on water side of the Shepherd Canyon at Shelterwood, Shepherd Canyon at Banning, RepairShepherd the sinkhole Canyon at the at intersection Tiffany of Shepherd Canyon and She Different Locations Roof Repair/Retrofit Oakland Main Library Install a new fire alarm system for the first and the second floor of th 1428 Alice Street Replace Roof, including insulation board, gutters, and flashings, and Different Locations Replace of damaged vinyl asbestos tile flooring with vinyl compositio 36th Street 2535 High Street Replace the existing roof with new asphalt shingle roof. And to repla 1021 - 81st Avenue New 22,000 sq ft library joint-use library on site of new two OUSD e on Mountain Blvd behind 34 Oval Rd Slide on the private property. The property owner claims slide was 11450 Gold Links Road Construction of a new Golf Course Cart Barn for compliance with cl Blair Ave. and Wood Dr. Rehab 4,900 LF of SS and structures Mandana Blvd and Paloma Ave, Easement Between Parmount Replacing Rd and Approx Carlston 850 Ave, lf ex. in 8" the dia Easement VCP with of10" 6101 dia Estate HDPE, Dr reconne and at Glenbrook Dr & Beechwood Dr Rehab 1,350 LF of 8" SS and structures Jean St and Elwood Ave. Hood St and Easement between Rehabilitation Hood st and Broadmoor of approx. View. 1916 LF of main SS and sewer structures Harbor View Bet. Carson & Huntington St and Easement Bet. Replacing Elbert & 650 Glendora lf of ex St 8" SS and 110 lf of ex 10"SS, sewer structure Citywide Perform PCC repairs on sidewalk damage caused by City Ots, repa Firetrail behind Castle Drive Phase A includes construction of drilled reinforced concrete piers, m Citywide: Golden Gate/Bob Mason Field, Franklin Park Field, Renovate Poplar Field, 7 existing Brookdale park ballfields Park Field, to provide Centralgirls'softball Reservoir, Arroyo program: Vie Brookdale Park Field improvements inlcuding drainage treatment in center field, new 66th, 69th and San Leandro Street Improve sidewalk and pave track approaches at 66th and 69th Ave 173 Hunter Building rehabilitation/Dry rot repair 3501 Adeline Street

Page 35

qryAllProjectsAndCCO

250 10th St. Make ADA improvement to Rec Center for Emergency Shelter. Inc 2528 Coolidge Ave. Improvements include design and partial construction of the Activity Easement bet Evergreen Lane and Slater Lane Repair and replacement of sanitary sewer main and manholes withi Shepherd Canyon Storm Drain from Banning Drive to GunnRehabilitate Drive the existing storm drain system Between 7257 and 7293 Skyline Boulvard, above 6770 Oakwood Permanent Drive roadway restoration and slide repair 491 Hardy Street Design and install a 1 stall unisex restroom structure at Hardy Park. Behind 333 Lancaster along the Estuary Install security-lighting along the estuary to deter vandalism. 3675 Alameda Ave. Construct a new Waterfront trail on grade from Alameda Ave. to a s Citywide Citywide Alvarado Road near Slater Lane Sanitary sewer and manhole repair and replacement within the ease Citywide Install 66 bicycle racks at locations throughout the city. El Centro, Trestle Glen, Fleet Rehab 733 LF of 8"SS and structures Marr Ave and Blair Ave Rehab 340 LF 8" SS and structures Mark St, Hood St and North End Rehab 392 LF of 8" SS and structures El Centro Ave, Park Ave and Dimond Park Rehab of 774 LF of 8" SS and structures Easement bounded by Linwood, E.38th, La Cresta & Hampel; Sanitary Easement sewer bounded repair and by Park, replacement Hampelwithin & Greenwood the easement bounde Oakwood Dr.& Skyline Blvd. Rehab 855 LF 8" SS and structures Easement between Evergreen Lane and Alvarado Road Sanitary sewer and manhole repair and replacement within the ease Broadway between MacArthur & College Avenue Improvements to the medians along 16 blocks of Broadway includin 9920 Empire Road

Grand Ave 666 Bellevue Avenue 470 El Paseo Drive

Rehabilatation of 3,300 linear feet of existing pathway and selective Richmond Blvd, Panama Resurfacing and base repair 1st Ave Broadway at 28th Street On Shepherd Canyon, next to the Soccer Field Installation of Traffic Signal Extend the existing parking lot to accomadate additional 20 cars

Flemming St. Between High and Monticello Rand, Beacon

Rehabilitation of a Path from Joaquin Miller School to Ascot and Mo Develop Conceptual plan and preliminary estimates

3,873 lf of 36" sewer 2535 High Street 2535 High Street 125 14th Street

3612 Webster Street San Leandro 39 & 40

Page 36

qryAllProjectsAndCCO

Olive, 78th. 3131 Union Street District 5 and Citywide District 6 and Citywide District 7 and Citywide Citywide 9920 Empire Road Lake Merritt

Re-line/repair existing storm drain system at Municipal Service Cen Provides annual appropriation to the Council member to fund discre Provides an annual appropriation to the Council member to fund dis

Provides annual appropriation to the Council member to fund discre Provides annual appropriation to the Council member to fund discre

Phase 1 of the Lake Merritt Bird Island Restoration and Demonstrat Construct parking lot adjacent to Joaquin Miller Community Center

810 Jackson Street 1801 Adeline Street

Install inlet filters at MSC buildings. Environmental coordinator is M Grade and remove turf; repair turf and irrigation; install asphalt and Replace the exterior wood siding of the building with stucco, and rep

Arroyo Viejo Recreation Center Conversion of the two offices to digital & live recording studio. 1427 88th Avenue Construct ADA compliant public restroom and other various ADA up Chinese Garden Paint and add tiling to building. Bid alt. includes painting pagoda an East side of Broadway from West Grand Avenue to 24th Street Construction of concrete curb and gutter, tree wells; installation of n

City of Oakland

Instal new Permit and Code Enforcement Tracking software New parking lot and access road for the "Redwood Bowl" area (Eas

5166 E. Montclair Plaza Lane District 4 and Citywide District 3 and Citywide

Provides annual appropriation to the Council member to fund discre

Provides annual appropriation to the Council member to fund discre

District 1 and Citywide 59th & Shattuck 998 42nd Street

50' of 8" Sewer Provides annual appropriation to the Council member to fund discre Improvements to the frontage of Bushrod Park including a new stair Remove existing sand and equipment in Tot Lots and replace with A

Page 37

qryAllProjectsAndCCO

District 2 and Citywide Grand Avenue 10 - Tenth Street Covour at Clifton

Provides annual appropriation to the Council member to fund discre

10th, 11th, & 12th Coolidge Ave. E.12th. Street E16 St Miller & 25 Ave 10 - Tenth Street Ext. E. 23rd St. 34th Street 94 East Tenth Street Wood & 9th Sts. 1719 Franklin Street 81-202 Mac Arthur 1000 Oak Street

10 - Tenth Street 1000 Oak Street 2025 Broadway

3304 Joaquin Miller Road 3304 Joaquin Miller Road 1000 Oak Street

Page 38

qryAllProjectsAndCCO

3860 Hanly Road

7000 Coliseum Way 3711 Suter Street 4550 Foothill Boulevard

1 Frank Ogawa Plaza

Mountain Blvd. 1233 Preservation Parkway Lowell - Adeline

1000 Oak Street 1000 Oak Street 1651 Adeline Street

3860 Hanly Road 1428 Alice Street Pershing & LaSalle Ney Ave Citywide

Citywide Pedestrian Safety Program 1719 Franklin Street Citywide 1000 Oak Street

Lawsuit mitigation. Approx 250 lf, 4 point repairs Creat database with Survey results of all intersections citywide and Replace 1,743 lf of 12" VCP; rehabilitate 7 sewer manholes; and rel This project contributes local funds for federally funded projects. Installation of a retaining wall. Washout repair of the roadway embankment due to a break in the E Construct a retaining wall and restore the slope Drainage improvements on 6th Ave. between E. 10th and E.11th. S Installation of new traffic signals and signal modicaiton citywide, to i Replacement of one elevator and the repair of one elevator in the F Citywide emergency repair of storm drainage system

Page 39

qryAllProjectsAndCCO

Citywide (based at 150 Frank H. Ogawa Plaza) Citywide (based at 150 Frank H. Ogawa Plaza) City of Oakland Citywide (based at 150 Frank H. Ogawa Plaza) City of Oakland (based at 150 Frank H. Ogawa Plaza) Citywide Citywide (based at 150 Frank H. Ogawa Plaza) 1000 Oak Street Oakland hills Sonoma Way from 22nd Ave. to Dead End Citywide

Provides funding for the replacement of the current version of Oracl Upgrade the Oracle applications from Version 10.7 to 11i. The obje Provides for the replacement of the current CEDA Loan Servicing a Update of City of Oakland GIS Parcel Layer. Will pay for the actual costs of physically installing the new, leased S Reduces direct governmental costs by transitioning Automated Coll Reduces direct governmental costs by transitioning Business Licens Install an automated, mechanical dust collection system for the Mus Management of vegetation in the wild land interface areas. This con Construct 270 lf of new 8" sanitary sewers and apputenant structure 3 - $250,000 contracts. Can be extended until next FY if needed

International Blvd from 40th Avenue to 98th Avenue MacArthur Blvd from 73rd Avenue to Durant Avenue 14th Avenue from E. 8th Street to E. 19th Street

Project includes new bulb-outs; sidewalk, curb, and gutter; storm dr Project includes new bulb-outs; sidewalk, curb, and gutter; landscap New streetscape - bulbouts, sidewalk, curb, gutter, ac paving, traffic

Virgo Road 1 Castle Park Way

Construction of retaining wall in Virgo Road. Rehabilitate line in front of 1 Castle Park Way as part of settlement Provides streetscaping improvements on Millsmont/MacArthur. Imp Oak St, Poplar St, Florida St, Locarno Path, Easement Between: Repair Acacia and rehab Ave and at various Margarido locations. Dr, Manzanita Replace Dr 1200 and lf Skyline 8"; slipline Blvd 30 Oak St between 9th and 11th Work added Various Locations Project. See C171110 Citywide Street Resurfacing Citywide Street Resurfacing 1719 Franklin Street An electronic geographic information system (GIS) mapping and inv Grizzly Peak/Skyline 1000 Oak Street 1000 Oak Street Multiple Locations City matching funds for Safe Routes to School Cycle 1 project. Pro International/27th New traffic signal 250 Frank H. Ogawa Plaza Aconstruct Transportation Management Center (TMC) at 250 Frank Brentwood and Melvin Investigate and repair leaking SS structure Pinehaven Road, Valley View Road Install approx 1000 lf of 8" liner, MH, LH and CO rehab/replacemen Install curb inlets at the intersection and install underground drainpip 6835 Thornhill Restore the slope using geotechnical recommendations. Install new Wood Drive Repair of approx. 3,171 LF of SS on Wood Drive between Harbord E.15th St. from 18th Ave. to 19th Ave. Construct approximately 140 lineal feet of 8" SS and appurtenant st 13560 Skyline Blvd. Improvements to existing structures. 150 Frank H. Ogawa Plaza, 8th Floor Upgrades of the HVAC system to the Data Center on the 8th floor o 1401 - 98th Avenue

Replace and repair 4 flights of stairs in the Oakmore District. These Replacement of two flights of wooden stairs with cantilevered timbe Eucalyptus Path and stair is 400 feet long connecting upper Repair Alvarado of 400 Road LFwith of Eucalyptus lower Alvarado Path and Road stairwhich connects uppe Intersection of Rockridge Blvd and Margarido Repair and replace one flight of concrete stairs between Rockridge Believe :WO#1 Eucalyptus Stair ($20K) Citywide Miscellaneous construction and repair of public infrastructure. 6943 Buckingham Blvd Restore the washout area by installation of a rock-filled buttress and Various Locations Project was established to allow for rapid response for emergency s

Page 40

qryAllProjectsAndCCO

Drainage improvements at 6000 Block of Buena Vista 13560 Skyline Blvd. 23rd Ave. between E. 17th Street and Foothill Blvd.

Design of a surface drainage solution to reduce the impact of pondi Phase I: Construction of 2 new paddock structures. Phase II: Cons Re-grading of the existing play field, installation of a new subsurfac

MacArthur Blvd. between 35th Ave. & High St. (Laurel Streetscape Construct Project) Bulb-outs, reconstruct crosswalks, plant trees, install stre 11th Street, between Clay and Broadway Widening the street, redo the sidewalk, grind and repave roadway b On Telegraph Avenue between 18th and 20th Street Construct bulbout and install new street lights on the west side of Te 3612 Webster; 1969 Park Blvd; 3860 Hanly Road Joaquin Miller Road & Castle Drive 1650 45th Street 1418 Lakeside Drive 1701 East 19th Street City of Oakland (based at 150 Frank H. Ogawa Plaza) 2528 Coolidge Ave. 1390 66th Avenue 3594 Sanborn Road 3300 Joaquin Milller Road Joquin Miller Road 1637 Fruitvale Ave. Citywide 250 Frank H. Ogawa Plaza (Dalziel Building)

Kitchen renovations to comply with County Health requirements at M Stabilize creek, install bridge, replace existing culvert, repair Sunset

Replacment of the pool shell and pool deck, and renovations to the Exterior Paint, Window Retrofit, and repair of the historic façade ele Renovation of the multi-purpose playing field, existing tot lot and pla Replacement of mobile and portable 800 MHz radio equipment. Thi Improvements to provide new multi-purpose lawn area with native g Renovations to the Greenman Baseball Field and the construction o Addition of a greenhouse (12' x 18') and two storage buildings (10' x Grading and installation of a new 5000 s.f. children's play area. Landscape improvement at Woodminster Cascade, replace irrigatio Consist of constructing a new community center with adjacent site i Provides annual appropriation to the Mayor to fund discretionary Ca Retrofit and upgrade of Master Control facility. Standardize equipme Provides streetscaping improvements on Eastlake/International Blvd 1010 E. 15th Street Modify and upgrade the men's restroom 9TH AVE/MERRA ST Constaruction of Sanitary sewer in easement between 38th and 39t Macarthur Boulevard between 73rd and Sn Leandro Border, Widening and International of sidewalks, Boulevard Construction from 40th of to Medians, 89th at Installation different nodes. of ped

Replace 478 LF of 6" with 8" HDPE by trenching or pipe expanding Replace two sewer lift station pumps. Replace broken storm drain and sanitary sewer.

MacArthur btwn Fruitvale and Canon 10 - Tenth Street 1000 Oak Street

Construct on-call requests for curb ramps.

Bywood Dr., Wellington St., Laguna Dr., Rosemount Rd.

Rehab/Replace ~300lf of broken SS main in easements and street Replace 1,520 lf of 8" sewer pipes with appurtenant structures

3,060 Butters Dr

Construct 30 lf of 24" RCP storm drain, manhole and outfall channe Rehab 1,700 L.F. of 8" SS and structures

1000 Oak Street

Page 41

qryAllProjectsAndCCO

Harrison to W Grand Ave 14th Street & Willow 77th Ave

Harvest Algae in Summer Install 3400 LF of 54" pvc liner to rehabilitate existing sewer.

1428 Alice Street 1428 Alice Street Varies throughout the City.

This project provides accommodations to individuals with disabilities

1309 - 66th Avenue

Citywide Conduct Engineering and Traffic Survey for every City street that re International/25th, Broadway/Broadway Ter and Broadway/College New traffic signals and signal modificatons Various locations citywide Fruitvale and various neighborhoods Broadway: 17th St. to 20th St. Near 5985 Buena Vista Avenue Chinatown Chinatown Area 1000 Oak Street Citywide International Blvd at 103rd Avenue Broadway/Broadway Terrace and Broadway/College

The project includes the contruction of traffic islands, bulb-outs, traf Offers business and property owners matching grants (one-to-one) 8,575 sf SW replacement incl. Waterproofing over ex. Basement va Re-design of the street, curb, and gutter to improve drainage in the Pedestrian improvements in the Chinatown area of Oakland. Traffic Pedestrian improvements in Chinatown including a new traffic signa Emergency project to replace existing storm drain. Gallery and systems renovation and general building improvements A citywide continuing program to install traffic islands, barriers, and Installation of new traffic signal at International Blvd at 103rd Avenu New traffic signal and signal modificatons-See C159310/C160210

Citywide Provides on-going engineering design services for various short-ter 10 - Tenth Street Area Bounded by Valejo St, 63Rd St, Adeline St and Arlington Rehab/replace Ave. of approximately 19000 linear feet of existing sanitar Rehab approx 1,300 LF sewer, 5 MH and 50 laterals in easement b 29th Avenue & Chapman Street Restoration of the Berm on 29th Avenue between Ford and East 7th Concrete curb and gutter and drainage inlets. Remove ex. cross culvert system and install inlets and underground

Study of drainage along Underhills to direct maintenance on the upc Construction of 87 LF of 12 inch RCP and Rehab of exist 24 inch C

Abandon existing system and route the new storm drain within the C 463 - 51st Street 1520 Lakeside Drive 29th Ave Grande Vista/E27th International/25th Grand Avenue at Lake Park Avenue.

Video Inspection of Sewer along 29th Ave Replacement of 593 LF of 8" Sanitary Sewer pipes; replacement of New traffic signal-See C159310/C160210 Complete renovation of the landscaping, irrigation, hardscape, pavin

Page 42

qryAllProjectsAndCCO

Area Bounded by Macarthur Blvd, Patterson Ave, ReinhardtSubbasin Dr, Carson 81-014 St and rehab Mandrone - approx. St. 10400 lf of rehab/replace of existin MacArthur Blvd., 73rd Ave., Sunkist, 75th Ave. Rehab 13,459 LF of 8" SS and 91 structures.

Area Bounded by Crest, Michigan and 82nd Ave and Macarthur Rehab Blvd SS in Subbasin 84-112. Approx. 14000 lf of sewer line to be Rhoda, Steinmetz, Maple Ave Rehabilitate 9,500 lf of 8" sewer main; replace laterals; rehabilitate a Vallejo, 67th, San Pablo Ave and 59th St Rehab 15,888 lf of SS and structures Citywide The Neighborhood Traffic Safety Program is a continuing program t Construction of private SD

2528 Coolidge Avenue

Market Street from MacArthur Blvd. to 57th Street Design and install a Class II/III bike lane facility on Market Street. Citywide Install and/or replace existing pedestrian signal heads with countdow 5050 Coliseum Way, 7101 Edgewater, #4 Install new emergeny generator to provide uninterrupted power sup Broadway Phase II SW Project: 14th & Broadway Transit Ctr. 18,606 Streetscape sf SW replacement incl. waterproofing over ex. basement va 7040 Chabot Road 5 Embarcadero 40th Street between MLK Jr. Way and Telegraph Ave. Installation of bike lanes, traffic signal lights and streetlights, constru Streets with fading bike lanes and stencils throughout the City Restripe and restencil existing bicycle lanes, and replace damaged 2666 Mountain Boulevard 6000 Shepherd Canyon Road Grand and MacArthur Corridors. Traffic signal and advanced transportation management system imp Citywde street resurfacing Scope of work consists of milling, AC overlay, repair of damaged sid

Roadway Restoration near 6721 Armour Drive Roadway stabilization w/ retaining wall & drainage improvements. C Watercourse (inlet area) restoration near 2300 Arrowhead Remove the loose materials and protect the slope with erosion cont Roadway Restoration near 6868 Balsam Way Stabilization w/ retaining wall. Construction of retaining wall includes The project is bounded by 7th St., 10th St., Broadway, and Harrison Pedestrian St.Improvements including bulbouts; scramble intersection Citywide Resurfacing of tot lot play areas at Montclair Western Town and Dim San Leandro Street from 66th to 73rd Avenue (Coliseum Transit Streetscape Hub Streetscape improvements Project) including new medians, traffic signals, o Broadway between 3rd and 20th Street Upgrade traffic signal controller, interconnect signals and install tran Resurfacing of Coolidge Ave, E 15th St, Mandana Blvd, andThe 38th project Ave consists of street resurfacing with rubberized asphalt on

81st & Olive Streets 1055 MacArthur Boulevard 2535 High Street 250 10th Street Grand Ave from Harrison to Euclid and Harrison/21st St 6th Ave at East 12th Street 660 Bellevue Avenue 1360 MacArthur Blvd. 3860 Hanly Road 2960 Peralta Oaks Court Market St @ Brockhurst & 33rd St, Foothill Bl @ 9th, 10th 600 Bellevue Avenue 3838 Aliso Avenue Drainage restoration near 1829 Gaspar Drive

Renovation of the exisitng junk ship playground sturcture and relate Install pedestrian bulb-outs at serveral intersections along Grand Av Renovate existing tot lot and replace play structure Repair and replace the damaged and/or deteriorated portions of the Replacement of pool deck and related work Replacement of pool deck surface and other related work Replace the roof of several buildings in the Dunsmuir House & Gard &Install 40th Av, pedestrian E. 12th St bulb-outs @ 37that Av serveral and High intersections St @ Courtland near Av schools an

Stabilization w/ slope reconstruction w/ rockfill & CIPP or replace SD

Page 43

qryAllProjectsAndCCO

5th & Embarcadero Lake Merritt Bird Islands Roadway Restoration near 3455 Dwight Way

Paving of parking lots and adding of signage and fencing are compl The Lake Merritt Bird Island Restoration and Demonstration Wetlan Retaining wall with piles embedded in concrete, lagging, guard rail,

Roadway restoration in the 2000 block of McKillop Roadway major retaining wall repair along McKillop Roadway from E29th to 2 Creek bank restoration and roadway stabilization near 7848Creek Claremont bank restoration using Redi-rock and roadway base, surface, Roadway restoration near 545 Dwight Place Concrete stitch piers, retaining wall, or a combination of both, and A

Tunnel Rd. between Hiller Dr. & Norfolk Dr.

Storm Drain Improvements incl. new inlet, new pipe, new pipe outfa

559 16th Street, Henry J. Robinson Multi-Service Center (HJRMSC) The project consists of re-roofing, removal of a skylight, equipment Citywide 9736 Lawlor Street

Street pavement rehabilitation, including: repair of damaged PCC si

Several locations: Glascock from Peterson to Derby, Derby Project from Glascock includes to sidewalk, Ford, Lancaster curb & gutter from Glascock improvements to Chapman, to Lancaster Cha On W. Grant Between Willow St and Maritime St. Sealing bridge deck, repair of joint and rialing Vic and Clarewood Work consists of lining 340 linear feet of 30-inch RCP storm drain a e and the dining hall Dry rot Repair, interior refurbishing and improvement of the 14 resid Roadway restoration near 7155 Marlborough Terrace Rebuild 80'x12' roadway section, construct 20-30' ret. Wall adj to ex 200 Grand Avenue Roadway restoration in the 6200 block of Skyline Blvd. Stabilization w/ geogrid reinforced buttress fill. a combination of fabr Rodway Restoration near 7969 Skyline Install retaining wall & repair existing SD. Retaining wall work includ Draiange watercourse restoration in an easement behind 7589 Rock-fill Hansom slope Drive stabilizations Creek/watercourse and earth dike repair along Larry Lane near Excavation, Ascot Drive offhaul, restoration activities and possible installation of Watercourse inlet structure restoration near 2120 Mastlands Installation of an erosion protection device, wing-wall with splash pa Stabilization w/ cantilever soldier pile/lagging wall. Construction of Rodway Restoration on Tunnel Road above caldecott Lane 35' retaining wall plus possible ancillary drainage improvements. Co

Roadway restoration on Claremont app. 3/4 mile N/E of Alvarado Stitch Road piers, retaining Wall, or other methods as recommended by th Elverton near Thorndale Emergency stabilization w/ slope reconstruction w/ rockfill plus . Con Repair of sinkholes on Shpherd Canyon near Escher Road Short-Term: 2 20' point repairs. Backfill with bedding materials and Roadway restoration on Thornhill Drive at the intersection of Retaining Heather Ridge Wall at Way 2 locations; restore roadway, storm drain and san Roadway restoration near 6227 Westover Install a retaining wall in R/W to protect public roadway; repair road Roadway restoration near 6245 Westover Drive Regrade roadway, installation of retaining wall or stitch piers Citywide Citywide Maintenance and Repair of bridges Five intersections located along routes to four elementary schools.

Investigation & monitoring of a washout/slide above 1300 block N/A of City's Alvarado consultant Road is monitoring the slope to protect roadway and Rehabilitate existing sewer.

Citywide

Redirect storm flow on Ridgmont Drive to minimize peak runoff to C Construct new storm drain This project funds design of streets based on on call needs.

Page 44

qryAllProjectsAndCCO

Citywide locations The Street Hazard Elimination Program identifies high accident loca Multiple Locations in the Downtown area. The project includes the upgrade of 3 to 5 existing traffic signals wit Grand, Broadway, 20th, Harrison, Fruitvale, High & MacArthur Installation of GPS clocks at over 30 intersections for traffic signal c Stanley Place and Fairmount Ave. Rehabilitate by liner method 685 lf of existing 8" VCP sewer pipe; re

Citywide Roadway repair near 2333 Tunnel Road

Retaining wall construction and roadway restoration as a result of sl Installation of drilled piers, lagging, backfill, and roadway pavement

Rehabilitate existing sewer 14th & Broadway 6300 Moraga Avenue Adeline St from 60th to 61st Streets

ADA upgrades of the exisitng recreation center. Work consists of th Repair of 500 feet of damaged street median See Project C96010.

Fallon Street between 8th and 9th Streets Sunset Ave.

Construct 520 lf of new 12" new storm drain and eliminate sanitary s Rehabilitate existing sewer 846/21lf-8"CIPP liner/8"vcp Provide temporary sewer bypass; remove and dispose of existing le 130lf-12"cmp & Gabrion Aprons

Remove cross culvert and improve local storm drainage system.

Rehabilitate 6800 linear feet of 8" VCP sanitary sewer by liner meth Shattuck, 63rd Avenue and Adeline (Sub-Basin 21-03) and the Replace construction 9100 lf 6" of to a relief 12"; slipline sewer in 9900 Adeline lf; replace Street10600 from 60th lf house to 61st lat 2465 - 34th Ave. Interpretive Exhibits for interior of historical Peralta house. Sereno Circle & Redwood Road International/69th, MacArthur/High and MacArthur/39th Crest, 82nd, Golf Links & Blandon Road 14th Ave at E 12th St., E 26th St. and E 29th St.

Citywide East 12th Street & International Blvd. Mandela & Union Street

New signal at International/69th; curb bulb-outs and textured crossw Rehab of 21,540 LF of 8" Sanitary Sewer. Construct new, parallel sewer to increase capacity. Construction fun Remove cross culvert and improve local storm drainage system. Rehabilitate existing sewer The project consists of sidewalk, curb, and gutter repair on Federal

Street trees, pedestrian lighting, sidewalk and curb ramp repairs, tre Realign Mandela; lighting, landscaping, sidewalk improvements, ne

Citywide on major arterials Citywide

Fed Project: Construction of~320 Curb Ramps Citywide & ancillary The project consists of sidewalk, curb, and gutter repair on Federal

Page 45

qryAllProjectsAndCCO

MacArthur Blvd (Lakeshore Ave to High St)

Feasibility study for Lakeshore to Park, Park to Lincoln, and 35th to Provide IT infrastructure system for computer training programs at t Bancroft/77th, Fruitvale/E. 16th and 13 other intersections citywide Install traffic signal, curb bulb-outs and pedestrian signal head Claremont Avenue and Huudson Street Improvements to creek area, new path of travel and ADA imprrovem 2631 -11th Avenue at E. 28th Street Renovation of an existing 1.6 acre park adjacent to Bella Vista Elem

Bancroft Avenue from 96th Ave to the San Leandro City Limits Design and construct a Class II bicycle facility on Bancroft; this proje Varies NCR operates the Façade Improvement Program, provides technic Citywide Acquisition and Development of K-TOP Fixed Assets 13560 Skyline Boulevard 13560 Skyline Boulevard Eastmont Mall Transit Center Org.#30191 Fund #2159 closed date 12/2000, Reso.#74869

Jackson St between 5th and 7th, Harrison between Posey Tube Install and traffic 7th,signing, and 7thstriping, between and Harrison channelization and Jackson island to address S 3rd St. (from Union St. to Brush St.) and 2nd St. (from Brush Rehabilitate St. to Broadway) street for bikelanes from 3rd St. and Union to 2nd St. a 6300 Moraga Ave. The scope of work includes the renovation of pathway, providing ac

Mosswood Park at the corner of Mc Arthur and Broadway Replace the existing wood shingle roof to meet the historic characte 13150 Skyline Blvd. 1368 Willow Street

Renovation of a 40,000 square feet mini-park. Scope to include new

medians and Bulb-outs on International blvd (33rd to 35th); Pedestr Pavement rehabilitation, partial replacement of curb & gutter, curb r Martine Luther King Jr. Way between West MacArthur Blvd.Resurfacing and Berkeley of City MLK limit. Jr. Way between West MacArthur Blvd. and B

Relocation of the ex. announcement-board-frame and installation of

Project is located at Telegraph Ave between 19th Street and Proposed Williams improvements Street consist of construction of circular concrete Provides technical support, studies, design, engineering, financial a 8th Street & Acorn Drive 8th Street & Mandela Parkway Street trees, pedestrian lighting, sidewalk & ramp repairs, irrigation, Citywide 1670 73rd Street

Root Foaming Contract Street improvements to 73rd Avenue between San Leandro St. and

East 18th Street from Lakeshore Avenue to 4th Ave.; Bulb-outs, Street crosswalk improvements and signals along along E18th Park Street; Blvd pedestrian at E. 19th, lights; Newton trees; Ave, la 125 14th Street Renovate Teen reading area Nirobi Coridor Oak Center Historic District in West Oakland Historic markers for the Oak Center Historic District 1462 Adeline In the pool building, improvements include painting, flooring, and lig 3411 East 12th Street Add lighting, decorative seating barrier on tree wells, planting and re 150 Frank Ogawa Plaza, 3rd Floor Construction of a one-hour corridor to divide the office space, instal Redevelop the blocks between Telegraph Ave, SanPablo Ave, 18th

Page 46

qryAllProjectsAndCCO

7701 Krause Ave. 9777 Golf Links Road

Street Rehabilitation and Resurfacing Remove failing concrete banks, restore creek banks, install protecti Consist of stabilizing the creek banks, restoring native vegetation, im 40lf-12" Storm & Slide Repair, Mcguire & Hester

Hegenberger Road Overhead over San Leandro St., UPRR, Bridge BART, Seismic & Snell Retrofit St. 1010 E. 15th Street Resurfacing between MacArthur and Doolittle. Project coordinated w Class II and Class III Bicycle Trail from 2nd/Broadway to Park St. Br Improve alignment ( new signals, striping, added turn lanes) from E Realignment of E12th Street; installation of traffic signals with interc 7th Street Resurfacing Project 3612 Webster Street

Provide PM support to RDA for the Kaiser Development tot lot gift; p

High St, 37th Ave, E. 8th St, 38th Ave, E8th St Sewer relocation at High St and Oakport St, 37th Ave and E. 8th St, 9255 Edes Avenue Replace greenhouse roof to mitigate heat gain and glare in children Cesar Chavez Library 3301 E 12th Street and Brookfield Library Routing 9255 of Edes electrical, phone, data lines at the two libraries for IT. 998-42nd Street Remove and replace existing resilient safety surface in existing tot l 125 14th Street 1st Floor: Modify northwest mezzanine stair with new lockable door;

Installation of rock and base material to stabilize slope failure. 40 to 60 feet of retaining wall along Golf Links Road to prevent road Remediate City Center Parcel T5 and T6 for future development by Not a Public Works project. Park will be developed under amendm Doolittle Drive (from Airport Access Road to Adams Avenue) Reconstructing the curb and gutter on the east side of Doolittle Driv Wood Street at Goss Street Mini-Park Renovation 6010 Castle Drive Providing a temporary pipe line to by pass the drainage water from Across the Street From 701 Panoramic Way Hillside erosion from FH discharge by EBMUD. City will keep monit 23rd Avenue from E.12th Street to Foothill Blvd. And Foothill Development Blvd. From 29th of the Ave. conceptual to High Street designs which includes streetscapin On Shepherd Canyon Road, next to soccer field Construct gravel parking lot next to the existing lot. Lot will be used Near 5717 Picardy Re-grade approximately 86 linear feet of roadway to new elevations

Alameda Cty to investigate pipe condition, City provides support ser 265lf-12"rcp (To be constructed under Resurfacing Contract C.O.)

4805 Foothill Blvd 1428 Alice St Jefferson St. at 7thSt. Harrison and 7th St. 2621, 2631, And 2633 Wallace Street 4550 Foothill Blvd. 125 14th St

Historic window repairs; space reconfiguration for service model up Replace windows; exterior paint; TI for SRO units; repair plumbing; Demolish storage building. Provide additional lighting for safety pur Design and install entry improvments including new concrete seat w Demolition of unsafe building structures Façade improvements to the entrance and pool area

Trench from street manhole to library to install conduit for fiber optic

Page 47

qryAllProjectsAndCCO

Oak Knoll

Install new up-to-date intercom system in the jail for life safety Demoliton of 18 homes in Oak Knoll

5 Embarcadero

5366 College Avenue

2611 - 98th Avenue

3528 Coolidge Avenue Org. #08811 Fund #2124 Closed date 6/30/1999 3594 Sanborn Drive 300 Frank Ogawa Plaza

7040 Chabot Road 7701 Krause Avenue

9255 Edes Avenue

3594 Sanborn Drive 700 Jean Street

Page 48

qryAllProjectsAndCCO

560 - 59th Street 3860 Hanly Road 2025 Broadway 125 14th Street 560 - 59th Street 1000 Oak Street 1800 Wood Street 3612 Webster Street 3612 Webster Street 241 curb ramps & anc. Concrete work 1651 Adeline Street 114/100lf-8"dip/4"vcp & 62lf-pile cap Renovate Children's Reading Room

200 Grand Avenue Hegenberger Road Overhead near San Leandro Street, Broadway-Patton Bridge SeismicPedestrian Retrofit Project Overcrossing near Broadway and Patton

3612 Webster Street 3300 Joaquin Miller Road 600 Bellevue Avenue 1701 East 19th Street 1724 Adeline Street

85th Avenue & 'E' Street

Extension of 3rd Street from 500 feet west of Union Street to Mande * Panoramic : Repair of landslide, approx.150' in length.* Fontaine: Stabilize slope and repair roadway along 200 ft frontage of Montere 42nd to 98th Ave.-Resurfacing,curb ramps,new signage,striping,bik 35th Avenue and Redwood Road from I-580 to Warren Freeway Resurfacing of 35th Ave. and Redwood Rd. from I-580 to Warren F 1309 - 66th Avenue Market, 45th, and West

Work includes lining 5,000 linear feet of 36" brick sewer and rehabil 1280lf-8"vcp, J.Flores Constr. 360/63/360lf-10"liner/8"foldpvc(pe)/6"to8"vcp,M&G Construction 482/471lf-8"vcp&10"peliner, E.H. John Const

Page 49

qryAllProjectsAndCCO

994lf-8"vcp/pe 1235 E. 14th Street; 1225 Derby Avenue 172 Santa Clara Ave; 822 Alice St; 3344 High St; 7100 Foothill Blvd Est Btw Armour & Thornhill 861lf-8"liner

27th, FWY 580 and Harrison

360/22,950lf-10"/8"rehab, D'Arcy & Harty 1,431/329/1,752lf-8"vcp/8"pburst/8"liner Rehabilitation of approx. 8,862 LF of 8" SS, 1,775 LF of 10" SS, and Construction of sidewalk, pavement and drainage improvements. 2,200lf-8"vcp 731/32 lf-8"/10" vcp 1,193lf-8"vcp Pt Repairs, New MH, use ex. sewer, Constructed under C47710 534/577lf-28"stl csg & 16"pe/15"vcp 600lf-8"vcp,Minor St Improvement, TGH Pipeline

Santa Rita, 40th, E 14th St

Park Blvd,Mountain To Scout 9600 Sunnyside Street 8th,San Leandro Crk,Swan Wy 1701 East 19th Street

219/1,781/927lf-8"pvc/8"vcp/8"liner 144/282lp-8"vcp/8"pvc 555lf-66"rcp 700/453lf-new8"vcp/8"vcp

1445 - 14th Street 200 Grand Avenue 2070/28lf-8"vcp/8"dip 1197lf-8"vcp 643/1,825/265lf-8"vcp/8"EP/10"EP Claremont,Gravatt Dr 402/551lf-10"liner/8"vcp 265/1,388lf-10"liner/8"liner 841lf-8"vcp/pe 96th,103rd,104th,106th Avs 355/1900lf-10"vcp/8"liner 6080 Colton Blvd; 3600 - 13th Ave; 5766 Miles Ave; 8501 Pardee Drive 554/407/60lf-27"/24"/18" pipe 677/18lf-10"vcp/10"dip Constructed under C64410 Constructed under C64410 1470/10/2465-8"vcp/8"dip/8"liner 665lf-8"pipe

Esmt In Dimond Park

405/42/114lf-8"pelp(EP)/8"dip/8"liner, added C68610 constr., Andes 82lf-10"dip

Page 50

qryAllProjectsAndCCO

Mountain Boulevard at Village Square

Installation of new traffic signal

E 11th, 10th, E 17th, & 9th 455 7th Street 455 7th Street 455 7th Street 455 7th Street

Dredge upper arms of Lake Merritt, Wheelabrator Water Tech. 18,000/4,086/1,760/2,209lf-8"/15"/18"/12"liner,D'arcy & Harty Upgrade existing sewer 2,817/735lf-18"/30"vcp, Inventory of Drainage in Oakland Hills, Woodward Clyde Consultan Replace 860 lf 8" VCP; 359 lf 10" VCP; 344 lf 12" VCP; 346 lf 15" V Phase 1 - Weak story seismic retrofit; misc ADA and life safety upg Renovate the women locker rooms in the basement of the Police Ad Voluntary installation of fire life safety system in PAB tower and bas The installation of new lockers in the women's, men's and manager

Citywide Lakeside, 13th, Alice and Harrison

This Project will fund the purchase of Phase II alerting and warning Rehab 16,100 lf of 8"-12" SS and structures 15,500/290/445/235lf-8''/21"/24"liner/21"vcp 901lf-36"pvc-cp

E. 17th St, 10th Ave; Bayview Avenue and 9th Ave

Replace 230 lf of 8" VCP; rehabilitate by liner method 6900 lf of 8" V 384/686lf-8"to10"/16"to15"vcp 25,000lf-8"liner, (C81810 & C77410 emergency added by CO)

73/361lf-12"/18" dip/rcp 1,124lf-8"vcp

Rockridge Boulevard Thermal Street Portal Av 155lf-12"SD liner(Gelco) 4314 Piedmont Avenue Make tenant improvements for relocated Library in OUSD leased po 450 Lancaster Street Emergency Repair for Structural members 915-939 66th Avenue Demolition of existing foundations, loading docks, parking area and Study of the potential sites for installation of continuous deflection Study and separators prioritize on potential storm drains trash into separator Lake Merritt sites and Damon Slou 711 71st Avenue Demolition of buildings

E 10th-Embarcadero Ettie Street Pump Station Pump Station Rehabilitation Repair of stair no. 146, adjacent to 915 Creed Rd. Ascending Replace from Creed broken Ctconcrete to 1057 Underhills staiars and Rd. landings;add new handrails, b 1672(4) - 7th Street

Westover & Bagshotte Dr 78/296lf-6"to8"/12"to21"vcp;584/473/644lf-10"/12"/15"cip liner High Street near Tidewater and Alameda Avenue near Fruitvale Installation trash separator of trash separators units on storm drainage pipes near the ou

Page 51

qryAllProjectsAndCCO

Thornhill-Westwood/Gouldin 937lf-8"liner Embarcadero East at Livingston Street on the Oakland Estuary Livingston Pier Project - Waterfront Trail segment around the Living Weldon Avenue 1899 Dennison St, Cryer beach analysis, permitting & clean-up. 6000 Shepherd Canyon Road Design and construct channel improvements to address flooding pr Citywide

PCC - curb & gutter and sidewalk repair, installation of ADA curb ra

Foothill Blvd/64th Ave

Install traffic signal

1 Frank Ogawa Plaza 436 East 14th Street 1000 Oak Street Chimes Creek MacArrthur and 88th Avenue 11th St between Broadway Telegraph Ave High St/Brookdale 35th Av/Foothill/MacArthur

807lf-15"pvc, construction reactivated 4/15/96 Replace broken conrete stairs and landing; add new guradrails and

Landfill Closure, Creek Restoration,Geotechnical investigation (50 d 1,363/1,025/3,454/18/260/260/635/350lf-27"sp/24"sp/18"sp/18"dip/2

1083lf-8"hdpe pipe bursting,The Plumbing Conn.(3rd Bid/2nd low bi

3050 International Blvd Davenport/MacArthur/Thompkins

Demolition of Building 625/5,494lf-8"vcp/8"liner Rehabiltate sanitary sewer in the 9,279lf-8"liner 70/15,519lf-8"pipe/8"liner, D.E. Bianchini, Inc 2,598/1,709/2,172lf-18"vcp/15"vcp/12"vcp 135/320/16,454lf-8"vcp/8"pvc/8"liner 323/4,860lf-10"vcp/8"liner 14/3,255/3,102lf-8"vcp/8"liner/10"liner, added C66810 constr

1101 - 29th Avenue 2795 Butters Drive; 1061 - 66th Avenue 64th & 63rd Avenues 399 - 9th Street Carrington Street 2,638lf-8"vcp 170lf-8"liner 3,493lf-8"vcp 455 - 27th Street 5th av,E 9th,Foothill

1,591/175/2406/55lf-30"pipe / 30"pipe-in-casing/27"pipe/27"p-in-c, a

Page 52

qryAllProjectsAndCCO

934 - 34th Street; 1700 - 50th Avenue MacArthur/Camden/Lily

1,313/13,569lf-8"pipe/8"liner

9255 Edes Ave Nimitz,105th,Douglas,Elm Macarthur / 73rd/Arthur/64th Skyline/Redwood/Campus/Denton 55th,Hillen,Birdsall/Morgan 5900 Shepherd Canyon Road Rosecrest

Make electrical upgrades - route cables to new workstations, wifi ins 221/490/29,053lf-18"pipe/12"pipe/8"liner 176/1,120/59/29/3,352lf-10"vcp/10"liner/10"dip/8"dip/8"liner

83lf-12"SD (Emergency, added by Change Order to C59810)

1,103/140 lf-8"vcp/8"vcp w conc. Bedding Rehabilitate sanitary sewers in project area. Replace lampholes wit Clay St from 11th to 8th, 8th St from Clay to Jefferson, Jefferson Construct St. from 520 lf 8th of 10"; to 6th, 305 6th lf of St 15"; from1758 Jefferson lf of 18"; to MLK, 93 lf and of 21"; MLK 1095 fr Rehabilitate 19,403 linear feet of 8" VCP sanitary sewer and 3477 li Remove cross culvert

29th Ave, E. 14th St, 28th Ave, E. 16th St, 27th Ave - from Chapman Construction St to ofFoothill 4300 linear Blvd feet of sanitary sewer to increase capac Citywide Concrete work including new curb ramps, and replacement of defec 14th Ave between 31st and MacArthur; in MacArthur Blvd between Replace 14th 2316 Ave lf of and 10" Ardley to 18"Ave; sewer in mains Woodruff andAve 14 sewer between structures. Excelsio Wilson Avenue, School Street, Coolidge Avenue, BrookdaleConstruct Avenue, Maple 2900 lineal Avenue, feet& 12" MacArthur dia; 700 Boulevard llineal feet 15" dia; 2300 linea Golf Links; Fontain St; 98th Ave and MacArthur Blvd Approx 9300 lf liner/CIPP 8" to 24" SS; replace 1000 lf house latera 165lf/10"CIP liner (Make Change Order to C43920-Gelco) 2700 LF of new sewer line to increase existing capacity.

Project merged with C75410. Rehabilitate 6,000 lf of 8" sewer main; replace lower laterals; rehabi 220lf-18"vcp

Webster St from 9th to Embarcardro

2200 lf 8" liner; 280 lf 4" building sewer replacement; rehabilitate ma Construct new, parallel sewer to increase capacity.

600/300lf-12"/36"Storm Conduit 139lf-12"rcp SD (See C66620) 230lf-8"vcp, Plumbing Connection

Citywide 14 Schools throughout the City

Emergency Work (CO to C59810) 150lf-48" Polycrete pipe & rehab 4,500 cy of slope Repair of tree damaged sidewalks, curbs and gutters. This project will install approximately 6,000 SF of rubber sidewalk p

Page 53

qryAllProjectsAndCCO

Citywide 250 Frank Ogawa Plaza Dimond Ave between Fruitvale Ave and Dimond Park.

The On-Call Sidewalk Project is used to respond quickly to extreme 303/875/48/111/52lf-36"/24"/18"/12"rcp & 12"dip. 1865 LF of parallel sewer to increase capacity. 50/80/50lf-12"/18"/24" rcp & Outfall Structure, Mcquire & Hester

5205 5606 4805 2607 1687

Telegraph Avenue San Pablo Avenue Foothill Boulevard Myrtle Street Mountain Boulevard 170lf-15"vcp

125 - 14th Street 666 Bellevue Avenue

659 - 14th Street Various City buildings and facilities. 7701 Krause Avenue Esmt 60/61st Av-Camden/McAr

Project provides physical access to existing City buildings and facilit 706lf-8" liner

2528 Coolidge Avenue Coliseum redevelopment area

Peralta Historical House exterior paint repair. ORA Coliseum Shoreline Project Montgomery Ward (Cesar Chavez Education Center)

1900 Fruitvale Avenue 10501 Acalanes Drive 98th Avenue to Airport Area around Doolittle Drive/Airport Airport Coliseum BART 1201 N. Telegraph Avenue 1000 Oak Street 125 - 14th Street 371 - 45th Street 3860 Hanly Road 1428 Alice Street 618 Jefferson; 1969 Park Blvd 1637 Fruitvale Avenue Foothill Blvd from Fruitvale vave to High Street 35th Av/Calif to Atlas

Re-design of intersection of Acolones.105th St. and Tyrone Carney Streetscape on 98th Avenue with Airport Roadway. Streetscape with Port and San Leandro Streetscape on Hegenberger Road. East and Airport Access Road 309lf-15"pvc Coliseum BART Area Plan Reconstruct 70 +/- ft of sewer pipe, McGuire & Hester

Incorporating streetscape elements including bulb -outs, street furni 440/3,300/1,200lf-8"/12"/15"pipe replacement

50 lf-15" HDPE, Constructed under C64110 220lf-10"rib lock liner 253lf-18"storm

Page 54

qryAllProjectsAndCCO

Shepherd Canyon Road between Snake and Banning Drive. Replace 5320 lf 10" to 15" sewer mains and 14 sewer structures; R Easement off Nairobi Place Rehabilitate existing sewer and repair damaged sewer pipe; stablize 1325lf-Creek Restoration 4,793/390/1,441/365/764/55lf-8"/12" liner, 8"/15"/18"/12" replaceme Replace 9,961 lf 8" VCP sewer pipe; Line 5,592 lf 8"; replace 997 lf Redwood, Atlas, Mac Arthur Rehabilitate 12,592 linear feet of 8" VCP sewer; replace 412 linear f Shepherd Canyon, Snake, Saroni Rehabilitate 15,482 lf 8" sewer by lining; Replace 1,008 lf 8" VCP se 14,000 lf of 8" liner and 800 lf 8" VCP replacement. 4,000lf TV Inspection Construct 263 lf 15" RCP; 62 lf 12" RCP; manholes and storm drain

3055lf-8"pvc, Andes Const Suncoast

Broadway & 12th Street

220lf-8"pipe Proposed Change Order Work Drury Road/Besito

Elliot St/E33rd to E34th St

73lf-27"HDPE; PCC Headwall (Exploring constructing as Change O Suncoast, C66710L Installed liner in wrong Manhole. This is the co 125lf-8"vcp, Constructed under C52310 250/53lf-12"cmp/pcc Vditch 375lf-12"rcp+ reshape intersection (Adding C79010 to project)

Mac Arthur Blvd, Seneca St, Dowling St and Stearns Ave

238lf-perforated 4" pvc Rehab 16,077 LF 8", 7,183 LF 10", 535 LF 12" SS and 114 structure 800/600lf-12"rcp/6"slotted pipe 168lf-21"rcp 260lf-8"vcp,J.S.J. Pipeline 200lf-8"vcp, Constructed under C56810 845ft-12"vcp 75lf-8"pipe 75lf-8" pvc, constr by Andes under C52610 100lf-8"vcp (Add to C61210) 425/137 lf-12"/18" rcp Pipe. 250lf-15"dip 35/115lf-8"vcp/8"liner

Michigan-Sunkist/Partridge 250 - 10th Street Wood St (E)N of 8th St 1053 Underhills Rd Emt Glenarms/Mountain Bl

Emt Behind 1415 W. View Dr

Esmt off Outlook Av

138lf-12"(rcp or pvc)

Page 55

qryAllProjectsAndCCO

333/37lf-15"/12"rcp+320lf pcc gutter Mandana Bl-Lakeshore/Paloma Av Sayre Dr 2,312/2,210/109lf-8"liner/10"vcp/10"dip 47lf-12"rcp

Page 56

qryAllProjectsAndCCO

Status Planning Planning Planning Planning Planning Planning Planning Planning Planning Planning Planning Planning Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design Design

Page 57

qryAllProjectsAndCCO

Design Design Design Design Design Design Design Design Design Design Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Bid-Award Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction

Page 58

qryAllProjectsAndCCO

Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Post-Construction Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 59

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 60

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 61

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 62

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 63

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 64

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 65

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 66

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 67

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 68

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 69

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 70

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 71

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 72

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 73

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 74

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 75

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 76

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 77

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 78

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 79

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 80

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 81

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 82

qryAllProjectsAndCCO

Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed

Page 83

qryAllProjectsAndCCO

Closed Closed Closed Closed

Page 84

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close