lisha Petipas-Haggerty
INTERIOR DESIGN PORTFOLIO
[email protected]
Worcester State Hospital Kirkbride Hotel and Conferencing Center
An adaptive re-use/historic preservation project adapting the Worcester State Hospital clock tower building into a hotel and conferencing center for the brand new hospital complex.
Relationship Diagram
Mechanical Stair Trash Staff Laundry
Toilet Room Housekeep Stair
Flex Space Private Lounge
Toilet Room
Stair Trash Guest Laundry/ Convenience
Gift Shop Stair
Conf. 7
Accessory Stair Storage
Guest 7 Guest 8
Stair
Guest 6 Guest 5 Hair/Nails Salon
Massage Stair Massage Room Room Jacuzzi/ Steam Room Elev Guest 4 Bicyles Tread mill Treadmill
Stair
Storage
Conf. 1
Toilet Room
Conf. 6
Elev
Elev
Elev
Stair
Elev Guest 1 Guest 2
Stair
Kitchen
Off i es c
Dining Room/Bar
Lobby/ Reception/ Concierge
Conf. 2
Conf. 5
Guest 3
Free Weights
Conf. 3
Conf. 4
Third/Fourth Floors
Fifth Floor
Basement
First Floor
Second Floor
Site before the new hospital complex. Building shown lower middle.
BELFRY
9'-9" 10'-10"
FIFTH FLOOR
FOURTH FLOOR
Circulation Diagram
THIRD FLOOR
Concept: To integrate a new design into a historic building by
Primary Circulation Secondary Circulation Tertiary Circulation
11'-8"
SECOND FLOOR
FIRST FLOOR
BASEMENT EXISTING BUILDING SECTION
Use of Grid/ Existing Walls Diagram
Basement Floor Plan
First Floor Plan
Second Floor Plan
Third Floor Plan
9'-6"
Organization Diagram
HVAC Diagram
taking the bare essence of existing materials and conditions and using these elements to inform and interpret into forms that balance old and new with a focus on energy and the sustainability that is inherent to the project.
12'-2"
13'-8"
Fourth Floor Plan
Fifth Floor Plan
Existing conditions
Kirkbride Hotel and Conferencing Center
Introduction, Existing Conditions, Exploratory Diagramming
lisha Petipas-Haggerty 2
UP
Breakout/ Rentable Flex Room 265
UP
Stair 190 DN
Trash Room 265
Hall
Private Lounge/ Dining Room 585
Women's W.C. 150 Men's W.C. 150
Guest Laundry/ Convenience 585
Gift Shop 315
UP
Stair 125 Central Circulation Space 425 DN
Storage 155
Waiting 65
Receptionist 60
Concierge 50
Receptionist 60
Dining Room/Bar 1215
Hostess Station 35
Lobby/Reception/ Concierge 1385
A
Bar 350
Entry Vestibule 100
Storage 155
B
Waiting 65
Receptionist 60
Concierge 50
Receptionist 60
UP
Dining Room/Bar 1215
Lobby/Reception/ Concierge 1385
Hostess Station 35
UP UP
Bar 350
NORTH
Entry Vestibule 100
FIRST FLOOR PLAN
1/8" = 1'-0"
ENLARGED DINING ROOM FLOOR PLAN
1/4" = 1'-0"
ENLARGED LOBBY FLOOR PLAN
Hospital Drive
1/4" = 1'-0"
DINING ROOM ELEVATION
1/4" = 1'-0"
LOBBY ELEVATION
1/4" = 1'-0"
Kirkbride Hotel and Conferencing Center
First floor Lobby and Dining Room Inspirational existing materials: Stone and Brick
lisha Petipas-Haggerty 3
UP
Stair 190 DN Conference 7 265 Conference 1 585 Hall
Accessory Storage 265
Women's W.C. 150 Men's W.C. 150
Conference 6 1100
Accessory Storage 120
UP
Conference 2 845
DN
Open To Below
Stair 125
Accessory Storage 75
Housekeeping 75
Hall
Conference 5 845
A
Conference 3 310
Conference 4 310
Breakout Space 390 B
Exterior Balcony 285
SECOND FLOOR PLAN
1/8" = 1'-0"
Accessory Storage 120
Conference 2 845
CONFERENCE ROOM ELEVATION
1/4" = 1'-0"
ENLARGED CONFERENCE ROOM FLOOR PLAN
Kirkbride Hotel and Conferencing Center
Second Floor Conference Rooms Inspirational existing material: Metal
1/4" = 1'-0"
lisha Petipas-Haggerty 4
UP
Guest 8 400
Guest 15 400
Stair 190 DN
Guest 7 400
Stair 190 DN
UP
Guest 14 400
Hall
Hall
Guest 1 910 UP
Guest 6 910
Guest 16 910 UP
Guest 13 910
DN
Hall
Hall
Hall
Hall Guest 2 595 A Guest 3 580
Guest 10 580
Hall
Guest 4 580
DN Hall Guest 11 580
Open To Below
Stair 125
Open To Below
Stair 125
Guest 5 595
A
Guest 9 450
Guest 12 450
B
Breakout Space 310
Exterior Balcony 345 B
Exterior Balcony 85
FOURTH FLOOR PLAN
1/8" = 1'-0"
THIRD FLOOR PLAN
1/8" = 1'-0"
Guest 1 910
GUEST ROOM ELEVATION
1/4" = 1'-0"
ENLARGED GUEST ROOM FLOOR PLAN
Kirkbride Hotel and Conferencing Center
Third and Fourth Floor Guest Rooms Inspirational existing material: Wood
1/4" = 1'-0"
lisha Petipas-Haggerty 5
Bicycle Station
Treadmill Station
Hall
Treadmill Station
Free Weights Station
Treadmill Station Storage Storage Salon Spa Room
Guest Room 9
Guest Room 10 Hall
Guest Room 11
Guest Room 12
Guest Room 10 Hall Guest Room 16 Guest Room 15
Guest Room 2
Guest Room 3 Hall
Guest Room 4
Guest Room 5
Guest Room 3 Hall Guest Room 1 Guest Room 8
Conference Room 7
Conference Room 2
Hall
Conference Room 5
Conference Room 3
Conference Room 2
Elevator Shaft
Men’s W.C.
Women’s W.C. Hall
Dining Room
Hall
Lobby
Dining Room
Men’s W.C.
Women’s W.C.
Hall
Breakout/ Rentable Flex Space
Kitchen
Offices
Kitchen
Men’s W.C.
Women’s W.C.
Hall
Mechanical/ Communication Room
Inspirational
Imagery
Kirkbride Hotel and Conferencing Center
Building Sections and Inspirational Imagery
lisha Petipas-Haggerty 6
12'2 Concealed LED Linelight
12'2
13'8
11'6
Dropped Ceiling
Dimmable LED Linelight
1/2" x 2" Metal Frame
9'0
12' x 4' Alabaster
Flat Screen Television Monitor
3'6" TYP
3'6 3'0
Marble Countertop Wood Blocking To Secure Alabaster
1/2" x 3/4" Oak Molding
3'6" TYP
1/2" x 3/4" Oak Molding 1/4" Oak Panel Wainscoting 1/4" x 1/2" Metal Strips
1/4" Oak Panel Wainscoting
Alabaster Dimmable LED Linelight
1/2" GWB
1/2" GWB
Wood Blocking Metal Track
Wood Base
BACKLIT ALABASTER RECEPTION DESK DETAIL
2"" = 1'-0"
2" = 1'-0"
1'-0"
BACKLIT ALABASTER WALL/ DATUM DETAIL
Wood Blocking Metal Track
CONFERENCE ROOM MEDIA WALL/ DATUM DETAIL
2" = 1'-0"
R R R R R R R R R R R R R R R R R R
R
R
R R R
R R
R R
R R
R R
R R
R
LEGEND
Flourescent Tubes (1'x4') Flourescent Tube Uplighting (1'x4') Concealed Linelights
R
R
R
R
HVAC Ducts
In-mirror f l urescent tubes o (bathrooms)
R R
R
R R R R R R R R R R R R R R R R R R
R
R
R R
R
R R R R
R R
R
Pendant Lights Wall Sconce
R
Recessed Downlights Ceiling/Wall Hung Light Fixtures Track Lighting
Wood Acoustic Panels
R
R
R
R
R R R
R
R R R
R
R
R
R
Dropped Ceiling
R R
R
R
R R
FIRST FLOOR REFLECTED CEILING PLAN
1/16" = 1'-0"
SECOND FLOOR REFLECTED CEILING PLAN
1/16" = 1'-0"
THIRD FLOOR REFLECTED CEILING PLAN
1/16" = 1'-0"
Kirkbride Hotel and Conferencing Center
Construction Details and Reflected Ceiling Plans
lisha Petipas-Haggerty 7
2
Aux. Coffee 50 sq. ft.
Partner's Office
Partner's Office
Associate's Office
Waltham Watch Tower MegaBytes Law Office
The client indicated the most important need in a law office is an ample amount of storage space. This need was the basis of exploration for the design.
Administrative Assistant
Associate's Office
Associate's Office
Administrative Assistant
Associate's Office
Medium Meeting Area Auxiliary Copy
DN
Administrative Assistants
Partner's Office
Slide out storage drawers are built into thick walls so they are out of the way while still being fully accessible both in the hallways and in the private offices.
Partner's Office
Associate's Office
Associate's Office
Medium
Associate's Office
Lunchroom
Telephone
DN
Assistant
DN
DUCT CHASE
Associate's Office
DN
Assistant
Paralegals
Medium Meeting Area
War Room
DN
86 sq. ft.
Mail/Copy/Supplies
Bath
Administrative Assistants
FLOOR PLAN - SIXTH FLOOR
Scale: 1/8" = 1'-0"
Reception Telephone Auxiliary Copy
DN
Paralegals
UP UP DN
DN
DUCT CHASE
Small Meeting Area Computer Room
ELECTRIC
PHONE & NETWORK
DUCT CHASE
UP
Administrative Assistant Administrative Assistants Kitchen/ Lunchroom War Room Administrative Assistant
Medium Meeting Area Telephone
1
Partner's Office
Partner's Office
Associate's Office
Associate's Office
Associate's Office
Associate's Office
Administrative Assistants Administrative Assistants
Small Meeting Area Administrative Assistants
Small Conference Room Administrative Assistants
Small Conference Room
Medium Conference Room 2
Medium Conference Room
Medium Conference Room 2
Large Conference Room
Telephone
UP
Small Meeting Area
Associate's Office
Small Meeting Area
Associate's Office
Associate's Office
Associate's Office
1
Paralegal Associate's Office Associate's Office
FLOOR PLAN - FIFTH FLOOR
Scale: 1/8" = 1'-0"
N
PLAN NORTH
Paralegal Associate's Office Associate's Office
Paralegal
Paralegal
Partner's Office
Partner's Office
Partner's Office
Partner's Office
Each new zone is introduced by a breakout space; a transition zone that breaks up the use of material for a visual and literal moment of rest.
MegaBytes Law Office
lisha Petipas-Haggerty 8
A monumental staircase was built within the space to connect the use of materials onto both floors. A datum was created using the height of the storage drawers. This datum changed material depending on if the space was public or private.
MegaBytes Law Office
lisha Petipas-Haggerty 9
FP3 Condominiums
Taking inspiration from architect Alvar Aalto and his ideas of bringing nature inside, the surrounding urban environment and its materials were designed into the interior space.
FP3 Condominiums
lisha Petipas-Haggerty 10
The materials included are brick, glass, stone, and concrete. All of these building materials were softened and organized to create a modernized interior reflective of the sustainability surrounding the architecture of the FP3 building. FP3 Condominiums
lisha Petipas-Haggerty 11
The entry level includes the master bed and bath, which are distinguished in design by the use of natural, not building, materials.
FP3 Condominiums
lisha Petipas-Haggerty 12
Oasis Nightclub
Oasis Nightclub
Renderings
lisha Petipas-Haggerty 13
A
Lounge
Small Bar
Manager's office Employee Area
Storage
B
DN
UP
Lobby
Empty bottle storage
Coat Check
Entry
Large Bar Section Scale: 1:20
A
The design for this nightclub was required to involve a natural phenomenon. A desert oasis was the idea used. The dance floor was the desert, with the bars and lounges as the drink and rest associated with an oasis.
Men's W.C.
UP
Small Bar
Coat Room
Large Bar
Large Bar Liquor Storage Walk-in Beer Cooler Women's W.C.
VIP Lounge
B
Up
UP
Disc Jockey
Dance Floor
Small Lounge and Bar
VIP Lounge
Stairs
Hallway Employee Area
UP
Large Bar
Extra Seating Area
Oasis Nightclub
Plans and Elevations
lisha Petipas-Haggerty 14
Olnick Spanu Glass Museum French Connection Newbury Street Using current Zara andfor the display of the stores, aSpanu museum was created Olnick
glass collection. Glass and the reflection and refraction of light are referenced in the design. Installations from Dale Chihuly were added to create double height spaces and pops of color.
Storage Dn
Janitor Closet Receiving
Large Gallery
Large Gallery
Staff Bath
Staff Office
A
Storage Room
Staff Room
Food Prep
Work Room Cafe Bookstore/Shop Director's Office
Small Gallery
Small Gallery
Special Exhibition Gallery
Small Gallery 1
Men's Bathroom Women's Bathroom
Up
Staff Room
Large Gallery
Large Gallery
Small Gallery 3
Small Gallery 2
Coat Room Lobby
Lecture Room
B
Tickets
Small Gallery
Small Gallery
Lobby
Lecture Room
Olnick Spanu Glass Museum
lisha Petipas-Haggerty 15
Wine Store
Geometry of design was explored in both plan and section
Wine Store
lisha Petipas-Haggerty 16
University of Minnesota Children’s Hospital
Designing a Hospital around the idea of a Town
Private Patient Room
390/415
Private Patient Room
390/390 Water Closet 55
Private Patient Room
390/390
Water Closet 55
390/390
Private Patient Room
Water Closet 55
Private Patient Room
390/390
Water Closet 55
Shown here, the private patient room “Townhouse” is the most important part of the entire hospital. This is due to the amount of time a patient spends healing in this environment.
Isolation Room
290/430
Water Closet 55 Water Closet 67
Private Patient Room
390/390
Private Patient Room
390/390
Private Patient Room
390/390
Private Patient Room
390/390
Care Team Workstation
180/230
290/430
Isolation Room
Private Patient Room
390/430
Family Lounge
350/350
Crash Cart Alcove P-tube Station 6/6
10/10
Handwashing Station
6/6
Communication Closet
120/240
Exam/ Treatment Room
Family Toilet
70
Water Closet 67
Water Closet 55
Water Closet 55
Water Closet 55
Water Closet 55
Water Closet 67
Family Lounge/ Overflow Waiting
475/510
Family Toilet/ Shower/ Changing
75/80
Pyxis Station
200/213
Stairs Office Nurse Manager
120/130
80/105
Housekeeping Closet
Staff Breakout/ Kitchenette/ Lockers
285/328
Clean Supply Room
160/160
140/140
Soiled Utility/ Trash Holding Office Assist. Nurse Manager & CNS Conference Room
300/300
Handwashing Station
6/6
Electric Closet
225/250
180/215
Care Team Workstation
160/166
Equipment
160/160
Clean Supply Room
Lactation Room
80/92
Office Utility
60/95
P rivate P atient R oom
Unit Secretary
Staff Toilet
55/55 200/200
Nourishment Toilet/ Shower Changing Staff
80/80
Electric Room Child Life Storage
110/110
On-Call Bathroom
70
80/80
Office-Family Services Care Team Workstation
180/230
Staff Toilet
55/55
240/240
Fellow/Resident Workroom
240/240
Soiled Utility/ Trash Holding
140/160
120/150
Consultation Room
P-tube Station
10/10
180/215
Care Team Workstation Crash Cart Handwashing Alcove 6/10 Station
6/6
On-Call Room
80/130
Handwashing Station
6/6
Water Closet 55
Water Closet 55
Water Closet 55
Water Closet 55
Water Closet 55
Water Closet 67
Playroom/ Child LifeSpecialty
320/325
Playroom/ Child LifeSchool Age
170/215
Water Closet 67
Water Closet 55
Water Closet 55
Water Closet 55
Water Closet 55
Water Closet 67
70/120
Pyxis Station
Nourishment
80/82
390/390
Isolation Room
290/430
Isolation Room
290/430
Private Patient Room
390/408
Private Patient Room
390/390
Private Patient Room
390/390
Private Patient Room
390/390
Private Patient Room
390/390
Private Patient Room
390/390
390/390
Private Patient Room
Private Patient Room
390/390
Private Patient Room
390/390
Private Patient Room
390/463
NORTH
W ater C loset 55
FIFTH FLOOR PLAN
1/8" = 1'-0"
University of Minnesota Children’s Hospital
Fifth Floor Plan and Private Patient Room
lisha Petipas-Haggerty 17
62
Sm Ro all o Co 5/6 m n
25
fer
en
ce
62
Sm Ro all o Co 5/6 m n
25
fer
en
ce
The Town Hall (reception desk) is an architectural statement and can be easily seen from all areas of the entrance and lobby.
62
Sm Ro all o Co 5/6 m n
25
fer
en
ce
Patient Workstations
6 @ 35/35
Small Conference Room
625/625
Stairs
Patient/ Family Resource Center
1875/3634
Toilet Room
55/68
325/340
Toilet Room Men's Toilet Room Women's
325/340
For a total of 400/400
Breakout Spaces
Storage
120/120
Large Conference Room
2000/2000
Indoor Play Area
1200/1200
Staff Work Stations
3@35/35
Office
150/150
Meditation Room/ Chapel
600/600
Gift Shop
1000/1000
Storage
40
Food Service
1000/1000
95
Prep Kitchen
Toilets
55/60
Private Office
120/120
120/120
Private Office Seating
400/430
Fitting Room
25
Reception
200/206
Children's Reading Area
625/650
Toilets
55/60
Wheelchair Storage
150/150
Special Events Storage
60
900/940
Special Events
The “Town” centers around the Town Hall (reception) Town Common (public seating and events) and Town Park (breakout spaces for the conference rooms) in a sequential path of circulation on the ground level.
NORTH
Public seating and events areas are framed by materials for organization while remaining open and loosely defined.
FIRST FLOOR PLAN
1/8" = 1'-0"
University of Minnesota Children’s Hospital
First Floor Plan, Lobby, and Reception
lisha Petipas-Haggerty 18
Modules are used to create a sense of balance, so the design is calming and predictable in an environment where patients may feel as is if they have lost all control.
3A
PATIENT ROOM ELEVATION A
1/2" = 1'-0"
9'-0"
2'-0"
7'-6"
Research has proven patients heal better in an environment they can control, one that feels like their own. LED lighting is used in the patient room, giving them the option to change the color to fit their desires for a sense of individuality.
LED Light Secured In Wall
Dividing 1" Thick Solid Wood Shelf
1/2" Thick Glass Push To Open
Solid 1" Thick Wood Doors
2x2 Wood Base
2"
2'-4"
1'-3"
2'-6"
1'-3"
University of Minnesota Children’s Hospital
Private Patient Room
lisha Petipas-Haggerty 19
7"
10'-0"
Glass Screwed In On Sides
LED Point Lights
Cavity For Wiring
3'-2"
2"
2'-0"
1/2" Thick Glass
1/2" Thick Gypsum Wall Board
The module light wall carries you serenely down the length of the long corridor and introduces you to all of the functions of the first floor. It also introduces you to the idea of modularity and the LED lighting that can be controlled in the patient rooms.
Insulation
1" Thick Wood Panel
6" Metal Studs
1/2" Thick Metal Cladding
2B
BREAKOUT ELEVATION B
1/2" = 1'-0"
1'-0"
3'-2"
6"
The Park (conference break-out spaces) is reminiscent of hollowed out tree trunks and shafts of light breaking through the branches.
2A
BREAKOUT ELEVATION A
1/2" = 1'-0"
University of Minnesota Children’s Hospital
First Floor Main Hallway, Conference Break-out Spaces
lisha Petipas-Haggerty 20