Site

Published on January 2017 | Categories: Documents | Downloads: 59 | Comments: 0 | Views: 596
of 5
Download PDF   Embed   Report

Comments

Content

SITE SURVEY REPORT
08/08/2014

Date

GENERAL INFORMATION

CITY

LIMA

DIRECT TV - LIMA

SITE NAME

UBICACIÓN o DIRECCION/ADDRESS

Av. Ricardo Palma Nro. 341 Dpto. 1301
Dennis Delgado

SITE RESPONSIBLE

MOBILE

967748241

DATUM WGS '84
COORDINATES

ALTITUDE (msnm)

94

LATITUDE

12

07

08

LONGITUDE

77

01

38

MEASURE REFERENCE POINT

REFERENCES FOR ARRIVING TO THE SITE
The site is in the city of LIMA - MIRAFLORES, Between Ricardo Palma avenue and Suarez street

NAME
DIRECT TV PERSON 1

Dennis Delgado

DIRECT TV PERSON 2

Hugo Cabello

AFTER SALES ENGINEER

Roberto Jesus Puma

CELL PHONE
967748241

E-MAIL
[email protected]
[email protected]

944637740

[email protected]

SIGNATURE

1. Site Photo
1.1 Site overview photo

Site Location Drawing

Front Photo

1.2 Environment photo
OUTDOOR

OUTDOOR
CABINET

PISO 14

INDOOR

SWTICH ZTE

DESKTOP ZTE

PISO 10

ENERGY SYSTEM
AC available

YES

CNO

C220V Single Phase

Generator available

YES

CNO

CBrand

DC available

YES

CNO

C

+24V DC

C

220V Three Phase

C

380V Three Phase

-48V DC

C

Nominal Voltage (V)

220

Total capacity (A)

No information

Power supply brand

No information

Available capacity(A)

No information

Rectifiers QTY

No information

Rectifier capacity (A)

No information

Battery capacity (A)

No information

Nominal Voltage (V)

Total capacity (A)

Power supply brand

Available capacity(A)

Rectifiers QTY

Rectifier capacity (A)

Battery capacity (A)

Nominal Voltage (V)

Total capacity (A)

Power supply brand

Available capacity(A)

Rectifiers QTY

Rectifier capacity (A)

Battery capacity (A)

DC-DC converter board

YES

C

NO

C

48V PDB available

YES

C

NO

C

Breaker Available in PDB

YES

C

NO

C

Quantity

Board Capacity (A)

Capacity (A)

A

Quantity

Capacity (A)

A

Quantity

A

Quantity

Capacity (A)
Space for New Breaker in PDB:

YES

C

NO

C

Quantity

C

REMARKS
Is necessary to install a breaker AC for outdoor cabinet (recomendation 40 Amp). Commercial breakes of 50A or 63A.

Main Equipments are:

BBU: - 48Vdc

RRU: - 48Vdc

the BBU will be inside of oudoor cabinet and RRU will be outside of cabinet

C

C

CABLE DISTANCE AND MATERIAL
QTY

REMARKS

INDOOR INFORMATION
NEW RACK 19"
PGND CABLE LENGTH (m)
INDOOR LADDER LENGTH (m)
INDOOR GROUNDING BAR
NEW PDB REQUIRED
TERMOMAGNETIC BREAKER

NO
10 Mts
NO
NO
NO
NO

INSIDE OF RACK

OUTDOOR INFORMATION
IF CABLE LENGTH (m)
OUTDOOR GROUNDING BAR
PGND CABLE 25 mm2 LENGTH (m)
FEEDER WINDOW
OUTDOOR LADDER LENGTH
ANTENNA POLE
LAN CABLE
POWER CABLE

NO
NO
50 mts
NO
NO
YES
50 mts
50 mts

Remarks:
The cabinet outdoor will be installed in four floor next to pole of LTE antenna

Pole

OUTDOOR
CABINET
ZXSDR
B8200

To the 10th Floor

Pole of 2.30 Mts
To the 10th Floor
To the 10th Floor

NORTH SITE VIEW

SOUTH SITE VIEW

EAST SITE VIEW

WEST SITE VIEW

OUTDOOR CABLE LADDER

OUTDOOR GROUNDING BAR

RACK POSITION (10 floor)

INDOOR CABLE LADDER

POWER SUPPLY

DC PDB

AC PDB

INDOOR GROUNDING

COVERAGE

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close