Project execution and operation of the world’s first FDPSO – Azurite
- Claes W. Olsen, Prosafe Production

1

Content


Introduction



Project overview



FDPSO specifics



Project execution



Operations



Lessons learned



The future



Summary

2

Company Profile


One of the world’s leading FPSO contractors



Fleet of 11 units, including


Large Gas FPSO (ca 20,000T topside)



Worlds first FDPSO



Harsh weather disconnectable FPSO



Two FSOs



VLCC conversion candidate



Solid project execution and operational
experience built over more than 20 years



Proven proprietary turret/swivel mooring
technologies, including dis-connectable turret



Excellent operational uptime (>99%)



Excellent HSE records

Cost efficiency, innovative solutions and sustainable growth
3

Global Presence
- Vessels
- Offices

Amsterdam

FSO ENDEAVOR
(India)
Cyprus

FSO MADURA JAYA
(Indonesia)

Houston

FPSO ESPOIR IVOIRIEN
(Cote D'Ivoire)

Mumbai
Abidjan

Lagos
Singapore

FPSO CIDADE DE SAO MATEUS
(Brazil)

Pointe Noire
Vittoria
Rio de Janeiro

FPSO NINGALOO VISION
(Australia)

FPSO UMUROA
(New Zealand)
Perth

FPSO POLVO
(Brazil)

New Plymouth

FPSO ABO
(Nigeria)

FPSO PETROLEO NAUTIPA
(Gabon)

FDPSO AZURITE
(Congo)

4

Safety First – Always

Lost Time Incident Frequency
against Million Man-hours

1,6

1,4

1,2

1

0,8

0,6

0,4

0,2

0

2006

2007

2008

2009

Prosafe Production Project Safety Statistics 2006 - 2009

The Azurite Field Development delivered without Lost Time Injuries !
5

FDPSO Azurite - A Success

Murphy Oil Corporation’s President and CEO, David M. Wood:
“The Azurite project marks an innovative approach to
minimizing the cost and maximizing the value of a
deepwater development. Production from the field will
continue to ramp up for the remainder of the year as
additional wells are brought on stream.”
Source: Press Release , 10 August 2009

6

Key Project Milestones


Concept definition late 2006



Long lead items placed early 2007



Left shipyard January 2009



Ready for drilling April 2009



First oil August 2009

Fast track project execution in a heated and challenging market environment

7

FDPSO Specifics


260,000 dwt VLCC conversion



Oil Production:

40,000 BOPD



Gas production:

75 mmscfd



Water injection:

60,000 BWPD



Oil storage:

1.4 mmbbls



Accommodation:

136 POB



12 line “active” spread mooring solution



Modular drilling derrick capacity:


1,250kip hook load



Top Drive: 500T x 1,150HP
Simultaneous drilling, production and water injection
8

FDPSO Design Process
Prosafe Production

Murphy Oil

Experience

Nabors Drilling

Innovation

Cooperation

Well
intervention

Production

&
Drilling
Integrated
FDPSO
Concept

A unique concept based on proven technology and entrepreneurship
9

Strong Project Partners
• Murphy Oil supported by Doris and WJM
- operatorship, functional specifications and follow-up

• Keppel Shipyard, Benoi
- Vessel R&LE and conversion + drilling modules integration

• Nabors Drilling
- Modular drilling equipment set + drilling services

• Kencana, Malaysia
- Provision of topside modules

• Det Norske Veritas (DNV)
- Classification and design reviews

Licence partners PA Resources and Société Nationale des Pétroles du Congo
10

Offshore Installation Phase


Field located in 1,400 m of water depth



80 nautical miles offshore



12 line “active” spread mooring system



3 flexible risers (2 prod + 1 WI) connected
to subsea manifold



Good planning and close co-operation
between involved parties



Offshore hook-up / installation
management by Prosafe Production
Installation campaign offshore Congo done in record time of 8 days
11

Field Layout

12

Simultaneous Operations


Simultaneous drilling and production


Drilling services by Nabors



All other operations done by Prosafe Production



Coherent HSE philosophy



Operations and maintenance managers in country



Training program for national employees



All support activities managed locally

A strong in-country presence ensuring safe and efficient operations

13

Lessons Learned


The general challenges of a “heated market”



Interpretation of class rules for new concepts



Optimization of drilling and FPSO yard

integration work


Definition of interfaces drilling/production



Freeze of “conceptual designs”



Close co-operation between Operations and
Project teams – a key to success



Communication over time zones
Optimizations will be realized during the next FDPSO project
14

FPSO - Demand


Pipeline of floating production
projects continue to grow



Drivers for F(D)PSO concept
remains intact



Leading indicators point to
strong long-term demand



Supply side decreasing

No. of FPU projects in planning stage
170

134

141

143

Jul-08

Nov-08

156

160

Mar-09

Jul-09

119

Nov-07

Mar-08

Nov-09

Source: IMA

Bright long-term outlook

15

Leading Indicators
Brent oil price – high for several years

Oil price has remained
high for several years
(except of a few
months late 2008/early
2009)



Deepwater drilling
activity is set to remain
high for several years
to come

Deepwater drillers – high activity level expected
180

Available

160

Contracted

140
50

120
Rig years



100

97

110

132

1

80
60

Positive leading indicators

81

8

40

97

112

101

89

74

62

20

40

0
2009

2010

2011

2012

2013

Source: First Securities

2014

2015

16

FDPSO – Drivers
Implications

Main Challenges

Deep
waters

Increased
exploration
in “difficult”
areas

High cost for production and
drilling units

FDPSO Benefits?

Yes

Lack of infrastructure
Remote
areas

Marginal
fields

High cost for mobilization of
drilling rigs

Short lifetime of fields and need
of well intervention capabilities

Yes

Yes

Marginal
fields

Needs for early production and extended life of fields are important drivers

17

Future Drilling Market

18

18

Commercial Benefits of FDPSO
Dayrate of FDPSO vs. Drilling Unit and FPSO

• Lower combined cost of drilling and
production*

• Accelerated production

Drilling rig + FPSO

450,000
Dayrate in USD per day

USD 300k/day vs. USD 470k/day
(FDPSO)
(Drilling rig + FPSO)

500,000

400,000
350,000
300,000
FDPSO

250,000
200,000

Topside drilling rig removed from FDPSO

150,000
100,000
50,000

FDPSO – production from 1st well
FPSO – production from arrival of FPSO

0
Arrival of FPSO

Sample Production Profile
FDPSO vs. Drilling Unit + FPSO

60,000

* Indicative rates for 1,500 m drilling rig, single hull
FPSO with 1.5 mill bbls storage in benign area, 50,000
bopd, 50,000 b/d water inj., Spread moored, 15 year life

50,000

Oil Production b/d

• Lower cost of logistics and
consumables

Time

Completion of drilling

40,000
30,000
FDPSO
Drilling Unit + FPSO

20,000
10,000

Benefit from accelerated production depends
on timing of arrival of FPSO

0
0

20

40

60
Months

80

19

100

19

FDPSO Competitiveness
• Benefits from “fast tracking” the field development
• Availability and cost of drilling rigs
• The length of the drilling program, and need for future wells
• The number of wells that can be drilled with “active” spread mooring
• The complexity of the wells and need for future well intervention
• Benefits from simultaneous drilling and production

• Benefits from a phased field development (EWT period, EPS etc)
• Re-deployment on future fields
• The environmental conditions at the field
Competitiveness is determined by a range of factors
20

Offering a Range of Services
• FDPSO design and project execution
• Co-operation with modular drilling package providers
• Delivery of different sizes modular rigs
- Well intervention

- Well completions, in-fill drilling/side-tracks
- Full drilling capacity

• Simultaneous operations
- Including drilling and well services

• Split of responsibilities dependant upon client and contractor team
- Experience and capabilities
Prosafe Production will expand the range of FDPSO services
21

Summary
• A unique FDPSO successfully delivered

• Exceptional safety performance
• World class operational performance

• Cost efficient solution
• A Catalyst for marginal, remote and deepwater fields
• Expanding the range of FDPSO services
• Optimizations of the next project execution

FDPSO Azurite – An innovative stepping stone for the industry
22

Thank You for Your Attention

23

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close