Tariq CV IBS

Published on November 2022 | Categories: Documents | Downloads: 4 | Comments: 0 | Views: 26
of 4
Download PDF   Embed   Report

Comments

Content

 

TARIQ MAHMOOD Phone: +92-345-4493514, +92-302-8488790 Phone: [email protected],, [email protected] E-mail:: [email protected] E-mail Present Address: Address:  H # 84, Block L, Shah Ruken-e-Alam Colony Multan, Pakistan.  

Permanent Address: H # 29, Street # 7, Zaildar Road Ichra Lahore, Lahore, Pakistan.  Pakistan.  OBJECTIVE: I am seeking a position in a dynamic field of Telecom & Electrical Engineering, which commensurate with my   qualification and experience resulting in growth of my career and organization as well.  P R O F I L E :

I have 4+ years of extensive experience in the Telecommunications Technology. Expert in Implementation & Troubleshooting of Nokia of Nokia IBS Sites, Sites, NOKIA Ultra BTS, BTS, NOKIA FLEXI EDGE BTS, BTS, NOKIA IBS Metro Sites, Sites, SIEMENS BS240XL BTS, BTS, NOKIA Flexi Hopper MW Transmission, Transmission , Siemens SralxD MW Transmission,, Huawei RTN600/620 Commission Transmission Commissioning ing,, Sweep Testing, BER Testing, Troubleshooting and Integration of MW Media from BSC. Good at organizational skills, time management and has the ability to handle multiple projects and deadlines. PROFESSIONAL

EXPERIENCE

DURATION: 

DESIGNATION: 

Ju Junn-09 09 to FebFeb-11 11

BSS BSS En Engi gine neer er (Tea (Team m Le Lead ad))

PROJECT:  Tele Teleno norr GS GSM M PK

COMPANY NAME:  IKAN IKAN EN ENGI GINE NEER ERIN ING G SERV SERVIC ICES ES

Responsibilities as TI Team Leader: o o

o o o o o o o o o o o

Reporting to National Manager TI and Regional Project Manager. Responsible for all TI Activates in the Region, including Implementation, Commissioning, Alarm patching, Sweep Test, Troubleshooting to Partial Acceptance and Final Acceptance of a site. Responsible to carry out all the TI the Rollout activates in the region to meet monthly targets. Responsible to maintain the Quality of TI installation as described by the client (Telenor). Responsible for assigning the daily task to TI team. Responsible for Co-ordination with Telenor and sub cons. Responsible for making FAB forms for more than 200 sites. Responsible for coordination with Regional CW, Site Acq. Team Leader for the successful execution of the monthly targets. Hand on experience on commissioning, integration of Nokia BTS. Hand on experience on Commissioning, Troubleshooting, Panning and Alignment of the PDH link of Nokia. Hand on experience on Sweep Test using the BIRD for comm. scope cable. Also has performed the Partial Acceptance Test (PAT) for the numerous sites.

Nokia Indoor BTS (IBS) Site Commissioning & Troubleshooting: o o

Nokia IBS Site Installation, Commissioning & Troubleshooting. Integration of IBS through PDH/SDH integrated Transmission with Flexi Hopper.

o o o o o o o o o o o o o

Nokia IBS Site Commissioning with (000/444) single Cabinet Configuration. Nokia IBS Site BTS Commissioning with (222/444,222/343, 222/424, etc) dual Cabinet Expansion. Nokia IBS Site BTS Expansion (simple and complex) with single/dual Cabinet. Nokia IBS Site BTS Abis Creation for (TCH, TRXSIG, EDAP, OMU). NOKIA E1 Sharing Complex Expansion Dual BTS and Abis Allocation. NOKIA Diversity Frame in Antenna Mount Expansion. NOKIA ET/HiT & NEC C-Node Patching & Cross Connection. NOKIA Soft Cross Connection using BTS HUB Manger. NOKIA ABIS Traffic Allocation with EDGE Implementation. NOKIA BTS Environmental Alarms Commissioning & Troubleshooting. NOKIA BTS Internal HW Alarms Troubleshooting. NOKIA Sweep Testing using BIRD and ANRITSU Site Master (900+1800 Bands).

 

DURATI DUR ATION: ON: Jun-2008 to Jun-09

DESIGN DES IGNATI ATION: ON: BSS & TXN Engineer

PROJECT PROJ ECT:: Telenor GSM PK

COM COMPANY PANY NAME NAME:: IKAN ENGINEERING SERVICES

Technical Expertise with Nokia Flexi Hopper (MW Transmission): o o o o o o o o o o o o

Nokia Flexi Packet Networks & Flexi Hub MW Network Implementation & Troubleshooting. Nokia Flexi Hub configuration with Nokia Flexi Packet Hub. Commissioning & Configuration of Nokia Flexi Packet HW 1200 & 2200. Configuring the Flexi Packet 1200 & 2200 for 2G(E1) and 3G(Eth) interfaces. Configuring the MW Chain site without Flexi Packet First Mile. Performance and Monitoring of Flexi Packet Networks. Nokia Flexi Hopper 4/8/16xE1 IDU, ODU (1+0) configuration and commissioning. Nokia Flexi Hopper 4/8/16xE1 IDU, ODU (1+0) configuration and commissioning. Nokia Flexi Hopper FIU19E 16xE1 IDU, (1+1) ODU configuration and commissioning. Nokia E1/T1 Cross Connection configuration b/w different MW Links. Nokia Flexi Hopper FIU19E to RRI E1 Cross connection creation. Nokia BSC3i ET to PDH Cross Connection Creation & Hard Patching with HiT.

Technical Expertise with Siemens SralxD (MW Transmission): o o

Siemens SralxD 4/8/16xE1 PDH (1+0) configuration and Commissioning. Siemens SralxD 16/32xE1 PDH (1+1) with HSB Protection Commissioning.

o o o o o o o o

Siemens SralxD SralxD up up gradation gradation 16/32xE1 8xE1 using License update of Memory Key ofShifting. IDU. Siemens with IDU Replacement and Traffic Siemens SralxD 32xE1 SD, (1+1) Configuration and Commissioning. Siemens SralxD MW Equipment Inventory generating & Physical Alarm Testing. Siemens SralxD Access the Far End Site remotely at Near End using NCT 7.0 & Net Builder. DCN Connectivity of MW Network Links for NMS access on Terminal. Testing the External and Environmental Alarm of NE and Alarm History Analysis. Siemens CBSC & EBSC Cross Connections Creation & PCMB Creation.

Technical Expertise with HUAWEI RTN600 (MW Transmission): HUAWEI RTN610/620 IDU & ODU Installation and Commissioning. o HUAWEI RTN610/620 Configuration Configuration using Optix iManager T2000 T2 000 Web LCT. Configuration & Commission Optix RTN600 4/8/16xE1 and 1xSTM-1. o o Configuration of IDU Boards (PXC, SCC, IF1A,IF1B,IFX, PH1,PO1 PH1,PO1 SL1, SD1, EFT-4, EMS-6,etc). Implementation of Service Protection and Equipment Protection Schemes of the Optix RTN 600 o Implementation of RTN620 with 1+1 Hot Stand By (HSB) protection o o Implementation of RTN620 with Microwave 1+1 Space Diversity (SD) protection Implementation of RTN620 with Microwave 1+1 Frequency Diversity (FD) protection o o Implementation of RTN620 with Sub-network connection protection (SNCP) o Implementation of RTN620 with Cross-connect and clock unit (PXC) active/standby protection Configuration of IDU 605 1A 5xE1 (1+0) Microwave Transmission Network. o o Configuring the HUAWEI IDU 605 1B 16xE1 (1+0) Microwave Transmission Network. Configuring the HUAWEI IDU 605 2B 16xE1 (1+1) Microwave Transmission Network. o Configuring the HUAWEI IDU 610 16xE1 (1+0) Microwave Transmission Network. o o Configuring the HUAWEI IDU 620 16xE1 (1+1) Microwave Transmission Network. DCN Connectivity of HUAWEI RTN 600/620 IDUs. WM Transmission Nodes. o o E1 Line Cross Connection of HUAWEI RTN 610/620 MW Transmission Network. URATION: URAT ION: DES DESIGN IGNATI ATION: ON: PROJECT PROJ ECT:: COM COMPANY PANY NAME NAME:: o

Mar-2007 to Jun 2008

BSS & TXN ENGINEER

NSN GSM PK

MYSON ENGINEERING SYSTEMS

Technical Expertise with Nokia Ultra Site (BTS): o o o

Nokia Ultra Site BTS Installation & Commissioning. Nokia Ultra Site BTS Commissioning with (222/222) single Cabinet. Nokia Ultra Site BTS Commissioning with (222/444,222/343, 222/424, etc) dual Cabinet.

 

o o o o o o o o o o

Nokia Ultra Site BTS Expansion (simple and complex) with single/dual Cabinet. Nokia Ultra Site BTS Abis Creation for (TCH, TRXSIG, EDAP, OMU). NOKIA E1 Sharing Complex Expansion Dual BTS and Abis Allocation. NOKIA Diversity Frame in Antenna Mount Expansion. NOKIA ET/HiT & NEC C-Node Patching & Cross Connection. NOKIA Soft Cross Connection using BTS HUB Manger. NOKIA ABIS Traffic Allocation with EDGE Implementation. NOKIA BTS Environmental Alarms Commissioning & Troubleshooting. NOKIA BTS Internal HW Alarms Troubleshooting. NOKIA Sweep Testing using BIRD and ANRITSU Site Master (900+1800 Bands).

Technical Expertise with Siemens BS240xL (BTS): o o o o o o o o o

SIEMENS BS240XL EDGE BTS Installation and a nd Commissioning. SIEMENS BS240XL BS240XL Edge BTS Software up gradation BR80, BR90 and BR91 SIEMENS Simple Simple & Complex Expansion with Single and Dual Cabinets. SIEMENS Commissioning Commissioning the BS240xL with different configuration (222/222, 2 222/444, 22/444, 222/666). SIEMENS BTS Environmental Alarms Commissioning & Troubleshooting. SIEMENS BTS Internal HW Alarms Troubleshooting with BS240xL Cabinet. SIEMENS BSC & EBSC to BTS Media Clearance for Cell Site Expansion. SIEMENS TYPE2 and TYPE4 BTS (BS240XL) Installation and Commissioning. SIEMENS EDGE Implementation Implementation and Call Testing.

Technical Expertise with Power One, Eltek, Delta Rectifiers (Power): o o o o o

Commissioning the Power One, Eltek & Delta Rectifiers for -48V power supply for BTS. Commissioning the Rectifier Alarms (Rectifier Failure, Low Volt, High Volt, Symmetry, OVBD, FAN, AC Main, Hex,). Testing the Rectifier Batteries Voltage and drainage with 2 Hours Battery Test. Configuration the Rectifier Switching Relays on different Rectifier output Alarm Terminal. Fault Troubleshooting and HW Replacement for Alarm Terminal Card of Rectifiers.

Professional Trainings NOKIA Flexi (FCOA) EDGE BTS Installation & Commi Commissioning: ssioning: (May 25 2009 to May 27 2009)

o

Nokia Flexi FCOA BTS Commissioning. Nokia Flexi FCOA BTS Installation. Nokia Flexi FCOA Modules (ESMA, DTRX, DDU) Installation. Nokia Flexi FCOA Modules (ESMA, DTRX, DDU) Commissioning.

o

Nokia Flexi MW Transmission FIPA, FIFA Card Installation & Commissioning.

o

Nokia Flexi ECA (External Alarm Configuration) Installation & Commissioning.

o o o

HUAWEI BTS & MW Equipment Ins Installation tallation & Commi Commissioning: ssioning: (Feb 09 2009 to Feb 1 14 4 2009) o HUAWEI BTS3012EA Commissioning. HUAWEI BTS3012EA Installation. o HUAWEI RTN600/620 Commissioning. o HUAWEI RTN600/620 Installation. o o

HUAWEI DG Installation & Commissioning.

P r o f e s s i o n a l T o o l s & S o f t w a r e s : 1. 2.

Path Loss 4.0 Nok Nokia ia EGDE EGDE BTS BTS M Mana anager ger Ver Versio sion n 2. 2.0. 0.

3. 4.

Nokia Ultra Site BTS Hub Manager Version 4.5. TE TEMS MS for for D Dri rive ve Te Test stin ing. g.

5. 6. 7.

Flexi EDGE BTS Manager. Noki Nokia a Ho Hopp pper er M Man anag ager er.. LMT LMT Evo volluti ution. on.

8. 9.

NCT 7.0 & Net Builder. Web LCT T2000.

10. Nokia Ultra Site HW Configuration. 11. Map In Info fo Prof Profession essional al Ver Version sion 8. 8.5. 5.

EDUCATION DURATION:

DEG DEGREE REE

UNI UNIVER VERSIT SITY Y

GRA GRADE DE

 

2002—2007 2000—2002 1998—2000

BS (Elect Engr) HSSC SSC

REFRENCES  

Available on demand

University of Lahore BISE-Faisalabad BISE-Faisalabad

AA+ A+

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close