Nom de la tâche

TYP MIL Typicals milestones
TYP MIL.Project Main project Milestones

Durée
restante

535.0d
0.0d

Feed endorsement

0.0d

Start Project

0.0d

TYP MIL.P&S Process and Safety

0.0d
271.0d

PID Issued for design

0.0d

HAZOP Review report first issue

0.0d

PID Issued for construction

TYP MIL.CIV Civil / Earthwork

0.0d
380.5d

Building service technical specification

0.0d

First Piling Requisition

0.0d

Earthworks Drawings IFC (30%)

0.0d

Civil Drawings (30%)

0.0d

Civil Drawings Completion

TYP MIL.STR Structural
First Structural MTO
Steelwork drawings completion

0.0d
336.5d
0.0d
0.0d

TYP MIL.PIP Piping

406.3d

3D Model - 30 % progress

0.0d

Piping bulk first MTO

0.0d

Piping Valves 1rst MTO

0.0d

Plot plan (IFD)

0.0d

3D Model - 70 % progress

0.0d

Piping Valves last MTO

0.0d

Piping bulk last MTO

0.0d

Piping Isometrics - 50% of progress

0.0d

Piping support last MTO

0.0d

3D Model - 100 % progress

0.0d

Piping Isometrics - 99% of progress

TYP MIL.E&I Electrical & Instrumentation

0.0d
209.0d

Instruments first requisition for queries

0.0d

Control System requisition for query

0.0d

First main electrical equipment requisition for query

0.0d

Last main electrical equipment requisition for query

0.0d

Instruments last requisition for queries

0.0d

List of consumers & Power balance IFD

0.0d

First electrical cable routing drawings issued for construction

0.0d

Electrical bulk first MTO

0.0d

Last electrial cable routing drawings issued for construction

0.0d

Electrical bulk last MTO

PCS Process
PCS.PR Process discipline
PCS.PR.01 Design Basis

0.0d
525.0d
525.0d
249.0d

Block Flow Diagram (IFA)

23.0d

Design Basis (IFA)

23.0d

Equipment List (IFA)

45.0d

Process Description (IFA)

23.0d

Utility Information Specification (IFA)

23.0d

Design Basis (IFD)

23.0d

Utility Information Specification (IFD)

23.0d

Equipment List (IFD)

23.0d

Process Description (IFD)

23.0d

Block Flow Diagram (IFD)

23.0d

Equipmenty list (IFC)

PCS.PR.02 HMB & Process Flow Diagram

45.0d
182.0d

Heat & Material Balance (IFA)

23.0d

Process Flow Diagram & Utility Flow Diagram (IFA)

23.0d

Heat & Material Balance (IFD)

23.0d

Process Flow Diagram & Utility Flow Diagram (IFD)

23.0d

Process Flow Diagram & Utility Flow Diagram (IFC)

23.0d

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

545.3d

Basic design frozen

End of engineering

Mois
-1 1 2 3 4

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche

PCS.PR.04 Process data Sheet for Equipment & Pack

Durée
restante

45.0d

Process and Utility Data sheet for Equipment / Packages (

45.0d

Process Spec for critical Equipment (IFD)

45.0d

Process and Utility Data sheet for Equipment / Packages (

45.0d

Process and Utility Data sheet for Equipment / Packages (

45.0d

PCS.PR.05 Utility Consumption & Effluent List

45.0d
183.0d

Utility Balance (IFA)

23.0d

Table of simultaneous vent to Flare & Blow Down (IFA)

23.0d

Utility Balance (IFD)

23.0d

Table of simultaneous vent to Flare & Blow Down (IFD)

23.0d

Table of simultaneous vent to Flare & Blow Down (IFC)

23.0d

PCS.PR.06 Process and Instrument Diagrams (P&ID)

454.0d

PID / UID (IFA)

66.0d

PID / UID (IFD)

109.0d

PID / UID (IFC)

271.0d

PCS.PR.08 Calculation Report
Calculation Report

390.0d
390.0d

Adequacy checks of existing equip & system (IFA)

45.0d

Adequacy checks of existing equip & system (IFD)

66.0d

Dynamic Simulation (IFA)

42.0d

Dynamic Simulation (IFD)

PCS.PR.09 Safety & Shut Down Philo, CEM & Safegua

23.0d
395.0d

Shut Down & Blow Down Philosophy (IFA)

23.0d

Safeguarding Flow Diagram (IFA)

23.0d

Safeguarding Memorandum (IFA)

23.0d

Shut Down & Blow Down Narrative (IFA)

23.0d

Process Cause & Effect Matrix (IFA)

45.0d

Safeguarding Flow Diagram (IFD)

23.0d

Shut Down & Blow Down Narrative (IFD)

23.0d

Shut Down & Blow Down Philosophy (IFD)

23.0d

Process Cause & Effect Matrix (IFD)

23.0d

Safeguarding Memorandum (IFD)

23.0d

Process Cause & Effect Matrix (IFC)

45.0d

Safeguarding Memorandum (IFD 1)

PCS.PR.10 Valves & Instrumentation DS & Control ph

23.0d
440.0d

Control Philosophy (IFA)

23.0d

Process and Utility Control and Safety Valves data Sheet (I

45.0d

Control Philosophy (IFD)

23.0d

Control Narrative (IFA)

45.0d

Process and Utility Data Sheets of instruments & analyzers

45.0d

Process and Utility Control and Safety Valves data Sheet (IF

45.0d

Process and Utility Control and Safety Valves data Sheet (IF

45.0d

Process and Utility Data Sheets of instruments & analyzers

45.0d

Control Narrative (IFD)

23.0d

Control Narrative (IFC)

45.0d

Process and Utility Data Sheets of instruments & analyzers

PCS.PR.11 Health, Safety & Environment
HAZOP Analysis
Safety Integrity Level

45.0d
155.0d
23.0d
23.0d

HAZOP Analysis Follow up

132.0d

Safety Integrity Level Follow up

110.0d

PCS.PR.12 Materials Supply

187.3d

Chemical Supply Specification (IFA)

23.0d

Catalyst & Chemicals summary (IFA)

23.0d

Chemical Supply Specification (IFD)

23.0d

Catalyst & Chemicals summary (IFC)

23.0d

PCS.PR.13 Operating Manuals

289.8d

Operating Manual Index (IFA)

23.0d

Operating Manual Index (IFD)

23.0d

Operating Manual (IFA)
Precommissioning procedure
Operating Manual (IFC)

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

462.0d

Process Spec for critical Equipment (IFA)

Process Spec for critical Equipment (IFD 1)

Mois
-1 1 2 3 4

66.0d
154.0d
45.0d

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche
Test Run Performance Procedure (IFA)
Test Run Performance Procedure (IFC)

LPE Loss Prevention & Environnement
LPE.SE Safety engineering
LPE.SE.01 HSE Plan
HSE plan for engineering
HSE Plan General

LPE.SE.03 Project HSE Requirements

Durée
restante

23.0d
515.5d
482.0d
459.0d
88.0d
454.0d
89.0d
89.0d

Project Environmental Requirement

62.0d

HAZARD Identification for design

LPE.SE.07 HAZOP
Coarse HAZOP
Main HAZOP during detailed design

78.0d
78.0d
459.0d
43.0d
131.0d

Pre start HAZOP on modification

23.0d

LPE.SE.08 Safety Integrity Level

161.0d

Safety Integrity Procedure

45.0d

Safety Integrity Level Allocation Report

66.0d

LPE.SE.09 Safety at Site

23.0d

Operating Plan of safety

23.0d

LPE.LP Loss Prevention

515.5d

LPE.LP.01 Design Basis

177.0d

Active Fire Specification (IFA)

66.0d

Active fire specification (IFD)

45.0d

Active Fire Specification (IFC)

66.0d

LPE.LP.02 HMB and Process Flow Diagram

111.0d

Process Flow Diagram PFD ( HMB inclus) IFA

43.0d

Process Flow Diagram PFD ( HMB inclus) IFD

LPE.LP.04 Process data Sheets for eqp and Packages
Process data Sheet for Equipments (IFA)
Requirements for fire protection facilities in pack eqp and bu

23.0d
178.0d
23.0d
154.0d

Process data Sheet for Equipments (IFD)

23.0d

Process data Sheet for Equipments (IFC)

66.0d

LPE.LP.05 Utility Consumption and Effluent List
Electrical Load List

LPE.LP.06 Process & Instrument Diagram (P&ID)
PID (IFA)

45.0d
45.0d
220.5d
45.0d

PID (IFD)

45.0d

PID (IFC)

110.0d

LPE.LP.07 Firefighting Distribution Layouts

286.0d

Fire Master plan (IFA)

66.0d

Fire Master plan (IFD)

23.0d

Fire Protection Plan (Sprinker line location) IFA

23.0d

Fire Master plan (IFC)

66.0d

Fire Protection Plan (Sprinker line location) IFD

66.0d

Fire Protection Plan (Sprinker line location) IFC

LPE.LP.08 Calculation reports

23.0d
220.0d

Adequacy check for existing equipment and systems

23.0d

Calculation reports for distribution networks (IFA)

23.0d

Calculation reports for distribution networks (IFD)

45.0d

Calculation reports for distribution networks (IFC)

23.0d

Calculation reports for local distribution networks

LPE.LP.09 Safety & Shut down Philo, CEM & Safegua

45.0d
176.5d

Fire & gas cause and effect matrix (IFA)

23.0d

Fire & gas cause and effect matrix (IFD)

66.0d

Fire & gas cause and effect matrix (IFC)

LPE.LP.10 Valves and Instrum Data Sheets & Control

23.0d
117.0d

Process Data Sheet for Instrumentation (IFA)

21.5d

Process Control and Safety Valves Data Sheets (IFA)

23.0d

Process Control and Safety Valves Data Sheets (IFD)

23.0d

Process Data Sheet for Instrumentation (IFD)

LPE.LP.12 Operating Manual

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

23.0d

HSE Philosophy (safety concept)

LPE.SE.06 Hazard identification

Mois
-1 1 2 3 4

21.5d
155.0d

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche

Durée
restante

Operating Manual (IFA)

23.0d

Operating Manual (IFD)

132.0d

LPE.LP.13 Health, Safety and Environmental
HAZOP
SIL

23.0d
23.0d
132.0d

SIL action sheets

132.0d
91.0d

Loss Prevention Plan (IFA)

45.0d

Loss Prevention Plan (IFD)

23.0d

Loss Prevention Plan (IFC)

23.0d

LPE.LP.15 Safety Studies

132.0d

Anti Sismic Design Report (IFD)
CFD Simulation Report (IFD)

45.0d
132.0d

Flare Emission Study Report (IFD)

34.0d

Toxic Gas Dispersion Report (IFD)

34.0d

Vent Radiation Study Report (IFD)

LPE.LP.16 Risk Analysis
Building Risk-Assessment (IFA)
Building-Risk-Assessment (IFD)

45.0d
305.5d
34.0d
55.0d

Qualitative Risk Assessment (IFC)

132.0d

Quantitative Risk Assessment (IFC)

261.0d

Building-Risk-Assessment (IFC)

66.0d

LPE.LP.17 Safety Reports ( RdS)

460.0d

Preliminary Risk Assement Report (IFD)
Safety Report for minor plant modification (IFC)
Final Risk Assement Report (IFC)

LPE.LP.18 Safety Integrity Level Verification
SIL Verification Report (IFC)

LPE.LP.19 Hazardous Area Classification

144.0d
66.0d
250.0d
45.0d
45.0d
384.0d

Hazardous Area Classification Data Sheet (IFA)

45.0d

Hazardous Area Classification Data Sheet (IFD)

35.0d

Hazardous Area Classification Layouts (IFA)

77.0d

Hazardous Area Classification Layouts (IFD)

34.0d

HAC Supplementary Clarification (IFC)

45.0d

Hazardous Area Classification Data Sheet (IFC)

45.0d

Hazardous Area Classification Layouts (IFC)

45.0d

LPE.LP.20 Fire and Gas Detection Design

212.5d

Design Criteria (IFA)

23.0d

Design Criteria (IFD)

34.0d

Fire & Gas Schematic layout drawing (IFA)

66.0d

Design Criteria (IFC)

45.0d

Fire & Gas Schematic layout drawing (IFD)

23.0d

Fire & Gas Schematic layout drawing (IFC)

LPE.LP.21 Fireproofing Design

45.0d
268.0d

List of Potential source of fire (IFA)

40.0d

List of Potential source of fire (IFD)

21.0d

List of Potential source of fire (IFC)

21.0d

Fire Proofing layout drawing (IFA)

40.0d

Fire Proofing layout drawing (IFD)

21.5d

Fire Proofing layout drawing (IFC)

21.5d

List of structures and equipments to be fireproofed (IFA)

45.0d

List of structures and equipments to be fireproofed (IFD)

21.5d

List of structures and equipments to be fireproofed (IFC)

21.5d

LPE.LP.22 Emergency Management for Operation

391.0d

Environmental Emergency Plans for Operation (IFD)

45.0d

Pollution Contingency Plans for Operation (IFD)

45.0d

Emergency Escape drawings (IFA )

45.0d

Environmental Emergency Plans for Operation (IFC)

45.0d

Pollution Contingency Plans for Operation (IFC)

45.0d

Emergency Escape drawings (IFC)

LPE.LP.23 Safety Signs

23.0d
237.5d

Definition of Safety Signs Criteria (IFD)

45.0d

Layout drawings indicating Signs location (IFC)

45.0d

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

155.0d

HAZOP action sheet

LPE.LP.14 Loss Prevention & Environment Plan

Mois
-1 1 2 3 4

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche

Durée
restante

LPE.LP.24 RAM Analysis

111.0d

PLANT RAM Analysis (IFA)

88.0d

PLANT RAM Analysis (IFD)

LPE.LP.25 Environmental and Social Impact Assessm
Environmental impact assessment (IFA)
Environmental impact assessment (IFD)

LPE.LP.26 Environmental Studies for Operation

23.0d
88.0d
45.0d
332.5d
45.0d

Preliminary Noise Study (IFD)

23.0d

Noise Control Plan (IFA)

45.0d

Noise Control Plan (IFD)

23.0d

Final Noise Study (IFA)

45.0d

EQP Equipment & Packages
EQP.PK Process Packages & Handling

23.0d
446.4d
376.0d

Technical Specification Issue for PK

21.5d

Material Requisition for PK

10.0d

Technical Evaluation for PK

21.5d

Technical Documentation Issue for Order for PK
Vendor Doc Follow up for PK

EQP.CL Pressure Equipment

21.5d
270.0d
374.9d

Material Requisition for CL

21.5d

Technical Evaluation for CL

35.0d

Technical Doc Issue for order for CL
Vendor Doc Follow up for CL

EQP.FR Furnaces

21.5d
250.0d
383.5d

Technical Specification for FR

10.0d

Material Requisition for FR

10.0d

Technical Evaluation fo FR

21.5d

Technical Documentation Issue for Order for FR
Vendor Doc Follow up for FR

12.0d
250.0d

EQP.PE Energy Packages

354.0d

Material Requisition Issue for PE

21.5d

Technical Evaluation for PE

21.5d

Technical Documentation Issue for Order for PE
Vendor Documents Follow up for PE

EQP.MM Rotating Equipement

21.5d
258.0d
403.5d

Technical Specification for MM

22.0d

Material Requisition for MM

21.5d

Technical Evaluation for MM

21.5d

Technical Doc Issued for Order for MM
Vendor Doc Follow up for MM

EQP.SC Shell & Columns

21.5d
270.0d
348.0d

Thermal Design for SC

21.5d

Material Requisition for SC

21.5d

Technical Evaluation for SC

35.0d

Technical Doc Issued for Order for SC
Vendor doc Follow up for SC

PIP Piping & Layout
PIP.TB Piping
PIP.TB.02A Process P&ID Mechanization

21.5d
215.0d
545.3d
545.3d
387.0d

Process PID Mechanization (IFA)

53.8d

Process PID Mechanization (IFD)

75.3d

Process PID Mechanization (IFC)
Process PID Mechanization (update)

PIP.TB.03 Plot Plan & Single Line Structure
Plot Plan (IFA)

64.5d
193.5d
454.0d
129.0d

Single Line Structure IFA

86.0d

Single Line Structure IFD

150.5d

Plot Plan (IFD)

150.5d

Plot Plan (IFC)

107.5d

Plot Plan (update)

129.0d

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

228.0d

Preliminary Noise Study (IFA)

Final Noise Study (IFD)

Mois
-1 1 2 3 4

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche

PIP.TB.04 Underground Networks

Durée
restante

64.5d

Underground Networks MTO1

32.3d

Underground Networks (IFD)

53.8d

Underground Networks MTO2

53.8d

Underground Networks (update)

PIP.TB.05 Materials Specification
Specifications of Piping Component
Valves Specifications
Bids:Control & Tech Appraisal (piping component) (TE1)

86.0d
150.5d
454.0d
43.0d
155.0d
86.0d

Update Specification with Engineering & Client

150.5d

Bids for material not covered in previous agreement (TE2)

107.5d

Final Revision of Material Specification

248.0d

Technical Appraisal for Motorized Valves (TEV)

PIP.TB.06A Market Evaluation & Project Agreement
MTO for TB06A
Technical Evaluation for TB06A

PIP.TB.06B 1rst Piping Material Take Off

52.0d
52.5d
31.0d
21.5d
118.3d

MTO1 for piping bulk

32.3d

Material Requisition

43.0d

Technical Evaluation

43.0d

PIP.TB.06C 2nd Piping Material Take Off

64.5d

MTO2

32.3d

Material Requisition (for missing material on MTO1)

32.3d

PIP.TB.06D 3rd Piping Material Take Off (3rd MTO)

86.0d

MTO3

21.5d

Material Requisition (for missing material on MTO2)

43.0d

Technical Evaluation

PIP.TB.07 Piping Layout above ground
Preliminary Routings (Nozzles Orientation-Bases profile)

21.5d
440.8d
64.5d

Intermediate 3D Model (Piping layout & supports)

150.5d

Final 3D Model (Update piping layout above ground)

225.8d

PIP.TB.08 Isometrics
Isometrics (drawings with materials list)

PIP.TB.09 Piping Arrangement

310.0d
310.0d
451.5d

Key Plan Execution

75.3d

Piping Arrangment

172.0d

PIP.TB.10A Stress Analysis
General Specification for stress analysis
Material Requisition 1

429.8d
258.0d
43.0d

Technical Evaluation 1

21.5d

Vendor's doc. follow up

129.0d

Material Requisition 2

53.8d

Reports & Calculations

129.0d

Technical Evaluation 2

70.0d

Field Assistance

PIP.TB.11A Ladders & Platforms 1 MTO
MTO 1
Material Requisition 1
Vendor's doc. follow up 1

48.0d
198.5d
21.5d
21.5d
130.0d

MTO 2

10.8d

Material Requisition 2

43.0d

Vendor's doc. follow up 2

PIP.TB.11C Engineering and ladders and platforms
Ladders and platform layout
Ladders and platform layout (updated)

PIP.TB.12 Valves Materials MTO

64.5d
150.5d
64.5d
64.5d
246.0d

Valves specifications 1 (MR1)

21.5d

Valves MTO 1

53.8d

Material Requisition 1

43.0d

Valves MTO 2

53.8d

Material Requisition 2

64.5d

Valves specifications 2 (MR2)

21.5d

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

377.8d

Underground Networks (IFA)

Underground Networks (IFC)

Mois
-1 1 2 3 4

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche

PIP.TB.02B Utility Distribution P&ID

Durée
restante

43.0d

Utility Distribution Diagrams Mechanization(IFD)

43.0d

Utility Distribution Diagrams Mechanization (Update)

PIP.TB.10B Piping Supports

64.5d
182.8d
365.5d

Definition of Support Engineering Methodology (case B)

64.5d

Design of Support Engineering Methodology (case A)

64.5d

MTO 1 (case A)

21.5d

MTO 1 (case B)
Definition of standard and special supports (case A)
Material Requisition 1 (case B)
MTO 2 (Case B)
Support Standardization (case B)

43.0d
150.5d
43.0d
54.8d
215.0d

Material Requisition 2 (case B)

43.0d

MTO 2 (case A)

43.0d

MTO 3 (Case B)

64.5d

Material Requisition 3 (case B)

INS Instrumentation
INS.AS Instrumentation

43.0d
523.0d
523.0d

INS.AS.01 PID & Loop Data Sheet

395.0d

Instrument Data Base (Data entry)

334.0d

General Specification (IFA)

35.0d

PID Mechanization (IFA)

86.0d

General Specification (IFD)
PID Mechanization (IFD)

INS.AS.02 Control, Motorized & Safety valves

35.0d
108.0d
407.5d

Quality / Technical Spec for AS02 (IFA)

65.0d

Data Sheet & Calculation for AS02 (IFA)

151.0d

Quality / Technical Spec for AS02 (IFD)

42.0d

Technical Evaluation for AS02

82.0d

Data Sheet & Calculation for AS02 (IFC)
Vendor Doc Follow Up for AS02
Quality / Technical Spec for AS02 (IFC)

INS.AS.03 Measurement & Control Instrument

85.0d
193.0d
86.0d
355.0d

Quality / Technical Spec for AS03 (IFA)

67.0d

Data Sheet & Calculation for AS03 (IFA)

129.0d

Quality / Technical Spec for AS03 (IFD)

42.0d

Technical Evaluation for AS03

105.0d

Vendor Doc Follow Up for AS03

205.0d

Data Sheet & Calculation for AS03 (IFC)
Quality / Technical Spec for AS03 (IFC)

INS.AS.04 Analysers Systems

64.5d
65.0d
367.0d

Quality / Technical Spec for AS04 (IFA)

42.0d

Data Sheet & Calculation for AS04 (IFA)

43.0d

Quality / Technical Spec for AS04 (IFD)

34.0d

Technical Evaluation for AS04
Vendor Doc Follow Up for AS04
Data Sheet & Calculation for AS04 (IFC)
Quality / Technical Spec for AS04 (IFC)

INS.AS.05 Supervision & Control Systems
General Spec for AS05
Functional & Detailed technical Spec for AS05
Technical Evaluation for AS05
Vendor Doc Follow Up for AS05
Factory Acceptance Test (FAT) for AS05

INS.AS.06 Safety, Alarm & Automation System
General Spec for AS06
Functional & Detailed technical Spec for AS06
Technical Evaluation for AS06
Vendor Doc Follow Up for AS06
Factory Acceptance Test (FAT) for AS06

INS.AS.08 Process Simulators
General Spec for AS08

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

333.3d

Utility Distribution Diagrams Mechanization (IFA)
Utility Distribution Diagrams Mechanization(IFC)

Mois
-1 1 2 3 4

56.0d
200.0d
21.0d
20.0d
438.5d
45.0d
237.0d
44.0d
193.5d
86.0d
393.0d
23.0d
215.0d
44.0d
205.0d
43.0d
403.0d
23.0d

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche
Functional & Detailed technical Spec for AS08
Technical Evaluation for AS08
Vendor Doc Follow Up for AS08
Model Acceptance Test (MAT) for AS08
Factory Acceptance Test (FAT) for AS08

INS.AS.09 Installation drawings & Materials

Durée
restante

44.0d
215.0d
24.0d
43.0d
373.5d
65.0d

1° MTO, sketches, datasheets, BOQ (IFA)

64.5d

Main Cable Routing Layouts (IFA)

54.0d

Quality / Technical Job Spec for AS09 (IFD)

43.0d

Job Spec for ins. installation on vessels (IFA)

64.5d

Vendors Doc Follow up for 1°MTO AS09

84.0d
129.0d

Detailed cable Run Layouts (IFA)

67.0d

Job Spec for inst. installation on vessels (IFD)

35.0d

1° MTO, sketches, datasheets, BOQ (IFC)

86.0d

Quality / Technical Job Spec for AS09 (IFC)

86.0d

Wiring Diagram (IFD)

90.0d

Main Cable Routing Layouts (IFD)

43.0d

2° MTO

65.0d

Detailed cable Run Layouts (IFD)

43.0d

Vendors Doc Follow up for 2°MTO AS09

65.0d

Main Cable Routing Layouts (IFC)
Wiring Diagram (IFC)

43.0d
107.5d

Detailed cable Run Layouts (IFC)

42.0d

3°MTO

43.0d

Vendors Doc Follow up for 3°MTO AS09

43.0d

Job Spec for instrum instal on vessels (IFC)

INS.AS.10 Control Room Drawings

35.0d
392.5d

Wiring Diagram (IFA)

66.0d

Control & Technical Rooms Layouts (IFA)

65.0d

Detailed Layouts (IFA)

65.0d

Wiring Diagram (IFD)

43.0d

Control & Technical Rooms Layouts (IFD)

43.0d

Wiring Diagram (IFC)

43.0d

Control & Technical Rooms Layouts (IFC)

42.0d

Detailed Layouts (IFD)

45.0d

Detailed Layouts (IFC)

INS.AS.11 Instrum Packages & Follow up from other

45.0d
336.5d

Technical Spec for AS11 (IFA)

54.0d

Technical Spec for AS11 (RFA)

43.0d

Technical Evaluation for AS11

44.0d

Technical Spec for AS11 (IFD)
Vendor Doc Follow Up for AS11

INS.AS.20 Telecommunication Systems
Technical Spec for AS20 (IFA)
Plant Layout with Telecom equipment locati (IFA)

21.0d
207.0d
396.5d
61.0d
162.0d

Technical Spec for AS20 (IFD)

38.0d

Technical Evaluation for AS20

84.0d

Plant Layout with Telecom equipment locati (IFC)

77.0d

Vendor Doc Follow Up for AS20

190.0d

Wiring Diagram

190.0d

Technical Spec for AS20 (IFC)

INS.AS.21 Telecommunication System Packages

77.0d
470.0d

General Spec for AS21 (IFA)

61.0d

General Spec for AS21 (IFD)

38.0d

General Spec for AS21 (IFC)

22.0d

Technical Evaluation for AS21
Vendor Doc Follow Up for AS21

ELE Electrical
ELE.LAY Electrical Layouts
ELE.LAY.03C Electrical Load Data, Cable Sizing & rep

63.0d
314.0d
484.0d
484.0d
377.0d

Electrical Load List - 1st Issue (25%)

43.0d

Electrical Load Summary - 1st Issue (25%)

43.0d

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

213.0d

Quality/Technical Job Spec for AS09 (IFA)

Wiring Diagram (IFA)

Mois
-1 1 2 3 4

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche

Durée
restante

Power Cable Sizing Criteria (IFA)

22.0d

Power Cable Sizing Criteria (IFA Update)

10.0d

Electrical Load List - 2nd Issue (55%)

63.0d

Electrical Load Summary - 2nd Issue (55%)
Power Cable Sizing Calculation - 1st Issue (70%)

61.0d
10.0d

Electrical Load List - 3rd Issue (70%)

66.0d

Electrical Load Summary - 3rd Issue (70%)

62.0d

Power Cable Sizing Calculation - 2nd Issue (80%)

20.0d

Electrical Load List - 4th Issue (80%)

10.0d

Electrical Load Summary - 4th Issue (80%)

10.0d

Power Cable Sizing Calculation - 3rd Issue (90%)

10.0d

Electrical Load List - 5th Issue (90%)

10.0d

Electrical Load Summary - 5th Issue (90%)

10.0d

Electrical Load List - Final Issue

10.0d

Electrical Load Summary - Final Issue

10.0d

ELE.LAY.03B Electrical System Design

10.0d
442.0d

Electrical System Design (IFA)

22.0d

Electrical Proj. Document Standardization (IFA)

22.0d

Electrical System Control (IFA)

45.0d

Electrical System Design (IFA Update)

10.0d

Elec System Field Inspection & Test Plan (IFA)

22.0d

Electrical System installation (IFA)

22.0d

Erection BoQ List 1

21.5d

Electrical Proj. Document Standardization (IFA update)

40.0d

Electrical System Design (IFD)

10.0d

Electrical System Control (IFA Update)

21.0d

Electrical System installation (IFD)

14.0d

Erection BoQ List 2

10.0d

Elec System Field Inspection & Test Plan (IFD)

14.0d

Electrical System Control (IFD)

10.0d

Electrical Proj. Document Standardization (IFD)

22.0d

Erection BoQ List 3

10.0d

Erection BoQ List 4

10.0d

Erection BoQ List 5

10.0d

Electrical System Operating Manual (IFA)

43.0d

Electrical System Operating Manual (IFD)

ELE.LAY.03D Elec Single Line Diagram, Interconnect

44.0d
413.5d

Electrical General Single Line Diagram (IFA)

43.0d

Electrical General Single Line Diagram (IFA Update)

63.0d

Substations Single Line Diagram (IFA)

22.0d

Substations Single Line Diagram (IFA Update)

42.0d

Electrical General Single Line Diagram (IFD)

65.0d

Substations Single Line Diagram (IFD)

42.0d

Interconnection Wiring Diagram (IFA)

66.0d

Interconnection Wiring Diagram (IFD)

42.0d

Interconnection Wiring Diagram (IFC)

ELE.LAY.03E Electrical System Studies & reports

65.0d
479.0d

Motor Starting Studies (IFA)

43.0d

Short Circuit / Load Flow (IFA)

43.0d

Earthing Studies (IFA)

23.0d

Earthing Studies (IFA Update)

42.0d

Harmonic Studies (IFA)

43.0d

Motor Starting Studies (IFA Update)

63.0d

Short Circuit / Load Flow (IFA Update)

63.0d

Transcient Stability (IFA)

43.0d

Earthing Studies (IFD)

41.0d

Lighting Studies (IFA)

42.0d

Plant Lighting Calculation (IFA)

42.0d

Road Lighting Calculation (IFA)

42.0d

Harmonic Studies (IFA Update)

85.0d

Motor Starting Studies (IFD)

44.0d

Short Circuit / Load Flow (IFD)

44.0d

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

129.0d

Power Cable Sizing Criteria (IFD)

Power Cable Sizing Calculation - Final Issue

Mois
-1 1 2 3 4

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche

Durée
restante

Transcient Stability (IFA Update)

85.0d

Lighting Studies (IFA Update)

65.0d

Road Lighting Calculation (IFA Update)

22.0d

Plant Lighting Calculation (IFA Update)

22.0d

Road Lighting Calculation (IFD)

20.0d

Harmonic Studies (IFD)

88.0d

Plant Lighting Calculation (IFD)

20.0d

Lighting Studies (IFD)

45.0d

Transcient Stability (IFD)

88.0d

Documents for Local authorities

449.0d

General Protection Relay & Metering Diagram (IFA)

45.0d

CT's Calculation (IFA)

45.0d

CT's Calculation (IFA Update)

21.5d

General Protection Relay & Metering Diagram (IFA Update)

64.0d

CT's Calculation (IFD)

33.0d

General Protection Relay & Metering Diagram (IFD)

65.0d

Protection Coord Study & Relay Setting Tab (IFA)

86.0d

Protection Coord Study & Relay Setting Tab (IFD)

60.0d

ELE.LAY.03G Electrical Substations Layouts

445.5d

Substations Layout & Arrangment Drawings (IFA)

45.0d

Substations Cable Routing (IFA)

22.0d

Substations Earthing Layout (IFA)

21.0d

Substations Layout & Arrangment Drawings (IFD)

60.0d

Substations Cable Routing (IFD)

25.0d

Substations Layout & Arrangment Drawings (IFC)

45.0d
153.0d

Substations Earthing Layout (IFD)

22.0d

Substations Tray / Ladders Arrangement DWG (IFA)

20.0d

Substations Earthing Layout (IFC)

25.0d

Substations Cable Routing Cross Section (IFD)

25.0d

Substations Slab Drilling & Wall openings (IFA)

65.0d

Substations Tray / Ladders Arrangement DWG (IFD)

21.0d

Substations Cable Routing (IFC)

20.0d

Substations Tray / Ladders Arrangement DWG (IFC)

23.0d

Substations Slab Drilling & Wall openings (IFD)

108.0d

Substations Cable Routing Cross Section (IFC)

24.0d

Substations Slab Drilling & Wall openings (IFC)

ELE.LAY.13K Cable Run Layouts

65.0d
277.3d

General Main Cable Run Layout (IFA)

40.0d

Area Cable run Layout (IFA)

22.0d

General Main Cable Run Layout (IFA Update)

20.0d

Cable Cross Section (IFA)

45.0d

Road Crossing General Layout / Sections (IFA)

45.0d

Area Cable run Layout (IFA Update)

24.0d

General Main Cable Run Layout (IFD)

23.0d

Cable Cross Section (IFA Update)

24.0d

Road Crossing General Layout / Sections (IFA Update)

24.0d

Area Cable run Layout (IFC)

26.0d

Cable Cross Section (IFC)

24.0d

Road Crossing General Layout / Sections (IFC)

ELE.LAY.17D Earthing System Layouts

24.0d
204.5d

Typical Earthing Details (IFA)

23.0d

Earthing General Layout (IFA)

22.0d

Earthing General Layout (IFA Update)

22.0d

Typical Earthing Details (IFD)

24.0d

Earthing Area Layout (IFA)

21.0d

Earthing Area Layout (IFD)

24.0d

Earthing General Layout (IFD)

23.0d

Typical Earthing Details (IFC)

24.0d

Earthing Area Layout (IFC)

24.0d

ELE.LAY.19H Lighting Layouts

171.0d

Road & Open Yard Layouts (IFA)

41.0d

Fence Lighting Layouts (IFA)

41.0d

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

66.0d

ELE.LAY.03F Protection Relay Setting Studies

Substations Cable Routing Cross Section (IFA)

Mois
-1 1 2 3 4

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche

Durée
restante

Plant Lighting Layout (IFA)

43.0d

Road & Open Yard Layouts (IFD)

20.0d

Lighting Schematic & Wiring Diagrams (IFA)

45.0d

Fence Lighting Layouts (IFD)

20.0d

Road & Open Yard Layouts (IFC)

18.0d

Plant Lighting Layout (IFD)

24.0d

Fence Lighting Layouts (IFC)

18.0d

Lighting Schematic & Wiring Diagrams (IFD)

23.0d

Plant Lighting Layout (IFC)

24.0d

Lighting Schematic & Wiring Diagrams (IFC)

ELE.EQP Electrical Equipment
ELE.EQP.SQ1 Electrical Equipment First sequence

24.0d

279.0d
22.0d

Requisition Specification for ELE.EQP.SQ1

43.0d

Technical Spec for ELE.EQP.SQ1 (IFA Update)

10.0d

Technical Spec for ELE.EQP.SQ1 (IFD)

10.0d

Technical Evaluation for ELE.EQP.SQ1

43.0d

Instruction to Bidders for ELE.EQP.SQ1

21.5d

Vendor Doc Follow up for ELE.EQP.SQ1

140.0d
311.0d

Technical Spec for ELE.EQP.SQ2 (IFA)

22.0d

Requisition Specification for ELE.EQP.SQ2

43.0d

Technical Spec for ELE.EQP.SQ2 (IFA Update)

10.0d

Technical Spec for ELE.EQP.SQ2 (IFD)

10.0d

Technical Evaluation for ELE.EQP.SQ2

43.0d

Instruction to Bidders for ELE.EQP.SQ2

21.5d

Vendor Doc Follow up for ELE.EQP.SQ2

172.0d

ELE.EQP.SQ3 Electrical Equipment Third sequence

265.5d

Technical Spec for ELE.EQP.SQ3 (IFA)

43.0d

Requisition Specification for ELE.EQP.SQ3

32.3d

Technical Spec for ELE.EQP.SQ3 (IFA Update)

21.5d

Technical Evaluation for ELE.EQP.SQ3

43.0d

Technical Spec for ELE.EQP.SQ3 (IFD)

21.5d

Instruction to Bidders for ELE.EQP.SQ3

21.5d

Vendor Doc Follow up for ELE.EQP.SQ3

129.0d

ELE.EQP.SQ4 Electrical Equipment Fourth sequence

308.5d

Technical Spec for ELE.EQP.SQ4 (IFA)

22.0d

Requisition Specification for ELE.EQP.SQ4

35.0d

Technical Spec for ELE.EQP.SQ4 (IFA Update)

10.0d

Technical Spec for ELE.EQP.SQ4 (IFD)

10.0d

Technical Evaluation for ELE.EQP.SQ4

35.0d

Instruction to Bidders for ELE.EQP.SQ4

21.5d

Instruction to Bidders (IFC) for ELE.EQP.SQ4
Vendor Doc Follow up for ELE.EQP.SQ4

ELE.EQP.SQ5 Electrical Equipment Fifth sequence

10.0d
172.0d
204.5d

Technical Spec for ELE.EQP.SQ5 (IFA)

22.0d

Requisition Specification for ELE.EQP.SQ5

43.0d

Technical Spec for ELE.EQP.SQ5 (IFA Update)

10.0d

Technical Evaluation for ELE.EQP.SQ5

21.5d

Technical Spec for ELE.EQP.SQ5 (IFD)

10.0d

Instruction to Bidders for ELE.EQP.SQ5

21.5d

MTO 1 for ELE.EQP.SQ5

10.0d

MTO 2 for ELE.EQP.SQ5

10.0d

Instruction to Bidders (IFC) for ELE.EQP.SQ5

10.0d

MTO 3 for ELE.EQP.SQ5

10.0d

ELE.BLK Electrical Bulk

196.0d

ELE.BLK.SQ1 Electrical Bulk Second sequence

196.0d

Requi Spec for ELE.BLK.SQ1

43.0d

Technical Evaluation for ELE.BLK.SQ1

21.5d

1st MTO for ELE.BLK.SQ1

10.0d

Instruction to Bidders for ELE.BLK.SQ1

21.5d

Vendor Doc Follow up for ELE.BLK.SQ1

100.0d

2nd MTO for ELE.BLK.SQ1

ELE.BLK.SQ2 Electrical Bulk Second sequence

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

311.0d

Technical Spec for ELE.EQP.SQ1 (IFA)

ELE.EQP.SQ2 Electrical Equipment Second sequence

Mois
-1 1 2 3 4

10.0d
100.0d

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche

Durée
restante

1st MTO for ELE.BLK.SQ2

10.0d

2nd MTO for ELE.BLK.SQ2

10.0d

3rd MTO for ELE.BLK.SQ2

CIV Civil
CIV.CV Civil
CIV.CV.01 Site Investigation

10.0d

494.0d
124.0d
12.0d

Technical Evaluation

12.0d

Investigation Execution

45.0d

Investigation Report

24.0d
96.0d

Documentation for subcontracting requisition

22.0d

Technical Evaluation

22.0d

Demolition Layouts

22.0d

Grading Plans for Earthworks

22.0d

CIV.CV.03 Piling & Soil Improvement

75.5d

Layout of Soil Improvment works

22.0d

Typical Drawings

22.0d

Documentation for subcontracting requisition

22.0d

Technical Evaluation

CIV.CV.04A Roads, dikes and area finishing
Typical Road Section
Dike and finishing area
Grading Plan

CIV.CV.04B Fences
Typical Drawings & Fencing Plan

CIV.CV.04C Storm Water & Sanitary Sewers

10.0d
203.0d
32.0d
22.0d
100.0d
35.0d
35.0d
111.3d

Sewer scheme plan

33.0d

Storm Water sewer layout

43.8d

Sanitary sewer layout

43.0d

CIV.CV.07A HVAC system

478.5d

HVAC system design criteria

35.0d

HVAC Technical Specification

46.0d

Schematic diagram for HVAC system

46.0d

HVAC Detailed Design

63.0d

Docu for subcontracting requisition for CV07A

33.0d

Technical Evaluation for CV07A

23.0d

HVAC Construction Drawings

110.0d

HVAC Vendor Documents Follow up

210.0d

CIV.CV.07B Building Services

398.5d

Building Service design criteria

32.0d

Technical specification for building services

43.0d

Design of Electrical System

63.0d

Design of fire & gas detection system

63.0d

Design of Firefighting system

63.0d

Design of Plumbing system

63.0d

Design of Telecom System

63.0d

Documentation for subcontracting requisition for CV07B

21.5d

Technical Appraisal for CV07B

11.0d

Construction drawings for CV07B

90.0d

Vendor documents follow up for CV07B

176.0d

CIV.CV.08 Reinforced Concrete Works

455.5d

Reinforced Concrete Works design criteria

22.0d

Reinforced Concrete Documents Standardization

23.0d

Design of interconnecting piperack foundation

58.0d

Cooling Tower & other special works

133.0d

Design of process/utility piperack for foundation

123.0d

Prefabricated Piperack

70.0d

RC Foundation & Structures for Equipment design

112.0d

Design of storage sheds foundation

123.0d

Design of supp./serv. structures foundation

172.0d

Sleeper Design

23.0d

Design of compressor houses/shelters foundation

110.0d

Secondary & miscellaneous RC works

198.0d

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

494.0d

Documentation for site investigation requisition

CIV.CV.02 Site Preparation

Mois
-1 1 2 3 4

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche
Bridge Design
Tank Foundation Design

Durée
restante

66.0d
130.0d

Machines Foundation Design

130.0d

Design of secondary structures foundation

88.0d
188.0d

CIV.CV.09 Building General Activities

287.0d

Building General Activities design criteria

32.0d

Front End Design

66.0d

Docu for subcontracting requisition for CV09

46.0d

Technical Appraisal for CV09

23.0d

Subcontractor construction drawings for CV09

CIV.CV.10A Electrical Substations

90.0d
155.0d

Electrical Substations Architectural Design

155.0d

Electrical Substations Structural Design

133.0d

Electrical Substations Specific Design

CIV.CV.10B Control Rooms

67.0d
155.0d

Control Rooms Architectural Design

155.0d

Control Rooms Structural Design

133.0d

Control Rooms Specific Design

CIV.CV.10C Laboratories

67.0d
155.0d

Laboratories Architectural Design

155.0d

Laboratories Structural Design

133.0d

Laboratories Specific Design

67.0d

CIV.CV.10D Other Buildings

155.0d

Other Buildings Architectural Design

155.0d

Other Buildings Structural Design

135.0d

Other Buildings Specific Design

CIV.CV.11 Civil Works Subcontracting
Docu for subcontracting requisition for CV11
Technical Appraisal for CV11

CIV.CV.12 Purchase of Material

67.0d
93.0d
45.0d
13.0d
395.0d

Material requisition for CV12

22.0d

Technical Appraisal for CV12

11.0d

Construction drawings for CV12
Vendor Documents follow up for CV12

CIV.CV.05A Harbours, jetties and costal works

90.0d
177.0d
484.0d

Docu for site investigation requisition for CV05

23.0d

Site Investigation Technical Appraisal for CV05

12.0d

Investigation Execution for CV05

90.0d

Front End Design (IFA)

67.0d

Docu for subcontracting requisition for CV05

35.0d

Investigation Report for CV05

23.0d

Dredging layout (IFA)

23.0d

Technical Appraisal for CV05

24.0d

Subcontractor detailed design

155.0d

Subcontractor Construction Drawings

CIV.CV.06 Steelworks

70.0d
416.0d

Steelworks design criteria

22.0d

Steelworks Document Standardization

23.0d

Steelworks Material Requisition

22.0d

Design of interconnecting piperack for CV06
Design of process/utility piperack for CV06
Steelwork Technical Evaluation

61.0d
129.0d
22.0d

Design of storage sheds for CV06

118.0d

Design of supp./serv. structures for CV06

184.0d

Design of compressor houses/shelters for CV06

84.0d

Steelworks Construction Drawings

220.0d

Steelworks Vendor Document Follow up

220.0d

Design of secondary structures for CV06

118.0d

MAE Material Engineering
MAE.TB Piping
MAE.TB.01A Material supply by contractors
Technical specification for TB01A

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

60.0d

Heaters & Packages foundation Design
RC Bassins Design

Mois
-1 1 2 3 4

521.0d
503.5d
503.5d
140.0d

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Nom de la tâche
MTO 1 / Estimate for Bid and Appraisal
Support to bid construction for TB01A (TE1)
Quality Control Plan for TB01A
Check Materials for TB01A (TE2)
MTO2 / Final Appraisal for TB01A

MAE.TB.01B Materials Supply by Saipem to contracto

Durée
restante

44.0d
132.0d
58.0d
24.0d
373.5d
51.0d

MTO 1 / Material Quantity Estimation for TB01B

43.0d

Technical Evaluation for TB01B

35.0d

Vendors Doc Follow up for TB01B

97.0d

MTO 2 / Final Quantities of materials for TB01B

43.0d

MAE.LP.03 Materials Selection
Materials Selection (IFA)
Materials Selection ( IFD)

MAE.PR Process
MAE.PR.03 Material Selection

89.0d
89.0d
23.0d
23.0d
132.0d
132.0d

Material Selection Report (IFA)

23.0d

Material Selection Diagram (IFA)

23.0d

Follow up for PR03

86.0d

Material Selection Report (IFD)

23.0d

Material Selection Diagram (IFD)

MAE.EL Electrical
MAE.EL.23B Cathodic Protection System

23.0d
435.0d
339.0d

Design & Studies (IFA)

21.5d

Design & Studies (IFA Update)

21.5d

Design & Studies (IFD)

23.0d

Requisition Specification (MR)

45.0d

Technical Evaluation

23.0d

Materials Take Off (1rst MTO)

20.0d

Requisition Specification (ORD)

23.0d

Cathodic Protection Detail Design (IFA)
Vendor Doc Follow Up (IFA)
Materials Take Off (2nd MTO)
Cathodic Protection Detail Design (IFC)

MAE.EL.23C Cathodic Protection system - Package

54.0d
129.0d
20.0d
45.0d
435.0d

Design & Studies (IFA)

21.5d

Design & Studies (IFA Update)

21.5d

Requisition Specification (MR)

22.0d

Design & Studies (IFD)

20.0d

Technical Evaluation

35.0d

Requisition Specification (ORD)
Vendor Doc Follow Up (IFA)

Remaining Work
Critical Remaining Work

5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 20 21 22 23 24 25 26

86.0d

Technical specification for TB01B

MAE.LP Loss Prevention

Mois
-1 1 2 3 4

20.0d
270.0d

Date
Révision
03-... 1st Issue

Vér... Ap...
PR... O. ...

Planning Type EPCC
Onshore_TEST v1

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close