LPE.SE.07 HAZOP
Coarse HAZOP
Main HAZOP during detailed design
78.0d
78.0d
459.0d
43.0d
131.0d
Pre start HAZOP on modification
23.0d
LPE.SE.08 Safety Integrity Level
161.0d
Safety Integrity Procedure
45.0d
Safety Integrity Level Allocation Report
66.0d
LPE.SE.09 Safety at Site
23.0d
Operating Plan of safety
23.0d
LPE.LP Loss Prevention
515.5d
LPE.LP.01 Design Basis
177.0d
Active Fire Specification (IFA)
66.0d
Active fire specification (IFD)
45.0d
Active Fire Specification (IFC)
66.0d
LPE.LP.02 HMB and Process Flow Diagram
111.0d
Process Flow Diagram PFD ( HMB inclus) IFA
43.0d
Process Flow Diagram PFD ( HMB inclus) IFD
LPE.LP.04 Process data Sheets for eqp and Packages
Process data Sheet for Equipments (IFA)
Requirements for fire protection facilities in pack eqp and bu
23.0d
178.0d
23.0d
154.0d
Process data Sheet for Equipments (IFD)
23.0d
Process data Sheet for Equipments (IFC)
66.0d
LPE.LP.05 Utility Consumption and Effluent List
Electrical Load List
LPE.LP.06 Process & Instrument Diagram (P&ID)
PID (IFA)
45.0d
45.0d
220.5d
45.0d
PID (IFD)
45.0d
PID (IFC)
110.0d
LPE.LP.07 Firefighting Distribution Layouts
286.0d
Fire Master plan (IFA)
66.0d
Fire Master plan (IFD)
23.0d
Fire Protection Plan (Sprinker line location) IFA
23.0d
Fire Master plan (IFC)
66.0d
Fire Protection Plan (Sprinker line location) IFD
66.0d
Fire Protection Plan (Sprinker line location) IFC
LPE.LP.08 Calculation reports
23.0d
220.0d
Adequacy check for existing equipment and systems
23.0d
Calculation reports for distribution networks (IFA)
23.0d
Calculation reports for distribution networks (IFD)
45.0d
Calculation reports for distribution networks (IFC)
23.0d
Calculation reports for local distribution networks
LPE.LP.09 Safety & Shut down Philo, CEM & Safegua
45.0d
176.5d
Fire & gas cause and effect matrix (IFA)
23.0d
Fire & gas cause and effect matrix (IFD)
66.0d
Fire & gas cause and effect matrix (IFC)
LPE.LP.10 Valves and Instrum Data Sheets & Control
23.0d
117.0d
Process Data Sheet for Instrumentation (IFA)
21.5d
Process Control and Safety Valves Data Sheets (IFA)
23.0d
Process Control and Safety Valves Data Sheets (IFD)
Utility Distribution Diagrams Mechanization (Update)
PIP.TB.10B Piping Supports
64.5d
182.8d
365.5d
Definition of Support Engineering Methodology (case B)
64.5d
Design of Support Engineering Methodology (case A)
64.5d
MTO 1 (case A)
21.5d
MTO 1 (case B)
Definition of standard and special supports (case A)
Material Requisition 1 (case B)
MTO 2 (Case B)
Support Standardization (case B)
43.0d
150.5d
43.0d
54.8d
215.0d
Material Requisition 2 (case B)
43.0d
MTO 2 (case A)
43.0d
MTO 3 (Case B)
64.5d
Material Requisition 3 (case B)
INS Instrumentation
INS.AS Instrumentation
43.0d
523.0d
523.0d
INS.AS.01 PID & Loop Data Sheet
395.0d
Instrument Data Base (Data entry)
334.0d
General Specification (IFA)
35.0d
PID Mechanization (IFA)
86.0d
General Specification (IFD)
PID Mechanization (IFD)
INS.AS.02 Control, Motorized & Safety valves
35.0d
108.0d
407.5d
Quality / Technical Spec for AS02 (IFA)
65.0d
Data Sheet & Calculation for AS02 (IFA)
151.0d
Quality / Technical Spec for AS02 (IFD)
42.0d
Technical Evaluation for AS02
82.0d
Data Sheet & Calculation for AS02 (IFC)
Vendor Doc Follow Up for AS02
Quality / Technical Spec for AS02 (IFC)
INS.AS.03 Measurement & Control Instrument
85.0d
193.0d
86.0d
355.0d
Quality / Technical Spec for AS03 (IFA)
67.0d
Data Sheet & Calculation for AS03 (IFA)
129.0d
Quality / Technical Spec for AS03 (IFD)
42.0d
Technical Evaluation for AS03
105.0d
Vendor Doc Follow Up for AS03
205.0d
Data Sheet & Calculation for AS03 (IFC)
Quality / Technical Spec for AS03 (IFC)
INS.AS.04 Analysers Systems
64.5d
65.0d
367.0d
Quality / Technical Spec for AS04 (IFA)
42.0d
Data Sheet & Calculation for AS04 (IFA)
43.0d
Quality / Technical Spec for AS04 (IFD)
34.0d
Technical Evaluation for AS04
Vendor Doc Follow Up for AS04
Data Sheet & Calculation for AS04 (IFC)
Quality / Technical Spec for AS04 (IFC)
INS.AS.05 Supervision & Control Systems
General Spec for AS05
Functional & Detailed technical Spec for AS05
Technical Evaluation for AS05
Vendor Doc Follow Up for AS05
Factory Acceptance Test (FAT) for AS05
INS.AS.06 Safety, Alarm & Automation System
General Spec for AS06
Functional & Detailed technical Spec for AS06
Technical Evaluation for AS06
Vendor Doc Follow Up for AS06
Factory Acceptance Test (FAT) for AS06
INS.AS.08 Process Simulators
General Spec for AS08
Nom de la tâche
Functional & Detailed technical Spec for AS08
Technical Evaluation for AS08
Vendor Doc Follow Up for AS08
Model Acceptance Test (MAT) for AS08
Factory Acceptance Test (FAT) for AS08
INS.AS.09 Installation drawings & Materials
Durée
restante
44.0d
215.0d
24.0d
43.0d
373.5d
65.0d
1° MTO, sketches, datasheets, BOQ (IFA)
64.5d
Main Cable Routing Layouts (IFA)
54.0d
Quality / Technical Job Spec for AS09 (IFD)
43.0d
Job Spec for ins. installation on vessels (IFA)
64.5d
Vendors Doc Follow up for 1°MTO AS09
84.0d
129.0d
Detailed cable Run Layouts (IFA)
67.0d
Job Spec for inst. installation on vessels (IFD)
35.0d
1° MTO, sketches, datasheets, BOQ (IFC)
86.0d
Quality / Technical Job Spec for AS09 (IFC)
86.0d
Wiring Diagram (IFD)
90.0d
Main Cable Routing Layouts (IFD)
43.0d
2° MTO
65.0d
Detailed cable Run Layouts (IFD)
43.0d
Vendors Doc Follow up for 2°MTO AS09
65.0d
Main Cable Routing Layouts (IFC)
Wiring Diagram (IFC)
43.0d
107.5d
Detailed cable Run Layouts (IFC)
42.0d
3°MTO
43.0d
Vendors Doc Follow up for 3°MTO AS09
43.0d
Job Spec for instrum instal on vessels (IFC)
INS.AS.10 Control Room Drawings
35.0d
392.5d
Wiring Diagram (IFA)
66.0d
Control & Technical Rooms Layouts (IFA)
65.0d
Detailed Layouts (IFA)
65.0d
Wiring Diagram (IFD)
43.0d
Control & Technical Rooms Layouts (IFD)
43.0d
Wiring Diagram (IFC)
43.0d
Control & Technical Rooms Layouts (IFC)
42.0d
Detailed Layouts (IFD)
45.0d
Detailed Layouts (IFC)
INS.AS.11 Instrum Packages & Follow up from other
45.0d
336.5d
Technical Spec for AS11 (IFA)
54.0d
Technical Spec for AS11 (RFA)
43.0d
Technical Evaluation for AS11
44.0d
Technical Spec for AS11 (IFD)
Vendor Doc Follow Up for AS11
INS.AS.20 Telecommunication Systems
Technical Spec for AS20 (IFA)
Plant Layout with Telecom equipment locati (IFA)
21.0d
207.0d
396.5d
61.0d
162.0d
Technical Spec for AS20 (IFD)
38.0d
Technical Evaluation for AS20
84.0d
Plant Layout with Telecom equipment locati (IFC)
77.0d
Vendor Doc Follow Up for AS20
190.0d
Wiring Diagram
190.0d
Technical Spec for AS20 (IFC)
INS.AS.21 Telecommunication System Packages
77.0d
470.0d
General Spec for AS21 (IFA)
61.0d
General Spec for AS21 (IFD)
38.0d
General Spec for AS21 (IFC)
22.0d
Technical Evaluation for AS21
Vendor Doc Follow Up for AS21
Heaters & Packages foundation Design
RC Bassins Design
Mois
-1 1 2 3 4
521.0d
503.5d
503.5d
140.0d
Date
Révision
03-... 1st Issue
Vér... Ap...
PR... O. ...
Planning Type EPCC
Onshore_TEST v1
Nom de la tâche
MTO 1 / Estimate for Bid and Appraisal
Support to bid construction for TB01A (TE1)
Quality Control Plan for TB01A
Check Materials for TB01A (TE2)
MTO2 / Final Appraisal for TB01A
MAE.TB.01B Materials Supply by Saipem to contracto