Weatherford
Intervention & Well Abandonment Product Line

© 2006 Weatherford. All rights reserved.

0

Welcome, thank you for coming
The purpose of this presentation is to introduce you to new innovative equipment, processes and solutions we have developed. We bring “Rigless” P & A and Intervention work to the next level using SAFE, EFFICIENT and ECONOMICAL technologies which are unique to Weatherford.

Please feel free to ask questions!

© 2006 Weatherford. All rights reserved.

1

DH-200/600 Well Intervention System
Diesel powered hydraulic pulling and jacking unit.
Capable of pulling 220,000# in 60’ increments and Jacking 600,000# in 5’ increments.
• Mast Base
10’ L x 8’ W x 9’ H = 9,500#

• Mast System w/ Cylinder
4.5’ L x 3’ W x 41’ H = 34,000#

• Crown Assembly
10’ L x 4.5’ W x 6’ H = 6,000#

• Jack Base
8’ L x 8’ W x 9’ H = 6,500#

• Jacking False Rotary
6’ L x 6’ W x 8’ H = 21,000#

• 2 x Main Beams
50’ L x 24” W x 51” H = 19,500# ea

• 2 x Riser Beams
7.5’ L x 12’ W x 8’ H = 13,500# ea

• Racking Base
5’ L x 15’ W x 8’ H = 11,000# Intervention System Foot Print = 8’ W x 50’ L
© 2006 Weatherford. All rights reserved.

2

Unit 2 - Skidding System

© 2006 Weatherford. All rights reserved.

3

Unit 2 - Rack Back Towers

Capable of storing 200 joints of 3-1/2” IF drill pipe (6,200’)

© 2006 Weatherford. All rights reserved.

4

Unit 2 - Specifications

The unit is manufactured to meet: • API specification 4F third edition (Title: Specification for Drilling and Well Servicing Structures) • API Specification 8C fourth edition (Title: Specification for Drilling and Production Hoisting Equipment) • 220,000# pulling capacity in 60 foot increments and 600,000# jacking capacity in 5 foot increments • Rack Back Towers capable of holding up to 200 joints (6,200’) of 3-1/2” IF drill pipe, as well as smaller tubulars • By removing one row of drill pipe it is capable of holding 5 x 6-1/2” OD drill collars on each side

© 2006 Weatherford. All rights reserved.

5

Unit 2 – Cognac Accomplishments

© 2006 Weatherford. All rights reserved.

6

Unit 2 – Cognac Accomplishments

© 2006 Weatherford. All rights reserved.

7

Unit 2 – Lay out

© 2006 Weatherford. All rights reserved.

8

Unit 2 – Lay out

© 2006 Weatherford. All rights reserved.

9

Unit 2 – Lay out

© 2006 Weatherford. All rights reserved.

10

Unit 2 – Lay out

© 2006 Weatherford. All rights reserved.

11

Unit 2 - Storm Lay Down Preparation

© 2006 Weatherford. All rights reserved.

12

West Delta 94 Project

West Delta 94G project completed on April 2, 2008. Days on location 299. Customer’s estimated AFE days 365 Weatherford man hours on location 49,476 NO Recordable Injuries or Operational & Environmental Incidents JSEA’s conducted 2,276.

© 2006 Weatherford. All rights reserved.

13

Challenge?
• To provide a compact, innovative, SAFE system to perform 11 well abandonment operations on hurricane damaged West Delta 94G platform.

Platform listing at approximately 15º
© 2006 Weatherford. All rights reserved.

14

WFT Solutions!
Video – click to activate

© 2006 Weatherford. All rights reserved.

15

Unit 2 & Unit 1 – Power Swivel Top Drive

LOGAN POWER SWIVEL SPECIFICATIONS

MODEL NO. NOMINAL LOAD RATING (tons) DYNAMIC LOAD RATING @ 100 RPM (tons) MAXIMUM TORQUE (ft-lbs) MAXIMUM SPEED (rpm) MAXIMUM CIRCULATING PRESSURE STANDARD STEM CONNECTION GOOSENECK CONNECTION SWIVEL HEAD ASSEMBLY WEIGHT (lbs)

PS120 120 65 8,100 150 5,000 3-1/2 IF 3" LP 2,000

© 2006 Weatherford. All rights reserved.

16

Unit 1 - Well Intervention System
• 100,000 LBS capacity Telescoping mast able to lift: • • • • • 21,000’ x 2-3/8” 4.70# EUE tubing. 15,000’ x 2-7/8” 6.50# EUE tubing. 12,000’ x 2-7/8” 7.90# PH-6 tubing. 6,400’ x 3-1/2” IF 15.5# drill pipe. 1,800’ x 9-5/8” 53.5# casing.

Work Floor Jacks lift capacity is: • • 400,000 LBS., with 6’ stroke able to jack at this capacity. Also able to pull 200,000# from underneath while cutting

© 2006 Weatherford. All rights reserved.

17

Unit 1 - Well Intervention System

Integrated Multi-Functional Power Pack

Shipping Weight = 37,500# Wet Foot Print = 8’ W x 8’ H x 18’ L

• • • • •

WFT guillotine saws and hole boring hydraulic equipment. WFT cement blending units. WFT power swivel WFT power swivel stand and light duty work floors WFT Casing Jacks

© 2006 Weatherford. All rights reserved.

18

Unit 1 - Well Intervention System
• The WFT 400,000# self contained patented ®Hydra-Floor

© 2006 Weatherford. All rights reserved.

19

Unit 1 - Well Intervention System

V-Door

© 2006 Weatherford. All rights reserved.

20

Unit 1 - Well Intervention System

Pipe Rack Back Derrick
Size 3-1/2" IF DP 2-7/8" IF DP 2-7/8" PH-6 Tub 2-7/8" EUE Tub 2-3/8" EUE Tub
© 2006 Weatherford. All rights reserved.

Wt. 13.30 10.40 7.90 6.50 4.70

No. Joints 132 198 198 198 352

Feet 4,092 6,138 6,138 6,138 10,912

21

Unit 1 - Well Intervention System

Support Beams

Power Swivel control

© 2006 Weatherford. All rights reserved.

22

Other Rental Items

Fishing Operation
© 2006 Weatherford. All rights reserved.

23

Support Mode – Minimize NPT

Support Coil Tubing operations on Rig-Less Plug & Abandonment Advantages are: • Use of platform crane during coil tubing operations • Able to continue working when wind conditions would limit crane operations • Easily moved from well to well

© 2006 Weatherford. All rights reserved.

24

Riser System for BOP’s

BOP’s under Jacking Floor

© 2006 Weatherford. All rights reserved.

25

Applications
• Support Coil Tubing Operations • Rig Up and Repair Well Conductors • Change Out Tubing • Pull and Lay Down Production Casing • Plug and Abandon Wells • Cut and Pull Well Conductors • Set Whip-stock • Perform Section Milling • Run Internal Casing and Tubing Patches • Run and retrieve down hole electric pumps
© 2006 Weatherford. All rights reserved.

26

Intervention and P & A Equipment
Weatherford launched this product line in January 2007 and we are proud to say there have been no recordable INCIDENTS, ACCIDENTS or ENVIROMENTAL IMPACT to us or our customers. Customer List to date
Anadarko Petroleum Apache BEPCO OPERATING CO BHP BILLITON PETROLE BP America BURLINGTON RESOURCES Carl E Gungoll Exploration CHESAPEAKE OPERATING CHESTNUT RIDGE STORAGE-FAIRCHA Chevron CIMAREX ENERGY CO Comstock Oil & Gas CONOCOPHILLIPS-BILLINGS CORDILLERA TEXAS-LONGVIEW CRIMSON EXPLORATION DAVIS PETROLEUM CORP DOW CHEMICAL DUNE ENERGY INC-HOUSTON ENDURING RESOURCES ENERGY PRODUCTION CORP-LAFAYET Energy Resource Tech Energy XXI
© 2006 Weatherford. All rights reserved.

EOG RESOURCES-EDI-TYLER ERSKINE ENERGY LLC EXCO PARTNERS OPER-QUITMAN ExxonMobil FOREST OIL CORP-LAFAYETTE FRANKS CASING CREW & HILCORP Horizon Production & Operating Hunt Oil Co-Carencro Hydro Gulf LA Gas LIBERTY RESOURCES IN MANTI OPERATING-CORPUS CHRISTI MARINER ENERGY-HOUSTON MERIDIAN RESOURCE CO MIDSTATES PETROLEUM-HOUSTON MURPHY E&P (US ONLY)-EL DORADO NOBLE ENERGY EDI-ARDMORE-HOUST PB ENERGY PENNINGTON O&G INTERESTS-BATON Petro Hunt LLC PETROHAWK OPERATING-TYLER

PETSEC PINE PRAIRIE ENERGY PIONEER EXPLORATION Plains Exploration & Production PRECISION ENERGY SER REMINGTON OIL & GAS SAMSON RESOURCES-TULSA Shell Oil Company SONORAN ENERGY INC STERLING ENERGY INC SUBSURFACE CONSTRUCTION SUPERIOR ENERGY TURNKEY E&P-HOUSTON TXCO RESOURCES-SAN ANTONIO Valence Operating Co. W&T Offshore WHITEHEAD PRODUCTION XTO ENERGY INC

27

Well Abandonment Services Provided
• • • • • • • • • • • • Hydraulic casing jacks from 282 Ton through 500 Tons Multi purpose tri-plex pumps with hydraulic take offs Cement blending and fluid tanks Double drum E-Line and Slick-Line equipment E-Line and S-Line tool boxes, Fully equipped walk-in tool box Light duty work floors with 4,000# jib crane Hydraulic power swivel stand with 4’ stroke, Power Swivels Hydraulic remote controlled self-aligning casing saws Hydraulic remote controlled self aligning double drill pin boring State of the art pinning and hoisting system Cementing services DH-100/400 well intervention system

© 2006 Weatherford. All rights reserved.

28

Intervention and P & A Personnel

Crew compliment will be selected based on project scope • • • • • • Well-Site Supervisors (Toolpusher) P&A Tech Supervisors (Driller) Wireline Supervisor P&A Tech III (Pump Operator) P&A Tech II P&A Tech I

Well Site Supervisors & P&A Tech Supervisors are trained in Well Control & Cementing All personnel have extensive training in the Weatherford safety competency programs We have a SAFE and drug free work environment

© 2006 Weatherford. All rights reserved.

29

Intervention and P & A Equipment

Venture-Tech 150 Ton Power Swivel
16’ L x 7.5’ W x 8’ H = 14,000#

© 2006 Weatherford. All rights reserved.

30

Weatherford Work Deck System
Light Duty Work floor with
Power Swivel Stand
4’ W x 4’ L x 8’ H = 2,000#

80,000# hydraulic power swivel stand and 4,000# Jib crane

Light Duty Work Floor
8’ W x 12’ L x 3’ H = 6,500#

© 2006 Weatherford. All rights reserved.

Weatherford Work Deck System

Light duty work deck with 4,000# jib crane, power pack, 24” x 40’ work beams, 16” x 27’ work beams straddling, drill pipe tongs and Weatherford crew members. (24” beams 117# x 40’ long = 4,700# per beam)
© 2006 Weatherford. All rights reserved.

Weatherford Cantilever System, w/unique clamps

Winch Package with 2 x 50,000# single line pull winches

© 2006 Weatherford. All rights reserved.

33

WFT Solutions!
Video – click to activate

© 2006 Weatherford. All rights reserved.

34

Packaging of other Weatherford services
Rental Tools Drill Pipe BOP’s Handling Tools Re-completions Artificial Lift Well Head Packers

Casing Exit Services TRS Services

Weatherford Decommissioning & Intervention
Fishing Milling Cutting Services

Thru Tubing Fishing

Wire Line Services Electric Slick Line

© 2006 Weatherford. All rights reserved.

35

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close