Web site

Published on December 2016 | Categories: Documents | Downloads: 73 | Comments: 0 | Views: 484
of 3
Download PDF   Embed   Report

Comments

Content

2.0 ELECTRIC LOCOMOTIVE:
2.1 Electric Loco Sheds There are two electric loco sheds in NCR2.1.1 Electric Loco Shed, Kanpur: The Electric Loco Shed, Kanpur was established in 1965 with the electrification of Mughalsarai-Kanpur section. The shed started functioning with a meager holding of 11 imported WAM-1 type locomotives for Passenger services. Present holding of the shed is 169 locomotives (40-WAP-4, 126-WAG-7 & 3-WAM-4). Electric Loco Shed, Jhansi: Electric Loco Shed, Jhansi designed for a

2.1.2

holding of 100 locos was established in 1987 with an initial holding of 17 locos. Present holding of the shed is 176 locomotives i.e. 72 WAG-7 ( 23 BHEL & 49 CLW built) and 104 WAG-5 (74 BHEL & 30 CLW built) locomotives.

2.1

Rolling Stock Operations:
The salient features on the three divisions of NCR are as follows:

Sr. No. 1 2 3 4

Description Running staff (Sanctioned Strength) Trip Sheds Lobbies Running Rooms

ALD 2498

JHS 2062

AGC 1170

Total 5730

04 (ALD, CNB, TDL, MGS) 05 (MGS, ALD, CNB-2, TDL) 06 (MGS, ALD, CNB-3, TDL)

01 (JHS,) 01 (JHS) 01 (JHS)

02 (HNZM, NDLS) 03 (AGC, MTJ, NDLS) 05 (Agra-2, IDH, NDLS, MTJ)

7 9 12

2.0 2.1
Sr. No. 1. 2. 3. 4. 5.

Traction Distribution:
Description Electrified RKM % of RKM (BG) Electrified TKM No. of OHE Depots No. of PSI Depots Transmission Lines (Km) 220 KV 132 KV 66 KV Traction Sub - stations 220 KV 132 KV/ 66 KV 25 KV Remote control center Central Repair shop Tower Wagons

INFRASTRUCTURE: The summarized position of all three divisions is as below:
ALD 781.02 76.7 2175 15 13 25 KM 527 KM JHS 371.5 30.9 946 08 04 AGC 364 55.42 578 05 04 TOTAL 1526.52 53.0 3687 28 21 25 KM 573 KM 49 KM 02 28 05 04 01 31

12 KM 05 01 08

6.

7. 8. 9.

02 19 05 02 01 17

34 KM 49 KM 04 01 06

North Central Railway Electrical Department
3.0 Electrical Coaching Services (TL-AC): 3.1 Infrastructure: The salient features for all three divisions are as below:
Sr . No. 1 Description No. of primary Trains Primary maint. Rakes Secondary maint. Rakes TL Primary Coaches - BG+MG NG AC Primary coaches No of coaches with FL fittings(BG) Coaching Maintenance Depot ALD 20 30 14 411 83 411 03 (ALD, CNB, TDL) JHS 33 39 0 391 80 34 391 02 (JHS, GWL) AGC 05 09 0 120 02 115 03 (AGC,AF,MTJ) Total 58 78 14 922 80 119 917 08

2

4.0 4.1
S. N. 1 2 3 4 5 6 7

Electrical General Services: Infrastructure: Details of assets in ALD, JHS & AGC divisions are as per list
below: Description Av. Energy Consumed per month (in Million units) Electrified Stations DG Sets Water Coolers Pumps Sub-stations Staff Quarters (Electrified) ALD 5.886 106 84 98 158 51 15996 JHS 3.131 121 33 72 131 34 6322 AGC 1.972 56 12 50 47 32 4192 Total NCR 11.640 283 129 220 336 117 26510

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close